Workflow Management
Workflow Management
Workflow Management
An Integrated Framework for Methods and Tools for BPR Process Modeling Methods and Tools
IDEF0 Functional Flowchart
- IDEF 85 -
information of a process
Construct/ performance revise semi-formal static business data process process models
model
GDSS (GroupSystems V)
semi-formal data model
- IDEF 86 -
IDEF Notations
Order processing policy Work schedule
Customer order
Process Order
Processed order
Legends
Controls
Inputs
Function
Outputs
Mechanism
- IDEF 87 -
ICOM in IDEF
The ICOM of a function represents certain system principles:
Inputs are transformed into outputs, controls constrain or dictate under what conditions transformations occur, and mechanisms describe how the function is accomplished.
An IDEF box and its ICOM can be described as:
C I
"Inputs are transformed by the function into outputs according to controls, using mechanisms."
- IDEF 89 -
Definition of ICOM
Input: Describe resources or data that are needed to
perform the function and are transformed by the function into outputs.
- IDEF 90 -
In-service asset
Detected or suspected malfunction, or Item is scheduled for bench-check Remove & Replace Replaced asset 1 Man-hour standards and personnel availability Schedule into Shop 2 Asset (before repair) Inspect or Repair 3 Assets awaiting parts Asset (after repair) Status records
Spare asset
Repairable asset
Completed asset
Monitor & Route 4 Spare or NRTS
NODE:
TITLE:
NUMBER:
AF
pg. 4-5
Source: Integrated Computer-Aided Manufacturing (ICAM): Functional Minder Chen, 1995 Modeling Manual (IDEF0), June 1981, p. 4-5.
- IDEF 91 -
FUNCTION A
FUNCTION B
FUNCTION C
(Function B is constrained by one input and two controls, and produces a single output, which constrains Function C).
- IDEF 92 -
A-0
I1 C1
1
GENERAL
I2
2 3
4
A0
O1
Abstraction
2
3
Refinement
1 2 3
DETAILED
A42
- IDEF 93 -
Node Tree
Manufacture Product
- IDEF 94 -
Node Index
A0 Manufacture Product A1 Plan for Manufacture A11 Assume a Structure and Method of Manufacture A12 Estimate Requirements, Cost, Time to Produce A13 Develop Production Plans A14 Develop Support Activities Plan A2 .......
- IDEF 95 -
Attributes of Processes
Basic
Name Description Author Audit trails
Performance data
Importance: Core, Critical Value Added: Business, Customer, None Cycle time: Mean, Variance, and Distribution Cost/Unit
- IDEF 96 -
Detail Diagram
1
2 3
- IDEF 97 -
This is I1 below
This is O1 below
This is I2 below
ICOM code must be written at the unconnected ends of all boundary arrows except for A-0 diagram and on tunneled arrows.
C1
C3
C2
1
I1
O1
2
I2 O2
3
Minder Chen, 1995
- IDEF 98 -
Tunneled Arrows
( ) Tunneling an arrow where it connects to a box indicates that the data conveyed is not necessary at the next level of decomposition.
( )
( )
( )
( )
Tunneling an arrow at the unconnected end indicates that the data conveyed is not relevant to or supplied by the parent diagram.
( )
( ) ( )
- IDEF 99 -
Control will not be shown on detail diagram This arrow is still labeled as C3
A0
PARENT DIAGRAM
C1 C3 I1
O1
A2
DETAIL DIAGRAM
- IDEF 100 -
Process Evaluation
Eliminate Simplify Combine Parallelize Automate Create value-adding processes
- IDEF 101 -
Inputs Evaluation
Type: Data, Material Performance:
Quality Cost/Unit: include cost of processing purchase order, shipping cost, cost of the inputs, and inventory cost. Delivery timeliness Volume: Average and peak
Reduce the cost of inputs. Alternative sources of inputs. Ensure timeliness of inputs delivery.
Minder Chen, 1995
- IDEF 102 -
Controls Evaluation
Reduce unnecessary controls Embed controls as part of the process Let the workers who perform the process conduct the checking. Improve the procedures and guidelines of the process. Empower workers to learn and think and give them authority to make decision to make changes and improvements
- IDEF 103 -
Mechanism Evaluation
Who should perform the process? Are tools used for performing the process adequate? What are emerging and matured techniques, tools, and information technologies that may help the improvement of process productivity or effectiveness? What is the cost of the resources in employing the mechanism? Are there alternatives? Are there adequate training programs for employees in using tools and methods?
- IDEF 104 -
Activity
Transmission
- IDEF 105 -
Credit Checking 2
Check Credit
Inventory Shipping
P R O C E S S
C Y C L E
OK
Order Processing
Ship order
End
Minder Chen, 1995
- IDEF 106 -