ZC Site Readiness Check List For RF Implementation: No. Check Item Remarks

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

zc Site readiness check list for RF Implementation

No. 1 2 3 Check Item IWAN Ref No. Customer Name McNally Bharat Engg. Co. Ltd. MCNALLY BHARAT ENGG.CO LTD. ACC LTD, JAMUL CEMENT WORK P.O-JAMUL CEMENT WORK DIST.- DUGH PIN-490024 Chhattisgarh INDIA Remarks

Site Address

5 6 7 8 9

Customer Site Representative Contact Name Contact No. Customer Building/ Server room readiness UPS with 15 minute backup Server Room power Earthing <= 2 V Rack Space for placing RF Indoor Unit Permission for Cable routing (Terrace to Server room) Space & Permission for pole / mast Ground / Building Earthing available (Approx 20m Near to pole/mast) Any Special Work Permit requirement from customer. Eg. manpower insurance, safety related query etc

S.RAY-07697784967 R.S SAINI- 07587367079 YES Available Available YES YES YES YES YES YES NO YES YES Available Available YES YES

10 11 12

This is confirmed that above is complied. Any works pending will be completed with in defined timelines so that project delivery is not impacted.

Bharti PM Name & Signature Rudra Prasad De

Customer Representative Name & Signature Vipul

IP Pool : 192.168.170.0/24