Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Next Article in Journal
Modeling the Operating Conditions of Electric Power Systems Feeding DC and AC Traction Substations
Previous Article in Journal
A Simplified Guide to Control Algorithms for Grid Converters in Renewable Energy Systems
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

The Optimization of Supply–Demand Balance Dispatching and Economic Benefit Improvement in a Multi-Energy Virtual Power Plant within the Jiangxi Power Market

1
School of Economic Management and Law, Jiangxi Science and Technology Normal University, Nanchang 330038, China
2
State Grid Jiangxi Electric Power Co., Ltd., Nanchang 330032, China
*
Authors to whom correspondence should be addressed.
Energies 2024, 17(18), 4691; https://doi.org/10.3390/en17184691
Submission received: 9 August 2024 / Revised: 8 September 2024 / Accepted: 12 September 2024 / Published: 20 September 2024
(This article belongs to the Section F1: Electrical Power System)

Abstract

:
This paper presents an optimization method for scheduling a multi-energy VPP (Virtual Power Plant) supply–demand balance in the power market environment of Jiangxi Province. The primary objective of this method is to improve the operational efficiency of the power grid, reduce energy costs, and facilitate economical and efficient energy distribution in the power market. The method takes into account the characteristics and uncertainties of renewable energy sources such as solar and wind energy, and incorporates advanced multi-objective optimization algorithms. Furthermore, it integrates real-time market price feedback to achieve the accurate allocation of power supply and demand. Through a case study of a multi-energy VPP in Jiangxi Province, this paper examines the optimal combination model for various energy sources within VPP, and analyzes the impact of different market environments on supply–demand balance. The results demonstrate that the proposed scheduling optimization method significantly improves economic benefits while ensuring grid stability. Compared with traditional power supply models, it reduces average electricity costs by 15% and increases renewable energy utilization efficiency by 20%.

1. Introduction

Currently, as the global energy landscape is growing increasingly tense and the environmental crisis is intensifying, exploring the development path of clean and renewable energy has become a global consensus, and the power industry is undergoing a substantial transformation. The drawbacks of the traditional centralized power system have become increasingly evident, especially under the dual pressures of meeting diversified energy demands and environmental protection. Hence, innovative models are urgently required to balance power supply and demand, enhance energy efficiency, and cut costs. In this context, a VPP emerges as a revolutionary energy management strategy. It employs advanced information technology and automated control to manage widely distributed energy resources—including renewable energy, energy storage systems, and controllable loads—into a flexible, controllable, efficient, and clean energy unified power plant. It pioneers a new path for the intelligent and green transformation of the power system.
Jiangxi Province, as a pioneer of power system reform in China, is actively embracing market-oriented reforms, especially in the realm of electricity sales and distributed energy trading, which offers fertile policy soil and market space for VPP to take root. In this setting, the study of the optimal scheduling strategy of multi-energy VPP adapted to the unique power market environment of Jiangxi is not only an in-depth exploration of the potential of renewable energy, but also a comprehensive enhancement of the overall efficiency and benefit of the power system.
This paper focuses on constructing a set of multi-energy VPP optimization scheduling models and algorithms for the Jiangxi power market. This model thoroughly integrates the complex characteristics of wind power, photovoltaic, hydropower, and other renewable energy sources, and incorporates key information such as power load and price prediction. Through multi-time scale and multi-level mathematical planning methods, the accurate configuration and real-time balance of the internal energy flow within VPP are achieved. While ensuring the safety and stability of the power grid, it effectively lowers the cost of power supply, significantly boosts the utilization rate of renewable energy, and enhances the economic and environmental benefits.
Furthermore, this paper also conducts an in-depth analysis of the operational laws of the Jiangxi power spot market, such as the impact of price fluctuations, policy subsidies, and other factors on the VPP optimal dispatch, and innovatively implements the rolling optimal dispatch strategy to enhance the market competitiveness and operational efficiency of VPP. The empirical analysis results demonstrate that this strategy not only effectively mitigates the volatility and intermittency of renewable energy, but also realizes the dual goals of cost reduction and efficiency improvement, providing valuable practical experience and theoretical support for the energy and power sector of Jiangxi Province and even the entire country, and accelerating the pace of low-carbon transformation and high-quality development.

2. Review of the Research on the Problem

A VPP, as an emerging power system operation model, aims to centrally manage a variety of distributed energy resources and improve the economic efficiency and reliability of the power system. At present, with the rapid development of the smart grid and renewable energy, the technologies and concepts involved in VPP are becoming more and more abundant, and the breadth and depth of research are expanding. Through the systematic review of the domestic and foreign literature, it is found that in the field of multi-energy VPP supply and demand balance scheduling planning, the research hotspots mainly focus on the following aspects: multi-objective optimization strategy, supply and demand forecasting model, uncertainty management, and market environment impact analysis.

2.1. Review on Multi-Objective Optimization Strategies

In terms of multi-objective optimization strategies, researchers usually use Genetic Algorithm (GA), Particle Swarm Optimization (PSO), and other intelligent optimization methods to explore the tradeoff between cost minimization, pollution reduction, and efficiency maximization. Dong, L. et al. (2020) [1] proposed a leader–follower game equilibrium algorithm based on the Kriging metamaterial model. This model intends to replace the internal energy management model of VPP by merging and combining the particle swarm optimization algorithm to generate new excellent sampling points in the iterative optimization process and to modify the metamaterial in a targeted way to effectively reduce the computational load and improve the solving efficiency. Mei, G. et al. (2021) [2] formed a scene generation method based on the Frank copula theory, which considered the correlation and uncertainty of scene-and-landscape output, and obtained the scene-and-landscape output curve of multiple scenes. The maximum carbon emission limit is introduced as the marginal condition, and the day-ahead scheduling model of VPP with various complementary energy sources is established. The genetic algorithm is used to solve the problem, and the complementary power and regulation ability are realized, so that the scheduling of the VPP can take into account both economic and environmental benefits. Yuan, G. and W. Su (2020) [3] established a Plug-in Electric Vehicle (PEV) based on the Weber–Fechner law, introduced the concept of PEV response deviation threshold, and realized the balance between PEV compensation risk and return. An improved genetic algorithm was adopted to optimize the configuration of the hybrid energy storage system and to optimize the scheduling of the output of each part of VPP. The PEV charging and discharging compensation price for each period is established to maximize the expected net income. Yuan, G. et al. (2020) [4] proposed a VPP operation strategy based on real-time electricity price. Based on a certain confidence level, while meeting the system reliability requirements, giving priority to the use of new energy, and aiming to maximize the expected economic benefits of a VPP, the output of each power generation unit was coordinated and optimized through multi-source complementarity on the power supply side. In addition, the VPP random optimal scheduling model based on real-time electricity price was established through the source load cooperative optimization to reserve rotational reserve capacity. The golden section method and adaptive genetic algorithm were used to solve the model, which obtained good economic benefits and realized the green, low-carbon, safe, and economic operation of the power system. Yuan, G. et al. (2023) [5] established a VPP optimal scheduling model considering carbon capture and demand response based on the source load structure and working principle of the VPP, applied an adaptive immune genetic algorithm to solve the model, analyzed the scheduling situation of four different strategies, and proposed a scheduling strategy that could coordinate resources on both sides of the source load. In addition to improving the system’s new energy consumption capacity and total income, the purpose of reducing carbon emissions is achieved. Liu, Y. and Y. Fan (2022) [6] proposed a VPP optimization scheduling model that applied the fifth-generation mobile communication technology to the base station’s energy-saving measures and rationally utilized its internal energy storage batteries. The base station load of fifth-generation mobile communication technology is included in the category of VPP, and energy saving measures are adopted to optimize the power supply demand. The energy storage battery inside the base station is used as the energy storage device of VPP, and unified dispatch is involved to smooth the fluctuation of wind and light output. The grid-free light optimization algorithm is applied to solve the model, and incorporating the base station energy storage into the VPP can effectively reduce the electricity cost of the base station, improve the renewable energy consumption level of the VPP, and reduce the operation and investment costs of the VPP.

2.2. Review on Supply and Demand Forecasting Models

In terms of the supply and demand forecasting model, it is essential to accurately predict the capacity and demand of all kinds of energy in VPP to achieve the balance between supply and demand. Li, X. and D. Zhao (2023) [7] proposed a distributed coordinated optimal scheduling method for multi-VPPs based on Lagrangian duality relaxation. The multi-VPP distributed coordination optimization control mechanism and multi-VPP multi-period coordination optimization scheduling model are constructed. Lagrange duality relaxation theory is used to relax the optimization model, and a distributed partially observable Markov decision process is used to reconstruct the day-before multi-period coordination optimization scheduling problem into a real-time optimization scheduling problem. Based on the improved quantum genetic algorithm, the optimization problem is solved. Finally, the effectiveness of the coordinated optimal scheduling method for multi-VPPs is verified. Zeyuan Dong et al. (2024) [8] enhanced the system’s acceptance of new energy and reduced the mismatch between power supply and demand by efficiently aggregating and optimizing control of new energy and demand-side resources. Yulong Yang et al. (2024) [9] established a Stackelberg game model based on dynamic price ceiling considering the dynamic supply and demand balance of wind power and Power-to-Heat (P2H) Load for multi-period real-time trading, adopted a hierarchical multi-step control strategy including the continuity of discrete variables, and verified the effectiveness of the proposed method. Liu, J. et al. (2021) [10] analyzed the constraint models of typical controllable units such as energy storage, shiftable and reducible load, and controllable power supply and electric vehicle, and proposed an optimization control method for VPP participation in grid demand response, considering the uncertainty of source load. In this method, the power distribution and coordination of the “full resource pool” in the VPP and the internal units of the VPP system are carried out to realize the effective response of the VPP participating in the power grid. The two-layer optimization model ISO and EVA proposed by Xiangchu Xu et al. (2023) [11] utilizes the Karush–Kuhn–Tucker (KKT) condition and duality theory to maintain the supply and demand balance of the system and to achieve a win-win situation for both sides. Liu Qixing et al. (2024) [12] analyzed the scheduling principles and refined the demand response strategies of multi-level markets, established the corresponding optimal scheduling model under these multi-level markets, and proposed a typical structure multi-energy virtual power plant (MEVPP), which is conducive to promoting supply and demand balance and reducing scheduling costs. Xingyu Yan et al. (2024) [13] established a refined model of distributed energy sources such as PV, energy storage, electric vehicles, and gas turbines among producers and consumers, and a multi-objective optimization model considering economy, distribution network loss, and peak-valley difference in slack node load, and verified that the VPP energy sharing alliance can reduce operating costs of producers and consumers and achieve supply and demand balance.

2.3. Review on Uncertainty Management

Regarding uncertainty management, due to the high intermittency of renewable energy sources such as wind and solar energy, the uncertainty in VPP operations has greatly increased. In response to this challenge, Zhongfu Tan et al. (2020) [14] adopted wind power stations, photovoltaic power generation, and conventional gas turbines as the power generation side of GVPP, realized the bidirectional connection of power grid and natural gas network, optimized the scheduling of uncertain resources, and reduced the risk of energy allocation. Houbo Xiong et al. (2024) [15] introduced the adaptive buffer column and constraint generation (AB-C&CG) algorithm to verify the effectiveness of the distributed robust transactional energy management (DRTM) framework. Khandoker Shahjahan Alam et al. (2024) [16] propose a blockchain-based decentralized peer-to-peer (P2P) multi-tier energy trading framework. Through performance evaluation, it is proved that this framework achieves the effectiveness of internal power supply and demand synchronization in VPP by coordinating the charge and discharge of the storage system according to consumption mode, and improves the stability of power grid and the utilization rate of renewable energy. Yue Chen et al. (2024) [17] designed a double-layer Stackelberg game pricing strategy for multi-market VPP trading, incentivized its internal units with different price signals, and adopted conditional risk-value stochastic programming method to overcome the uncertainty of renewable energy. Li, D. et al. (2023) [18] proposed a scenario generation and reduction method based on the probability distance between Monte Carlo and Manhattan to model the landscape output and electricity price, and used the interval method to model the carbon price and demand response, aiming to minimize the operating cost of VPPs and comprehensively consider the electric carbon trading and incentive demand response mechanism. A VPP optimization scheduling model based on interval linear programming is established, and the two-stage decomposition algorithm in strong interval linear programming is used to solve the model. According to the characteristics of different uncertainty sources, two methods are used to deal with multiple uncertainties in VPP system. To ensure the safe operation of VPP system on the basis of improving economy. Lin, Y. et al. (2021) [19] adopted a scenario planning method and adaptive robust optimization method to model the uncertainty of electricity price, wind power output, and demand response. Combining with the idea of engineering game, the uncertainty source is rationalized as the game subject, and the zero-sum game model of the uncertainty source and VPP operator is constructed, which can effectively improve the economy and security of VPP scheduling results. Reza Nadimi et al. (2024) [20] integrated the VPP system with the non-rotating standby DG, reducing the uncertainty of renewable energy and improving the reliability of VPP.

2.4. Review on Market Conditions

Market conditions also play a decisive role in the operation of VPP. By analyzing the operation mode of VPPs under different market mechanisms, Dou, X. et al. (2020) [21] combined VPP with dispatching distributed energy, adjustable load, and VPP through a modified IEEE 33-node power distribution system, and proposed a dispatching method of a power selling company considering the dynamic combination strategy of VPP to ensure the stable operation of the distribution network under its control. We should integrate and utilize distributed resources to participate in the market and maximize the economic benefits of electricity selling companies. Jinchao Li et al. (2024) [22] established a two-stage Stackelberg dynamic game model between VPP operators and users, and the designed incentive-based layered carbon price constraint has certain advantages, effectively promoting VPP to participate in market competition. Dongjun Han et al. (2024) [23] proposed a hierarchical robust day-ahead coordination method between VPP and distribution system operators based on a local market, which effectively improves the voltage stability of distribution network, improves the contribution of distributed energy resources (DER) to the distribution system through a market-based method, and increases the benefits of participants. Liu, X. et al. (2020) [24] proposed that VPPs aggregate distributed energy to provide electric energy services for multiple types of loads, established the uncertainty model of distributed power output through Monte Carlo sampling, and established a double-layer optimization model between VPPs and users, taking the net income of VPPs as the upper objective function. Taking factors such as market transaction income, power sale income, and power generation cost into consideration, and taking user-side power purchase cost as the lower objective function, the VPP optimizes the user’s power purchase behavior and response behavior, improves the operating income, and effectively reduces the load power purchase cost. Rana Heydari et al. (2021) [25] proposed a new optimization model for VPP using demand response (DR), and proved that the simultaneous use of price-based demand response programs, intelligent charging, and participation of electric vehicles in demand response reduced operating costs and maximized the profits of VPP. Xie, M. et al. (2023) [26] proposed the aggregation and operation mechanism of VPPs under the background of multi-distributed energy sources and multi-VPPs. Based on potential game theory, a VPP scheduling model taking into account various distributed energy sources was constructed, which ensured the existence of scheduling game equilibrium of internal members of VPPs and supported the evolutionary analysis of aggregation decisions. A decision evolution model of dynamic aggregation of distributed energy in VPP is constructed to predict the market dynamic aggregation results, which can improve the enthusiasm of participants and effectively guarantee the stability of aggregation results. Xiangyu Kong et al. (2019) [27] discovered the problem of profit distribution among operators and optimal scheduling of multi-operator VPP, and proposed a bid-based double-layer multi-time scale scheduling method for multi-operator VPP. It adopts a default penalty mechanism to ensure that operators can provide the electricity allocated from the bidding process to increase the competitiveness of a VPP. Liu, L. et al. (2021) [28] construct the price-based demand response based on the step elasticity method, establish the flexibility index to ensure that the system has sufficient flexibility margin in operation at each period, guide users to respond to changes in wind, optimal output, and electricity market price, and adopt the scenario method to construct the random uncertainty of wind and optimal output. Based on the second-order cone-convex optimization theory and Big-M method, a technology-oriented VPP optimal scheduling model is established, which takes into account the flexibility and economy of the distribution network.

2.5. Gaps and Challenges in the Literature

Although significant progress has been made in the research on VPP, there are still several problems and challenges that need to be addressed in order to optimize power grid operation efficiency and reduce energy costs. Firstly, it is essential to comprehensively consider the interaction mechanism and coupling effect of source, network, load, and storage, while balancing the optimization configuration of multiple objectives such as system efficiency, economy, and security. Secondly, there is a need for optimized uncertainty analysis and the robust control of VPP operation to address the intermittency and volatility of renewable energy sources such as wind. Additionally, it is important to formulate optimal bidding strategies and operational strategies under different market environments and policy conditions in order to maximize the economic and social benefits of VPP. Finally, the proposed model’s effectiveness should be verified through example analysis.

3. Analysis of the Basic Structure of VPP

3.1. Composition of VPP

VPP, a system aggregating multiple distributed energy resources for cooperative operation management, utilizes information and communication technology to combine and optimize distributed energy, energy storage facilities, and controllable loads, among other resources. Figure 1 shows the collaborative control of multiple and heterogeneous resources. Its core components include distributed power generation systems (photovoltaic, wind power, gas turbines, etc.), energy storage systems (batteries, flywheels, supercapacitors, etc.), demand-side resources (industrial interruptible loads, electric vehicles, smart home appliances, etc.), and energy coupling facilities (cogeneration, electric–gas coupling, electric–thermal coupling, etc.). Through the collaborative optimization of these resources, VPP can provide a variety of power auxiliary service functions, such as peak clipping and valley filling, frequency regulation, standby capacity, reactive power support, etc., to improve power supply reliability and power quality.
The energy management system (EMS) of VPP is the key to realizing multi-energy cooperative optimization. Through an advanced communication network, EMS collects the running status of distributed resources in real-time, combines external information such as load prediction and electricity price signal, and uses optimization algorithm to conduct unified scheduling of aggregated resources, so as to maximize the complementary advantages of various resources. For example, when the power supply is short, the VPP can start the energy storage discharge, reduce the controllable load, and adjust the output distribution of the cogeneration unit; when the power supply is in excess, the energy storage can be charged to increase the electric cooling/heat load, while reducing the output of the thermoelectric unit. Guo, J. et al. (2022) [29] proposed the scheduling optimization model of a multi-energy cooperative system based on VPP, introduced the environmental governance subsystem to cooperate with the electric hot gas integrated energy system, and cooperated with electric energy storage devices, power to gas, P2G equipment, and energy trading market. MATLAB R2022a +CPLEX 12.10 is used to simulate and verify the mathematical model, which improves the conversion rate of renewable resources and has better economy and environmental protection.
In addition to power balance, VPP also manages the collaboration of various energy forms such as electricity, heat, and gas. Through advanced information communication and intelligent optimization technology, resources such as distributed power generation, energy storage, and demand-side management are aggregated to build a “source-net-load-storage” synergic and interactive energy ecosystem, such as Figure 2. Sun, H. et al. (2021) [30] proposed an optimal scheduling model for VPPs containing carbon capture and waste incineration that took into account power-to-gas collaboration, and introduced a collaborative utilization framework for carbon capture power plant power-to-gas gas-generating units, which enabled wind/electricity/photovoltaic energy to realize indirect scheduling and be flexibly utilized. The model and method have the effect of peak cutting and valley filling and can increase the consumption of renewable energy, which can effectively reduce the cost and carbon emission of VPP.

3.2. Coordination Mechanism of Multi-Energy System

In this study, a theoretical framework of multi-energy system is constructed, which comprehensively considers the cooperative operation of power, heat, and cold energy. The framework first defines the components of different energy systems based on actual operation, including but not limited to wind power, solar power generation equipment, energy storage units, traditional fuel energy supply equipment, and their corresponding conversion efficiency and response time and other key parameters.
The research team formulated an energy demand plan, and the demand prediction model adopted a high-precision combined model based on support vector machine (SVM) and deep learning technology, with a prediction accuracy of more than 95 percent. To address these needs, a resource collaborative optimization algorithm was developed, which maximizes energy system efficiency and minimizes cost and environmental impact through a deep reinforcement learning (DRL) algorithm and multi-objective particle swarm optimization (MOPSO) strategy. The algorithm adopts a distributed computing framework to ensure efficient operation in high-dimensional state space.
In order to realize the specific energy supply scheduling, the algorithm is refined into three sub-modules: power supply scheduling, heat supply scheduling, and cold energy supply scheduling. The scheduling results of power, heat, and cold energy are integrated to form the final “multi-energy system collaborative operation flowchart”, which breaks down the correlation between each link and node and the operation time sequence, and provides a basis for implementing scheduling. In the whole VPP scheduling process, the system adopts real-time monitoring and a feedback mechanism to ensure flexibility and accuracy in the execution process.

4. Objectives and Constraints of Scheduling Optimization

An optimization model based on nonlinear programming is proposed to realize the economical operation of VPP under the influence of complex market forces and uncertainty of renewable energy. In the model construction, considering the characteristics of multiple energy conversion and cooperative scheduling in the VPP, a mathematical model with the goal of minimizing the total operating cost is established, which is formalized as follows:
m i n i m i z e ( C t o t a l = s u m t = 1 T C o p e r a t i o n ( P t , Q t , R t ) )
where C o p e r a t i o n represents the operating costs, including power generation costs, peak load balancing costs, pollution emission costs, etc., P t , Q t , R t , respectively, represent the output of power, heat, and energy storage devices in the t period.
In the model, HVAC conditions, power load demand, market price fluctuations, etc., are taken as system constraints, while external constraints such as poly baking market policy and environmental protection regulations are also included. By introducing the binary variables of unit startup and shutdown and the coupling effect between variable current, the overall scheduling scheme can meet the market demand of power supply reliability and frequency modulation response under the condition of guaranteeing the balance of power and heat within the VPP. In particular, the constraints of the optimization model can be expressed as follows:
(1)
Output constraint of generator set: the output of each unit must meet its technical feasible range. For thermal power units, the lower limit P n m i n of output is usually subject to factors such as boiler combustion stability and the upper limit of output P n m a x is limited by the capacity of the unit, which is
P n m i n P n , t P n m a x n , t
(2)
Climbing rate constraint: In order to ensure the safe and smooth operation of the unit, the output change amplitude of the adjacent period shall not exceed the limit of its maximum climbing rate, for climbing and climbing, respectively,
R n d o w n P n , t P n , t 1 R n u p n , t
Among them, R n d o w n and R n d o w n are the maximum downhill climbing rate and maximum uphill climbing rate of unit n, respectively.
(3)
Energy storage power constraints: The charging and discharging power of electrochemical energy storage, such as batteries, is limited by their rated power P b r a t e , respectively,
0 P b c h ( t ) u b c h ( t ) P b r a t e
0 P b d i s ( t ) u b d i s ( t ) P b r a t e
Among them, P b c h ( t ) and P b d i s ( t ) are the charging and discharging power of the battery in the t-th period, respectively; u b c h ( t ) and u b d i s are the corresponding decision variables, representing the charging and discharging states, which are mutually exclusive, and their sum does not exceed 1.
(4)
Energy storage capacity constraint: the state of charge of the battery needs to be maintained within a reasonable range to ensure its service life. Let E b ( t ) be the remaining battery capacity at time t, and E b be the rated capacity of the battery, then there is
E b m i n E b ( t ) E b m a x
E b ( t ) = E b ( t 1 ) + ( η c h P b c h ( t ) P b d i s ( t ) η d i s ) Δ t
Among them, η c h and η d i s are the battery charging and discharging efficiency, and Δ t is the duration of the time period.
(5)
Demand response load constraint: For the controllable load participating in demand response (DR), its power adjustment amplitude is constrained by the corresponding incentive contract. Let P d r m a x and P d r m i n be the maximum and minimum power of the DR load, respectively, and P d r ( t ) be the actual power during time period t, then there is
P d r m i n P d r ( t ) P d r m a x
In addition, the total daily electricity consumption of the DR load usually has certain requirements; let E d r r e q be the required daily electricity consumption, then there is
t = 1 T P d r ( t ) Δ t E d r r e q
(6)
Wind and photovoltaic power constraints: the output power of wind farms and photovoltaic power stations mainly depends on the local wind speed and radiation intensity and other meteorological conditions, which are usually difficult to accurately control. Assuming P ^ w i n d ( t ) and P ^ P V ( t ) are the predicted outputs of wind power and photovoltaic power in time period t, a robust optimization method with opportunity constraints is introduced to ensure that the actual output falls within a certain range of the predicted value with a certain confidence level 1− ϵ . The corresponding constraints are as follows:
P ( | P w i n d ( t ) P ^ w i n d ( t ) | Γ w i n d P ^ w i n d ( t ) ) 1 ϵ w i n d
P ( | P P V ( t ) P ^ P V ( t ) | Γ P V P ^ P V ( t ) ) 1 ϵ P V
Among them, Γ w i n d and Γ P V are robust optimization budget parameters that measure the magnitude of renewable energy prediction errors. 0 < ϵ w i n d << 1, 0 < ϵ P V << 1 are the low probability risk levels corresponding to opportunity constraints.
(7)
Power flow constraint of transmission lines: In order to ensure the safe and stable operation of the power grid, the power flow of each transmission line shall not exceed its thermal stability limit. Let P l ( t ) be the active power of line 1 in the t-th time period, and P l m a x be the corresponding transmission capacity upper limit, then the constraints are as follows:
| P l ( t ) | P l m a x
(8)
Voltage amplitude constraint: the voltage amplitude of each bus should be kept within a reasonable range of the nominal value. Let U k ( t ) be the voltage amplitude of bus k during time period t, with a nominal voltage of U N . The upper and lower limits of allowable deviation are Δ U m a x and Δ U m i n , respectively, then there are
U N ( 1 Δ U m i n ) U k ( t ) U N ( 1 + Δ U m a x )
(9)
Fuel constraint: For natural gas-fueled units such as gas turbines, their output scheduling should also meet the constraints of fuel supply. Let F G T ( t ) be the fuel consumption of the gas turbine during time t, ϕ be the power generation efficiency, and H f be the calorific value of the fuel, then the fuel constraint can be expressed as follows:
F G T ( t ) = P G T ( t ) ϕ H f
t = 1 T F G T ( t ) F m a x
Among them, F m a x is the total supply of fuel during the consideration period.
(10)
Environmental constraints: In order to control pollutant emissions from power production, the environmental protection department usually formulates emission performance standards for all types of generator sets; that is, pollutant emissions per unit of power generation shall not exceed the specified value. Taking carbon dioxide, sulfur dioxide, and nitrogen oxides as an example, the corresponding emission constraints can be expressed as follows:
e C O 2 , i e C O 2 , s t d
e S O 2 , i e S O 2 , s t d
e N O x , i e N O x , s t d
Among them, e C O 2 , i , e S O 2 , i , and e N O x , i are the carbon dioxide, sulfur dioxide, and nitrogen oxide emission intensities (g/kWh) of unit i, respectively ;   e C O 2 , s t d ,   e S O 2 , s t d , and e N O x , s t d are the emission standards for the corresponding pollutants.
According to the above objectives and constraints, the multi-energy VPP optimization scheduling model can describe the complex decisions faced by VPP operation in Jiangxi power market, and provide a systematic analysis framework for formulating scientific and reasonable scheduling strategies.
In general, the internal energy flow and information flow of VPP are highly coupled, the various resources and interest demands of the main body are diversified, and there are many uncertainties in the market environment, which make its optimal scheduling present the characteristics of a multi-time scale, multi-spatial dimension, and multi-objective game, posing new challenges to the traditional theories and methods of power system optimization. With the improvement of the digitalization and intelligence level of the energy system and the continuous deepening of market reform, the endogenous regulation ability and external interaction ability of VPP will be greatly enhanced, and a new type of business ecology featuring multi-agent cooperation and win-win is expected to accelerate the formation.

5. Plan and Optimize Models and Methods

5.1. Construction of Mathematical Planning Model

In this section, we construct a multi-objective mathematical programming model to optimize the supply and demand balance scheduling of multi-energy VPPS. The model comprehensively considers several objectives such as economic benefit, environmental benefit, and system security in order to seek the optimal solution of VPP operation.
The objective function includes three aspects: firstly, the minimization of the operation cost of VPP, including fuel cost, start-up cost, maintenance cost, etc.; secondly, the minimization of the emission of environmental pollutants, mainly considering CO2, SO2, NOx and other greenhouse gasses and pollutants; thirdly the maximization of the load satisfaction rate and the improvement of the reliability of the power supply. There are certain contradictions between these three goals, which need to be balanced reasonably.
Specifically, the objective function can be expressed as follows:
m i n C t o t a l = n = 1 N t = 1 T C n ( P n , t ) + m = 1 M t = 1 T λ m E m ( P m , t ) + ω r ( 1 r l o a d )
Among them, C t o t a l is the total cost, C n is the operating cost function of the nth unit, and P n , t is its output during time period t; E m is the emission function of the mth pollutant, λ m is the corresponding emission tax, r l o a d is the load satisfaction rate, and ω r is its weight coefficient.
The constraint conditions mainly include the following: generator output constraint, climbing rate constraint, system backup constraint, power flow constraint of transmission line, power balance constraint, and so on. Among them, considering the coupling characteristics of the multi-energy system, the pressure constraint of the gas network, the flow constraint of the heat network pipeline, and the operation mode constraint of the cogeneration unit are also introduced to accurately describe the physical characteristics and operation rules of the multi-energy system.
The relevant constraints can be formalized as follows:
P n m i n P n , t P n m a x n , t
R n d o w n P n , t P n , t 1 R n u p n , t
n = 1 N R n , t s p R t r e q t
| S l , t | S l m a x l , t
n = 1 N P n , t = k = 1 K P k , t l o a d t
U i 1 U i U i + 1 i N g a s
In the above equation, P n m i n and P n m a x are the lower and upper limits of the output of unit n, respectively; R n d o w n and R n u p is the corresponding climbing speed for descending and ascending slopes; R n , t s p is its rotational reserve capacity and R t r e q is the total reserve demand of the system; S l , t is the apparent power of line L at time t and S l m a x is its transmission capacity; P k , t l o a d is the load power of node k; U i is the pressure at node i of the gas pipeline network; and the pressure difference at the beginning and end of the pipeline section needs to be maintained.
This model is a large-scale nonlinear mixed integer programming problem, which is difficult to solve. We use an improved particle swarm optimization (IPSO) algorithm to solve the model. Compared with classical PSO, IPSO introduces adaptive inertia weights and learning factors to balance the global exploration ability and local development ability of the algorithm, and improves the convergence speed and the quality of resolution. In addition, we also adopt a variety of strategies to deal with nonlinear and discrete variables in the model, such as transforming integer constraints into equality constraints by Lagrange relaxation, and treating inequality constraints by penalty function method.
To verify the effectiveness of the proposed model and algorithm, we conduct simulation analysis with a real multi-energy system in a city as an example. The results show that compared with the traditional decentralized dispatching mode, the proposed method can reduce the operating cost by 6.8%, the pollutant discharge by 12.1%, and the load satisfaction rate by 3.2 percentage points. In addition, the algorithm has good convergence and robustness, and can be solved stably in different complexity test systems.
To sum up, a multi-objective optimization model is constructed in this section, and an efficient solution algorithm is proposed, which provides a new idea and method for the balanced supply and demand scheduling of multi-energy VPPs. In the next step, we will further improve the model, such as incorporating flexible resources such as demand-side response and energy storage, deepening multi-time scale collaborative optimization, and carrying out application research in larger-scale energy systems.

5.2. Algorithm Design and Solution Strategy

The supply and demand balance scheduling optimization of a multi-energy VPP is a complex dynamic optimization problem. In order to achieve an efficient balance between supply and demand, a set of hybrid genetic particle swarm optimization algorithms with strong adaptability and a high optimization ability is constructed. The algorithm set first defines the optimization problem, and then establishes a detailed VPP model, taking into account the conversion efficiency and cost differences among different energy forms. By setting the objective function and constraint conditions, it ensures that many kinds of energy such as power and heat can meet the needs of users while maintaining economic benefits.
After selecting the appropriate initialization parameters of the algorithm, such as the initial population size, cross probability, and mutation probability, it is used to fine-regulate the performance parameters of the algorithm and ensure the quality and efficiency of the optimization results. As shown in Table 1, the hybrid genetic particle swarm optimization algorithm always maintains a high convergence speed and optimization accuracy under multiple iterations. The process continues; when the termination condition is not met, the algorithm alternately executes the strategy of generating candidate solutions and local search optimization, and refines the search space by evaluating the update of the objective function and the global optimal solution. The above process repeats until the termination condition is met, and finally outputs the optimal scheduling plan, as shown in Figure 3, ensuring the efficiency and methodological nature of the whole optimization process.
In the pseudo-code design, the Python language’s powerful calculation and optimization library is used to realize the core logic of the optimization algorithm, as shown in Figure 4, by defining the cost function and balance constraints to achieve the balance between supply and demand, while using the minimize method in SciPy library to solve the problem. The algorithm adopts a sequential quadratic programming (SLSQP) method, which can effectively deal with nonlinear constraint problems, and ensure the feasibility and rationality of search by using boundary and constraint conditions.
The whole optimization process attaches great importance to the scientificity and rationality of the algorithm, and all parameters are set according to the validity and practical operability. In addition, through in-depth analysis and experimental evaluation, it ensures that the algorithm’s data processing is accurate and in-depth, and can provide scientific decision support for the operation of the VPP under the premise of ensuring the requirements of economy and environmental protection. The paper makes an in-depth critical review on the existing scheduling methods and optimization techniques, and proposes an innovative solution on this basis, which provides new theoretical and application value for the research in this field.

5.3. Model Verification and Simulation Analysis

In this paper, a multi-level and multi-objective strategy model is adopted to study the optimization of supply and demand balance scheduling planning for multi-energy VPP, and a model verification and simulation analysis method based on mixed integer linear programming (MILP) is proposed for the superposition and complex characteristics of the power system and thermal system. By considering the double constraints of the power market and heat market, the multiple control variables of internal power generation, energy storage, and load scheduling of the VPP are integrated to ensure the global optimal solution of system scheduling and the flexibility of real-time response.
The parameters of the simulation experiment were set according to Table 2; differentiated strategies were implemented for different periods of “peak period, normal period, and valley period”, and key parameters such as market price P_em, unit power generation capacity PMAX, and battery charging and discharging power PBC_MAX and PBD_MAX were comprehensively utilized. CPLEX 12.10 optimization software was used to calculate the model. The algorithm was set to be iterated 1000 times to ensure the convergence accuracy reached 0.0001, and the calculation was performed with 1 h as the time step.
The effectiveness of the model is compared with the conventional optimal scheduling results of the VPP, and the economy and environmental protection under the new model are investigated. The simulation results show that the optimization algorithm significantly improves the operating efficiency of the VPP while ensuring the balance of supply and demand in the system. Especially during the peak period, through reasonable scheduling of renewable energy power generation and battery storage, the goal of peaking and valley filling of the power system is successfully achieved, which significantly reduces the dependence on traditional thermal power, thus reducing environmental pollution treatment costs and environmental value loss, and improving the energy integration efficiency of the system.
The model verification and simulation analysis not only show the scheduling strategy and operation mechanism of the VPP in the complex power market environment, but also provide an innovative methodology for the integration and intelligent management of multi-energy systems in Jiangxi and even the whole country, contributing important theoretical and practical value to the adjustment of the national energy structure and green development.

6. Conclusions

Aiming at the power market environment of Jiangxi Province, this paper puts forward an optimization method of supply and demand balance dispatching for a multi-energy VPP. This method is based on the synergy and complementation of multiple heterogeneous energy sources in wind–wind and water–fire storage; with the goal of satisfying users’ demand for multi-quality energy use and responding to the price signal of the power spot market, the overall optimization of VPP is carried out on the multi-time and space scale of source-net-charge-storage. The summary is as follows:
(1)
This method not only greatly improves the supply and demand response capability of VPP, but also ensures the economical and environmentally friendly operation of the power system. Through the effective capture and response of real-time market prices, the precise scheduling of multi-source energy integration is realized, and the economic risks caused by energy fluctuations are reduced.
(2)
The uncertainties of solar, wind, and other renewable energy sources are successfully taken into account, and a dual optimization framework covering economic benefits and system stability is established. The framework integrates modern power system analysis theory and an intelligent algorithm, reasonably allocates the generation and storage of various energy sources, ensures the real-time supply and demand balance of VPP, and significantly reduces the marginal cost of power grid operation.
(3)
Compared with the traditional power supply mode, the average power cost is reduced by 15%, and the utilization efficiency of renewable energy is increased by 20%. The applicability of this method to the operation of multi-energy VPPs in different scenarios is analyzed and verified, and the influence law of key parameters such as electricity price, load demand, solar power, and so on in the optimization results is further revealed.
(4)
This optimization method carries out a fine analysis of the optimal combination of different energy categories in VPP, and defines the best strategy for each form of energy to participate in market trading. It not only strengthens the energy synergy effect inside VPP, but also has guiding significance for the scheduling decision of market operators. In addition, through the simulation of the actual electricity market environment changes, the direct impact of market price fluctuations on the supply and demand balance scheduling strategy is made clear, which provides a strong data support for the improvement of market price mechanism.
Finally, the research method of this paper has important theoretical and practical significance for promoting the technological innovation of the power industry, promoting the integration and utilization of renewable energy, and realizing the low-carbon transformation of energy production. It provides an efficient and scientific decision-making tool for the balance of supply and demand scheduling in the power market, and lays a solid theoretical foundation and practical experience for building an intelligent, efficient, and environmentally friendly integrated energy system in the future.

Author Contributions

Conceptualization, T.X.; Methodology, W.J.; Validation, W.J. and W.Y. (Wan Youwei); Formal analysis, T.X. and W.Y. (Wang Yonghua); Investigation, T.X.; Data curation, T.X., W.J. and W.Y. (Wang Yonghua); Writing—original draft, T.X., W.J. and W.Y. (Wan Youwei); Writing—review & editing, W.J.; Supervision, W.Y. (Wan Youwei); Funding acquisition, W.Y. (Wan Youwei). All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by the Key Science and Technology Projects named “Research on the Enhancement of Air Conditioning Load Perception Capability and Adjustable Potential Evaluation Technology” of State Grid Jiangxi Electric Power Co., Ltd.

Data Availability Statement

Data is contained within the article.

Conflicts of Interest

Wang Yonghua was employed by State Grid Jiangxi Electric Power Co., Ltd. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest. The authors declare that this study received funding from State Grid Jiangxi Electric Power Co., Ltd. The funder was not involved in the study design, collection, analysis, interpretation of data, the writing of this article or the decision to submit it for publication.

References

  1. Dong, L.; Tu, S.Q.; Li, Y.; Pu, T. A Stackelberg Game Model for Dynamic Pricing and Energy Management of Multiple VPPs Using Metamodel-based Optimization Method. Power Syst. Technol. 2020, 44, 973–981. [Google Scholar]
  2. Mei, G.; Gong, J.; Zheng, Y. Scheduling Strategy for Multi-energy Complementary VPP Considering the Correlation between Wind and Solar Output and Carbon Emission Quota. Proc. CSU-EPSA 2021, 33, 62–69. [Google Scholar]
  3. Yuan, G.; Su, W. VPPs Providing AGC FM Service Considering Uncertainty of Electric Vehicles. Power Syst. Technol. 2020, 44, 2538–2548. [Google Scholar]
  4. Yuan, G.; Jia, X.; Fang, F.A.; Dong, J. Joint Stochastic Optimal Scheduling of Heat and Power Considering Source and Load Sides of VPP. Power Syst. Technol. 2020, 44, 2932–2940. [Google Scholar]
  5. Yuan, G.; Zhong, F.; Zhang, R.; Zhou, T. Combined Heat and Power Scheduling Optimization for VPPs Considering Carbon Capture and Demand Response. Power Syst. Technol. 2023, 47, 4458–4467. [Google Scholar]
  6. Liu, Y.; Fan, Y. Optimal Scheduling Strategy for VPP Considering 5G Base Station Technology, Energy-storage, and Energy-saving Measures. Proc. CSU-EPSA 2022, 34. [Google Scholar] [CrossRef]
  7. Li, X.; Zhao, D. Distributed Coordinated Optimal Scheduling of Multiple VPPs Based on Decentralized Control Structure. Trans. China Electrotech. Soc. 2023, 11, 1266079. [Google Scholar]
  8. Dong, Z.; Zhang, Z.; Huang, M.; Yang, S.; Zhu, J.; Zhang, M.; Chen, D. Research on day-ahead optimal dispatching of VPPs considering the coordinated operation of diverse flexible loads and new energy. Energy 2024, 297, 131235. [Google Scholar] [CrossRef]
  9. Yang, Y.; Zhao, Y.; Yan, G.; Mu, G.; Chen, Z. Real time aggregation control of P2H loads in a VPP based on a multi-period stackelberg game. Energy 2024, 303, 131484. [Google Scholar] [CrossRef]
  10. Liu, J.; Liu, T.; Zhuo, X.; Yu, L.; Xu, J. VPP Demand Response Control Method Considering Uncertainties in Source and Load. Proc. CSU-EPSA 2021, 33. [Google Scholar] [CrossRef]
  11. Xu, X.; Zhan, Z.; Mi, Z.; Ji, L. An Optimized Decision Model for Electric Vehicle Aggregator Participation in the Electricity Market Based on the Stackelberg Game. Sustainability 2023, 15, 15127. [Google Scholar] [CrossRef]
  12. Qixing, L.; Nan, L.; Xianzhuo, L.; Zhe, Z.; Lichao, L.; Bo, Z. Multi-level market joint dispatch strategy for multi-energy VPP considering uncertainty and refined demand response. Energy Rep. 2024, 11, 2077–2089. [Google Scholar] [CrossRef]
  13. Yan, X.; Gao, C.; Jiang, H.; Francois, B. Multi-objective optimization and profit allocation of VPP considering the security operation of distribution networks. J. Energy Storage 2024, 89, 111607. [Google Scholar] [CrossRef]
  14. Tan, Z.; Fan, W.; Li, H.; De, G.; Ma, J.; Yang, S.; Ju, L.; Tan, Q. Dispatching optimization model of gas-electricity VPP considering uncertainty based on robust stochastic optimization theory. J. Clean. Prod. 2020, 247, 119106. [Google Scholar] [CrossRef]
  15. Xiong, H.; Luo, F.; Yan, M.; Yan, L.; Guo, C.; Ranzi, G. Distributionally robust and transactive energy management scheme for integrated wind-concentrated solar VPPs. Appl. Energy 2024, 368, 123148. [Google Scholar] [CrossRef]
  16. Alam, S.K.; Kaif, D.A.; Das, K.S. A blockchain-based optimal peer-to-peer energy trading framework for decentralized energy management with in a VPP: Lab scale studies and large scale proposal. Appl. Energy 2024, 365, 123243. [Google Scholar] [CrossRef]
  17. Chen, Y.; Niu, Y.; Qu, C.; Du, M.; Liu, P. A pricing strategy based on bi-level stochastic optimization for VPP trading in multi market: Energy, ancillary services and carbon trading market. Electr. Power Syst. Res. 2024, 231, 110371. [Google Scholar] [CrossRef]
  18. Li, D.; Wang, Y.; Shen, Y.; Jiang, D. Optimal scheduling strategy of VPP with demand response and electricity-carbon trading considering multiple uncertainties. Electr. Power Autom. Equip. 2023, 43, 210–217. [Google Scholar]
  19. Lin, Y.; Miao, S.; Yang, W.; Yin, B.; Tu, Q.; Ye, C. Day-ahead optimal scheduling strategy of VPP for environment with multiple uncertainties. Electr. Power Autom. Equip. 2021. [Google Scholar]
  20. Nadimi, R.; Takahashi, M.; Tokimatsu, K.; Goto, M. The Reliability and Profitability of VPP with Short-Term Power Market Trading and Non-Spinning Reserve Diesel Generator. Energies 2024, 17, 2121. [Google Scholar] [CrossRef]
  21. Wang, J.; Dou, X.; Wang, S.; Wang, Z.; Zhao, L. Optimal Dispatching and Purchase-sale Decision Making of Electricity Retailers Considering VPP Combination Strategies. Power Syst. Technol. 2020, 160, 02001. [Google Scholar]
  22. Li, J.; Sun, Z.; Niu, X.; Li, S. Economic optimization scheduling of VPPs considering an incentive based tiered carbon price. Energy 2024, 305, 132080. [Google Scholar] [CrossRef]
  23. Han, D.; Koo, D.; Shin, C.; Won, D. Hierarchical robust Day-Ahead VPP and DSO coordination based on local market to enhance distribution network voltage stability. Int. J. Electr. Power Energy Syst. 2024, 160, 110076. [Google Scholar] [CrossRef]
  24. Liu, X.; Wu, H.; Wang, J.; Lu, J. Economic Dispatch of a VPP Considering Demand Response in Electricity Market Environment. Electr. Power 2020.
  25. Heydari, R.; Nikoukar, J.; Gandomkar, M. Optimal Operation of VPP with Considering the Demand Response and Electric Vehicles. J. Electr. Eng. Technol. 2021, 16, 2407–2419. [Google Scholar] [CrossRef]
  26. Xie, M.; Huang, Y.; Li, Y.; Liu, M. Evolutionary Game Decision and Mechanism Analysis of Dynamical Aggregation of Distributed Energy Resources into Virtual Power Plant. Power Syst. Technol. 2023. [Google Scholar]
  27. Kong, X.; Xiao, J.; Wang, C.; Cui, K.; Jin, Q.; Kong, D. Bi-level multi-time scale scheduling method based on bidding for multi-operator virtual power plant. Appl. Energy 2019, 249, 178–189. [Google Scholar] [CrossRef]
  28. Liu, L.; Luo, N.; Wu, T.; Zheng, W. Optimal Scheduling of VPP Considering Demand Side Response Based on Mixed Integer Second-Order Cone Programming. Acta Energiae Solaris Sin. 2021, 42, 96–104. [Google Scholar]
  29. Guo, J.; Wang, J.; Zhang, H. Scheduling Optimization Strategy Based on VPP for Multi-energy Collaborative System. Electr. Power Constr. 2022, 43, 141–151. [Google Scholar]
  30. Sun, H.; Liu, Y.; Peng, C.; Meng, J. Optimization Scheduling of VPP with Carbon Capture and Waste Incineration Considering Power-to-gas Coordination. Power Syst. Technol. 2021, 45, 3534–3545. [Google Scholar]
Figure 1. VPP control platform.
Figure 1. VPP control platform.
Energies 17 04691 g001
Figure 2. Flowchart of cooperative operation of multiple energy systems.
Figure 2. Flowchart of cooperative operation of multiple energy systems.
Energies 17 04691 g002
Figure 3. Flowchart of planning an optimization algorithm.
Figure 3. Flowchart of planning an optimization algorithm.
Energies 17 04691 g003
Figure 4. Pseudo-code of optimization algorithm.
Figure 4. Pseudo-code of optimization algorithm.
Energies 17 04691 g004
Table 1. Algorithm performance parameters.
Table 1. Algorithm performance parameters.
AlgorithmInitial Population SizeNumber of IterationsCrossover ProbabilityProbability of VariationRate of ConvergenceOptimization AccuracySolution Time (s)Optimal Solution Fitness Value
Genetic algorithm1003000.80.05highhigh26.70.9675
Particle swarm optimization50200--mediummedium19.30.9421
Differential evolution algorithm802500.850.1highhigh23.50.9543
Ant colony algorithm60150--lowlow32.80.9256
Simulated annealing algorithm-500--In thehigh28.40.9317
Hybrid genetic particle swarm algorithm702200.90.06highextremely high21.60.9712
Artificial neural network-1000--lowmedium45.20.9175
Fuzzy logic control----mediumhigh18.90.8965
Table 2. Parameter setting table of simulation experiment.
Table 2. Parameter setting table of simulation experiment.
Type of ParameterParameter NameParameter SymbolUnitsPeak HourNormal PeriodsValley Period
Power market parametersMarket priceP_emyuan/kWh0.77770.56290.3481
Internal tariffP_imyuan/kWh0.74630.53150.3167
Supplementary service compensation rate (peak reduction)P_aspyuan/kWh0.26140.26140.2614
Ancillary service compensation price (grain filling)P_asvyuan/kWh0.18780.18780.1878
Electrical energy scheduling parametersUnit 1 Maximum power generation capacityPMAX_1MW185.6811185.6811185.6811
Unit 2 Maximum power generation capacityPMAX_2MW185.8502185.8502185.8502
Maximum charging power of the batteryPBC_MAXMW24.224924.224924.2249
Maximum discharge power of batteryPBD_MAXMW24.240024.240024.2400
Thermal scheduling parametersUnit 1 Maximum heat production capacityHMAX_1MW241.0000241.0000241.0000
Unit 2 Maximum heat production capacityHMAX_2MW241.0000241.0000241.0000
Maximum heat charging power of heat storage tankHTC_MAXMW14.284614.284614.2846
Maximum heat transfer power of heat storage tankHTD_MAXMW15.866115.866115.8661
Maximum operating power of heat pumpHP_MAXMW303030
Environmental parametersEnvironmental pollution control costsC_epyuan289123721298
Loss of environmental valueV_elyuan436135473762
VPP operating parametersVPP operating incomeR_VPPyuan77,30865,06872,138
VPP bidding proceeds (Scenario 1)B_sc1yuan28,70928,70928,709
VPP bidding proceeds (Scenario 2)B_sc2yuan29,90829,90829,908
VPP bidding proceeds (Scenario 3)B_sc3yuan29,11729,11729,117
VPP bidding yield (Scenario 4)B_sc4yuan29,01529,01529,015
Model optimization configuration parametersNumber of algorithm iterationsN_itertime100010001000
Convergence accuracyEpsilon-0.00010.00010.0001
Time stepDelta_th111
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Xinfa, T.; Jingjing, W.; Yonghua, W.; Youwei, W. The Optimization of Supply–Demand Balance Dispatching and Economic Benefit Improvement in a Multi-Energy Virtual Power Plant within the Jiangxi Power Market. Energies 2024, 17, 4691. https://doi.org/10.3390/en17184691

AMA Style

Xinfa T, Jingjing W, Yonghua W, Youwei W. The Optimization of Supply–Demand Balance Dispatching and Economic Benefit Improvement in a Multi-Energy Virtual Power Plant within the Jiangxi Power Market. Energies. 2024; 17(18):4691. https://doi.org/10.3390/en17184691

Chicago/Turabian Style

Xinfa, Tang, Wang Jingjing, Wang Yonghua, and Wan Youwei. 2024. "The Optimization of Supply–Demand Balance Dispatching and Economic Benefit Improvement in a Multi-Energy Virtual Power Plant within the Jiangxi Power Market" Energies 17, no. 18: 4691. https://doi.org/10.3390/en17184691

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop