Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
×
Bierwirth, C., Meisel, F.: A survey of berth allocation and quay crane scheduling problems in container terminals. · Chang, D.F., Jiang, Z.H., et al.: ...
Collaborative scheduling problem of container terminal is one of multi-objective, multi-restraint, multi-resources, dynamic NP-combination optimization ...
Collaborative scheduling problem of container terminal is one of multi-objective, multi-restraint, multi-resources, dynamic NP-combination optimization ...
Bibliographic details on Research on Cooperative Scheduling at Container Terminal under Uncertainties.
Oct 10, 2023 · This research provides valuable guidance for ongoing SRACT projects and advances and methodological approaches in multi-equipment co-operative ...
Scheduling techniques for addressing uncertainties in container ports: A systematic literature review ... terminal handling equipment cooperative scheduling ...
Mar 6, 2023 · Study on Layout and Operation of Container ... Yard crane scheduling problem in a container terminal considering risk caused by uncertainty.
This paper addresses the integration of scheduling each constituent of handling equipment in an automated container terminal, in order to minimise the loading ...
A collaborative scheduling model for AQCs and AGVs is established and the capacity limitation of the transfer platform on AQCs is considered in the model ...
This paper proposes a PSO (particle swarm optimization) -based integrated optimization of container terminal scheduling with uncertain factors.