Curriculum Vitae
Name: Anang Priambodo
Nationality: Indonesian
Qualifications:
Master Degree of Civil Engineering with Special Program, Engineering Transportation From Diponegoro University, Semarang.
Professional Memberships:
-
Computing Skill:
Caesar II, Staad Pro, AutoCad, Sap2000, Autopipe , MS Project, MS Office
Training:
Course development for project re-build Aceh from Tsunami Disaster with Knock down house building system RIsha, by Departemen Pekerjaan Umum (DPU), on Bandung
Training Management Control Construction for Office Engineer, Construction Manager, etc by PT. Nindya Karya (persero) on Puncak, Bogor.
Staad Pro Design Course, by Research Engineering International, Jakarta
Quality Surveyor Training Sponsored by PT. Nindya Karya (persero), Jakarta
K3 Safety Health Environmental Course, Jakarta
Course Problem Solving for Design Pipeline Construction by Persatuan Insiyur Indonesia (PII), Jakarta
Course Caesar II by Oil Institute, Jakarta
Experience Summary
Anang Priambodo has more than 8 years of extensive and continuous for engineering and construction on pipeline oil and gas, including civil work also. Experience cover for prepare Stress Analysis, Data Sheet, Specification, TBE, etc. Mostly project is onshore pipeline design. project.
.
Key Projects Summary:
J P KENNY – PT WOOD GROUP KENNY INDONESIA (AUGUST 2012 – ONGOING)
Title : Sr. Pipeline Engineer
CONOCOPHILLIPS ENGINEERING SERVICE CONTRACT PACKAGE-C
Suban Gathering (17,18 & 20) Flowline and Wellsite Faclity FEL-2/3 & Detail Engineering(July 2014 – On going)
Position : Sr. Pipeline Engineer
Responsibilities :
Performed Data Sheet and Specification material on pipeline scope.
Performed calculation document.
Performed report document.
Reviewed Drawing, Alignment Sheet, Typical Drawing, Detail Drawing, etc.
Suban Gathering FEL-2 (February 2014 – June 2014)
Position : Sr. Pipeline Engineer
Responsibilities :
Performed Reporting Application Insulation Pipe for Buried pipeline installation, including tie in method.
Title : Sr. Pipeline Engineer
Suban Basement Water Injection (Mid Term) (August 2013 – Ongoing)
Position : Sr. Pipeline Engineer
Responsibilities :
Performed Data Sheet and Specification material on pipeline scope.
Performed calculation document.
Performed report document.
Reviewed Drawing, Alignment Sheet, Typical Drawing, Detail Drawing, etc.
Suban Long Term Water Disposal FEEL-3 (October 2013 – March 2014)
Position : Sr. Pipeline Engineer
Responsibilities :
Performed Data Sheet and Specification material on pipeline scope.
Performed calculation document.
Performed report document.
Reviewed Drawing, Alignment Sheet, Typical Drawing, Detail Drawing, etc.
Suban Phase 2 (Suban-13, Suban-14) Well Site Facilities & Flowline Tie-Ins (Agust 2013 - Ongoing)
Position : Sr. Pipeline Engineer
Responsibilities :
Performed Data Sheet and Specification material on pipeline scope.
Performed calculation document.
Performed report document.
Reviewed Drawing, Typical Drawing, Detail Drawing, etc.
PERTAMINA EP DEVELOPMENT PROJECT
Tanki Bahan Bakar Minyak (TBBM) Ruwulu Pertamina (April 2013 – July 2013)
Position : Sr. Pipeline Engineer
Company : PT. Enersi Kontruksindo (ENERKON)
Responsibilities :
Performed Data Sheet and Specification material, TBE, MTO on pipeline scope.
Reviewed Drawing, Typical Drawing, Detail Drawing, etc.
PT. PERUSAHAAN GAS NEGARA (PGN), (Persero)
Development Pipeline Installation on Pasar IX Medan (PGN)
(December 2012-April 2013)
Position : Pipeline Engineer
Company : PT. AMEC BERCA INDONESIA
Responsibilities :
Evaluate isometric drawing, alignment sheet, as-built drawing
Evaluate document stress analysis pipe calculation,
Preparing document detail design such as data sheet, specification, calculation,
MTO, TBE related to pipeline work
CONOCOPHILLIPS INDONESIA Inc. Ltd
CONOCOPHILLIPS SOUTH BELUT DEVELOPMENT PROJECT (ONSHORE PIPELINE DETAIL DESIGN)
(October 2012 – May 2013)
Position : Pipeline Engineer
Contractor : PT. AMEC BERCA INDONESIA
Responsibilities :
Evaluate isometric drawing, alignment sheet, as-built drawing
Evaluate document stress analysis pipe calculation,
Preparing document detail design such as data sheet, specification, calculation,
MTO, TBE related to pipeline work
PT. TOTAL E & P INDONESIE
Rubby Development Project (ONSHORE PIPELINE DETAIL DESIGN, TOTAL E&P)
(January 2012 – December 2013)
Position : Pipeline Engineer
Contractor : PT. AMEC BERCA INDONESIA
Responsibilities :
Evaluate isometric drawing, alignment sheet, as-built drawing
Evaluate document stress analysis pipe calculation,
Preparing document detail design such as data sheet, specification, calculation,
PT. PERUSAHAAN GAS NEGARA (PGN), (Persero)
Package 8B PCC Branchline Jakarta-Bogor-Banten, PT. Perusahaan Gas Negara.(persero), tbk (PGN)
(Agust 2009 – December 2011)
This project is construction pipeline with various diameter, from 4” to 16” diameter. The purpose of the project was for Distribution Gas Pipeline, total length is 35 Km. The activity are procurement long lead material (not include pipe) construction, Pre-Commissioning and commissioning.
Position : Pipeline Engineer
Contractor : PT. Nindya Karya (Persero)
Responsibilities :
Evaluate isometric drawing, alignment sheet, as-built drawing
Evaluate document stress analysis pipe calculation,
Preparing document detail design such as data sheet, specification, calculation,
Preparing construction document, hydrotest procedure, pre-commissioning prosedur, commissioning procedure and hot tap procedure
As Coordinator for Pre-Commissioning activity, Commissioning activity and Hot Tap activity
PT. LIPPO CIKARANG
Pipeline Distribution Lippo Cikarang, PT. LIPPO Cikarang
As Pipeline Management Consultant (PMC) for LIPPO Cikarang to develop Pipeline Distribution inside of Lippo Cikarang inside of area Lippo Cikarang Industries. Proposed construction detail document for Pipeline 8” diameter.
Position : Pipeline Engineer
Contractor : PT. Enearsi Konstruksindo
Responsibilities :
Evaluate drawing and review document contract from contractor
PT. PERUSAHAAN GAS NEGARA (PGN), (Persero)
Package IFB-1 EPC Banten Distribution Mainline .PT. Perusahaan Gas Negara.(persero), tbk (PGN)
(October 2006 – January 2009)
This project is Procurement all material including contracted pipeline Transmission with diameter Pipeline 16”. The distance is 35 K.
Position : Pipeline Engineer
Contractor : PT. Nindya Karya (Persero)
Responsibilities :
Evaluate isometric drawing, alignment sheet, as-built drawing
Preparing document detail design such as data sheet, specification, calculation.
PT. Nidya Karya (Persero)
(May 2005 – October 2006)
Position : Office Engineer
Contractor : PT. Nindya Karya (Persero)
Responsibilities :
Preparing document tender including cost price analysis, work method, related to EPC Project, such as Hydro Power Plant, Oil and Gas, including High Risk Building and Highway Construction.