Equipment Schedule: BULLDOZER (7units)

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 12

EQUIPMENT SCHEDULE

CODE EQUIPMENT LOCATION Rockville Ciudad Verde Hill Crest PMP Dasamarinas PMP Antipolo Corinthian PII Motorpool EXPECTED PULL OUT NEW ASSIGNMENT REMARKS

BULLDOZER (7units) 835 D85-12 825 D85-12 818 D80 801 D30 810 D80-12 828 D80-12 808 D60 MOTOR GRADER (5 units) 802 MG-3 839 MG-3 811 GD-40 827 LG-2H 830 GD-31 ROAD ROLLER (5 units) 837 Road Roller 832 Road Roller 819 Road Roller 803 Road Roller 812 Road Roller BACKHOE (10 units) 824 PC-120-3 807 PC-60-4 845 MS-035 844 S-120 841 PC-120-3 809 PC-120 838 UH-04 834 UH-04-5 846 PC-40-3 817 PC-120-2 PAYLOADER (2 units) 840 TCM 75B 829 TCM 75B DUMPTRUCKS 831 RAD 703 814 UNT 738 842 RAW 576 815 TGL 962

Miracle Heights

Greenville

Rockville Ciudad Verde PMP Dasamarinas PMP Antipolo Motorpool

Miracle Heights Hill Crest

Corinthian

Rockville Ciudad Verde Tierra Hermosa PMP Dasamarinas PMP Antipolo

Miracle Heights Hill Crest Corinthian

Rockville Ciudad Verde Ciudad Verde Hill Crest Tierra Hermosa PMP Dasamarinas PMP Dasamarinas PMP Antipolo PMP Antipolo MP (breakdown)

Greenville Miracle Heights Corinthian

Rockville PMP Antipolo

Ciudad Verde Motor Pool PMP Antipolo MP (breakdown)

EQUIPMENT SCHEDULE
STATUS CODE EQUIPMENT LOCATION
OPERATIONAL, BREAKDOWN, UNDER REPAIR

NEW ASSIGNMENT

REMARKS

BULLDOZER (7units) 835 D85-12 825 D85-12 818 D80 801 D30 810 D80-12 828 D80-12 808 D60 MOTOR GRADER (5 units) 802 MG-3 839 MG-3 811 GD-40 827 LG-2H 830 GD-31 ROAD ROLLER (5 units) 837 Road Roller 832 Road Roller 819 Road Roller 803 Road Roller 812 Road Roller BACKHOE (10 units) 824 PC-120-3 807 PC-60-4 845 MS-035 844 S-120 841 PC-120-3 809 PC-120 838 UH-04 834 UH-04-5 846 PC-40-3 817 PC-120-2 PAYLOADER (2 units) 840 TCM 75B 829 TCM 75B DUMPTRUCKS 831 RAD 703 814 UNT 738 842 RAW 576 815 TGL 962

EQUIPMENT SCHEDULE OF DEPLOYMENT


EQUIPMENT LOCATION DEPLOYMENT REMARKS

006-II CORINTHIAN SOUTH PHASE 2 819 807 830 Road Roller PC-60-4-Backhoe GD-31-Grader Tierra Hermosa Ciudad Verde Motorpool 03-Jan-06 05-Jan-06 6-Jan-06 to be utilized also by 009-11

016 HILLCREST 839 832 MG-3-Grader Road Roller Ciudad Verde Ciudad Verde 17-Feb-06 20-Feb-06

009-II GREENVILLE 808 D60-Dozer Container Van 841 PC-120-3-Backhoe Submitted by: Motorpool Antipolo Tierra Hermosa 09-Jan-06 11-Jan-06 25-Jan-06 Noted by:

JOVEN R. ALFUERTO Project Management Head

GUILLERMO C. UY, Jr. President

PIC & WAREHOUSEMAN ASSIGNMENT


LOCATION 020 017 011 013 015 018 019 006-II 009-II 016 021 023 022 010-II Tierra Hermosa PMP-Dasmarinas PMP-Antipolo Ciudad Verde Rockville Easter Mansion Highland Park Corinthian Extension Greenville South Hillcrest Indigo Bay Miracle Heights Madison Garden Creekside Phase II Ferdinand Gumban Bienvenido Adan. Jr. Ferdinand Gumban Ariel Lavapiez Daniel David Ruel Villanueva Jovito Velasco Andy Belen Noted by: Francis Agura Alberto Tenorio to be filled up by 15 Jan, 2006 Ricardo Mendoza Daniel David not necessary PROJECT IN-CHARGE Ariel Lavapiez Mario Mallari Gil Chipre Daniel David WAREHOUSEMAN not necessary Victor Nati Delmar Tacadena not necessary

Submitted by:

JOVEN R. ALFUERTO Project Management Head

GUILLERMO C. UY, Jr. President

NMENT
REMARKS

completed completed completed

H.E. OPERATOR ASSIGNMENT


OPERATOR Samuel Diaz Efren Zulueta Allan Sagayno Romeo Zulueta Arnel Munoz Sonny Roda Manuel Salcedo, Jr. Fernando Carmona Manuel Salcedo, Sr. Operator #1 Operator #2 Operator #3 Submitted by: Noted by: CURRENT LOCATION Tierra Hermosa PMP-Dasmarinas PMP-Antipolo PMP-Antipolo Ciudad Verde Ciudad Verde Rockville Rockville Corinthian Extension Hillcrest on sick leave NEW LOCATION Greenville REMARKS

JOVEN R. ALFUERTO Project Management Head 2300

GUILLERMO C. UY, Jr. President 153.3333333 2000 1200000 400000 4,600,000.00 30000 15600 561600 2,161,600.00 1,600,000.00 3,761,600.00 838,400.00 2,438,400.00

SCHEDULE OF HIRING
NAME Leonardo Tizon Virgilio Chipre POSITION Eqpt. Supervisor Proj. In-Charge EXPECTED DATE 03-Jan-06 04-Jan-06 PROJECT PMP-Antipolo

Eusebio Hernandez Victor A. Valdez Warehouseman Submitted by:

H.E. Operator H.E. Operator Warehouseman

17-Jan-06 10-Jan-06 16-Jan-06

Hillcrest Corinthian Extension Greenville Noted by:

JOVEN R. ALFUERTO Project Management Head

GUILLERMO C. UY, Jr. President

3-Jan-06 REMARKS just started for proper coordination & eventual turn-over with Engr. Villanueva (familiarization)

SCHEDULE OF BIDDING FOR 15M BRIDGE


HILLCREST, Malvar, Batangas ACTIVITIES: 1) Finalization of plans 2) Nomination of prospective bidders 3) Submittal of letter of intent 4) Issuance of plans/Pre Bid Conference & Site inspection 5) Submission of bids 6) Opening of bids 7) Negotiation/Clarification for the winning bidder 8) Submission of Bonds 9) Pre-construction meeting/Submission of bonds 10) Notice to proceed Contract Duration Expected date of start Expected date of completion Nominated Contractors: 1) D.V. Salud 2) Jemacon 3) GAE Submitted by: Noted by:

February 4, 2006 February 6, 2006 February 10, 2006 February 17, 2006 February 24, 2006 February 25, 2006 February 28, 2006 March 6, 2006 March 6, 2006 March 16, 2006 90 calendar days March 16, 2006 June 14, 2006

JOVEN R. ALFUERTO Project Management Head

GUILLERMO C. UY, Jr. President

ELEVATED WATER TANK


EXPECTED DATE OF EXPECTED DATE OF BIDDING EXECUTION Elevated Tank Elevated Tank Elevated Tank Ground Tank Ground Tank Elevated Tank Elevated Tank Repair/Rectifications works

PROJECT Ciudad Verde, Padre Garcia Rockville, Sariaya, Quezon Cliffview, San Pablo City PMP-Antipolo PMP-Dasmarinas Corinthian Extention, Lipa City Hillcrest, Malvar, Batangas Highland Park, Tiaong, Quezon Nominated Contractors: 1) Alden Well Drilling 2) Melagrosa Construction 3) FA Trading and Well Drilling 4) Ricky Lee 5) VEO Well Drilling

CAPACITY 20,000.00 gals 20,000.00 gals 15,000.00 gals 25,000.00 gals 30,000.00 gals 10,000.00 gals 30,000.00 gals 30,000.00 gals

SITE VISIT

REMARKS

Submitted by:

Noted by:

JOVEN R. ALFUERTO Project Management Head

GUILLERMO C. UY, Jr. President

DEEPWELL DRILLING
EXPECTED DATE OF EXPECTED DATE OF BIDDING EXECUTION

PROJECT Ciudad Verde, Padre Garcia Corinthian Extention, Lipa City Cliffview, San Pablo City Hillcrest, Malvar, Batangas PMP - Dasmarinas Nominated Contractors: 1) Alden Well Drilling 2) Ryan Guallar Deepwell 3) Hydro Drilling Services 4) Veo Well 5) Explorer Submitted by:

DEPTH 300 ft. 500 ft. 500 ft. 600 ft. 600 ft.

CASING 6" 8" 6" 8" 6"

BOREHOLE 8" 10" 8" 10" 10"

SITE VISIT

REMARKS

January 24, 2006 January 31, 2006 February 6, 2006 January 27, 2006 February 3, 2006 January 25, 2006 February 1, 2006 January 27, 2006 February 3, 2006 February 2, 2006 February 9, 2006 February 15, 2006 February 20, 2006 February 28, 2006 March 6, 2006

Noted by:

JOVEN R. ALFUERTO Project Management Head

GUILLERMO C. UY, Jr. President

EQUIPMENT SCHEDULE
CODE EQUIPMENT LOCATION Motorpool Backhoe NEXT ASSIGNMENT REMARKS

BACKHOE 841 PC-120-3 809 PC-120 DUMPTRUCKS 814 UNT 738 831 RAD 703 815 TGL 962 PMP ANTIPOLO CODE 829 TCM 75B 846 PC-40-3 827 LG-2H 810 D80-12 842 RAW 576 812 Watanabe PMP DASMARINAS CODE 838 UH-04 803 Bomag 801 D30 811 GD-40 840 TCM 75B CIUDAD VERDE CODE 825 D85-12 839 MG-3 832 Bomag 845 MS-035 ROCKVILLE CODE 824 PC-120-3 802 MG-3 837 Road Roller 835 D85-12 834 UH-04-5 CORINTHIAN EXT. CODE 828 D80-12 830 GD-31 819 Watanabe 817 PC-120-2 HILLCREST CODE 818 D80 844 S-120 GREENVILLE II CODE 808 D60 807 PC-60-4

Motor Pool Motor Pool MP (breakdown)

EQUIPMENT Payloader Backhoe Motor Grader Bulldozer Dumptruck Road Roller

NEXT ASSIGNMENT

REMARKS

EQUIPMENT Backhoe Road Roller Bulldozer Motor Grader Payloader

NEXT ASSIGNMENT

REMARKS

EQUIPMENT Bulldozer Motor Grader Road Roller Backhoe

NEXT ASSIGNMENT to Greenville II to Greenville II

REMARKS 15-Mar-06 15-Mar-06

EQUIPMENT Backhoe Motor Grader Road Roller Bulldozer Backhoe

NEXT ASSIGNMENT

REMARKS

EQUIPMENT Bulldozer Motor Grader Road Roller Backhoe

NEXT ASSIGNMENT to Hillcrest if necessary to Hillcrest via lowbed trailer

REMARKS

EQUIPMENT Bulldozer Backhoe

NEXT ASSIGNMENT

REMARKS

EQUIPMENT Bulldozer Backhoe

NEXT ASSIGNMENT

REMARKS

as of February 1, 2006