Phase Number Purpose Entry Criteria To guide you in developing module-level programs Problem description PSP0 Project Plan Summary form Time and Defect Recording Logs Defect Type Standard Stop watch (optional) Produce or obtain a requirements statement. Estimate the required development time. Enter the plan data in the Project Plan Summary form. Complete the Time Recording Log. Design the program. Implement the design. Compile the program and fix and log all defects found. Test the program and fix and log all defects found. Complete the Time Recording Log. Complete the Project Plan Summary form with actual time, defect, and size data. A thoroughly tested program Completed Project Plan Summary form with estimated and actual data Completed Defect and Time Recording Logs
Planning
Development