Piping Materail Take Off: No. Mat'L Description Mat'L Description Unit QTY KG

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 6

PIPING MATERAIL TAKE OFF

No. 5 3 7 1 6 4 2 8 11 9 10 MAT'L DESCRIPTION G1 PU-A R1-E(L3000 R4-D R6-F3(H2058) R6-F6(H2850) R6-F6(H3000) R7-B3(L200) R9-04(L700) S1(H76) S1(H76) MAT'L DESCRIPTION L50X50X6-130LX2 U_BOLT 6" PIPE 4"X300 L+ PL170X170X9 SLIDE SHOE UNIT KG 1.15 6.84 5 23.52 79.8 84 2 14.04 3 3 QTY

L90X90X10-200L C150X50 SHOE SHOE

11.26666667

SG930003

2
SG930002

3
SG930004 SHT 1/2

1 2 1 1 1 1 1 1 1 5 2 1 8 1 1 4 1 1 1 1 5.76 6.84 40.00 23.52 79.80 336.00 2.00 14.04 3.00 3.00 513.96 1 1 1 1 2 2
WW930014

SG930004 SHT 2/2

SG930005 SHT 1/3

SG930005 SHT 2/3

SG930005 SHT 3/3

TOTAL EA

TOTAL WEGHT

MANPOWER LOADING PLAN


CLIENT : BB THAI CONTRACTOR : ENSURE ENGINEERING CO.LTD. JOB TITLE : FAB&INSTALL PIPE UNDER GROUND WF LINE/SRU/IRPC ID POSITION JUN'2010 17 18 19 20 21 22 23 24 25 26 27 28 29 30 DATE : 14/10/2010 REV : 00

JUL'2010 10 11 12 13 14 15 16 17 18 19 20

1 2 4 5 6 7 8 9 10 11 12 13

PROJECT MANAGER SUPERVISOR CONSTRUCTION FOREMAN WELDER PIPE(GTAW+SMAW) QC INSPECTOR SAFETY FIRE WASH MAN PIPE FITTER HELPER RIGGER DRIVER PAINTER TOTAL==> PREPARE BY, MR.KRIENGSAK R.

0 PREPARE BY,

14-Jul-10

EQUIPMENT LOADING
CLIENT : THE AROMATICS (THAILAND)CO.,LTD PUBLIC CONTRACTOR : CCK LTD.PART JOB TITLE : PLANT MODIFY WORK ID DESCRIPTION LUNE 2008 27 28 29 1 1 LULY 2008 7 8 9 1 1 1 1 2 2 3 4 DATE : 19/06/2008 REV : 00

25

26

30 1 1

10

11

12

13

14

15

1 2 3 4 5 6 7 8 9

HAIB 5 TONS PICK-UP 1 TON WELD GENERATOR HANDTOOL BOX GAS CUTTING SET WELD ACC SET GRIDER WHEEL 7" GRIDER WHEEL 4" WATER PRESSURE PUMP 30 BAR

1 1 2 2 3 4

1 1 2 2 3 4

1 1 2 2 3 4

1 1 2 2 3 4

1 1 2 2 3 4

1 1 2 2 3 4

1 1 2 2 3 4 1

1 1 1 2 2 3 4 1

1 2 1 2 2 3 4

1 2 1 2 2 3 4

APPR BY, PREPARE BY, MR.THONGCHAI TH. (MANAGER CONSTRUCTION) MR.KRIENGSAK R. (PLANING ENGINEER DEPT.)

PROJECT PLAN SCH OF WORK


CLIENT : THE AROMATICS (THAILAND)CO.,LTD PUBLIC CONTRACTOR : CCK LTD.PART JOB TITLE : PLANT MODIFY WORK ID A TASK FABRICATION & INSTALL PIPING WORK - MAT'L ORDER - SANDBLAST PAINTING - PRE FIT-UP & WELD PIPE - NDT (PT,RT) -HYDRO TEST & FLUSHING -FIELD WELD &TIE - IN -LEAKAGE TEST -FINAL PAINTING LUNE 2008 27 28 LULY 2008 7 8 9 DATE : 19/06/2008 REV : 00

25

26

29

30

10

11

12

13

14

15

APPR BY, PREPARE BY, MR.THONGCHAI TH. (MANAGER CONSTRUCTION) MR.KRIENGSAK R. (PLANING ENGINEER DEPT.)

LEADER ORGANIZATION CHART


CLIENT : THE AROMATICS (THAILAND)CO.,LTD PUBLIC CONTRACTOR : CCK LTD.PART JOB TITLE : PLANT MODIFY WORK DATE : 19/06/2008 REV : 00

PROJECT MGR.
MR.THONGCHA

ENGINEER
CONSTRUCT
MR.KRIENGASK

WORKING GROUP FABSHOP


MR.SOMSAK

WORKING GROUP ERECTION


MR.APIBAN

QC/QA
MR.TAKSIN

SAFETY
MR.AROM

NOTE : WORKING GROUP ARE 1FITTER 2 HELPER 1 WELDER