01 - Subsolo
01 - Subsolo
01 - Subsolo
16.00
2.00
C.E. C.G.
JARDIM
4.00
8.00
8.00
PISCINA
10.50
2.00 2.00
3.00 1.00
8.00
2.00
1.30
11.00
VARANDA
2.50
2.50
2.50
7.00 3.35
FACHADA PRINCIPAL
ESCALA 1:50
4.40
4.90
1.30 1.20
1.80 1.90
8.50
8.50
2.50
1.15
1.05
A
3.05 3.50
P
2.30
HALL A'
BANHO
0.90
1.00
1.00 0.90
35.00
BOX
1.00
1.00
BANHO
BOX
7.65
3.10
2.50
3.05
ADEGA
1.85
JARDIM
INTERNO 3.80 0.90
3.80
4.05
DESPENSA
1.80
2.50
1.00
V.P.
3.80
3.20
LAVANDERIA
2.00
/466/77/8
PLANTA COMPLETA ESC. 1:100
3.25
4.20
BOX
1.10
0.90 1.20
WC ALAMEDA LUXEMBURGO NR.418
5.95
5.95
QUARTO EMPREGADA
2.30
1.30
2.00
1.30
3.25
PARTE DA PREFEITURA NO DIREITO DE
PROPRIEDADE DO TERRENO.
EUROPA
QUADRA 21
2.50 11.00 2.50 LOTE 07 N
LOCAL AUTOR DO PROJETO
RGO
E MBU
ALAMEDA LUX
6.00
A CONSTRUIR
CREA 18175 PREF 0818
ART 78103