SUMMARY OF QUANTITIES

ITEM NO.

DESCRIPTION

UNIT

QUANTITY

102-2

SURPLUS COMMON EXCAVATION

Cu.m.

1,840.00

104-1

EMBANKMENT (from roadway cut)

Cu.m.

2,685.00

105-1

SUBGRADE PREPARATION (Common Materials)

Sq.m.

4,669.59

200

AGGREGATE SUB-BASE COURSE, (35 cm. Thk.)

Cu.m.

4,140.00 COMPACTED VOLUME

300

AGGREGATE SURFACE COURSE, (15cm. Thk.)

Cu.m.

450.00 COMPACTED VOLUME

311-1

PCCP (Plain) - 23 cm. Thk.

Sq.m.

5,599.00

612-1

REFLECTORIZED THERMOPLASTIC PAVEMENT MARKING (White)

Sq.m.

209.10

REMARKS

Name of Project :
Location
:
STATION
0

DIST.

4.50

4.50
15.50
+

20

40

60

80

100

120

140

160

180

200

220

240

260

280

300

320

340

360

380

400

420

440

460

480

500

520

540

560

580

600

620

640

660

680

20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
20.00
18.70
0

+
698.70
Subtotal

EXCAVATION
Area
Volume
0
0.00
0.00
24.49
3.16
48.20
1.66
19.10
0.25
2.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.40
0.14
1.40
0.00
0.00
0.00
5.90
0.59
15.20
0.93
17.70
0.84
21.50
1.31
19.90
0.68
11.50
0.47
13.00
0.83
8.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.40
0.34
4.20
0.08
0.80
0.00
3.80
0.38
21.30
1.75
92.30
7.48
169.90
9.51
165.31
8.17
671.10

EMBANKMENT
Area
Volume
0
0.00
0.00
3.80
0.49
8.20
0.33
27.30
2.40
64.40
4.04
102.40
6.20
146.80
8.48
166.60
8.18
152.10
7.03
120.70
5.04
102.80
5.24
107.90
5.55
120.50
6.50
132.40
6.74
117.20
4.98
114.30
6.45
128.80
6.43
103.30
3.90
74.00
3.50
66.00
3.10
60.10
2.91
55.70
2.66
57.20
3.06
69.90
3.93
95.70
5.64
104.80
4.84
95.30
4.69
104.00
5.71
65.50
0.84
18.80
1.04
34.70
2.43
40.40
1.61
17.80
0.17
1.70
0.00
0.00
0.00
0.00
0.00
2681.10

ITEM 300
Area
Volume
0
0.00
0.00
4.26
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
10.29
0.55
377.55

ITEM 200
Area
Volume
0
0.00
0.00
39.22
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
94.62
5.06
3473.44

Name of Project :
Location
:
STATION
0

DIST.

0.00

3.35

3.35
16.65
+

20.00

40.00

60.00

80.00

100.00

120.00

140.00

20.00
20.00
20.00
20.00
20.00
20.00
4.95
+
144.95
Subtotal

EXCAVATION
Area
Volume
0.00
0.00
0.00
64.94
7.80
170.00
9.20
187.40
9.54
183.20
8.78
161.30
7.35
173.00
9.95
200.00
10.05
24.87
0.00
1164.71

EMBANKMENT
Area
Volume
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

ITEM 300
Area
Volume
0.00
0.00
0.00
4.58
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
11.00
0.55
1.36
0.00
71.94

ITEM 200
Area
Volume
0.00
0.00
0.00
42.12
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
101.20
5.06
12.52
0.00
661.84

SUMMARY
EXCAVATION

EMBANKMENT

ITEM 300

ITEM 200

VOLUME

VOLUME

VOLUME

VOLUME

671.10

2,681.10

377.55

1,164.71

0.00

71.94

661.84

1,835.81

2,681.10

449.49

4,135.28

PAGE

Item 102-2: Surplus Common Excavation =

1835.81

=
SAY

Item 104 -1: Embankment (from Roadway Cut) =

1840.00

CU.M

2685.00

CU.M

4140.00

CU.M

450.00

CU.M

2681.10
SAY

Item 200: Aggregate Sub-base Course =

1835.81

4135.28
SAY

Item 300: Aggregate Surface Course =

449.49
SAY

3,473.44

Name of Project :
Location
:
STATION
0

DIST.

4.50

SUBGRADE PREPARATION
Length
Area
23.51

4.50
10.45

161.99

15.50
+

20

40

10.45
177.56

20.00
7.30

106.31

20.00
+

60

3.33
33.27

20.00
+

80

0.00
0.00

20.00
+

100

0.00
0.00

20.00
+

120

140

0.00
0.00

20.00
0.00

0.00

20.00
+

160

0.00
0.00

20.00
+

180

0.00
0.00

20.00
+

200

0.00
0.00

20.00
+

220

0.00
0.00

20.00
+

240

0.00
0.00

20.00
+

260

0.00
40.16

20.00
+

280

300

320

4.02
40.16

20.00
0.00

0.00

20.00
0.00

56.36

20.00
+

340

360

5.64
111.12

20.00
5.48

117.63

20.00
+

380

6.29
131.44

20.00
+

400

6.86
128.89

20.00
+

420

6.03
110.64

20.00
+

440

460

480

5.03
79.85

20.00
2.95

29.53

20.00
0.00

0.00

20.00
+

500

0.00
0.00

20.00
+

520

0.00
0.00

20.00
+

540

0.00
67.66

20.00
+

560

580

6.77
67.66

20.00
0.00

0.00

20.00
+

0.00

600

51.61

20.00
+

620

640

5.16
156.63

20.00
10.50

254.75

20.00
+

660

14.97
299.46

20.00
+

680

14.97
280.00

18.70
0

+
Subtotal

698.70

14.97
2526.19

Name of Project :
Location
:
STATION
0

DIST.

0.00

3.35

3.35
16.65
+

20.00

40.00

60.00

80.00

100.00

120.00

140.00

+
Subtotal

144.95

20.00
20.00
20.00
20.00
20.00
20.00
4.95

SUBGRADE PREPARATION
Length
Area
0.00
24.97
14.91
248.22
14.91
298.79
14.97
299.46
14.97
299.46
14.97
299.46
14.97
299.46
14.97
299.46
14.97
74.12
14.97
2143.40

Limits
Limits

Sta.
Sta.

0
0

PAVEMENT MARKING : EDGE LINE


+ 4.500 - Sta. 0 + 698.700
=
+ 3.500 - Sta. 0 + 144.950
=

Net Length
Total Length (both sides)
Width of Edge Line
AREA =
Total Length x Width of Edge Line

=
=
=
=
SAY

694.200
141.450
835.650
1671.3
0.100
167.13
167.10

PAVEMENT MARKING : EDGE LINE


m.
m.
m.
m.
m
sq.m
sq.m

ITEM 612-1: REFLECTORIZED THERMOPLASTIC PAVEMENT


MARKING
CENTERLINE (WHITE)
Strips
Station
(pcs)
From
To
77
0
+
4.500
0
+
698.700
16
0
+
3.500
0
+
144.950
TOTAL
93
Length of Center Line (L)

Width of Center Line (W)

0.15

AREA (Strips*L*W)

=
SAY

Plus :
TOTAL

Edge Line
=

41.72

SQ. M.

42.00

SQ. M.

167.10

SQ.M.

209.10

SQ.M.

Limits
Limits

Sta.
Sta.

0
0

+
+

PAVING QUANTITIES
4.500 - Sta. 0 + 698.700
3.500 - Sta. 0 + 144.950

Net Length
Pavement Width
AREA =
Net Length x Pavement Width
TOTAL
TO ESTIMATE

=
=

694.200
141.450

=
=
=
=
=

835.650
6.700
5,598.855
5,598.8550
5,599.000

PAVING QUANTITIES
m.
m.
m.
m
sq.m.
sq.m.
sq.m.

ROAD UPGRADING (GRAVEL TO PAVED) OF NUEVA VIZCAYA PANGASINAN ROAD


Limits

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

219
221
222
225
229
230

+
+
+
+
+
+

687.100
862.000
200.000
529.000
740.000
960.000

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

221
221
224
226
230
232

+
+
+
+
+
+

20.000
935.185
204.340
80.000
660.000
830.258

BACK -UP COMPUTATIONS


Prepared by:

Checked by:

JOVE G. REVOCAL
Engineer II
JETT ROSS PENERA
Engineer II
LUZVIMINDA BANATAO
Engineer II

HILARIO Y. CASEM
Engineer II

ROAD UPGRADING (GRAVEL TO PAVED) OF NUEVA VIZCAYA PANGASINAN ROAD


Limits

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

219
221
222
225
229
230

+
+
+
+
+
+

687.100
862.000
200.000
529.000
740.000
960.000

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

221
221
224
226
230
232

+
+
+
+
+
+

20.000
935.185
204.340
80.000
660.000
830.258

SUMMARY OF QUANTITIES

ROAD UPGRADING (GRAVEL TO PAVED) OF NUEVA VIZCAYA PANGASINAN ROAD


Limits

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

219
221
222
225
229
230

+
+
+
+
+
+

687.100
862.000
200.000
529.000
740.000
960.000

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

221
221
224
226
230
232

+
+
+
+
+
+

20.000
935.185
204.340
80.000
660.000
830.258

ITEM 102-2:

SURPLUS COMMON EXCAVATION

ITEM 102-3:

SURPLUS SOLID ROCK EXCAVATION

ITEM 102-3a:

SURPLUS RIPPABLE ROCK


EXCAVATION

ITEM 104-1:

EMBANKMENT
(FROM ROADWAY CUT)

ITEM 300:

AGGREGATE SURFACE COURSE

ITEM 200:

AGGREGATE SUB-BASE COURSE

ROAD UPGRADING (GRAVEL TO PAVED) OF NUEVA VIZCAYA PANGASINAN ROAD


Limits

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

219
221
222
225
229
230

+
+
+
+
+
+

ITEM 311-1:

687.100
862.000
200.000
529.000
740.000
960.000

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

221
221
224
226
230
232

+
+
+
+
+
+

20.000
935.185
204.340
80.000
660.000
830.258

PORTLAND CEMENT
CONCRETE PAVEMENT

ROAD UPGRADING (GRAVEL TO PAVED) OF NUEVA VIZCAYA PANGASINAN ROAD


Limits

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

219
221
222
225
229
230

+
+
+
+
+
+

687.100
862.000
200.000
529.000
740.000
960.000

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

221
221
224
226
230
232

+
+
+
+
+
+

20.000
935.185
204.340
80.000
660.000
830.258

DRAINAGE SCHEDULE
ITEM 103-3:

FOUNDATION FILL

ITEM 103-6:
ITEM 500-1:

PIPE CULVERT AND DRAIN


EXCAVATION
PIPE CULVERTS- 910mm

ITEM 502-3:

CATCH BASIN

ITEM 504-1:

REMOVING, CLEARING,
STOCKPILING OF SALVAGED
CULVERT PIPE

ITEM 504-2:

REMOVING, CLEANING,
AND RELAYING OF
SALVAGED CULVERT PIPE

ITEM 505:

GROUTED RIPRAP

ROAD UPGRADING (GRAVEL TO PAVED) OF NUEVA VIZCAYA PANGASINAN ROAD


Limits

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

219
221
222
225
229
230

+
+
+
+
+
+

ITEM 105-1:

687.100
862.000
200.000
529.000
740.000
960.000

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

221
221
224
226
230
232

+
+
+
+
+
+

20.000
935.185
204.340
80.000
660.000
830.258

SUBGRADE PREPARATION

ROAD UPGRADING (GRAVEL TO PAVED) OF NUEVA VIZCAYA PANGASINAN ROAD


Limits

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

219
221
222
225
229
230

+
+
+
+
+
+

687.100
862.000
200.000
529.000
740.000
960.000

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

221
221
224
226
230
232

+
+
+
+
+
+

20.000
935.185
204.340
80.000
660.000
830.258

CONCRETE LINED DITCH


ITEM 404:

REINFORCING STEEL

ITEM 405:

STRUCTURAL CONCRETE CLASS "A"

ROAD UPGRADING (GRAVEL TO PAVED) OF NUEVA VIZCAYA PANGASINAN ROAD


Limits

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

219
221
222
225
229
230

+
+
+
+
+
+

687.100
862.000
200.000
529.000
740.000
960.000

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

221
221
224
226
230
232

+
+
+
+
+
+

20.000
935.185
204.340
80.000
660.000
830.258

ITEM 603-3a:

METAL GUARDRAIL (METAL


BEAM)

ITEM 603-3b:

METAL BEAM END

ITEM 605-1:

ROAD WARNING SIGNS

ITEM 612-1:

REFLECTORIZED
THERMOPLASTIC PAVEMENT
MARKING (WHITE)

ITEM 612-2:

REFLECTORIZED
THERMOPLASTIC PAVEMENT
MARKING (YELLOW)

ITEM 622-1:

COCONET

ITEM 622-2:
ITEM 622-3:

COCOLOG
VEGETATION(VETIVER)

ROAD UPGRADING (GRAVEL TO PAVED) OF NUEVA VIZCAYA PANGASINAN ROAD


Limits

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

219
221
222
225
229
230

ITEM 506:

+
+
+
+
+
+

687.100
862.000
200.000
529.000
740.000
960.000

Sta.
Sta.
Sta.
Sta.
Sta.
Sta.

221
221
224
226
230
232

+
+
+
+
+
+

20.000
935.185
204.340
80.000
660.000
830.258

STONE MASONRY