Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
×
This paper presents a metrology for risk analysis of tunnel lining by employing fault tree theory and entropy measurement. Some risk factors of tunnel lining ...
Bibliographic details on Risk Analysis of Tunnel Lining Using Fault Tree Theory and Entropy Measurement.
Risk analysis of tunnel lining is a vital and complex problem. This paper presents a metrology for risk analysis of tunnel lining by employing Fault Tree ...
N. G. Jin, L. Tang, C. Q. Fu, X. Y. Jin: Risk Analysis of Tunnel Lining Using Fault Tree Theory and Entropy Measurement. CSIE (6) 2009: 207-212.
Risk analysis of tunnel lining is a vital and complex problem. This paper presents a metrology for risk analysis of tunnel lining by employing Fault Tree Theory ...
Jan 15, 2024 · A novel approach using the best–worst method and a data envelopment analysis model was proposed to analyze the risks of underground tunnel ...
Jan 10, 2024 · In this paper, the potential risk of undesirable events occurring during tunneling with application of a shield tunnel boring machine (TBM) ...
Sep 26, 2022 · It is a multi-criteria decision issue to conduct a risk assessment of the tunnel. In this paper, a tunnel collapse risk assessment model ...
Jul 28, 2023 · To determine the weight of the impact factors, this paper introduces the combination weighting method based on game theory for the first time.