Piping Materail Take Off: No. Mat'L Description Mat'L Description Unit QTY KG
Piping Materail Take Off: No. Mat'L Description Mat'L Description Unit QTY KG
Piping Materail Take Off: No. Mat'L Description Mat'L Description Unit QTY KG
No. 5 3 7 1 6 4 2 8 11 9 10 MAT'L DESCRIPTION G1 PU-A R1-E(L3000 R4-D R6-F3(H2058) R6-F6(H2850) R6-F6(H3000) R7-B3(L200) R9-04(L700) S1(H76) S1(H76) MAT'L DESCRIPTION L50X50X6-130LX2 U_BOLT 6" PIPE 4"X300 L+ PL170X170X9 SLIDE SHOE UNIT KG 1.15 6.84 5 23.52 79.8 84 2 14.04 3 3 QTY
11.26666667
SG930003
2
SG930002
3
SG930004 SHT 1/2
1 2 1 1 1 1 1 1 1 5 2 1 8 1 1 4 1 1 1 1 5.76 6.84 40.00 23.52 79.80 336.00 2.00 14.04 3.00 3.00 513.96 1 1 1 1 2 2
WW930014
TOTAL EA
TOTAL WEGHT
JUL'2010 10 11 12 13 14 15 16 17 18 19 20
1 2 4 5 6 7 8 9 10 11 12 13
PROJECT MANAGER SUPERVISOR CONSTRUCTION FOREMAN WELDER PIPE(GTAW+SMAW) QC INSPECTOR SAFETY FIRE WASH MAN PIPE FITTER HELPER RIGGER DRIVER PAINTER TOTAL==> PREPARE BY, MR.KRIENGSAK R.
0 PREPARE BY,
14-Jul-10
EQUIPMENT LOADING
CLIENT : THE AROMATICS (THAILAND)CO.,LTD PUBLIC CONTRACTOR : CCK LTD.PART JOB TITLE : PLANT MODIFY WORK ID DESCRIPTION LUNE 2008 27 28 29 1 1 LULY 2008 7 8 9 1 1 1 1 2 2 3 4 DATE : 19/06/2008 REV : 00
25
26
30 1 1
10
11
12
13
14
15
1 2 3 4 5 6 7 8 9
HAIB 5 TONS PICK-UP 1 TON WELD GENERATOR HANDTOOL BOX GAS CUTTING SET WELD ACC SET GRIDER WHEEL 7" GRIDER WHEEL 4" WATER PRESSURE PUMP 30 BAR
1 1 2 2 3 4
1 1 2 2 3 4
1 1 2 2 3 4
1 1 2 2 3 4
1 1 2 2 3 4
1 1 2 2 3 4
1 1 2 2 3 4 1
1 1 1 2 2 3 4 1
1 2 1 2 2 3 4
1 2 1 2 2 3 4
APPR BY, PREPARE BY, MR.THONGCHAI TH. (MANAGER CONSTRUCTION) MR.KRIENGSAK R. (PLANING ENGINEER DEPT.)
25
26
29
30
10
11
12
13
14
15
APPR BY, PREPARE BY, MR.THONGCHAI TH. (MANAGER CONSTRUCTION) MR.KRIENGSAK R. (PLANING ENGINEER DEPT.)
PROJECT MGR.
MR.THONGCHA
ENGINEER
CONSTRUCT
MR.KRIENGASK
QC/QA
MR.TAKSIN
SAFETY
MR.AROM