Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

D 2 1 B RP: São Gonçalo Ii - 133,056 MWP

Fazer download em pdf ou txt
Fazer download em pdf ou txt
Você está na página 1de 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

SÃO GONÇALO II - 133,056 MWp

E=472000
E=467000

E=468000

E=469000

E=470000

E=471000
N

E=473000
35
R1
O MB
AC RASTREADORES STRING
ITIV MÓDULOS SÉRIES UNIDADES DE
A IA DE
F I N
MWp 385Wp (30 PAINÉIS) 2x45 INVERTER CONVERSÃO A
IÁR
E=466000

O V
R OD 133,056 345.600 11.520 3.840 808 24
ÃO

0+15.16
Ç

1+1
0.32
.00
0+0

SE

2+1
3+3

8.42
3+9

.91
.41
4+1
.11
N=8885000 ER LEGENDA

4+2
0.0
0
S1

INT

6+1
0.87
FINAL=EST.4+8,679

9+0
.64
9+19

-A
0+0

.15

01
.00

DC
DC 01
B

74+3.06
75+10

74+0.00
LIMITE DO PARQUE (1.950ha)
.75

INÍCIO=EST.0+0,000

.00
73+0
75+0
.00

0.00
72+
INÍCIO=EST.0+0,000

S3

0.00
5+0
74+6.56

71+
.00

0
0.0
70+
S1 73+3.78 69+
0.0
0

0
0.0
68+ 16.76
67+

10+
0.00
.00 79+14.70
80+0

CERCA PERIMETRAL
62
17.

13+
79+

0+0

11.5
0

.00

5
70+0.00 0.0
65+

S4

5+0
.00
S1

B 75+0.00
+0
.00

9+1
60

9+1 0.00

1.39
10+
6.81
S1
65+0.00

ACESSO EXTERNO

15+
0.00
80+0.00
C SGL-01.3.C C SGL-01.1.A 55+
0.00

79+1
7.61 79+14.70

C SGL-01.6.B 70+0.00

S3
ACESSO INTERNO

19+1
0+0.

8.34
00
60+0.00

5+0
0

.00
00
20.

-
49+

BR
75+0.00

ACESSO PROVISÓRIO
L
S1 65+0.00

10+
0.83
47+ 0.00

0.00
47+

.96 46+13.09
46+16
55+0.00

SG
S3

13
15+0
45+0.00

.00
.00
80+0
.16
79+14
6
17.0 79+9.76

18+
79+

RASTREADORES

0+0

8.81
.00

5
70+0.00

60+0.00

88+8.57 50+0.00

S2

4+4
4+9.78
4+14.85
5+0.00

.71
1+10.3
1+8.78
88+

10+0.00
95+1

12+0.51
4.61

0+0.00
8.25

S1

1
96+1.15

5+0.00
S1

10+0.00
C SGL-01.2.A

15+0.00
16+8.30
0+0.00
95+0 40+0.00
.00

1+9.55
2+18.8
75+0.00

4
85+
0.00

5+0.0
C SGL-01.4.B

0
65+0.00

UNIDADES DE CONVERSÃO
55+0.00

10+0
45+0.00

.00
90+0
.00
C SGL-01.7.B
C
S3 SGL-02.1.B 35+0.00

15+0
.00
80+

C SGL-02.4.A
0.00

79+1 70+0.00 34+0.00


1.88

CANAL DE DRENAGEM
88+0
.00

S1

C C

32+
32+19.20

32+
60+0.00

5.23
20+0

0.00
86+1

C SGL-03.1.C

.00

31+ 16.24
5.73 59+12.00 50+0.00

30+
32+

0.0
86+9 12.2
.95 2

0
86+4. 30+
18 11.7

S2
4

25+1
40+0.00
30+7.24

9.80
30+0.00
85+0.

25+0
00
.96

.00
95+3

0+0
6
1.0

.00
0+0.
95+ 75+14.79

00
ÁREA DE BOTA FORA (13,11ha)
7
3.2
94+ 7.70
93+1 3 75+0.00

2+10.00
93+12.1
65+0.00

7 82+12
92+15.2 .54
92+9.50

5+0.
92+3.73

5+0
00

.00
82+0.00 55+0.00
81+16.38
45+0.00

7+10.00
81+0.21
35+0.00

10+0
AE

.00
90+0.00 25+0.00

ÁREA DE ESTOCAGEM

10+
80+0.00

0.00
12+10.00
S1 S1
70+0.00
S3 C SGL-22.8.A

15+0
.00
60+0.00

C SGL-22.6.C

17+10.0

15+
17+

0.00
0
135

15.5

16+1
2
50+0.00

S1

3.67
68 40+0.00

S2
95+14.

C SGL-01.5.C R BACIAS DE DETENÇÃO


95+0.00

MB

18+1
30+0.00
94+8.14

6.88
0+0
N=8884000

.00
85+0.00 20+0.00
94+0.00

CO
75+0.00

93+8.80
93+3.02

C SGL-01.8.C
93+0.00
92+17.25

C SGL-02.2.B RIA
92+10.00

65+0.00


55+0.00

5+0
.00
C SGL-02.7.C

2 PO DISSIPADORES
45+0.00

C SGL-02.5.B 35+0.00

M
TE
2
90+0.00

IA

10+0
25+0.00

.00
-
C SGL-03.2.B
80+0.00 15+0.00

IÁR
70+0.00
S1
C SGL-03.5.C
ÃO
L
S4 AC2
OV
87+10.00

S3
60+0.00

15+
50+0.00

0.00
Ç
31+0.00

OD
SG
TA
40+0.00

18+
3.19
30+0.00

2 OR
85+0.00

0+0
.00
S

0+0
20+0.00

.00
S2

BE
0
75+0.00 10+0.00

Ã
65+0.00

SU
- EÇ

5+0
82+10.00

.00
C SGL-22.9.A
55+0.00 30
31

29

5+0
28

40
27
45+0.00

.00
39
L
26

38
25

37
24

36
23

35
22

34
21

33
20

TER

32
19
18

S2
17

40
16
15

S2

39
LT 500kV - SE São Gonçalo / SE Gilbués IID
14

D
35+0.00 13

38
12

37
11

FILLET1
Xref
10

36
09
25+0.00

35
08
07

34
06

10+

33
05
25

C SGL-22.7.A
04

SG

0.00
80+0.00

C SGL-22.4.C

32
03
24

31
02

S1
01 23

10+

30
IN
22

29
0.00
21

28
FILLET1
Xref
15+0.00 20

27
19

26
18
Y
17
70+0.00 5+0.00 x Elétrica
Entrada
16
Entrada Elétrica

15
60+0.00 30-___-HI

14

S3

30-___-HI

30-___-HI
30-___-HI

de
13

Motocicletas
30-___-HI

Lugares
30-___-HI

12

Estacionamento
de 84

Motocicletas
30-___-HI 30-___-HI 30-___-HI

30-___-HI

com
bebedouros,
e banheiro 11

Total

30-___-HI
Tenda cadeiras

30-___-HI
10

Motos:
0+0
mesas, 30-___-HI

30-___-HI

09

30-___-HI
.00
30-___-HI

S1

15+
30-___-HI

01

30-___-HI
02 08

C SGL-22.2.C
03 04 07

0.00
05 06
77+10.00

50+0.00

15+
0.0
S3
SUBCONTRATADAS
40+0.00

S2

0
31+0.00

30+12.00

C SGL-02.3.A
X

18+
P9
30+0.00

16.9
0+0
X H=14,90

5+0
Elétrica
Entrada

Entrada
Elétrica
.00
TOZZI ENEL

.00
20+0.00 VISITANTE

2440
6000

12000

2440

COPA
6000

BASCULANTE 400 X 400


Entrada
Elétrica

75+0.00 G

400
X
400

BASCULANTE
20+
x Elétrica

Entrada
2440

0.00
2440

C SGL-02.6.A
6000

2440

Elétrica
Entrada
2440

12000
19520

CERCA SINALIZAÇÃO
2440

COM BRITA
2440

PERIMETRAL
TIPO "D"
6000

2440
10+0.00

2440
Elétrica
Entrada

EntradaElétrica

400
Elétrica

X
Entrada

400

BASCULANTE

400
X
400

BASCULANTE
6000

1,00

1,00
/ 1,50

/ 1,50
/ 2,00

/ 2,00
Embarque

C SGL-02.8.C
Elétrica

0.45

Entrada
0.45 2440

PROJEÇÃO

2440

12000
Ônibus

1,00 / 1,50 / 2,00


6000

DE 2440

1,00
/ 1,50
/ 2,00
ÁREA FUTURA

S3
0+0.00

Elétrica
0.45 2440

DEMARCAÇÕES
2440 Entrada

12200
65+0.00
6000

0.45 18000

2440

1 2
6000

DE ROTA 2440

Elétrica 2440

Entrada
1,00
/ 1,50
/ 2,00
2440

S3
0.45

2
6000

1,00
55+0.00

/ 1,50
/ 2,00
1
Elétrica
Entrada

3 2440

0.45
Elétrica
Entrada

Desembarque

1,00
/ 1,50
2440

/ 2,00
2440

Ônibus
0.45

5+0
31720

1,00 / 1,50 / 2,00


2440

CAIXA D'AGUA SISTEMA DE PURIFICAÇÃO

DE ÁGUA

0.45

2440

10+

.00
3 2440

LY

P
SHUT
OPEN SHUT
OPEN

0.00
2.9914
P
1

1,00
2440

/ 1,50
/ 2,00
V = 25.000 litros P P

1,00
/ 1,50
CAIXA
V = 30.000 L d=3m 0.45 0.45

/ 2,00
2440

D'ÁGUA

1 d=2,4m h=4m
h=6,6m z min=13 m

10.3884 OPEN
SHUT

1,00
/ 1,50
/ 2,00
2440

0.45
3
2440

Área com 6 mesas de


Motobomba
25m /h - pr.=25m
3 centrífuga
xadrez/dama
4
entrada/saída=2" x1,5"

25+
5

EO
72+10.00 6

0.00
PROJEÇÃO

45+0.00
DE

C SGL-03.6.A
FUTURA
ÁREA

35+0.00
S1 7
8
ÁREA DE ESTACIONAMENTO
DE ÔNIBUS

CASA

C SGL-03.3.B
9

2M

ALTURA
ATÉ
DE
ETE

BLOCO DE
10

PAPELÃO
PAPEL
ESG

S1
250
mm

DN
CASA
BOMBAS
DE SOPRADOR
COMANDO

11
DE
DE AR

PLÁSTICO
3000L

TANQUE
ACUMULO
DE
12

20000L
UASB
3
Xref FILLET1

14000L

TANQUE
AREACAO
DE

SE GILBUÉS II

RECICLÁVE
10000L

10+0
DECANTADOR
SECUNDARIO

NÃO
PRESSURIZADOR
5200L
TANQUE

13

15+
25+0.00

.00
170L

Cl

14

1500L

METAL
TANQUE
CLORACAO
DE

2M
DE ATÉ
ALTURA
0.00
ÁREA DE MANOBRA DO

BLOCO
15

DE
CAMINHÃO DE COLETA

(SÓLIDO)
PERIGOSO
AE 01

RESÍDUO
FILLET1
Xref
16
15+0.00

(LÍQUIDO)
PERIGOSO
RESÍDUO
COLETORA
CM
50X50

VIDRO
CAIXA
GALPÃO

30+
70+0.00

FILLET1
Xref
Xref FILLET1

0.0
10

C SGL-04.1.A
ULOS

9
CASA

0
0

8
GALINHEIRO MOD ADAS

EIR

7
CIO TRAT
6
ESPA CON5
5+0.00

4
SUB-

FILLET1
Xref
3
GALINHEIRO
ÁREA 3 ESPACIO MODULOS

2
SUB-CONTRATADAS 1
1 2 3 4 5 6 7 8 9 10

60+0.00
S4

- NT

FILLET1
Xref
15+
50+0.00

MONTE ALEGRE

0.00
20+
MV-06
MV-05

0.00
I

CA
31+0.00
ZZ

35+
TO os

0.00
M
67+10.00 MV-07

GE cab
40+0.00

L
H0

H1
H0 H1
H0 H1
H0 H1

H0
H1 H0
H1 H0
H1

CA de ha

18+
3.19
30+0.00

TO es 1.0

GUARe Posicionam
(Dimensões

37+
ES obin A =

4.60
ITA ento
H0
H1

DO PIAUÍ
H1 H0
H1

H1
H0

H0
H1 H0
H1 H0

0+0.
DEFIa definir
B RE
H1 H1H0
H1 H0

H0
H1 H0

00
NITIV
A

pela
0

ENEL)
A
38+6

INÍCIO=EST.0+0,000
25+0
.26
20+0.00

78+0.00
79+0.00
.00

0
77+0.0
80+0
10+0.00

.00
EM

.00
26+
80+
G

76+0

9
10.8
14.2
11.8
AG
65+0.00

75+
15

0
OC

0.0
93+

5
20.

75+
0

S1
00
0+0.00
ST ZI)
0.0
0
/ E OZ
RA S T

5+0
74+

.00
OB DA
55+0.00

5
DE ATA .5ha
45+0.00
0.00

S1

S
73+

OS TR = 1
C SGL-22.5.B

85+
EIR ON EA

0.00
72+0.
00
62+10.00
5
ANT UBC AR
35+0.00 C (S
25+0.00

C SGL-22.3.B
01
71+0.00

87+

10+0
19.5
S4 C SGL-21.9.A

.00
90+ 10

1
0.0
0 70+7.57

S1
70+0.00 15+0.00

90+

0
IAAE

0.00
INÍCIO=EST.0+0,000

5+0.00

0
S4 60+0.00

C
5+3.49
5+0.00

C SGL-21.7.A
02

15+
BA

0.00
15

50+0.00
DC

86+ 40+0.00
11

10.
B

95+0
15
31+0.00

95+
C SGL-02.9.C

.00
DC 11 - A

4.82
86+0

S1
.17
.00

0+0
.00
18+
57+10.00

S2

16.9
85+10.19 30+0.00

0+0
96+

8
.00
19.

19
S3
20+0.00

FINAL=EST.19+4,411
94+6.50

22
85+0.00 FINAL=EST.3+15,049

C SGL-03.4.B
100

100+0
.00
65+0.00 10+0.00
100

DC

C SGL-03.7.A
E E
09 100+9
B .79 FINAL
=EST. 0+0.00

5+0
100+9

EC

.00
,790
83+5.83
55+0.00
55+0.00

LT
-A

5+0
83+0.84
SO
09

83+0.00

.00
S1 EM 0ha
DC

82+15.85 0+0.00
G
CA = 1.
27

TO REA
76+5.

ES

AE 03
45+0.00
0

A
INÍCIO=EST.0+0,000

7
75+0.0

4.5
INÍCIO=EST.0+0,000

72+ 35+0.00
.00
72+0

.16
72+17
C SGL-04.2.A S1

10+
C SGL-04.4.B

0.00
71+11.99

S2
90+0.00

10+
52+10.00

0.00
EI
25+0.00

15+0.00 AW
80+0.00
/HU
NO
ER a
NT
C SGL-04.7.C
70+0.00
60+0.00 5+0.00 SA 1.0h
EM A=

15+
AG ARE

0.00
OC

15+
50+0.00
ST

0.00
50+0.00

E
DC 12 B

0
DC 12 - A
S3 58+0.00 40+0.00

ZZ
I)

18+
AE 04
30+0.00

(TO

3.08
S2 ITA a

20+
BR

0+0

0.0
.00
M 1.0h
C SGL-05.1.A

0
GE =
94+7.80 85+0.00 47+10.00

20+0.00
CA EA
C SGL-05.4.B TO AR

L
10+0.00
ES
75+0.00
E M
AG
OC
ST ZI)
65+0.00

/ E OZ

25+0
55+0.00 0+0.00

RA S T

.00
5+0
OB ADA a

.00
SG
DE AT
45+0.00
45+0.00

S1 C SGL-22.1.B NT
OS NTR = 1.
EIR BCO REA
CA (SU
A
5h

N=8883000 C SGL-21.5.B
35+0.00

S3
AE 06
25+0.00

C SGL-21.8.A

30+
S3

0.00
10+0
90+0.00

.00
80+0.00
S1

-21
42+10.00

15+0.00

AE 05
5+0.00

P2
70+0.00

S3

35+
60+0.00

C SGL-21.3.C

0.00
15+
50+0.00

0.00
EO
40+0.00
40+0.00

31+0.00
S3
58+0.00

C SGL-03.8.A

18+
GL

16.8
30+0.00

0+0

40+0
0
.00
20+0.00

.00
38+20.00
85+0.00

75+0.00
C SGL-04.3.A 37+10.00

10+0.00

0+0.00
36+
20.0
0
65+0.00

C SGL-04.5.B

5+0

45+
.00

0.00
55+0.00
45+0.00

S
S3 35+0.00
35+0.00
35+
0.00

S1
C SGL-05.2.A C SGL-04.8.B

10+0

50+
25+0.00

.00

0.00
15+0.00

80+0.00

C SGL-05.5.A 70+0.00 32+10.00

5+0.00

60+0.00

15+
0.00
5

55+
30+
19.7

0.0
2
50+0.00

0
31+0.00
40+0.00

S4
F F
30+0.
00

18+
29+14.5

0
3.26
5 30+0.00
30+0.00

58+0.00

C SGL-05.7.C

0+0
.00

60+
29+0.00

L-

0.00
20+0.00

28+9.39 10+0.00

75+0.00

C SGL-05.9.C 65+0.00 27+10.00

S5

5+0.
S1

00

65+
C SGL-21.6.B
55+0.00

0.00
S1 45+0.00
35+0.00

SG
S2 S1 0

INÍCIO=EST.0+0,000
25+0.00
25+0.00

C SGL-21.1.C

69+
10+

4.43
0.00

70+
C SGL-21.4.B

0.0
0
15+0.00
5+0.00

70+0.00

71
GILBUÉS

+9
.01
C SGL-10.8.C
60+0.00 22+10.00
15+
0.00

PI=EST.4+12,338
5

50+0.00

40+0.00
18+

30+0.00
2.56

S1
20+0.00

C SGL-04.6.C 20+0.00 0
0+0
.00

S2
10

10+0.00

65+0.00

C SGL-05.3.B C SGL-04.9.C 0+0.00

5
55+0.00
5+0

17+10.00
.00

15

45+0.00

C SGL-05.6.B 35+0.00

02
C SGL-05.8.C
25+0.00

S1 10
10+

15+0.00
15+0.00
0.00

INÍCIO=EST.0+0,000

BC

0+0
20

.00
MV-02

5+0.00
22

FINAL=EST.22+4,223
60+0.00
S3
15+

50+0.00
0.00

12+10.00

5+0
.00
31+0.00

40+0.00

58+0.00
18+
3.03

30+0.00

PANÉIS (ESPAÇAMENTOS)
20+0.00
0+0

S2
.00

30

15
42°
10+0.00
10+0.00

10+
0.00
S1 0+0.00

55+0.00 S2
5+0
.00

45+0.00

C SGL-21.2.C SÃO GONÇALO


4.13 14.83
7+10.00

35+0.00

C SGL-10.9.C
P3
25+0.00

18+
DO GURGUÉIA
15+0.00
10+

0.0
0.00

0
S1 C SGL-10.6.C
G 20+

G
5+0.00
5+0.00

0.00

EO
15+0

C SGL-10.4.B
50+0.00
.00

25+0

RASTREADORES 2x45
40+0.00
.00

2+10.00

C SGL-06.1.B 30+0.00
S3
18+

S1
16.8
0+0

7
.00

20+0.00
10+0.00

51+5.37
30+

50+19.65 51
0.00

51+0.00

C SGL-06.6.A
47
0+0.00

C SGL-06.2.B
11. 0+0.00
9

35+9.84
51+6

36+
2.9
51+

.32
36+1.47

35+0.00

50+0.00
5+0.
00

46.20
45+0.00
35+
0.0

35+0.00
0

-10
25+0.00
10+
0.00

S1
15+0.00
5+0.00 S5
40+0
.00
41+
0.03

30+0.00
15+

45+0.00

N=8882000
0.00

0.4
42+
14.
22
31+0.00

GL
40+0.00

S1
18+3

30+0.00
.19

3
0+0

S1
.00

UFV SÃO GONÇALO


135

0
BR
COM
VA
20+0.00 DEFINITI A
VIÁRI
AC1
O RODO
SEÇÃ
INTER
BSTC Ø 1,00m

BSTC Ø 0,60m

BSTC
L= 85,00m
Ø 0,60m

10+0.00

BC
0+0.00 BF1BF2

C SGL-01.3.C C SGL-01.1.A
C SGL-01.6.B

L-01
BF5

BF4 BF3
SG

S
BF6 C SGL-01.2.A
BF7 C SGL-01.4.B
BF9

C SGL-02.1.B C SGL-01.7.B
C SGL-02.4.A
5+0

C SGL-03.1.C

BOTA ESPERA
25+0.00
.00

BF8
SUPRESSÃO - LENHA C SGL-22.6.C
C SGL-22.8.A
135

48+16.47 40+0.00 5,10 ha C SGL-02.2.B C SGL-01.8.C


C SGL-01.5.C

ÁRIA
COM
BR

C SGL-02.7.C C SGL-02.5.B A

L-22
C SGL-03.2.B TEMPOR
SA1 C SGL-03.5.C AC2 VIÁRI
ÃO
O RODO

C SGL-10.7.B
C2

L-02
WP01
STAÇWP04
SG C SGL-22.9.A 29 31
30

SEÇÃ

28
SUBE
22

34
25
24
23 37
27
26
36
35

40
38
39

S2
17
19
18
16 21
20 40
33
32

SA2 12
11
10 14
15
13 36 37
38 39

FILLET1
Xref

Você também pode gostar