The team observed the condition of the walls, gathered information from building owners, combined... more The team observed the condition of the walls, gathered information from building owners, combined the received information and finally conducted an engineering analysis. Based on this study, the best recommendation was obtained for the building owner to make an additional strengthening structure in the form of a combination of reinforced concrete column and beam with a cross section size of 300 x 300mm. The strengthening structure installed in the form of right triangles as high as the retaining wall. The strengthening structure located 1500mm apart. The strengthening column and beam are supported by two 300mm diameter drilled pile foundations tied together by 1500 x 300 x 300mm pile caps. The drilled pile foundation is buried to a depth of 600mm lying on above hard layer soil. Between strengthening structures that are 1500mm apart are tied with reinforced concrete beam with a 300 x 300mm cross section to unite the strengthening structure. In conducting this study of solving the con...
A site of land used as gas station has been filled to the ground level with the level of the road... more A site of land used as gas station has been filled to the ground level with the level of the road that passes near the station site. To hold the landfill, a 4000mm high retaining wall was built, but the construction of this wall was made without adequate planning resulting in damage in the form of collapse in several parts of the wall. The andesite stone material used is a textured stone that tends to be round with a smooth surface and is bound with a cement mortar that is too thick so that the bond is not strong enough. The damage of the wall has been identified and could lead to the collapse of the wall which could endanger people who pass near the wall. The proposed improvement is to partially dismantle the old wall and construct a new retaining wall built on the inside of the land along the old wall where the old retaining wall was dismantled. To ensure that the new wall has a strong bond with the old wall, at some point bonding reinforcement are installed between the old and ne...
The foundation is the element that receives the forces from the building construction above and c... more The foundation is the element that receives the forces from the building construction above and channels them to the subsoil, where they function to support the building so that there is no failure of the structure from the bottom. Driven Piles are deep foundations that are precast or finished in the factory to certain specifications. Piles have a long and direct shape with the aim of transmitting structural loads to deeper soil. Bored piles are the foundation for channeling structural loads to great depths. Drilled piles are directly printed in the field (cast in the field) with pre-drilled holes and immediately reinforced in situ. Of these three foundations, they are analyzed and designed in such a way as to be able to support a 2-story house with soil conditions that are former paddy fields. Then, after completing the design, the results are analyzed in terms of price to find out which one is cheaper when using the foundation for a two-story house. The total cost of the pile is R...
Problem that often occurs in soft cohesive soils is settlement caused by consolidation process. I... more Problem that often occurs in soft cohesive soils is settlement caused by consolidation process. If construction activities doing when the soils has not been consolidated, settlement can occur. To accelerate the consolidation process, soil improvement are usually do, one method of soil improvement to accelarate the consolidation process is vertical drain using prefabricated vertical drains (PVD). The soft soil layers in the field are not always continuous, sometimes found soft soil layers that have a lens layer. In this study, will discuss about the settlement and consolidation time of soft soil layers that have a lens layer which has been improved by PVD with 1 meter distance. Infrastructure that stand on a location that is installed by PVD is taxiway and loading by Airbus A380 aircraft of 18,22ton/m2. Analysis using the 1 dimensional consolidation theory of Terzaghi. For PVD installation to a depth of 50 meters, preloading settlement of 234,80 cm with a consolidation time of 22...
The driven pile foundation is a foundation structure that not only withstands static loads but al... more The driven pile foundation is a foundation structure that not only withstands static loads but also dynamic loads due to vibrations generated during the pile driving process. It’s not impossible that the vibrations can cause damage to both the foundation structure itself and the surrounding building structures. Therefore, in this study dynamic soil modeling was carried out based on the dynamic parameters from the finite element back analysis of the Vibration Monitoring Test (VMT) which was measured using a geophone placed at a distance of 80 m from the vibration source originating from the foundation pile driving activity. The VMT parameter that was used was acceleration ay = 0,025 m/s2. The VMT parameter is modeled using a 2D finite element application and the dynamic parameter is obtained in the form of a damping ratio of 0,22 % with a percentage difference of 0,66 %. From the dynamic parameters that have been obtained, further research can be made by modeling the structure of the...
Indonesia is one of the countries that has the largest area of peat soil. Construction on peat so... more Indonesia is one of the countries that has the largest area of peat soil. Construction on peat soil may cause problems to the structure due to poor physical properties of peat soil such as having low bearing capacity, which usually soil improvement methods are used to solve this issue, however this requires additional cost during construction. There have been several cases where roads build on peat experience damages like the occurrence of settlement that results in road surface subsidence making the road uneven. This research will conduct a study in peat soil without soil improvement where the peatland will be used as a location for road construction, which the bearing capacity, settlement and time required for settlement to take place is predicted as well as the risks of not using soil improvements on peat. The analysis will be conducted in a condition where in the pavement will be placed right above the elevation of 0,0 m, and the pavement as well as vehicle will be considered as...
The foundation is one of the most important parts of a structure. The distribution of bearing cap... more The foundation is one of the most important parts of a structure. The distribution of bearing capacity in pile foundations is inversely related to depth. The part of the pile that is close to the acting force will carry a greater force than the part of the pile that is at a deeper depth. By paying attention to this, the reinforcement of the pile foundation can be varied according to the distribution of the pile bearing capacity. The type of pile foundation to be analyzed is a drilled pile foundation or bored pile in the form of an end bearing pile, with soil data located in Semarang. Analysis was carried out on three piles with a diameter of 600 mm, 1000 mm, and 1800 mm with a pile length of 65 m. In this study, an analysis of the internal force diagram that occurs in the pile will be carried out. The results of the analysis show that the need for pile reinforcement are getting less and less at the pile which is further away from the working load. The result of the need for pile rei...
Waste is one of the problems in Indonesia. Based on the Ministry of the Environment, each person ... more Waste is one of the problems in Indonesia. Based on the Ministry of the Environment, each person produces an average of 0.8 kg of waste per day. The average waste per person will increase in line with the increase in people's welfare and lifestyle. Assuming 220 million Indonesians, waste reaches 176,000 tons per day. Accompanied by increasing population growth, the need for infrastructure development on land is increasing. Soils that is often used for construction land is organic soil. It has low soil bearing capacity values and soil improvement methods are commonly used. The general method usually is to mix the soil with better bearing capacity. To minimize costs, a physical stabilization system is carried out that can use soil improvement methods with waste. This can deal with 2 problems at once, where there is the use of certain types of waste and also the planning of organic soil stabilization with small carrying capacity. By doing a triaxial test on organic soil by mixing 4...
Water is one of the natural resources that has very important role in the daily life of all livin... more Water is one of the natural resources that has very important role in the daily life of all living creatures. Mishandling of water might result in water catastrophe. Associates want to give learning to students regarding the environment, use water wisely, and do greywater recycling. Associates need help to make discussion topic regarding the use and saving also conceptual of greywater recycle for rest room necessity. Water treatment need to be done which is one of important factor to accomplish sustainable development related to our natural resources in this case is water. This devotion aim is to supply material to discuss between teachers and students about water necessity and give understanding to next generation regarding the important of clean water, to use water responsibly and understand greywater recycle. The output of greywater recycling can be used as an alternative water resource to solve the lack of water. Recycled water can be used for toilet and watering plant. Associa...
Foundation is a part of an engineering changes system that continuing load supported by the load ... more Foundation is a part of an engineering changes system that continuing load supported by the load itself into the land/ground and rocks that located underneath. High level building are usually built using deep foundation likely : bore pile or stake pile, but there are also high level building that are built on raft foundation that is one of shallow foundation. Function of Raft foundation is to spread out the load from land structure underneath that consist of widespread single plate, and support structure load upward (Aratus, 2004). Building are usually have tower and podium side which the load is different. The aims of this study are for comparison the settlement happen on flecible raft pile foundation in accordance with the load that are borne by themselves. If the load that are borne bigger than tower, therefore the settlement which happen are also bigger compared with the settlement on podium area. the reduction in the length of the pile obtained also differ between the tower a...
IOP Conference Series: Materials Science and Engineering, 2020
Soil is the most important component in construction field, because soil supports construction bu... more Soil is the most important component in construction field, because soil supports construction buildings. The problem is, almost 65% soil in Indonesia is expansive soil that has large swelling and shrinking potential. This problem made worse by the tropical climate. Expansive soils easily shrink in dry season and swell in rainy season. Not only those problems, waste is also major problem in Indonesia. In order to prevent these two problems, a research was conducted by using organic waste as expansive soil stabilization material. Organic wastes that use in this research includes sugarcane bagasse, used tea leaves, rice husk ash, eggshell, and palm fiber. These five organic wastes will be combined with South Jakarta, Cikupa, Bekasi 1, Cikarang, and Bekasi 2 soil sample. All of these samples will be tested with penetrometer and free swell test. Based on the results, organic waste that most affected the increase of qu up to 69.56% and decrease of FSI up to 80.00% of South Jakarta, Bekas...
IOP Conference Series: Materials Science and Engineering, 2020
Construction starts with earth work that takes a long time. To reducing these problems, accelerat... more Construction starts with earth work that takes a long time. To reducing these problems, acceleration is usually done on the site. For example, doing basement excavations at same time with driven piling. Early basement excavation work has the potential to cause the foundation piles that has been driven will be slided. Besides being supported by expansive soil, use of diesel hammer which has large blow energy as driven machine will also affect additional lateral load on the ground which causes pile or wall to slide or roll. In this study, the calculation of additional loads due to piling and soil using Boussinesq and Rankine Theory. The Reese and Matlock Method is used to calculate the lateral deflection of the pile. Pile will experience lateral deflection 30 mm exceeding the permit tolerance of 25 mm. Earth retaining wall with 3,2 m and 6,4 m excavations, the wall does not slide and roll. On the earth retaining wall with 9,6 m excavations, the wall does not slide but it will be rolle...
Perubahan kedalaman muka air tanah merupakan masalah utama yang membuat tanah ekspansif memiliki ... more Perubahan kedalaman muka air tanah merupakan masalah utama yang membuat tanah ekspansif memiliki sifat merusak. Kedalaman tanah dimana sering terjadi perubahan kedalaman muka air tanah inilah yang disebut active zone karena tanah ekspansif hanya aktif pada kedalaman tersebut. Salah satu cara yang sudah banyak diterapkan di lapangan untuk mengatasi tanah ekspansif ini adalah stabilisasi tanah menggunakan kapur. Namun saat ini dilakukan berbagai penelitian untuk mencari material lain yang lebih mudah diperoleh. Gipsum memiliki unsur kalsium yang juga terdapat di dalam kapur. Oleh karena itu gipsum dipertimbangkan sebagai pengganti kapur. Dalam penelitian sebelumnya diketahui bahwa gipsum dapat meningkatkan kuat geser tanah. Pada penelitian ini tanah yang dicampur gipsum diuji kuat tekan bebasnya terhadap siklus basah-kering sebagai gambaran active zone. Pengambilan sampel tanah dilakukan di Jl. Science Timur 2 Jayamukti, Cikarang Pusat, Bekasi, Jawa Barat. Penambahan gipsum yang digun...
Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan, 2018
Timbunan tanah yang akan digunakan sebagai fondasi jalan raya biasanya dipadatkan dengan cara dig... more Timbunan tanah yang akan digunakan sebagai fondasi jalan raya biasanya dipadatkan dengan cara digilas dengan energi tertentu. Kekuatan tanah dapat diidentifikasi melalui nilai kohesi dan sudut geser dalam. Ketika pemadatan dilakukan di lapangan kondisi ideal yaitu pada saat kadar air optimum tidak selalu bisa diperoleh, sehingga pemadatan dapat terjadi lebih kering atau lebih basah dari kadar air optimum. Akibatnya nilai parameter kohesi dan sudut geser dalam mengalami pergeseran pada rentang nilai tertentu. Penelitian ini dilakukan dengan simulasi kondisi pemadatan pada kadar air optimum, 98% lebih kering dari kadar air optimum dan 98% lebih basah dari kadar air optimum. Contoh tanah dibuat di laboratorium dan diuji pada alat triaksial. Parameter kekuatan tanah yang diperoleh dari uji triaksial dengan unconsolidated undrained (UU) dengan sampel tanah yang dipadatkan telah dicoba di laboratorium. Standar uji Triaksial menggunakan standar ASTM D2850-87 dan SNI 4813-2015.Komposisi uku...
Airport parking became one of the most serious problems due to the high usage of private vehicles... more Airport parking became one of the most serious problems due to the high usage of private vehicles in airport activities. This has made a demand for parking facilities to provide a better service. There are several parameters that was the foundation of this research. For the Customer Satisfaction Index (CSI), the result shows that the user was very satisfied with the performance and facilities that was given by the airport authorities. Whereas the field observation result shows that there are several points that needed to be fixed such as pedestrian that supposed to accommodate the visually impaired persons, parking arrangements, trolley arrangements, etc. In this research, design will be made based on the recommendation that was given in research on the user feedback to the parking facilities in Halim Perdanakusuma airportPermasalahan parkir di Bandara diakibatkan oleh Sebagian besar calon penumpang menuju dan Kembali dari Bandara menggunakan kendaraan pribadi, yang mewajibkan pen...
Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan, 2021
The imbalance population and number of vehicles increasing from year to year with number of roads... more The imbalance population and number of vehicles increasing from year to year with number of roads causing traffic jam. Build toll road is the government's effort to solve traffic jam. The construction of toll roads that carried out by Government is expected to be able reduce traffic jam on arterial roads but in reality, does not reduce traffic jam even though traffic jam still exist on toll roads. Traffic jam causes stress and fatigue and can lead to traffic accidents. Indonesia has a much higher mortality rate compared to other countries. Traffic accidents are influenced by three main factors: human factors, vehicle factors, and road factors. To improve road safety and high number of deaths each year, it will be carried out research by direct observation using the Road Safety Audit (RSA) form of the Kunciran-Serpong Toll Road. The result of this research by direct observation on Kunciran-Serpong Toll Road in general there are still many shortcomings, such as various types of ro...
The team observed the condition of the walls, gathered information from building owners, combined... more The team observed the condition of the walls, gathered information from building owners, combined the received information and finally conducted an engineering analysis. Based on this study, the best recommendation was obtained for the building owner to make an additional strengthening structure in the form of a combination of reinforced concrete column and beam with a cross section size of 300 x 300mm. The strengthening structure installed in the form of right triangles as high as the retaining wall. The strengthening structure located 1500mm apart. The strengthening column and beam are supported by two 300mm diameter drilled pile foundations tied together by 1500 x 300 x 300mm pile caps. The drilled pile foundation is buried to a depth of 600mm lying on above hard layer soil. Between strengthening structures that are 1500mm apart are tied with reinforced concrete beam with a 300 x 300mm cross section to unite the strengthening structure. In conducting this study of solving the con...
A site of land used as gas station has been filled to the ground level with the level of the road... more A site of land used as gas station has been filled to the ground level with the level of the road that passes near the station site. To hold the landfill, a 4000mm high retaining wall was built, but the construction of this wall was made without adequate planning resulting in damage in the form of collapse in several parts of the wall. The andesite stone material used is a textured stone that tends to be round with a smooth surface and is bound with a cement mortar that is too thick so that the bond is not strong enough. The damage of the wall has been identified and could lead to the collapse of the wall which could endanger people who pass near the wall. The proposed improvement is to partially dismantle the old wall and construct a new retaining wall built on the inside of the land along the old wall where the old retaining wall was dismantled. To ensure that the new wall has a strong bond with the old wall, at some point bonding reinforcement are installed between the old and ne...
The foundation is the element that receives the forces from the building construction above and c... more The foundation is the element that receives the forces from the building construction above and channels them to the subsoil, where they function to support the building so that there is no failure of the structure from the bottom. Driven Piles are deep foundations that are precast or finished in the factory to certain specifications. Piles have a long and direct shape with the aim of transmitting structural loads to deeper soil. Bored piles are the foundation for channeling structural loads to great depths. Drilled piles are directly printed in the field (cast in the field) with pre-drilled holes and immediately reinforced in situ. Of these three foundations, they are analyzed and designed in such a way as to be able to support a 2-story house with soil conditions that are former paddy fields. Then, after completing the design, the results are analyzed in terms of price to find out which one is cheaper when using the foundation for a two-story house. The total cost of the pile is R...
Problem that often occurs in soft cohesive soils is settlement caused by consolidation process. I... more Problem that often occurs in soft cohesive soils is settlement caused by consolidation process. If construction activities doing when the soils has not been consolidated, settlement can occur. To accelerate the consolidation process, soil improvement are usually do, one method of soil improvement to accelarate the consolidation process is vertical drain using prefabricated vertical drains (PVD). The soft soil layers in the field are not always continuous, sometimes found soft soil layers that have a lens layer. In this study, will discuss about the settlement and consolidation time of soft soil layers that have a lens layer which has been improved by PVD with 1 meter distance. Infrastructure that stand on a location that is installed by PVD is taxiway and loading by Airbus A380 aircraft of 18,22ton/m2. Analysis using the 1 dimensional consolidation theory of Terzaghi. For PVD installation to a depth of 50 meters, preloading settlement of 234,80 cm with a consolidation time of 22...
The driven pile foundation is a foundation structure that not only withstands static loads but al... more The driven pile foundation is a foundation structure that not only withstands static loads but also dynamic loads due to vibrations generated during the pile driving process. It’s not impossible that the vibrations can cause damage to both the foundation structure itself and the surrounding building structures. Therefore, in this study dynamic soil modeling was carried out based on the dynamic parameters from the finite element back analysis of the Vibration Monitoring Test (VMT) which was measured using a geophone placed at a distance of 80 m from the vibration source originating from the foundation pile driving activity. The VMT parameter that was used was acceleration ay = 0,025 m/s2. The VMT parameter is modeled using a 2D finite element application and the dynamic parameter is obtained in the form of a damping ratio of 0,22 % with a percentage difference of 0,66 %. From the dynamic parameters that have been obtained, further research can be made by modeling the structure of the...
Indonesia is one of the countries that has the largest area of peat soil. Construction on peat so... more Indonesia is one of the countries that has the largest area of peat soil. Construction on peat soil may cause problems to the structure due to poor physical properties of peat soil such as having low bearing capacity, which usually soil improvement methods are used to solve this issue, however this requires additional cost during construction. There have been several cases where roads build on peat experience damages like the occurrence of settlement that results in road surface subsidence making the road uneven. This research will conduct a study in peat soil without soil improvement where the peatland will be used as a location for road construction, which the bearing capacity, settlement and time required for settlement to take place is predicted as well as the risks of not using soil improvements on peat. The analysis will be conducted in a condition where in the pavement will be placed right above the elevation of 0,0 m, and the pavement as well as vehicle will be considered as...
The foundation is one of the most important parts of a structure. The distribution of bearing cap... more The foundation is one of the most important parts of a structure. The distribution of bearing capacity in pile foundations is inversely related to depth. The part of the pile that is close to the acting force will carry a greater force than the part of the pile that is at a deeper depth. By paying attention to this, the reinforcement of the pile foundation can be varied according to the distribution of the pile bearing capacity. The type of pile foundation to be analyzed is a drilled pile foundation or bored pile in the form of an end bearing pile, with soil data located in Semarang. Analysis was carried out on three piles with a diameter of 600 mm, 1000 mm, and 1800 mm with a pile length of 65 m. In this study, an analysis of the internal force diagram that occurs in the pile will be carried out. The results of the analysis show that the need for pile reinforcement are getting less and less at the pile which is further away from the working load. The result of the need for pile rei...
Waste is one of the problems in Indonesia. Based on the Ministry of the Environment, each person ... more Waste is one of the problems in Indonesia. Based on the Ministry of the Environment, each person produces an average of 0.8 kg of waste per day. The average waste per person will increase in line with the increase in people's welfare and lifestyle. Assuming 220 million Indonesians, waste reaches 176,000 tons per day. Accompanied by increasing population growth, the need for infrastructure development on land is increasing. Soils that is often used for construction land is organic soil. It has low soil bearing capacity values and soil improvement methods are commonly used. The general method usually is to mix the soil with better bearing capacity. To minimize costs, a physical stabilization system is carried out that can use soil improvement methods with waste. This can deal with 2 problems at once, where there is the use of certain types of waste and also the planning of organic soil stabilization with small carrying capacity. By doing a triaxial test on organic soil by mixing 4...
Water is one of the natural resources that has very important role in the daily life of all livin... more Water is one of the natural resources that has very important role in the daily life of all living creatures. Mishandling of water might result in water catastrophe. Associates want to give learning to students regarding the environment, use water wisely, and do greywater recycling. Associates need help to make discussion topic regarding the use and saving also conceptual of greywater recycle for rest room necessity. Water treatment need to be done which is one of important factor to accomplish sustainable development related to our natural resources in this case is water. This devotion aim is to supply material to discuss between teachers and students about water necessity and give understanding to next generation regarding the important of clean water, to use water responsibly and understand greywater recycle. The output of greywater recycling can be used as an alternative water resource to solve the lack of water. Recycled water can be used for toilet and watering plant. Associa...
Foundation is a part of an engineering changes system that continuing load supported by the load ... more Foundation is a part of an engineering changes system that continuing load supported by the load itself into the land/ground and rocks that located underneath. High level building are usually built using deep foundation likely : bore pile or stake pile, but there are also high level building that are built on raft foundation that is one of shallow foundation. Function of Raft foundation is to spread out the load from land structure underneath that consist of widespread single plate, and support structure load upward (Aratus, 2004). Building are usually have tower and podium side which the load is different. The aims of this study are for comparison the settlement happen on flecible raft pile foundation in accordance with the load that are borne by themselves. If the load that are borne bigger than tower, therefore the settlement which happen are also bigger compared with the settlement on podium area. the reduction in the length of the pile obtained also differ between the tower a...
IOP Conference Series: Materials Science and Engineering, 2020
Soil is the most important component in construction field, because soil supports construction bu... more Soil is the most important component in construction field, because soil supports construction buildings. The problem is, almost 65% soil in Indonesia is expansive soil that has large swelling and shrinking potential. This problem made worse by the tropical climate. Expansive soils easily shrink in dry season and swell in rainy season. Not only those problems, waste is also major problem in Indonesia. In order to prevent these two problems, a research was conducted by using organic waste as expansive soil stabilization material. Organic wastes that use in this research includes sugarcane bagasse, used tea leaves, rice husk ash, eggshell, and palm fiber. These five organic wastes will be combined with South Jakarta, Cikupa, Bekasi 1, Cikarang, and Bekasi 2 soil sample. All of these samples will be tested with penetrometer and free swell test. Based on the results, organic waste that most affected the increase of qu up to 69.56% and decrease of FSI up to 80.00% of South Jakarta, Bekas...
IOP Conference Series: Materials Science and Engineering, 2020
Construction starts with earth work that takes a long time. To reducing these problems, accelerat... more Construction starts with earth work that takes a long time. To reducing these problems, acceleration is usually done on the site. For example, doing basement excavations at same time with driven piling. Early basement excavation work has the potential to cause the foundation piles that has been driven will be slided. Besides being supported by expansive soil, use of diesel hammer which has large blow energy as driven machine will also affect additional lateral load on the ground which causes pile or wall to slide or roll. In this study, the calculation of additional loads due to piling and soil using Boussinesq and Rankine Theory. The Reese and Matlock Method is used to calculate the lateral deflection of the pile. Pile will experience lateral deflection 30 mm exceeding the permit tolerance of 25 mm. Earth retaining wall with 3,2 m and 6,4 m excavations, the wall does not slide and roll. On the earth retaining wall with 9,6 m excavations, the wall does not slide but it will be rolle...
Perubahan kedalaman muka air tanah merupakan masalah utama yang membuat tanah ekspansif memiliki ... more Perubahan kedalaman muka air tanah merupakan masalah utama yang membuat tanah ekspansif memiliki sifat merusak. Kedalaman tanah dimana sering terjadi perubahan kedalaman muka air tanah inilah yang disebut active zone karena tanah ekspansif hanya aktif pada kedalaman tersebut. Salah satu cara yang sudah banyak diterapkan di lapangan untuk mengatasi tanah ekspansif ini adalah stabilisasi tanah menggunakan kapur. Namun saat ini dilakukan berbagai penelitian untuk mencari material lain yang lebih mudah diperoleh. Gipsum memiliki unsur kalsium yang juga terdapat di dalam kapur. Oleh karena itu gipsum dipertimbangkan sebagai pengganti kapur. Dalam penelitian sebelumnya diketahui bahwa gipsum dapat meningkatkan kuat geser tanah. Pada penelitian ini tanah yang dicampur gipsum diuji kuat tekan bebasnya terhadap siklus basah-kering sebagai gambaran active zone. Pengambilan sampel tanah dilakukan di Jl. Science Timur 2 Jayamukti, Cikarang Pusat, Bekasi, Jawa Barat. Penambahan gipsum yang digun...
Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan, 2018
Timbunan tanah yang akan digunakan sebagai fondasi jalan raya biasanya dipadatkan dengan cara dig... more Timbunan tanah yang akan digunakan sebagai fondasi jalan raya biasanya dipadatkan dengan cara digilas dengan energi tertentu. Kekuatan tanah dapat diidentifikasi melalui nilai kohesi dan sudut geser dalam. Ketika pemadatan dilakukan di lapangan kondisi ideal yaitu pada saat kadar air optimum tidak selalu bisa diperoleh, sehingga pemadatan dapat terjadi lebih kering atau lebih basah dari kadar air optimum. Akibatnya nilai parameter kohesi dan sudut geser dalam mengalami pergeseran pada rentang nilai tertentu. Penelitian ini dilakukan dengan simulasi kondisi pemadatan pada kadar air optimum, 98% lebih kering dari kadar air optimum dan 98% lebih basah dari kadar air optimum. Contoh tanah dibuat di laboratorium dan diuji pada alat triaksial. Parameter kekuatan tanah yang diperoleh dari uji triaksial dengan unconsolidated undrained (UU) dengan sampel tanah yang dipadatkan telah dicoba di laboratorium. Standar uji Triaksial menggunakan standar ASTM D2850-87 dan SNI 4813-2015.Komposisi uku...
Airport parking became one of the most serious problems due to the high usage of private vehicles... more Airport parking became one of the most serious problems due to the high usage of private vehicles in airport activities. This has made a demand for parking facilities to provide a better service. There are several parameters that was the foundation of this research. For the Customer Satisfaction Index (CSI), the result shows that the user was very satisfied with the performance and facilities that was given by the airport authorities. Whereas the field observation result shows that there are several points that needed to be fixed such as pedestrian that supposed to accommodate the visually impaired persons, parking arrangements, trolley arrangements, etc. In this research, design will be made based on the recommendation that was given in research on the user feedback to the parking facilities in Halim Perdanakusuma airportPermasalahan parkir di Bandara diakibatkan oleh Sebagian besar calon penumpang menuju dan Kembali dari Bandara menggunakan kendaraan pribadi, yang mewajibkan pen...
Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan, 2021
The imbalance population and number of vehicles increasing from year to year with number of roads... more The imbalance population and number of vehicles increasing from year to year with number of roads causing traffic jam. Build toll road is the government's effort to solve traffic jam. The construction of toll roads that carried out by Government is expected to be able reduce traffic jam on arterial roads but in reality, does not reduce traffic jam even though traffic jam still exist on toll roads. Traffic jam causes stress and fatigue and can lead to traffic accidents. Indonesia has a much higher mortality rate compared to other countries. Traffic accidents are influenced by three main factors: human factors, vehicle factors, and road factors. To improve road safety and high number of deaths each year, it will be carried out research by direct observation using the Road Safety Audit (RSA) form of the Kunciran-Serpong Toll Road. The result of this research by direct observation on Kunciran-Serpong Toll Road in general there are still many shortcomings, such as various types of ro...
Uploads