Résumé/Abstract The soil survey was conducted from August 21 to September 8, 1999 for six mapping... more Résumé/Abstract The soil survey was conducted from August 21 to September 8, 1999 for six mapping units of erosion in the Hilkot watershed project area. The analysis revealed that 98 ha (6.8%) of the area was under slight sheet erosion, moderate rill and river bank ...
Résumé/Abstract The soil survey was conducted from August 21 to September 8, 1999 for six mapping... more Résumé/Abstract The soil survey was conducted from August 21 to September 8, 1999 for six mapping units of erosion in the Hilkot watershed project area. The analysis revealed that 98 ha (6.8%) of the area was under slight sheet erosion, moderate rill and river bank ...
Uploads
Papers by Bashir Wani