Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

The Manager Gulf Group Electrical and Mechanical Contracting Company

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

To, TThe Manager, Gulf Group Electrical and Mechanical Contracting Company Dammam, Subject: Installation of A/C Package

Unit at Bldg#5402 Respected Sir, This is with regards to the installation of a/c package unit at bulding no.----------, The a/c unit has been mounted on a steel iron bar on the roof top of the said build but this isnstallation is inappropriate. to inform you that the One of the Package A/C unit mounted on the steel Iron Bar at the roof top of the building which is not appropriate (enclosed here with photo copy) Therefore youHence you are directed to change the Package package unit from /Down sideDown side air flow to Horizontal side air flow. , so Therefore please advise the Contractor to stop that particular A/C unit till the matter is agreed upon by (operation Operation Maintenance) dept. Please Note : A photograph of the above stated a/c unit is attached along with this email. Thanks and regards, Facilities and Maintenance Dept, Abdul Salaam ---------------------------------------------------------------------------------------------------------------------------------To, The Manager, Gulf Group Electrical and Mechanical Contracting Company,

Subject: Installation of A/C Central Unit at Bldg#2719

As per our decision discussion regarding on the replacement of the air condition unit. took place and I We have provided the related relevant information such as:

, Cooling Capacity, load and Air Flow in CFM of the unit by fax onfax on 4/Feb2013. So I We are anow ma waiting for- the outcome betweenoutcome between You your company and Trane Air Condition Company concerning to the subjectconcerning this issue. Thanks and regards, ___AbdusSalam________________________________________________________________________ _________ CC; Manager GulfGroup , Inform Trane air Condition /Dallah trading, regarding subject requirement

To, Trane Air Condition Company, Subject:; Change of Order Please stop delivering the Down side air flow air condition unit. Well, asAs the project requirement is at Dhahran at Dhahran Air Base is Horizontalfor Horizontal side airflow A/C package Unit. Thanks and regards, Abdus Salam CC; Manager GulfGroup , Inform Trane air Condition /Dallah trading, regarding subject requirement

You might also like