Re: pgadmin 1.8.4 pgagent schedule issue
От | Dave Page |
---|---|
Тема | Re: pgadmin 1.8.4 pgagent schedule issue |
Дата | |
Msg-id | 937d27e10810020901w1abd96educ3f1a01bc6c2f7bb@mail.gmail.com обсуждение исходный текст |
Ответ на | pgadmin 1.8.4 pgagent schedule issue (susan.williams@us.michelin.com) |
Ответы |
Re: pgadmin 1.8.4 pgagent schedule issue
|
Список | pgadmin-support |
On Thu, Oct 2, 2008 at 4:21 PM, <susan.williams@us.michelin.com> wrote: > > I am experiencing an issue with pgadmin 1.8.4 (Windows). The issue is with > the pgagent job scheduler. I am able to create new jobs and steps. > However, I am unable to create a new schedule. I am also unable to edit / > change a schedule that currently exist. The schedule window informs me that > I must enter a start date. I do this and it still does not recognize that > it has a date and will not activate the OK button even though there is a > visible date in the field. I have used the drop down in the field as well > as tried typing in the date with no luck. One of my co-workers is having > the same problem and is running the same version (1.8.4 - however he is > running linux ). The other co-worker is not having this problem and is > running version 1.8.0 (linux ). I tried to go back to 1.8.0(Windows); but, > was still unable to create a new schedule. Thanks for your assistance > regarding this issue. > It works for me on OS X, though somewhat annoyingly it seems to be using MM/DD/YYYY. If you modify another control after selecting the date (ie. add a comment), does that allow it to recognise there's a date there? -- Dave Page EnterpriseDB UK: http://www.enterprisedb.com
В списке pgadmin-support по дате отправления: