Bis List
Bis List
Bis List
(1
2011
PROGRAMME OF WORK
(AS ON 1st APRIL 2011)
,9 -110002 BUREAU OF INDIAN STANDARDS MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG NEW DELHI -110 0 02
PREFACE
A programme of work is prepared every year for each Division of the Bureau of Indian Standards, to indicate the latest position of published Indian Standards and draft standards at different stages of processing. This programme of work for Water Resources Division Council (WRDC) has been prepared Sectional Committee-wise, as on 1st April 2011, and arranged in sequential order of the Committees. The scope of WRDC is as under:
Standardization in the field of water resources development and management; to include activities covering utilization of water resources for all uses. In regard to drinking and industrial water supply, the work shall be confined to making the raw water available for treatment and distribution. However, Water Code shall include all facets of technology and engineering covering entire hydrologic cycle. In regard to water for hydroelectric uses, the work shall include planning and design of hydroelectric development and powerhouse structures but may not include generation, transmission and distribution equipment.
In the programme of work an asterisk mark (*) given before a printed standard indicates that the standard is under revision and the document is available at different stages of processing; whereas, a double asterisk mark (**) indicates a standard identified for revision the document being yet to be prepared. Below the designation of a published standard, wherever /ISO.. standard number is given, it implies that the Indian Standard is the total adoption of ISO standards under dual numbering scheme. (The designations such as IS/ISO 9001:2008 also indicate dual number standards.) . Below the designation of a published standard, wherever | ISO. Standard number is given, it implies that the Indian Standard is technically equivalent to the ISO standard. It is hoped that this publication will provide the community of standard users a convenient tool for obtaining the latest information about new and upcoming standards in the field of Water Resources Development and Management. For further information, please write to : Head (Water Resources Department) Bureau of Indian Standards Manak Bhavan, 9, Bahadur Shah Zafar Marg New Delhi- 110 002 E-mail: wrd@bis.org.in Tele: 011-23231906
STATISTICS AT A GLANCE
ASPECT WISE POSITION OF STANDARDS ASPECT OF STANDARD PRODUCT METHODS OF TEST CODES OF PRACTICE TERMINOLOGY DIMENSIONS SYMBOLS OTHERS TOTAL NUMBER OF STANDARDS 11 -NIL362 37 -NIL5 18 433
INDIAN STANDARDS UNDER DUAL NUMBER (IDENTICAL WITH ISO OR IEC STANDARDS) INDIAN STANDARDS TECHNICALLY EQUIVALENT WITH ISO OR IEC STANDARDS INDIAN STANDARDS HARMONIZED WITH EN STANDARDS/REGULATIONS/DIRECTIVES INDIAN STANDARDS HARMONIZED WITH STANDARDS OF OTHER BODIES TOTAL
CONTENT
COMMITTEE WISE POSITION OF WORK OF WATER RESOURCES DIVISION COUNCIL (WRDC)
S.N. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 WRD 1 WRD 3 WRD 5 WRD 6 WRD 8 WRD 9 WRD 10 WRD 12 WRD 13 WRD 14 WRD 15 WRD 16 WRD 21 WRD 22 WRD 23 WRD 24 WRD 27 HYDROMETRY GROUND WATER AND RELATED INVESTIGATIONS GEOLOGICAL INVESTIGATIONS AND SUB-SURFACE EXPLORATION WATER RESOURCES PLANNING, MANAGEMENT AND EVALUATION FOUNDATIONS AND FOUNDATION TREATMENT DAMS AND SPILLWAYS RESERVOIRS AND LAKES HYDRAULIC GATES AND VALVES CANALS AND CROSS DRAINAGE WORKS WATER CONDUCTOR SYSTEMS HYDROELECTRIC POWER HOUSE STRUCTURES HYDRAULIC STRUCTURES INSTRUMENTATION SAFETY IN CONSTRUCTION, OPERATION AND MAINTENANCE OF RIVER VALLEY PROJECTS RIVER TRAINING AND DIVERSION WORKS MEASUREMENT AND COST ANALYSIS OF WORKS FOR RIVER VALLEY PROJECTS ENVIRONMENTAL ASSESSMENT AND MANAGEMENT OF WATER RESOURCES PROJECTS HANDBOOKS & CODES FOR WATER RESOURCES MANAGEMENT TITLE PAGE 4 10 12 14 16 18 21 22 25 29 32 34 37 39 42 46 47 48
WRD 1 HYDROMETRY
SCOPE - a) STANDANDARDIZATION OF METHODS, PROCEDURES, INSTRUMENTS AND EQUIPMENT RELATING TO TECHNIQUES FOR HYDROMETRIC DETERMINATION OF WATER LEVEL, VELOCITY, DISCHARGE AND SEDIMENT TRANSPORT IN OPEN CHANNELS AND FLUID FLOW IN CLOSED CONDUITS, HYDROLOGICAL AND METEROLOGICAL INVESTIGATIONS b) CO-ORDINATION OF WORK WITH: i) ISO/TC 113 HYDROMETRY AND ITS SUBCOMMITTEES SC 1 AND SC6 - SECRETARIAT ii) ISOT/TC 113/SC1, SC2, SC5 & SC 6 - P MEMBER iii) ISO/TC 30 MEASUREMENT OF FLUID FLOW IN CLOSED CONDUITS AND ITS SUBCOMMITTEES SC2,SC5 AND SC7 - O MEMBER Sl. No. IS Number/ DOC Number Reaffirm No. of Date Amd. _________________________________________________________________________________________________________ STANDARDS PUBLISHED Title
1 2 3 4 5
IS 1191:2003 | ISO 772:1996 IS 1192:1981 | ISO 748:1979 IS 1194:1960 IS 2912:1999 / ISO 1070:1992 IS 2951(Part 1):1965
Hydrometric determination - Vocubulary and Symbols (Second Revision) Velocity area Methods for measurement of flow of water in open channels (first revision) Forms for recording measurement of flow of water in open channels Liquid flow measurement in open channels - Slope-area method ( first revision) Recommendation for estimation of flow of liquids in closed conduits Part 1 Headloss in straight pipes due to friction resistance Recommendation for estimation of flow of liquids in closed conduits Part 2 Headloss in valves and fittings Requirements for rotating element current meters (cup type) for water flow measurement (first revision) Surface floats - Functional requirements (first revision) Sounding rods - Functional requirements (first revision) Suspended sediment load samplers - Specification (first revision) Specification for scoop type bed material samplers (first revision) Code of practice for use of current meter (cup type) for water flow measurement Specification for fish weights
Mar 2009 Mar 2011 Mar 2011 Mar 2010 Dec 2007 1
6 7 8 9 10 11 12 13
IS 2951(Part 2):1965 IS 3910:1992 | ISO 2537:1988 IS 3911:1994 IS 3912:1993 | ISO 3454:1983 IS 3913:2005 | ISO 3716 IS 3917:2003 | ISO 4364:1997 IS 3918:1966 IS 4073:1967
14 15 16 17 18
Vertical staff gauges Functional requirements (First Revision) Methods of measurement of fluid flow by means of venturi meters: Part 2 Compressible fluids Specification for velocity rods Methods for measurement of suspended sediment in open channels Code of practice for installation of rain-gauge (nonrecording type) and measurement of rain (second revision) Recommendations for establishing net work of raingauge stations (first revision) Guide for storm analysis (first revision) Method of measurement of flow of water in open channels using standing wave flume-fall Method of measurement of flow of water in open channels using standing wave flume Specification for sounding and suspension equipment Recommendation for liquid flow measurement in open channels by weirs and flumes- end depth method for estimation of flow in rectangular channels with a free overfall (approximate method) Methods of analysis of concentration, particle size distribution and specific gravity of sediment in streams and canals Code of practice for installation and use of raingauges, recording (second revision) Liquid flow measurement in open channels using thin plate weirs Method for estimation of incompressible fluid flow in closed conduits by bend meters (first revision) Specification for water stage recorder (float type) (first revision) Method for measurement of pressure by means of manometer Method for flow estimation by jet characteristics (approximate method)
Mar 2010 Mar 2011 Mar 2011 Mar 2011 Dec 2007 1
19 20 21 22 23 24
Mar 2010 Mar 2010 Mar 2010 Mar 2010 Mar 2011 Dec 2007
25
IS 6339:1971 | ISO 4365 IS 8389:2003 IS 9108:1979 | ISO1438-1 IS 9115:2002 IS 9116:2002 IS 9118:1979 IS 9119:1979
Mar 2011
26 27 28 29 30 31
Mar 2009 Dec 2007 Dec 2007 Dec 2007 Mar 2011 Mar 2011
32 33 34 35 36 37 38 39 40
* IS 9163(Part 1):1979 | ISO9555-1:1973 IS 9922:2010 | ISO/TR 8363:1997 IS 12752:1989 | ISO 8368:1985 IS 13083:1991 / ISO 4377:1990 IS 13084:1991 / ISO 4374:1990
Dilution methods of measurement of steady flow Part 1 constant rate injection method Measurement of liquid flow in open channel - General guidelines for selection of method (first revision) Guidelines for the selection of flow gauging structures Liquid flow measurement in open channels- flat-V weirs Liquid flow measurement in open channels - round nose horizontal crest weirs Code of Practice for calibration (rating) of rotating element current meters instraight open tank Echo sounders for water depth measurements Measurement of liquid flow in open channels - Parshall and SANIIRI flumes Liquid flow measurement in open channels - Velocity area methods - collection and processing of data for determination of errors in measurement Measurement of liquid flow in open channels by weirs and flumes- end depth method for estimation of flow in non rectangular channels with a free overfall (approximate method) ) Measurement of fluid flow by means of pressure differential devices Part 1: Orifice plates, nozzles and venturi tubes inserted in circular cross-section conduits running full. Liquid flow measurement in open channels by weirs and flumes - Triangular profile weirs Liquid flow measurement in open channels - Rectangular, trapezoidal and U-shape flumes Measurement of fluid flow in closed conduits - Velocity area method using Pilot Static Tubes Liquid flow measurement in open channels by weirs and flumes - Rectangular broad-crested weirs Measurement of fluid flow in open channels - Stream lind triangular profile weirs Hydrometric determination- Cable way system for stream gauging Measurement of liquid flow in open channel - Water level measuring devies
** INDICATES STANDARDS TO BE REVISED | INDICATES EQUIVALENT STANDARDS
Mar 2011
Mar 2011 Dec 2007 Dec 2007 Mar 2010 Dec 2007 Dec 2007 Mar 2010
* IS 13371:1992
| ISO 3455:1976
* IS 14359:1996
| ISO 4366:1979 IS 14371:1996 | ISO 9826:1982 IS 14573:1998 / ISO 1088:1985 IS 14574:1998 / ISO 4371:1984
41
Mar 2010
42
Mar 2010
43 44 45 46 47 48 49
Mar 2010 Mar 2010 Jan 2007 Jan 2007 Jan 2007 Dec 2007 Dec 2007
50 51 52 53
IS 15119(Part 1):2002 / ISO 1100-1:1996 IS 15119(Part 2):2002 / ISO 1100-2:1998 IS 15122:2002 / ISO 2425:1999 IS 15123:2002 / ISO 4362:1999 IS 15124:2002 / ISO 9195:1992 IS 15352:2003 / ISO 6420:1984 IS 15353:2003 / ISO 8333:1985 IS 15358:2003 / ISO 9196:1992 IS 15359:2003 / ISO 11329:2001 IS 15360:2003 | ISO 4364:1997 IS 15362:2003 / 14139:2000 IS 15454:2004 | ISO/TR 9823:1990 IS 15527:2004 | ISO/TR 9210:1992 IS 15646(Part 1):2006 | ISO /TR 9824-1:1990 IS 15646(Part 2):2006 | ISO/TR 9824-2:1990
Measurement of liquid flow in open channels - Part 1 Establishment and operatin of a gauging station Measurement of liquid flow in open channels - Part 2 Determinationof the stage-discharge relation Measurement of liquid flow in open channels under tidal condition Hydrometric determination - Flow measurement in open chaqnnels using structures-Trapezoidal broad-crested weirs Liquid flow measurement in open channels - Sampling and analysis of gravel-bed-material Liquid flow measurement in open channels - Position fixing equipment for hydrometric boats Liquid flow meaurement in open channels by weirs and flumes - V- shaped broad-crested weirs Liquid flow measurement in open channels - Flow measurement under ice conditions Liquid flow measurement in open channels -Measurement of suspended sediment transport in tidal channels Measurement of liquid flow in open channels -Bed material sampling Liquid flow measurement in open channels - Flow measurements in open channels using structurescompound gauging structure Liquid flow measurement in open channels- Velocity-area method using a restricted number of verticals Measurement ofliquid flow in open channels Measurement in meandering rivers and in streams with unstable boundaries Measurement of free surface flow in closed conduits Part 1 : Methods Measurement of free surface flow in closed conduits Part 2: Equipment Measurement of liquid flow in open channels - Field measurement of discharge in large rivers and floods Measurement of liquid flow in open channels - Equipment for the measurement of discharge under ice conditions Hydrometry - Computing stream flow using an unsteady flow model(based on ISO/TR 11627:1998)
** INDICATES STANDARDS TO BE REVISED | INDICATES EQUIVALENT STANDARDS
54 55 56 57 58
Dec 2007 Mar 2009 Mar 2009 Mar 2009 Mar 2009
59 60
61 62
63 64 65 66
67
68
Measurement of total discharge in open channels - Stagefall-discharge relationship (adoption of ISO 9123:2001) Hydrometric determination - Unstable channels and ephemeral streams
69
1 2 3 4 5 6 7
DOC.WRD 1(381) DOC.WRD 1(382) DOC.WRD 1(384) DOC.WRD 1(385) DOC.WRD 1(386) DOC.WRD 1(387) DOC.WRD 1(499)
Revision of IS 6330:1971 [adoption of ISO 3847:1977] Revision of IS 6339:1971 (adoption of ISO 4365:1985) Revision of IS 9163:1979 [adoption of ISO 9555(Pt1):1994] Revision of IS 9163:1979 [ adoption of ISO 9555(Pt2):1992] Revision of IS 9163:1979 [adoption of ISO 9555(Pt3):1992] Revision of IS 9163:1979 [ adoption of ISO 9555(Pt 4):1994] Hydrometry Measurement of Liquid Flow in Open Channels using Current Meters or Floats (Revision of IS 1192 and Adoption of ISO 748:2007) Hydrometric determinations-Flow measurement in open channels using structures-Guidelines for selection of structure (Revision of IS 12752 and based on ISO 8368) Hydrometry- Rotating element current meters (Revision of IS 3910 and based on ISO 2537) Liquid flow measurement in open channels using thin plate weirs (revision of IS 9108 and based on ISO 1438:2008)
DOC.WRD 1(528)
9 10
DOC.WRD 1(531)
Measurement Of Liquid Flow In Open Channels-Methods For Measurement Of Characteristics Of Suspended Sediment (Revision of IS 4890 and based on ISO 4363) Hydrometry- Direct depth sounding and suspension equipment ( Revision of IS 3912 and based on ISO 3454)
DOC.WRD 1(533)
DOC.WRD 1(389)
Measurement of liquid flow in open channels -- Method of specifying performance of hydrometric equipment (Adoption of ISO 11655:1995 )
** INDICATES STANDARDS TO BE REVISED | INDICATES EQUIVALENT STANDARDS
DOC.WRD 1(500)
Measurement of liquid flow in open channels - Method of measurement of bed load discharge (Based on ISO/TR 9212:1992) Revision of IS 3913 (adoption of ISO/TS 3716 2006) Measurement of liquid velocity in open channels -Design, selection and use of electromagnetic current meters (Adoption of ISO/TS 15768:2000)
3 4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
IS 4410(Part 11/Sec 1):1972 IS 4410(Part 11/Sec 2):1972 IS 4410(Part 11/Sec 3):1973 IS 4410(Part 11/Sec 4):1973
Glossary of terms relating to river valley projects Part 11 Hydrology Section 1General terms Glossary of terms relating to river valley projects: Part 11 Hydrology section2 Precipitation and run-off Glossary of terms relating to river valley projects: Part 11 Hydrology: Section3: Infiltration and water losses Glossary of terms relating to river valley projects: Part 11 Hydrology Section 4 Hydrographs Hydrology Section 6 Ground water
Mar 2011 Mar 2011 Mar 2011 Mar 2011 Aug 2009 Mar 2011 Aug 2009 Jul 2008 Jul 2008 Jul 2008 Jul 2008 Jul 2008 Jul 2008 Jul 2008 Jul 2008
* IS 4410(Part 11/Sec 6):1994 Glossary of terms relating to river valley projects: Part 11
IS 4410(Part 11/Sec 7):1984 IS 13969:1994 | ISO 5667-11:1993 IS 14476(Part 1):1998 IS 14476(Part 2):1998 IS 14476(Part 3/Sec 1):1998 IS 14476(Part 3/Sec 2):1998 IS 14476(Part 3/Sec 3):1998 IS 14476(Part 3/Sec 4):1998 IS 14476(Part 4):1998 IS 14476(Part 5):1998 Glossary of terms relating to river valley projects: Part 11 Hydrology Section 7 Quality of water Guidelines for sampling of groundwater Test pumping of water wells - Code of practice Part 1 General Test pumping of water wells - Code of practice Part 2 Hydrogeological considerations Test pumping of water wells - Code of practice Part 3 Pre-test planning Sec 1 General aspects Test pumping of water wells - Code of practice Part 3 Test planning Sec 2 Testdesign Test pumping of water wells - Code of practice Part 3 Pre test planning Sec 3 Observation wells Test pumping of water wells - Code of practice Part 3 Pre test planning Sec 4 Test wells Test pumping of water wells - Code of practice Part 4 Pretest observations Test pumping of water wells - Code of practice Part 5 Pumping test
10
16 17 18 19 20
IS 14476(Part 6):1998 IS 14476(Part 7):1998 IS 14476(Part 8):1998 IS 14476(Part 9):1998 IS 15755:2007 | ISO/TR 14685(E):2001 IS 15792:2008 IS 15797:2008
Test pumping of water wells - Code of practice Part 6 Special tests Test pumping of water wells - Code of practice Part 7 Post test observations and presentation of data. Test pumping of water wells - Code of practice Part 8 Water level and discharge measuring devices Test pumping of water wells - Code of practice Part 9 Well development Hydrometry - Goephysical logging of boreholes for hydrogeological purposes-considerations and guidelines for making measurement Guidelines for artificial recharge to ground water Guidelines for roof top rain water harvesting
21 22
1 2
Manual method for measurement of a ground water level in a well (based on ISO 21413:2005) Surface geophysical surveys for hydrogelogical studies
DOC.WRD 3(505)
Hydrometry - Measuring the water level in a well using automated pressure transducer methods - Guidelines (based on ISO/TR 23211:2009)
11
1 2 3 4
Code of practice for indexing and storage of drill cores (first revision) Glossary of terms relating to river valley projects: Part 7 Engineering geology(first revision) Code of practice for exploration by pits, trenches, drifts and shafts (second revision) Code of practice for presentation of drilling information and core description in foundation investigation (first revision) Guide for core drilling observations (first revision) Guide for topographical surveys for river valley projects (second revision) Code of practice for in-situ permeability test: Part 1 Test in overburden (first revision) Code of practice for in-situ permeability test: Part 2 Test in bedrock (second revision) Diamond core drilling for site investigation for river valley projects - Code of practice (first revision) Method for determination of water level in a bore hole Code of practice for subsurface exploration for earth and rockfill dams (first revision) Symbols and abbreviations for use in geological maps, sections and subsurface exploratory logs: Part 1 Abbreviations Symbols and abbreviations for use in geological maps, sections and subsurface exploratory logs: Part 2 Igneous rocks Symbols and abbreviations for use in geological maps, sections and subsurface exploratory logs: Part 3 Sedimentary rocks
5 6 7 8 9 10 11 12
IS 5313:1980 IS 5497:2008
Sep 2009
* IS 5529(Part 1):1985
IS 5529(Part 2):2006 IS 6926:1996 IS 6935:1973 IS 6955:2008 IS 7422(Part 1):1974
Sep 2009
Sep 2009
13
IS 7422(Part 2):1974
Sep 2009
14
IS 7422(Part 3):1974
Sep 2009
12
15
IS 7422(Part 4):1985
Symbols and abbreviations for use in geological maps, sections and subsruface exploratory logs: Part 4 Metamorphic rocks Symbols and abbreviations for use in geological maps, sections and subsurface exploratory logs: Part 5 Line symbols for formation contacts and structural features Code of practice for subsurface investigation for power house sites Code of practice for photogeological interpretation and mapping of river valleyproject site Code of practice for subsurface exploration for canals and cross drainage works (first revision) Code of practice for geological exploration for reservoir sites Subsurface exploration for barrrages and weirs - Code of practice (first revision) Groundwater investigations for hydraulic structures Guidelines Code of practice for geological exploration for gravity dams and overflow structures Goelogical exploration by geophysical method (seismic refraction) - Code of practice Recommendations for preparation of geological and geotechnical maps for river valley projects Geological exploration by geophysical method (electrical resistivity)- Code of practice
Sep 2009
16
IS 7422(Part 5):1992
Feb 2008
17 18 19 20 21 22 23 24 25 26
* IS 10060:1981
IS 10290:1982 IS 11385:2008 IS 13216:1991 IS 13578:2008 IS 14330:1996 IS 15662:2006 IS 15681:2006 IS 15686:2006 IS 15736:2007
Sep 2009
Sep 2006 1
1 2
In-situ permeability test: Part 1 Test in overburden [(second revision of IS 5529(Part 1)] Subsurface investigation for power house sites- Code of practice (First revision of IS 10060)
13
1 2 3 4 5 6 7
IS 4008:1985 IS 4186:1985 IS 4410(Part 1):1991 IS 4410(Part 2):1967 IS 4410(Part 4):1982 IS 4410(Part 11/Sec 5):1977 IS 4410(Part 14/Sec 1):1977
Guide for presentation of project report for river valley projects (first revision) Guide for preparation of project report for river valley projects (first revision) Glossary of terms relating to river valley projects:Part 1 Irrigation practice (first revision) Glossary of terms relating to river valley projects: Part 2 Project planning Glossary of terms relating to river valley projects: Part 4 Drawings (first revision) Glossary of terms relating to river valley projects: Part 11 Hydrology Section 5 Floods Glossary of terms relating to river valley projects: Part 14 Soil conservation and reclamation Section 1 Soil conservation Glossary of terms relating to river valley projects: Part 14 Soil conservation and reclamation Section 2 Reclamation Glossary of terms relating to river valley projects: Part 17 Water requirements of crops Glossary of terms relating to river valley projects: Part 21 Flood control Guide for soil surveys for river valley projects Recommendations for watershed management relating to soil conservation Part 1 Agronomic aspects Guidelines for allocation of cost among different purposes of river valley projects Guidelines for preparation of completion reports of multipurpose river valley projects Guidelines for overall planning of river basin
Jan 2011 Jan 2011 Aug 2007 Jan 2011 Jan 2011 Jan 2011 Nov 2007
Aug 2007
9 10 11 12 13 14 15
IS 4410(Part 17):1977 IS 4410(Part 21):1987 IS 5510:1969 IS 6748(Part 1):1973 IS 7560:1974 IS 10336:1982 * IS 13028:1991
Sep 2008 Feb 2010 Jan 2011 Jan 2011 Dec 2006 Jan 2011 Dec 2006
14
16 17 18 19 20 21 22 23
* IS 13142:1991 IS 13218(Part 1):1992 IS 13218(Part 2):1991 IS 13218(Part 3):1992 IS 13668:1993 IS 13739:1993 IS 14519:1998 IS 15087:2001
Proforma for reporting progress of benefits created by river valley projects Proforma for reporting progress during construction for river valley projects: Part I Irrigation works Proforma for reporting progress during construction for river valley projects:Part 2 Hydel works Proforma for reporting progress during construction for river valley projects: Part 3 Flood control Guidelines for fixing intensity of irrigation Guidelines for estimation of flood damages Guidelines for fixing rates for irrigation water Guidelines for planning and design of drainage in irrigation projects
Dec 2006 Jan 2008 Jan 2008 Jan 2008 Dec 2006 Dec 2006 Jan 2008 Mar 2008
1 2
Guidelines for performance evaluation of completed irrigation projects ( Major or Medium) Guidelines for integrated planning, development & management of river basins Part 1: Overall planning (Revision of IS 13028:1991) Proformae for reporting progress of benefits due to irrigation created by river valley projects ( Draft amendment No. 2 to IS 13142) (Revision of IS 4877:1968) Draft Amendment No. 1 to IS 4410 (Pt 21) :1987
DOC.WRD 6(497)
4.
DOC.WRD 6(584)
15
1 2 3 4 5 6 7 8
IS 4410(Part 19):1996 IS 4999:1991 IS 5050:1992 IS 6066:1994 IS 8414:1977 IS 11293(Part 1):1985 IS 11293(Part 2):1993 IS 11973:1986
Glossary of terms relating to river valley projects: Part 19 Grouting Recommendations for grouting of pervious soils (first revision) Code of practice for design, construction and maintenance of relief wells (first revision) Pressure grouting of rock foundations in river valley projects - Recommendations(second revision) Guidelines for design of under-seepage control measures for earth and rockfill dams Guidelines for the design of grout curtains: Part 1 Earth and rockfill dams Guidelines for the design of grout curtains: Part 2 Masonry and Concrete dams Code of practice for treatment of rock foundations, core and abutment contacts with rock, for embankment dams Bentonite for grouting in civil engineering works Specification Choice of grouting materials for alluvial grouting Guidelines Design and construction of diaphragms for under seepage control - Code of practice
Mar 2007 Jun 2009 Aug 2006 Jun 2009 Jun 2009 Jun 2009 Aug 2006 Aug 2006 1 1 2 1 1
9 10 11
1 2 3
Draft Amendment No.1 to IS 5050:1992 Draft Amendment No.1 to IS 12584:1989 Draft Amendment No.1 to IS 11973:1986
16
DOC.WRD 8(540)
1 2 3
Draft Indian Standard on Guidelines for investigations for foundation of existing earth and rock fill dams Draft Indian Standard on Guidelines for jet grouting Draft Indian Standard on Guidelines for design of underseepage control measures for earth and rockfill dams (first revision of IS 8414)
17
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Design aid for anchorages for spillway piers, training walls and divide walls. Glossary of terms relating to river valley projects: Part 8 Dam and dam section (first revision) Glossary of terms relating to river valley projects: Part 9 Spillway and syphons (first revision) Glossary of terms relating to river valley projects: Part 18 Energy dissipator devices - Stilling basins Criteria for design of hydraulic jump type stilling basins with horizontal and sloping apron Design of chute and side channel spillways - Criteria (first revision) Criteria for design of solid gravity dams (first revision) Recommendations for hydraulic design of high ogee overflow spillways(first revision) Criteria for hydraulic design of bucket type energy dissipators (second revision) Code of practice for stability analysis of earth dams Code of practice for construction of masonry in dams Guidelines for design of large earth and rockfill dams Guidelines for inspection and maintenance of dam and appurtenant structures(first revision) Recommendations for lighting, ventilation and other facilities inside the dam Code of practice for drainage system for earth and rockfill dams(first revision) Code of practice for drainage system for gravity dams, their foundations and abutments (first revision)
** INDICATES STANDARDS TO BE REVISED | INDICATES EQUIVALENT STANDARDS
Mar 2010 Aug 2007 Mar 2011 Mar 2011 Mar 2010 Mar 2010 Mar 2009 Nov 2007 1 1
Feb 2008 Mar 2009 Mar 2009 Feb 2008 Mar 2011 Mar 2009 Feb 2008
1 1 1
*IS 9297:1979
IS 9429:1999 IS 10135:1985
18
17 18 19 20 21 22 23 24
*IS 10137:1982
* IS 10635:1993 IS 11155:1994 IS 11216:1985 IS 11223:1985
Guidelines for selection of spillways and energy dissipators Freeboard requirements in embankment dams - Guidelines (first revision) Construction of spillways and similar overflow structures Code of practice (First Revision) Code of practice for permeability test for masonry (during and after construction) Guidelines for fixing spillway capacity Criteria for hydraulic design of sluices in concrete and masonry dams Criteria for structural design of energy dissipators for spillways Guidelines for design of drainage arrangements of energy dissipators and training walls of spillways ( first revision) Criteria for design of small embankment dams Provision of water stops at transverse contraction joints in masonry and concrete dams - CP (first revision) Criteria for structural design of spillway training walls and divide walls (second revision) Hydraulic design of impact type energy dissipators Recommendations Criteria for estimation of aeration demand for spillways and outlet structures Code of practice for galleries and other openings in dams: Part 1 General requirements Code of practice for galleries and other openings in dams: Part 2 Structural design Recommendations for hydraulic design of duck bill spillways Recommendations for provision of facilities outside dams Preliminary design, operation and maintenance of protection works downstream of spillways - Guidelines.
Mar 2010 Mar 2009 Mar 2010 Mar 2009 Mar 2010 Mar 2010 Mar 2010
*IS 11485:1985
* IS 11527:1985 IS 11772:2009
25 26
IS 12169:1987 IS 12200:2001
27 28 29 30 31 32 33 34
IS 12720:2004 IS 12731:1989
Mar 2010 Mar 2010 Mar 2010 Feb 2008 Feb 2008 Mar 2010 Feb 2008 Mar 2010
*IS 12804:1989
IS 12966(Part 1):1992 IS 12966(Part 2):1990 IS 13048:1991 IS 13144:1991 IS 13195:1991
19
35 36 37 38 39 40
Criteria for structural design of spillway pier and crest Guidelines for guniting the upstream face of masonry dams Temperature control of mass concrete for dams Guidelines Quality control during construction of earth and rockfill dams - Recommendations Distress and remidial measures in earth and rockfill damsGuidelines Specification for PVC waterstops at transverse contraction joints in masonry and concrete dams
Feb 2008 Feb 2008 Mar 2010 Mar 2010 Oct 2006 Feb 2008 1
1 2 3 4 5 6
DOC.WRD 9(489) DOC.WRD 9(468) DOC.WRD 9(512) DOC.WRD 9(520) DOC.WRD 9(538) DOC.WRD 9(570)
Criteria for structural Design of Energy Dissipators for Spillways (Firs Revision of IS 11527) Freeboard requirements in dams- Guidelines (second revision of IS 10635) Criteria for design of solid gravity dams (second revision of IS 6512) Guidelines for preliminary Design of Spillway Aerators (first revision of IS 12804) Draft amendment to IS 9297:1979 Recommendations for hydraulic design of high ogee overflow spillways (second revision of IS 6934)
1 2 3
Criteria for Hydraulic Design of Sluices in Concrete and Masonry Dams (first revision of IS 11485) Junction between spillways and earth dams Colgrout Masonry in Dams Code of Practice
20
1 2 3 4 5 6 7 8 9 10
IS 4410(Part 6):1983 IS 5477(Part 1):1999 IS 5477(Part 2):1994 IS 5477(Part 3):2003 * IS 5477(Part 4):1971
Glossary of terms relating to river valley projects: Part 6 Reservoirs (first revision) Methods for fixing the capacities of reservoirs: Part 1 General requirements Methods for fixing the capacities of reservoirs: Part 2 Dead storage (first revision) Methods for fixing the capacities of reservoirs: Part 3 Live storage (first revision) Methods for fixing the capacities of reservoirs: Part 4 Flood storage Code of practice for control of sediment in reservoirs (first revision) Methods for determination of evaporation from reservoires (first revision) Operation of reservoirs - Guidelines (first revision) Code of practice for protection of slope for reservoir embankments (first revision) Guidelines for determination of effects of sedimentation in planning and performance of reservoirs Sedimentation in reservoirs - Method of measurement Minimising evaporation losses from reservoirs Guidelines Guidelines for planning and design of low level outlets for evacuating storage reservoirs Determination of volume of water & water level in lakes & reservoirs
Mar 2011 Feb 2010 Feb 2010 Mar 2008 May 2008 Oct 2007 Oct 2007 May 2008 Oct 2007 Oct 2007
**IS 6518:1992
IS 6939:1992 IS 7323:1994 IS 8237:1985 IS 12182:1987
11 12 13 14
1 2
Sedimentation in Reservoirs- Method of Measurement (First Revision of IS 13665:1993) Draft Amendment 1. to IS 5277(Pt 2): 1994
** INDICATES STANDARDS TO BE REVISED | INDICATES EQUIVALENT STANDARDS
21
Glossary of terms relating to river valley projects: Part 16 Gates and valves Section 1 Gates and terms related with gates (first revision) Glossary of terms relating to river valley projects: Part 16 Gates and valves Section 2 Valves Glossary of terms relating to river valley projects Part 23 Hoists, Cranes and other related terms. Recommendations for structural design of fixed wheel gates(third revision) Recommendations for structural design of radial gates (third revision) Recommendations for structural design criteria for low head slide gates (second revision) Design of rope drum and chain hoists for hydraulic gates - Code of practice (second revision) Penstock and turbine inlet butterfly valves for hydropodwer stations and systems: Part 1 Criteria for structural and hydraulic design (first revision) Penstock and turbine inlet butterfly valves for hydropower stations and systems: Part 2 Guidelines for design and selection of control equipment (first revision) Penstock and turbine inlet butterfly valves for hydropower stations and systems: Part 3 Recommendations for operations and maintenance Spherical valves for hydropower stations and systems: Part 1 Criteria for structural and hydraulic design (first revision) Spherical valves for hydropower stations and systems: Part 2 Selection of control equipment (first revision) Spherical valves for hydropower stations and systems: Part 3 Recommendations for operation and maintenance of spherical valves (first revision)
May 2009
2 3 4 5 6 7 8
IS 4410(Part 16/Sec 2):1981 IS 4410(Part 23):1999 IS 4622:2003 IS 4623:2000 * IS 5620:1985 IS 6938:2005 IS 7326(Part 1):1992
May 2010 May 2009 Mar 2009 May 2009 May 2010 May 2010 Mar 2008
IS 7326(Part 2):1992
Mar 2008
10
IS 7326(Part 3):1976
Mar 2008
11
IS 7332(Part 1):1991
Mar 2009
12
IS 7332(Part 2):1993
Mar 2008
13
IS 7332(Part 3):1994
Mar 2008
22
14 ** IS 7718:1991
Recommendations for inspection, testing and maintenance of fixed wheel and slide gates (first revision) Recommendations for structural design of medium and high head slide gates (second revision) Guidelines for de-icing systems for hydraulic installations (first revision) Recommendations for inspection, testing and maintenance of radial gates and rope drum hoists: Part 1 Inspection, testing and assembly at the manufacturing stage Section 1 Gates Recommendations for inspection, testing and maintenance of radial gates and roof drum hoists: Part 1 Inspection, testing and assembly at the manufacturing stage Section 2 Rope Drum Hoists Recommendations for inspection, testing and maintenance or radial gates and rope drum hoists: Part 2 Inspection, testing and assembly at the time of erection *Recommendations for inspection, testing and maintenance of radial gates and rope drum hoists: Part 3 After erection (second revision) Criteria for design of hydraulic hoists for gates Recommendations for design of screw hoists for hydraulic gates Guidelines for design of float-driven hoisting mechanism for automatic gated control Guidelines for design and use of different types of rubber seals for hydraulic gates (first revision) Recommendations for inspection, testing and maintenance of hydraulic hoist (After Erection) Criteria for design of lifting beams Criteria for choice of gates and hoists Guidelines for painting system for hydraulic gates and hoists Rubber seals for hydraulic gates - Specification
May 2010
15 16 17
18
May 2010
19
IS 10096(Part 2):1983
May 2010
20
IS 10096(Part 3):2002
Mar 2008
21 22 23 24 25 26 27 28 29
May 2009 May 2010 May 2010 May 2009 May 2010 May 2009 Mar 2009 May 2009 May 2009 1
23
DOC.WRD 12(379)
Draft Indian Standard on recommendations for structural design criteria for low head slide gates (third revision of IS 5620)
1 2 3
Draft amendment no. 1 to IS 4622:2003 Draft Amendment No. 1 to IS 6938:2005 Draft Indian Standard on recommendations for inspection, testing and maintenance of hydraulic hoist (After Erection) (first revision of IS 13041)
DOC.WRD 12(571)
Draft Indian Standard on guidelines for design and use of rubber seals for hydraulic gates (second revision of IS 11855) Draft Indian Standard on recommendations for inspection, testing and maintenance of radial gates and rope drum hoists:Part 1 Inspection, testing and assembly at the manufacturing stage, Section 1 Gates [first revision of IS DIS on recommendations for inspection, testing and maintenance of radial gates and rope drum hoists:Part 1 Inspection, testing and assembly at the manufacturing stage, Section 2 Rope drum hoists [first revision of IS
DOC.WRD 12(575)
DOC.WRD 12(576)
24
1 2 3 4 5 6 7 8
IS 3872:2002 IS 3873:1993 IS 4410(Part 5):1982 IS 4410(Part 15/Sec 1):1973 IS 4410(Part 15/Sec 2):1973 IS 4410(Part 15/Sec 3):1977 IS 4410(Part 15/Sec 4):1977 IS 4410(Part 15/Sec 5):1992
Lining of canals with burnt clay tiles - Code of practice (first revision) Laying cement concrete/stone slab lining on canals Code of practice (second revision) Glossary of terms relating to river valley projects: Part 5 Canals (first revision) Glossary of terms relating to river valley projects: Part 15 Canal structures Section 1 General terms Glossary of terms relating to river valley projects: Part 15 Canal structures Section 2 Transitions Glossary of terms relating to river valley projects: Part 15 Canal structures Section 3 Flumes Glossary of terms relating to river valley projects: Part 15 Canal structures Section 4 Regulating works Glossary of terms relating to river valley projects: Part 15 Canal structures Section 5 Cross drainage works (first revision) Stone pitched lining for canals - Code of practice (seond revision) Under-drainage of lined canals - Code of practice (second revision) Code of practice for earthwork on canals Maintenance of canals - Code of practice : Part 1 Unlined canals (second revision) Maintenance of canals - Code of practice : Part 2 Lined canals (second revision) Code of practice for maintenance of canals: Part 3 Canal structures, drains, jungle clearance, plantation and regulation (second revision) Sealing expansion joints in concrete lining on canals Code of practice (first revision)
Mar 2008 Jul 2009 Jul 2010 Jul 2010 Jul 2010 Jul 2010 Jul 2010 Aug 2007
1 1
9 10 11 12 13 14
Mar 2008 Aug 2006 Jul 2009 Mar 2008 Aug 2006 Mar 2008 1 1 1 1
15
IS 5256:1992
Mar 2008
25
16 17 18 19 20 21 22 23 24 25 26 27 28 29
IS 5690:1982 IS 5968:1987 IS 6004:1980 IS 6522:1972 IS 6531:1994 IS 6936:1992 IS 7112:2002 IS 7113:2003 IS 7114:1973 IS 7331:1981 IS 7495:1974 * IS 7784(Part 1):1993 IS 7784(Part 2/Sec 1):1995 IS 7784(Part 2/Sec 2):2000
Guide for laying combination lining for existing unlined canals (first revision) Guide for planning and layout of canal system for irrigation (first revision) Criteria for hydraulic design of sediment ejector for irrigation and power canals (first revision) Criteria for design of silt vanes for sediment control in offtaking canals Canal head regulators - Criteria for design (first revision) Guide for location, selection and hydraulic design of canal escapes (first revision) Criteria for design of cross section for unlined canals in alluvial soil (first revision) Soil-cement lining for canals - Code of practice (first revision) Criteria for hydraulic design of cross regulators for canals Code of practice for inspection and maintenance of cross-drainage works (first revision) Criteria for hydraulic design of silt selective head regulator for sediment control in offtaking canals Design of cross drainage works - Code of practice: Part 1 General features (first revision) Design of cross drainage works - Code of practice: Part 2 Specific requirement Section 1 Aqueducts Code of practice for design of cross drainage works: Part 2 Specific requirement Section 2 Superpassages (first revision) Code of practice for design of cross drainage works - : Part 2 Specific requirement Section 3 Canal syphons (first revision) Design of cross drainage works - Code of practice : Part 2 Specific requirement Section 4 Level crossings (first revision) Code of practice for design of cross drainage works: Part 2 Specific requirement Section 5 Syphon aqueducts (first revision) Criteria for hydraulic design of groyne walls (curved wing) for sediment distribution at offtake points in a canal
** INDICATES STANDARDS TO BE REVISED | INDICATES EQUIVALENT STANDARDS
Jul 2009 Mar 2008 Jul 2009 Jul 2009 Mar 2010 Mar 2008 Mar 2008 Mar 2008 Jul 2009 Mar 2008 Jul 2009 Mar 2008 Jul 2010 Jul 2009
30
Aug 2006
31
Jul 2009
32
Jul 2009
33
IS 7871:1975
Jul 2009
26
34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
IS 7873:1975 IS 7880:1975 IS 7986:1976 IS 8835:1978 IS 9097:1979 IS 9447:1980 IS 9451:1994 IS 9452(Part 1):1993 IS 9452(Part 2):1980 IS 9452(Part 3):1988 IS 9698:1995 IS 9913:2000 IS 10430:2000 IS 10646:1991 IS 11809:1994 IS 12331:1988 IS 12379:1988 IS 13143:1991
Code of practice for lime concrete lining for canals Criteria for hydraulic design of skimming platform for sediment control in offtaking canal Code of practice for canal outlets Guidelines for planning and design of surface drains Guide for laying lining of canals with hot bitumen or bituminous felts Guidelines for assessment of seepage losses from canals by analytical method Guidelines for lining of canals in expansive soils (second revision) Measurement of seepage losses from canals - Code of practice : Part 1 Ponding method (first Revision) Code of practice for measurement of seepage losses from canals : Part 2 Inflow Outflow method Code of practice for measurement of seepage losses from canals: Part 3 By seepage meter method Lining of canals with polyethylene film - Code of practice (first revision) Code of practice for construction of cross drainage works (first revision) Criteria for design of lined canals and guidelines for selection of type of lining (first revision) Canal linings - Cement concrete tiles - Specification (first revision) Lining for canals by stone masonry - Code of practice (first revision) General requirements for canal outlets Code of practicefor lining water courses and field channels Joints in concrete lining of canals - sealing compound specification
Jul 2009 Jul 2009 Jul 2009 Jul 2009 Jul 2009 Jul 2006 Jul 2009 Jul 2009 Jul 2009 Jul 2009 Jul 2010 Jul 2009 Jul 2009 Jul 2009 Jul 2009 Mar 2008 Mar 2008 Jul 2009
1 1 3 1 1 1
27
DOC.WRD 13(447)
Draft Indian Standard on Code of practice for design of cross drainage works: Part 1 General features [first revision of IS 7784(Pt 1)]
DOC.WRD 13(527)
DOC.WRD 13(543)
DOC.WRD 13(542)
P-DRAFT PREPARATION
DOC.WRD 13(495)
Draft Indian Standard on canal head regulators - Criteria for design (first revision of IS 6531)
28
1 2 3 4 5
IS 4410(Part 20):1983 IS 4880(Part 1):1987 IS 4880(Part 2):1976 IS 4880(Part 3):1976 * IS 4880(Part 4):1971
Glossary of terms relating to river valley projects: Part 20 Tunnels Code of practice for design of tunnels conveying water: Part 1 General design (first revision) Code of practice for design of tunnels conveying water: Part 2 Geometric design(first revision) Code of practice for design of tunnels conveying water: Part 3 Hydraulic design(first revision) Code of practice for design of tunnels conveying water: Part 4 Structural design of concrete lining in rock Code of practice for design of tunnels conveying water: Part 5 Structural design of concrete lining in soft strata and soils Code of practice for design of tunnels conveying water: Part 6 Tunnel supports Code of practice for design of tunnels conveying water: Part 7 Structural design of steel lining Criteria for design of anchor blocks for penstocks with expansion joints (firstrevision) Code of practice for contruction of tunnels conveying water: Part 1 Precision survey and setting out Code of practice for construction of tunnel conveying water: Part 2 Underground excavation in rock, Section 1 Drilling and blasting Code of practice for construction of tunnels conveying water: Part 2 Underground excavation in rock, Section 2 Ventilating, lighting, Mucking and Dewatering Code of practice for construction of tunnels conveying water: Part 2 Underground excavation in rock, Section 3 Tunnelling method for Steeply Inclined Tunnels, Shafts and Underground Power Houses Code of practice for construction of tunnels conveying water: Part 3 Underground excavation in soft strata
** INDICATES STANDARDS TO BE REVISED | INDICATES EQUIVALENT STANDARDS
Jul 2010 Nov 2008 Jul 2010 Jul 2010 Jul 2010 2 1
IS 4880(Part 5):1972
Jul 2010
7 8 9 10 11
IS 4880(Part 6):1971 * IS 4880(Part 7):1975 IS 5330:1984 IS 5878(Part 1):1971 IS 5878(Part 2/Sec 1):1970
Jul 2010 Jul 2010 Jul 2010 Nov 2008 Jul 2010 2 1
12
Jul 2010
13
Jul 2010
14
IS 5878(Part 3):1972
Jul 2010
29
15 16 17 18 19 20
IS 5878(Part 4):1971 IS 5878(Part 5):1976 IS 5878(Part 6):1975 IS 5878(Part 7):1972 IS 7357:1974 IS 7396(Part 1):1985
Code of practice for construction of tunnels conveying water: Part 4 Tunnel supports Code of practice for construction of tunnels conveying water: Part 5 Concrete lining (first revision) Code of practice for construction of tunnel conveying water: Part 6 Steel lining Code of practice for construction of tunnels conveying water: Part 7 Grouting Code of practice for structural design of surge tanks Criteria for hydraulic design of surge tanks: Part 1 Simple, restricted orifice and differential surge tanks (first revision) Criteria for hydraulic design of surge tanks: Part 2 Tail race surge tanks (first revision) Criteria for hydraulic design of surge tanks: Part 3 Special surge tanks Criteria for hydraulic desgn of surge tanks: Part 4 Multiple surge tanks Code of practice for structural design of cut and cover concrete conduits (first revision) Open power channels - Code of practice (first revision) Hydropower intakes - criteria for hydraulic design (first revision) Design and construction of tunnel plugs - Code of practice (first revision) Recommendations for design for trash racks for intake (first revision) Criteria for hydraulic design of irrigation intake structures Criteria for hydraulic design of penstocks Criteria for structural design of penstocks: Part 1 Surface penstocks Structural design of penstocks - Criteria: Part 2 Buried/embedded penstocks Criteria for structural design of penstocks: Part 3 Specials for penstocks
** INDICATES STANDARDS TO BE REVISED | INDICATES EQUIVALENT STANDARDS
Jul 2010 Jul 2010 Jul 2010 Jul 2010 Jul 2010 Jul 2010
2 1 1 2
21 22 23 24 25 26 27 28 29 30 31 32 33
IS 7396(Part 2):1985 IS 7396(Part 3):1990 IS 7396(Part 4):1983 IS 7563:1985 * IS 7916:1992 IS 9761:1995 IS 11105:2004 * IS 11388:1995 IS 11570:1985 IS 11625:1986 IS 11639(Part 1):1986 IS 11639(Part 2):1995 IS 11639(Part 3):1996
Jul 2010 Jul 2010 Jul 2010 Jul 2010 Nov 2008 Jul 2010 Mar 2010 Jul 2010 Nov 2008 Jul 2010 Jul 2010 Jul 2010 Nov 2008 3 1
30
34 35
First filling and emptying of pressure tunnels - Guidelines Analysis of hydraulic transients in hydro-electric and pumping plants - Code of practice: Part 1 Criteria for analysis Design of sediment excluders - Guidelines Hydraulic design of pump sumps and intakes - Guidelines
36 37
IS 13495:1992 IS 15310:2003
DOC.WRD 14(374)
Draft Indian Standard on Recommendations for design of trash racks for intakes (second revision of IS 11388)
DOC.WRD 14(496)
Draft Indian Standard on Guidelines for Design of Branching in Penstocks for Hydro Electric Projects
DOC.WRD 14(544)
DOC.WRD 14(545)
Draft Indian Standard on code of Practice for design of tunnels conveying water:Part 4 Structural design of concrete lining in rock[first revision of IS 4880(Part 4)] Draft Indian Standard on Code of practice for design of tunnels conveying water: Part 7 Structural design of steel lining [first revision of IS 4880(Part 7)] Draft Indian Standard on Open power channels - Code of practice (second revision of IS 7916) Draft Indian Standard on critiera for hydraulic design of sediment ejectors from hydro power projects
DOC.WRD 14(546)
3 4
31
IS 4247(Part 1):1993
Code of practice for structural design of surface hydroelectric power stations:Part 1 Data for design (third revision) Code of practice for structural design of surface hydroelectric power stations: Part 2 Superstructure (second revision) Code of practice for structural design of surface hydel power stations: Part 3 Substructure (second revision) Glossary of terms relating to river valley projects : Part 10 Hydro-electric Power station including water conductor system (first revision) Code of practice for joints in surface hydro-electric power stations (second revision) Code of practice for ventilation of surface hydro power station (first revision) Code of practice for drainage and dewatering of surface hydroelectric power stations Guide for preliminary dimensioning and layout of elbow type draft tubes for surface hydroelectric power stations (first revision) Criteria for design of generator foundation for hydroelectric power stations (first revision) Criteria for design of spiral casing (concrete and steel) (first revision) Guidelines for planning, layout and design of cavities in underground hydro-electric power stations Code of practice for amenities in power houses Guidelines for selection of turbines, preliminary dimensioning and layout of surface hydro-electric power houses Part 1 Medium and large power houses Guidelines for selection of turbines, preliminary dimensioning and layout of surface hydro-electric power house Part 2 Pumped storage power houses Section 1 Vertical francis runner
** INDICATES STANDARDS TO BE REVISED | INDICATES EQUIVALENT STANDARDS
Jan 2008
IS 4247(Part 2):1992
Jan 2008
3 4
5 6 7 8
IS 4461:1998
9 10 11 12 13
IS 7207:1992 IS 7418:1991
Jan 2008 Jan 2008 Jan 2008 Mar 2011 Jan 2008
**IS 9120:1979
IS 10824:1984 IS 12800(Part 1):1993
14
Mar 2011
32
15
IS 12800(Part 3):1991
Guidelines for selection of turbines, preliminary dimensioning and layout of surface hydro-electric power house Part 3 Small mini and micro power houses Hydraulic turbines for medium and large hydro-electric power houses - Guidelines for selection
Jan 2008
16
IS 12837:1989
Mar 2011
33
IS 6524:1972
Code of practice for installation and observation of instruments for temperature measurements inside dams; resistance type thermometers Code of practice for design, installation, observation and maintenance of uplift pressure pipes for hydraulic structures on permeable foundations Code of practice for installation, maintenance and observation of instruments for pore pressure measurements in earth dams and rockfill dams: Part 1 Porous tube piezometers (second revision) Installation, observation and maintenance of insturments for pore pressure measurements in earth and rockfill dams - Code of practice Part 2 - Twin tube hydraulic piezometers (second revision) Guide for types of measurements for structures in river valley projects and critria for choice and location of measuring instruments: Part 1 For earth and rockfill dams (second revision) Guide for types of measurements for structures in river valley projects and criteria for choice and location of measuring instruments: Part 2 Concrete and masonry dams (first revision) Code of practice for installation and observation of cross arms for measurementof internal vertical movement in earth dams Code of practice for installation and observation of base plates for measurement of foundation settlement in embankments Code of practice for installation, maintenance and observation of pore pressuremeasuring devices in concrete and masonry dams: Part 1 Electrical resistance type cell Installaion maintenance and observations of pore pressure measuring devices in cncrete and masonry dams - Code of practice: Part 2 Vibrating wire type cell Code of practice for selection, splicing, installation and providing protection to the open ends of cables used for connecting resistance type measuring devices in concrete and masonry dams
** INDICATES STANDARDS TO BE REVISED | INDICATES EQUIVALENT STANDARDS
Mar 2009
IS 6532:1972
May 2010
IS 7356(Part 1):2002
Mar 2007
IS 7356(Part 2):2003
Mar 2009
IS 7436(Part 1):1993
Mar 2009
IS 7436(Part 2):1997
Mar 2009
IS 7500:2000
May 2010
** IS 8226:1976
May 2010
IS 8282(Part 1):1976
Mar 2009
10
IS 8282(Part 2):1996
May 2010
11
IS 10334:1982
May 2010
34
12
IS 10434(Part 1):2003
Installation, maintenance and observation of deformation measuring devices in concrete and masonry dams Guidelines, Part 1 Resistance type jointmeters (First Revision) Guidelines for installation, maintenance and observation of deformation measuring devices in concrete and masonry dams: Part 2 Vibrating wire type joint meter Code of practice for installation, maintenance and observation of instruments for pore pressure measurments in earth dams and rockfill dams: Electrical pore pressure cells - vibratory wire type Installation, maintenance and observation of displacement measuring devices in concrete and masonry dams Code of practice: Part 1 Deflection measurement using plumb lines (First Revision) Code of practice for installation, maintenance and observation of displacement measuring devices for concrete and masonry dams Part 2: Geodetic observation - Crest collimation Installation, maintenance and observation of electrical strain measuring devices in concrete dams -Code of practice Guidelines for instrumentation of barrages & weirs Stress measuring devices in concrete and masonry dams - Installation, commissioning and observations - Code of practice . Code of practice for installation, maintenance and observation of seepage measuring devices for concrete/masonry and earth/rockfill dams Code of practice for installation, maintenance and observation of instruments for vibration studies (other than earth quake)
Mar 2009
13
IS 10434(Part 2):1996
May 2010
14
* IS 12949:1990
Mar 2009
15
IS 13073(Part 1):2002
Mar 2008
16
IS 13073(Part 2):2000
May 2010
17
IS 13232:1992
Mar 2009
18 19
IS 14248:1995 IS 14278:1995
20
* IS 14750:2000
May 2010
21
* IS 14793:2000
May 2010
DOC.WRD 16(503)
Draft Indian Standard code of practice for installation, maintenance and observation of the the instruments for vibration studies other than earthquakes (first revision of IS 14793) Draft Amendment No.1 to IS 7356(Part 1):2002
DOC.WRD 16(537)
DOC.WRD 16(504)
Draft Indian Standard code of practice for installation, maintenance and observation of instruments for pore pressure measurments in earth dams and rockfill dams: Electrical pore pressure cells - vibratory wire type (First
** INDICATES STANDARDS TO BE REVISED | INDICATES EQUIVALENT STANDARDS
35
DOC.WRD 16(574)
Draft Indian Standard on code of practice for installation, maintenance and observation of seepage measuring devices for concrete/masonry and earth/rockfill dams (first revision of IS 14750)
36
IS 4410(Part 13):1985
Glossary of terms relating to river valley projects: Part 13 Operation, maintenance and repair of river valley projects Safety code for construction, operation and maintenance of river valley projects: Part 1 General aspects Safety in construction, operation and maintenance of river valley projects: Part 2 Amenities, protective clothing and equipment Safety code for construction, operation and maintenance of river valley projects: Part 3 Plant and machinery Construction, operation and maintenance of river valley projects - Safety code: Part 4 Handling, storage and transportation of explosives Safety code for construction, operation and maintenance of river valley projects: Part 5 Electrical aspects Safety code for construction, operation and maintenance of river valley projects: Part 6 Construction Construction, operation and maintenance of river valley projects - Safety code: Part 7 Fire safety aspects Safety code for construction, operation and maintenance of river valley projects: Part 8 Open Excavation Safety code for operation and maintenance of river valley projects Part 9 Canals and cross drainage works Safety code for construction, operation and maintenance of river valley projects: Part 10 Storage, handling, detection and safety measures for gases, chemicals and flammable liquids
May 2010
* IS 10386(Part 1):1983
May 2010
* IS 10386(Part 2):1982
May 2010
IS 10386(Part 3):1992
Oct 2007
* IS 10386(Part 4):1992
Oct 2007
* IS 10386(Part 5):1992
Oct 2007
IS 10386(Part 6):1983
May 2010
IS 10386(Part 7):1993
Oct 2007
IS 10386(Part 8):1995
May 2010
10
IS 10386(Part 9):1998
Oct 2007
11
IS 10386(Part 10):1983
May 2010
37
DOC.WRD 21(463)
Draft Indian Standard safety code for construction, operation and maintenance of river valley projects Part 11 Underground Excavation Draft Amendment No.1 to IS 10386(Part 9):1983
DOC.WRD 21(470)
DOC.WRD 21(492)
Draft Indian Standard safety code for construction, operation and maintenance of river valley projects: Part 2 Amenities, protective clothing and equipment [first revision to IS 10386(Part 2)] Draft Indian Standard safety code for construction, operation and maintenance of river valley proje cts Part 4 Handling, transportation and storage of explosives [first revision to IS 10386(Part 4):1992)] Draft Indian Standard on safety code for construction, operation and maintenance of river valley projects: Part 1 General aspects [first revision of IS 10386(Part 1)] Draft Indian Standard on safety code for construction, operation and maintenance of river valley projects: Part 5 Electrical aspects [first revision of IS 10386(Part 5)]
DOC.WRD 21(493)
DOC.WRD 21(507)
DOC.WRD 21(508)
38
Title
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
IS 4410(Part 3):1988 IS 4410(Part 12):1993 IS 4410(Part 22):1994 IS 6966(Part 1):1989 * IS 7349:1989 IS 7720:1991 * IS 8408:1994 IS 9461:1980 IS 9795(Part 1):1981 IS 10084(Part 1):1982 * IS 10084(Part 2):1994 * IS 10751:1994 IS 10788(Part 1):1984 IS 11130:1984 IS 11150:1993
Glossary of terms relating to river valley projects: Part 3 River and river training (first revision) Glossary of terms relating to river valley projects: Part 12 Diversion works (first revision) Glossary of terms relating to river valley projects: Part 22 Barrages & weirs Hydraulic design of barrages and weirs - Guidelines: Part 1 Alluvial Reaches (first revision) Barrages and weirs operation and maintenance Guidelines(first revision) Criteria for investigation, planning and layout of barrages and weirs (first revision) Planning and design of groynes in alluvial river Guidelines (first revision) Guidelines for data required for design of temporary river diversion works Guidelines for the choice of type of diversion works : Part 1 Coffer dams Criteria for design of diversion works : Part 1 Coffer dams Design of diversion works - Criteria :Part 2 Diversion channel and open cut or conduit in the body of dam. Planning and design of guide banks for alluvial river Guidelines (first revision) Code of practice for construction of diversion works: Part 1 Cellular coffer dams Criteria for structural design of barrages and weirs Construction of concrete barrages - Code of practice (first revision)
Mar 2008 Sep 2009 Sep 2009 Mar 2011 Mar 2011 Mar 2011 Mar 2011 Mar 2008 Mar 2008 Mar 2008 Mar 2009 Mar 2011 Mar 2011 Mar 2011 Mar 2011 1 1 1 1
39
16 17 18 19 20 21 22 23 24 25
IS 11532:1995 * IS 12094:2000 IS 12892:1989 IS 12926:1995 IS 13877:1993 IS 13912:1993 * IS 14262:1995 IS 14592(Part 1):1998 IS 14815:2000 IS 14955:2001
Construction and maintenance of river embankments (levees)- Guidelines (first revision) Guidelines for planning and design of river embankment (levees) (first revision) Safety of barrage and weir structures - Guidelines Construction and maintenance of guide banks in alluvial rivers - Guidelines (first revision) Planning and design of fish pass- Guidelines Closure of diversion channel and open cut or conduit in the body of dam- Code of practice. Planning and design of revetments - Guidelines Planning and design of river powerhouses : Part 1 Investigation, planning and layout - Guidelines Design flood for river studies of barrages and weirs Guidelines Hydraulic model studies of barrages and weirs Guidelines
Mar 2011 Mar 2011 Mar 2011 Mar 2011 Mar 2011 Mar 2009 Mar 2011 Mar 2011 Mar 2011
DOC.WRD 22(341)
Draft Indian Standard on barrages and weirs operation and maintenance - Guidelines (second revision of IS 7349)
1 2
DOC.WRD 22(577)
Draft Indian Standard on planning and design of river power houses integrated with barrages _ Guidelines, Part 2 Design criteria (as part of IS 14592) Draft Indian Standard on design of diversion works Criteria : Part 2 Diversion channel and open cut or cundit in the body of dam [First Revision of IS 10084(Part 2)] Draft Indian Standard on planning and design of groyne/spur in alluvial river Guidelines (Second Revision of IS 8408)
** INDICATES STANDARDS TO BE REVISED | INDICATES EQUIVALENT STANDARDS
DOC.WRD 22(578)
DOC.WRD 22(579)
40
DOC.WRD 22(580)
Draft Indian Standard on planning and design of guide banks for alluvial rivers - Guidelines (Second Revision of IS 10751) Draft Indian Standard on guidelines for planning and design of rivers embankments (Levees) (second revision of IS 12094) Draft Indian Standard on planning and design of revetment - Guidelines (Second Revision of IS 14262)
DOC.WRD 22(581)
DOC.WRD 22(582)
41
WRD 23 MEASUREMENT AND COST ANALYSIS OF WORKS FOR RIVER VALLEY PROJECTS
SCOPE - STANDARDIZATION IN THE FIELD OF MEASUREMENT AND COST ANALYSIS OF CIVIL ENGINEERING WORKS FOR WATER RESOURCE PROJECTS Sl. No. IS Number/ DOC Number Reaffirm No. of Date Amd. _________________________________________________________________________________________________________ STANDARDS PUBLISHED Title
* IS 4851:1987
Proforma for analysis of unit rate of concrete used in mechanised construction of river valley projects (second revision) Proforma for analysis of unit rate of masonry used in construction of river valley projects (second revision) Guide for preparation of estimate for river valley projects. Method of measurement of works in river valley projects (dams & appurtenant stru structures) :Part 1 Excavation for foundation [first revision] Method of measurement of works in river valley projects (dams & appurtenant structures): Part 2 Dewatering (first revision) Method of measurement of works in river valley projects (dams and appurtenant structures): Part 3 Grouting (second revision) Method of measurement of works in river valley projects (dams and appurtenant structures): Part 4 Concrete works Method of measurement of works in river valley projects (dams and appurtenant structures): Part 5 Masonry Method of measurement of works in river valley projects (dams and appurtenant structures): Part 6 Ventilation pipes and other embedded materials Method of measurement of works in river valley projects (dams and appurtenant structures): Part 7 Joints Method of measurement of works in river valley projects (dams and appurtenant structures):Part 8 Instrumentation Method of measurement of works in river valley projects (dams and appurtenant structures): Part 9 Lining
Apr 2008
2 3 4
IS 9401(Part 2):2003
Mar 2008
IS 9401(Part 3):2003
Mar 2008
* IS 9401(Part 4):1980
Jun 2007
* IS 9401(Part 5):1980
Jun 2007
* IS 9401(Part 6):1984
Mar 2011
10
* IS 9401(Part 7):1984
Mar 2011
11
IS 9401(Part 8):1985
Mar 2011
12
IS 9401(Part 9):1987
Jun 2007
42
13
IS 9401(Part 10):1990
Method of measurement of works in river valley projects (dams and appurtenant structures):Part 10 Form work Method of measurement of works in river valley projects (dams and appurtenant structures): Part 11 Diaphragm walls (first revision) Method of measurement of works in river valley projects (dams and appurtenant structures): Part 12 Topographical surveys Method of measurement of works in river valley projects (Dams and appurtenant structures): Part 13 Earth and fill dams Method of measurement of works in river valley projects (Dams and appurtenant structures): Part 14 Canal works Method of measurement of works of river valley projects (Dams and appurtenant structures Part 15 Investigation Works Drilling of Boreholes and Exploratory Drifting and Logging Method of measurement of works in river valley projects (dams and appurtenant structures): Part 16 Tunneling Method of measurement of works in river valley projects (Dams and appurtenant structures): Part 17 Hydromechanical and related metal works Method of measurement of works in river valley projects (Dams and appurtenant structures): Part 18 Sheet piling Method of measurement of works of river valley projects (Dams & appurtenant structures) Part 19 Electromechanical works Proforma for analysis of unit rate of excavation of tunnels by cyclic drilling and blasting (first revision) Proforma for analysis of unit rate of quarrying rock by mechanical means (firstrevision) Proforma for analysis of unit rate of earthwork used in construction of river valley projects Proforma for analysis of unit rate of shuttering/formwork for concrete items Proforma for analysis of unit rate of rock excavation by mechanical means including blasting for open excavation (first revision)
Jun 2007
14
IS 9401(Part 11):1998
Jun 2007
15
IS 9401(Part 12):1992
Jun 2007
16
IS 9401(Part 13):1992
Jun 2007
17
IS 9401(Part 14):1992
Jun 2007
18
IS 9401(Part 15):2010
19
IS 9401(Part 16):1999
Mar 2011
20
IS 9401(Part 17):1999
Mar 2011
21
IS 9401(Part 18):2000
Mar 2011
22
23 24 25 26 27
Mar 2011 Mar 2011 Mar 2011 Mar 2011 Mar 2011
43
28
IS 11399(Part 1):1985
Guidelines for estimating output norms of items of work in construction of river valley projects: Part 1 Earthwork excavation Guidelines for working out unit rate cost of the construction equipment used for river valley projects (first revision) Proforma for analysis of unit rate of construction of embankment by mechanical means (first revision) Proforma for analysis of unit rate of grouting Proforma for analysis of unit rate of shotcreting/guniting used in river valley projects Proforma for analysis of unit rate of dewatering Proforma for analysis of unit rate of underground excavation by cyclic drilling and blasting Guidelines for estimating unit rate of items works in construction of rubble masonry for river valley projects
Mar 2011
29
* IS 11590:1995
Mar 2011
30 31 32 33 34 35
Jan 2007 Apr 2008 Apr 2008 Apr 2008 Mar 2011 Mar 2011
DOC.WRD 23(480)
Method of measurement of water in River Valley Projects (Dams and Appurtenant Structures) Part 4 Concrete Works (First Revision of IS 9401(Part 4):1980) Method of measurement of water in River Valley Projects (Dams and Appurtenant Structures) Part 5 Masonry (First Revision of IS 9401(Part 5):1980) Method of measurement of water in River Valley Projects (Dams and Appurtenant Structures) Part 6 Ventilation pipes and other embedded materials (First Revision of IS 9401(Part 6):1984) Method of Measurement of Works in River Valley Projects - (Dams And Appurtenant Structures) Part 20 Protective Treatment (As Part 20 of IS 9401) Method of measurement of water in River Valley Projects (Dams and Appurtenant Structures) Part 7 Joints (First Revision of IS 9401(Part 7):1984)
DOC.WRD 23(481)
DOC.WRD 23(482)
DOC.WRD 23(367)
DOC.WRD 23(483)
DOC.WRD 23(556)
Proforma for Estimating Unit Rate of Concrete Used in Mechanized Construction of River Valley Projects (Third Revision of IS 4851) Proforma for analysis of unit rate of masonry used in construction of river valley projects (third revision of IS 4852)
** INDICATES STANDARDS TO BE REVISED | INDICATES EQUIVALENT STANDARDS
DOC.WRD 23(557)
44
DOC.WRD 23(558)
Proforma for analysis of unit rate of excavation of tunnels by cyclic drilling and blasting (second revision of IS 10061) Proforma for analysis of unit rate of quarrying rock by mechanical means (second revision of IS 10062) Proforma for analysis of unit rate of earthwork used in construction of river valley projects (First Revision of IS 10160) Proforma for analysis of unit rate of rock excavation by mechanical means including blasting for open excavation (Second Revision of IS 10777) Guidelines for working out unit rate cost of the construction equipment used for river valley projects (Second Revision of IS 11590) Proforma for analysis of unit rate of construction of embankment by mechanical means (Second revision of IS 11638) Proforma for analysis of unit rate of grouting (first revision of IS 13418) Proforma for analysis of unit rate of shotcreting/ guniting used in river valley projects (first revision of IS 13419) Proforma for analysis of unit rate of dewatering (first revision of IS 14590) Proforma for analysis of unit rate of underground excavation by cyclic drilling and blasting ( first revision of IS 14749) Guidelines for estimating unit rate of items of works in construction of rubble masonry for river valley projects (First Revision of IS 14835) Proforma for analysis of unit rate of shuttering/ formwork for concrete items (first revision of IS 10421)
4 5
DOC.WRD 23(561)
DOC.WRD 23(562)
DOC.WRD 23(563)
9 10
11 12
13
DOC.WRD 23(568)
14
DOC.WRD 23(569)
45
1 2 3
*IS 15442:2004
IS 15832:2008 IS 15845:2009
Parameters for environmental impact assessment of water resources projects Glossary of technical terms related to environmental impact Environmental Management plan for Hydropower/ Irrigation/Flood Control/Multipurpose River Valley Projects.
Feb 2010
DOC.WRD 24(490)
Guidelines for Assessment of the Environmental Health Impacts of River Valley Projects
46
47
2 3
WRD 1 WRD 1
WRD 1
IS 2915:1964
5 6 7 8
IS 2952 (Pt 1): 1964 Recommendation for methods of measurement of liquid flow by means of orifice plates and nozzles: Part 1 Incompressible fluids. IS 2952 (Pt 2):1975 IS 4477 (Pt 1):1967 IS 9117:1979 Recommendation for methods of measurement of liquid flow by means of orifice plates and nozzles: Part 2 Compressible fluids. Methods of measurement of fluid flow by means of venture meters: Part 1 Liquids (Superseded by IS 14615-1:1998) Recommendation for liquid flow measurement in open channels by weirs and flumes end depth method for estimation of flow in non rectangular channels with a free overfall (approximate method) (Superseded by IS 14574:1998) Recommendations for liquid flow measurement in open channels by weirs and flumes - weirs of finite crest width for free discharge (Superseded by IS 14974 :2001)
WRD 1
IS 6059:1971
10 11 12 13
IS 6065 (Pt 1): 1985 Recommendations for the Preparation of Geological and Geotechnical Maps for River Valley Project: Part 1 Scales{first revision) IS 3860:1966 IS 4745:1968 IS 4969:1968 Specification for precast cement concrete slabs for canal lining (Superseded by IS 10646:1991) Code of practice for design of cross section of lined canals (Superseded by IS 10430:1982) Method of test for determining flexural strength of precast Cement Concrete slabs for canal lining (Superseded by IS 10646:1991) Guide for selection of type of lining for canals (Superseded by IS 10430:1982) Guidelines for maintenance of river embankments (levees) (Superseded by IS 11532:1995)
14 15 16
IS 5331:1969 IS 12028:1987
IS 9401 (Part 15/Sec Method of Measurement of Works in River Valley Projects (Dams and 1):1993 appurtenant structures) Part 15 Investigation Works-Section 1 Drilling of Bore Holes IS 9401 (Part 15/Sec Method of Measurement of Works in River Valley Projects (Dams and 2):1992 appurtenant structures) Part 15 Investigation Works-Section 2 Exploratory Drifting
17
WRD 23
48