This document outlines a 3 phase process for developing module-level programs: 1) Planning - produce requirements and estimate time, 2) Development - design, implement, compile, test and fix defects, 3) Postmortem - complete logs and forms with actual time and defect data and deliver a tested program. The entry and exit criteria for each phase are provided to guide following the process.

Uploaded by

Henry McBride
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views

C10 PSP0 Process Script

This document outlines a 3 phase process for developing module-level programs: 1) Planning - produce requirements and estimate time, 2) Development - design, implement, compile, test and fix defects, 3) Postmortem - complete logs and forms with actual time and defect data and deliver a tested program. The entry and exit criteria for each phase are provided to guide following the process.

Uploaded by

Henry McBride
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Table C10 PSP0 Process Script

Phase Number Purpose Entry Criteria To guide you in developing module-level programs Problem description PSP0 Project Plan Summary form Time and Defect Recording Logs Defect Type Standard Stop watch (optional) Produce or obtain a requirements statement. Estimate the required development time. Enter the plan data in the Project Plan Summary form. Complete the Time Recording Log. Design the program. Implement the design. Compile the program and fix and log all defects found. Test the program and fix and log all defects found. Complete the Time Recording Log. Complete the Project Plan Summary form with actual time, defect, and size data. A thoroughly tested program Completed Project Plan Summary form with estimated and actual data Completed Defect and Time Recording Logs

Planning

Development

Postmortem Exit Criteria