SIAP
SIAP
SIAP
NOTES:-
Piling Equipment
A Allow for the provision of all necessary piling plant,
equipment and tools; including transportation to the
site, handling, assembling, moving piling plant and
equipment about the site; dismantling and removing
from site after completion of piling. Item
Piling Record
C/F:
Sch 2 (Bgl) / 1
SCHEDULE NO. 2 - PILING WORKS (BUNGALOW)
(CONT'D) B/F:
Extension Joints :-
Pile Test :-
SCHEDULE NO. 2
PILING WORKS (ALL PROVISIONAL)
Total Carried To Final Summary RM
Sch 2 (Bgl) / 2
SCHEDULE NO. 5 - BANGALOW
PLOT 1
ITEM DESCRIPTION UNIT RATE
QTY AMOUNT
WORKS BELOW LOWEST FLOOR LEVEL
Excavation Works
Excavation commencing from reduced level and get out; part return, fill in and
ram; remove surplus excavated materials from site :-
Concrete Works
Vibrated reinforced concrete (Grade 30) as described filled into formwork and
well packed around rod or fabric reinforcement (formwork and steel
measured separately) in :-
J Pile caps. M3 5
K Column stumps. M3 1
Vibrated reinforced concrete (Grade 25) as described filled into formwork and
well packed around rod or fabric reinforcement (formwork and steel
measured separately) in :-
L Ground Beams. M3 4
Q Pile caps
Y16 Kg 224
Y12 Kg 97
Y10 Kg 54
R Column Stumps
Y20 Kg 79
Y16 Kg 103
Y12 Kg 43
Y10 Kg 10
TO COLLECTION : RM
WORKS BELOW LOWEST FLOOR LEVEL (cont'd)
A Ground Beams
Y16 Kg 9
Sch 5 / 3
SCHEDULE NO. 5 - BANGALOW
Y12 Kg 12
Y10 Kg 208
B Column Stumps
R6 Kg 65
C Ground Beams
R6 Kg 88
K Edge of apron and terrace; 100mm but not exceeding 200mm high M 80
TO COLLECTION : RM
WORKS BELOW LOWEST FLOOR LEVEL (cont'd)
Sch5/1 ………….
Sch5/2 ………….
Sch 5 / 4
SCHEDULE NO. 5 - BANGALOW
TO SUMMARY : RM
FRAME AND UPPER FLOOR
B Columns. M3 5
C Stiffener. M3 1
Floor slabs
D 200mm Thick floor slabs. M2 25
E 175mm Thick floor slabs. M2 35
F 150mm Thick floor slabs. M2 58
G 125mm Thick floor slabs. M2 100
H 100mm Thick floor slabs. M2 13
J Floor Beams
Y20 Kg 715
Y16 Kg 276
Y12 Kg 103
Sch 5 / 5
SCHEDULE NO. 5 - BANGALOW
Y10 Kg 248
K Columns
Y20 Kg 195
Y16 Kg 364
Y12 Kg 99
Y10 Kg 389
L Stiffener.
Y12 Kg 264
M Floor slabs
Y20 Kg 32
Y12 Kg 10
Y10 Kg 565
Q Columns
R6 Kg 322
R Stiffener.
R6 Kg 49
TO SUMMARY : RM
ROOF STRUCTURE
G Roof Beams
Y25 Kg
Y20 Kg 343
Y16 Kg 95
Y12 Kg 52
Y10 Kg 231
J Upstand Beams
Y10 Kg 80
K Roof Beams
R10 Kg 0
Sch 5 / 6
SCHEDULE NO. 5 - BANGALOW
R6 Kg 225
M Upstand Beams
R6 Kg 39
N Roof slabs
B.R.C Ref. No. A7; 3.02kg/m2 M2 135
B.R.C Ref. No. A6; 2.22kg/m2 M2 112
A Staircases. M3 2
B Landing beam. M3 1
F Landing beams
Y12 Kg 123
G Landing beams
R6 Kg 43
Sch 5 / 7
SCHEDULE NO. 5 - BANGALOW
TO SUMMARY : RM
ROOF COVERING AND FINISHES
Concrete roofing tiles of approved source and colour; fixed on steel purlins
(measured separately); including all accessories tiles, all in accordance with
manufacturer's instruction (measured nett - allow for laps) :-
A Roof coverings M2 83
C One layer of "Tacfoil" or other equal and approved double sided reflective
aluminium foil, to roof. (measured nett: no allowance for laps) M2 83
E GI gauge 22 flashing 600mm wide in three times bent with one end built into
concrete or brickwalls and the other end dressed onto roof tiles, including
galvanised angle sealed with silicon sealant. M 21
F Prepare and clean surface, supply and apply 1.3mm thick WFT of "FOSROC"
Nitoproof 600 liquid applied, elestometric, brush on waterproofing membrane or
approved equivalent; all done in accordance with manufacturer's instruction and
'specification. M2 120
G Supply and lay minimum 25mm thick cement and sand (1:3) protective screed;
incorporated in with 600 g/m3 of micro fibre; all done in accordance with
manufacturer's instruction and specification. M2 120
Sch 5 / 8
SCHEDULE NO. 5 - BANGALOW
TO SUMMARY : RM
STAIRCASE FINISHES & BALUSTRADING
Prepare and apply one coat of alkali resisting primer and two coats
of "Jotun" fungus resistant emulsion paint internally on:-
G Landing slab M2 10
L Extra over for 75mm x 19mm x 8.5mm thick ceramic nosing tiles
with rounded edge and groove, in colours to be approved by the
S.O., bedded and jointed on and including cement and sand (1:3)
base screed and pointed in tinted cement. M 43
Sch 5 / 9
SCHEDULE NO. 5 - BANGALOW
TO SUMMARY : RM
EXTERNAL WALLS
A Half brickwalls (115mm thick) cement sand bricks in cement mortar (1:3) with
an approved plasticiser, reinforced with and including brick reinforcement as
described at every fourth course, well lapped. M2 357
C 6mm Diameter mild steel bonding ties 450mm girth hooked both
ends, one end cast into concrete structure and the other end built
into brickwork. No. 704
Sch 5 / 10
SCHEDULE NO. 5 - BANGALOW
TO SUMMARY : RM
INTERNAL WALLS AND PARTITION
A Half brickwalls (115mm thick) cement sand bricks in cement mortar (1:3) with
an approved plasticiser, reinforced with and including brick reinforcement as
described at every fourth course, well lapped. M2 210
C 6mm Diameter mild steel bonding ties 450mm girth hooked both
ends, one end cast into concrete structure and the other end built
into brickwork. No. 368
Sch 5 / 11
SCHEDULE NO. 5 - BANGALOW
TO SUMMARY : RM
DOORS
A 100mm x 250mm Lintols, reinforced with 2 Nos. 12mm diameter and 2 Nos.
10mm Diameter high tensile rod reinforcement and 6mm diameter mild steel
link at 150mm centres, including all necessary formwork M 4
B 100mm x 225mm Lintols, reinforced with 4 Nos. 10mm diameter high tensile
rod reinforcement; ditto. M 2
C 100mm x 200mm Lintols, reinforced with 4 Nos. 10mm diameter high tensile
rod reinforcement centres, including all necessary formwork M 14
D 300mm x 100mm thick door hood, reinforced with 4 Nos. 10mm diameter
high tensile rod reinforcement and 6mm diameter mild steel link at 200mm
centres, including all necessary formwork M 7
Door Frames
38mm Thick flush door formed with 100 x 25mm h.w. stiles, 100 x 25mm h.w.
top, middle and bottom rails, finished on both sides with 5mm thick plywood,
38mm x 13mm h.w.edging all round, fixed into position :-
PVC Door
Supply and fix in position the following powder coated aluminium frame
(1.2mm thick) doors complete with ironmongery and accessories including
pinning lugs, bedding and grouting frames in cement mortar (1:3) and
pointing with approved mastic:-
TO COLLECTION : RM
DOORS (Cont'd)
Sch 5 / 12
SCHEDULE NO. 5 - BANGALOW
Knot, prime, stop and apply one undercoat and two finishing coats
of "Jotun" gloss paint, on woodwork :-
B General surfaces. M2 54
TO COLLECTION : RM
DOORS (cont'd)
Sch5/11 ………….
Sch5/12 ………….
Sch 5 / 13
SCHEDULE NO. 5 - BANGALOW
TO SUMMARY : RM
IRONMONGERY
Sch 5 / 14
SCHEDULE NO. 5 - BANGALOW
TO SUMMARY : RM
WINDOWS
A 300mm x 100mm thick window hood, reinforced with 4 Nos. 10mm diameter
high tensile rod reinforcement and 6mm diameter mild steel link at 200mm
centres, including all necessary formwork M 103
Aluminium Works
Supply and fix in position the following powder coated aluminium frame
(1.2mm thick) windows complete with heads, jambs, mullions, transomes,
cills, glazing beads, silicone sealant,neoprene gasket, ironmongery and
accessories including 5mm thick green tinted glass, pinning lugs, bedding
and grouting frames in cement mortar (1:3) and pointing with approved
mastic :-
Sch 5 / 15
SCHEDULE NO. 5 - BANGALOW
Composite Window
TO SUMMARY : RM
INTERNAL WALL FINISHES
Sch 5 / 16
SCHEDULE NO. 5 - BANGALOW
TO SUMMARY : RM
INTERNAL FLOOR FINISHES
A Floors M2 68
C Floors M2 160
E Floors M2 40
Sch 5 / 17
SCHEDULE NO. 5 - BANGALOW
Waterproofing System
TO SUMMARY : RM
INTERNAL CEILING FINISHES
Sch 5 / 18
SCHEDULE NO. 5 - BANGALOW
TO SUMMARY : RM
EXTERNAL FINISHES
Floor Finishes
A Floors M2 124
B Floors M2 47
Wall Finishes
Prepared and apply "SKK" or other approved equivalent texture spray painting,
comprising of one coat solvent based sealer, one coat texture based coat
and two finishing coats of acrylic spray paint, in colour, design and patterns to
be selected by the S.O., applied instrict accordance to the manufacturer's
printed instructions externally to :-
Sch 5 / 19
SCHEDULE NO. 5 - BANGALOW
Ceiling Finishes
TO SUMMARY : RM
INTERNAL COLD WATER PLUMBING
Notes
Contractor shall submit breakdown of prices for water
reticulation works for variation purposes.
A Supply and install internal cold water plumbing comprising ABS (Eurapipe)
pipes and dropper complete with all short lengths, sockets, connectors, back
nuts, elbows, bends, fire ends, tees, diminishing pieces, plugs, screwed joints
and stopcocks including connection to existing water tank; all as detailed in
Engineer's drawings. Sum
B PBA approved type of 1,362 litres polytank complete with ball valve, scour
and overflow pipes, supported with mild steel angle iron on hardwork timber
plank including painting works No 1
C 35litre Pressure Type water heater (PBA Aprroved Type) c/w vent pipe and
RMC valve No 1
D 22mm Diameter stainless steel stand pipe at wall with stopcock as approved No -
E 20mm Diameter stainless steel meter position with lockable valve and
stopcock as approved No 1
F Allow for testing the whole internal cold water plumbing installation system in
the presence of and to the satisfaction of the S.O. and Local Authorities,
making good defects and obtain written approval from Local Authorities Sum
Sch 5 / 20
SCHEDULE NO. 5 - BANGALOW
TO SUMMARY : RM
INTERNAL SANITARY INSTALLATION
Notes:-
Sch 5 / 21
SCHEDULE NO. 5 - BANGALOW
TO SUMMARY : RM
SANITARY WARES AND FITTINGS
Supply and fix the following sanitary wares, fittings and accessories including
storing, assembling, bedding, plugging and screwing with matching screws,
cutting and pinning or building brcakets, jointing and connecting services,
soil and waste pipes and making good all works disturbed :-
B JohnsonSuisse Boston 500 wall hung wash basin size 500 x 420mm in
white colour complete with concealed bracket, stainless steel waste and
UPVC bottle trap No. 5
F Approved 55" x 18" double bowl, double drainer aluminium sink c/w
waste, sink tap with quarter turn lever handle. No. 1
H 1770mm x 950mm wide long bath complete with handgrip, waste, chain and
stopper. No. 1
J 50mm Diameter uPVC floor trap and hopper with 50mm diameter
inlet and outlet, complete with 50mm diameter hinged stainless steel
floor strainer and frame including setting in concrete floor and
finishing frameflush with floor finish and jointing to uPVC pipes. No. 7
Sch 5 / 22
SCHEDULE NO. 5 - BANGALOW
TO SUMMARY : RM
SUNDRIES
A 1,100mm High stainless steel railing, fixed into concrete with pipe
sleeves as per Architect's drawing (at Balkoni) M 19
B Basin counter top size, 1400mm (L) x 300mm (W) x 75mm (T) No 1
C 1,500mm high fence wall, constructed of 750mm high 115mm thick brickwall
and 750mm high 50mm x 50mm m.s hollow section all round, 75mm x
75mm m.s hollow section post and 8mm x 75mm fibre cement board
including reinforced concrete footing, and plastering and all painting works,
all as per Architect's Drawing M 10
D 1,500mm High PVC coated chain link fence including concrete footing , all as
per Architect's Drawing. M 67
E 4,200mm x 1,500mm High mild steel gate constructed of 50mm x 50mm m.s
hollow section all round and 8mm x 50mm fibre cement board including
ironmongeries and painting works as per Architect's Drawing. No 1
G Overall size, 700mm x 600mm x 1,760mm high, comprising of gate pier, letter
box and TNB meter box,constructed of 115mm thick brickwall, p.c slab, p.c
coping over, 5mm thick viewing glass panel and meter box to M&E detail,
60mm high text with 100mm x 150mm perspec house no and reinforced
concrete footing, including excavation, all necessary formwork, plastering and
painting as per Architect's Drawing No. 06030/D/00 No 1
Sch 5 / 23
SCHEDULE NO. 5 - BANGALOW
TO COLLECTION : RM
SUNDRIES (cont'd)
A 225mm Half round glazed ware invert including brickwork wall, reinforced
concrete base and plastering works M 56
Supply and fix in position the following natural anodised aluminium framed
louvred panels with outer and inner frames of approved section and thickness,
all in accordance with manufacturer's details and S.O.'s approval :-
Sch 5 / 24
SCHEDULE NO. 5 - BANGALOW
TO COLLECTION : RM
SUNDRIES (cont'd)
Sch5/23 ………….
Sch5/24 ………….
Sch 5 / 25
SCHEDULE NO. 5 - BANGALOW
TO SUMMARY : RM
SUMMARY
C Roof Structure
D Staircase Structure
G External Walls
J Doors
K Ironmongery
L Windows
Q External Finishes
U Sundries
BUILDING WORKS
TOTAL CARRIED TO FINAL SUMMARY
(Page No FS/1)
1 Unit
RM/sf -
Sch 5 / 26
AMOUNT
ITEM DESCRIPTION UNIT QTY RATE
(RM)
EARTHWORKS & SITE WORKS
(ALL QUANTITIES ARE PROVISIONAL)
A Genaral site clearing including demolish , excavate and remove from site all
trees and plant of all sizes, any debris and unsuitable materilas, etc Sum
B Over site cut and fill; earth cutting to the required level, select approved
excavated earth, load, transport, deposit, level and compact with 10-ton roller
in 225mm layers to fill area within the site to the required level M3 668
C Selected imported earth obtained from an approved source, fill and compact
to make up the required levels, consolidated in layer as described. (Quantities
measured nett after consolidation) M3 2,037
D Excavate for footing, part return, fill in and ram, dispose surplus materials from
site M3 294
H Ditto in beams M3 24
High tensile steel rod reinforcement to B.S. 4449 as described in footings and
walls
Q Guardrail channel steel post and parker single mounted type as described,
750mm high constructed of 178 x 76 x 6 g.i. channel section at 2,000mm centre;
3 nos 16mm diameter Hex Head Bolt with Hex nut and washer for connection;
360mm long piece of guardrail use as backing of intermediate post; cast into
400mm width x 915mm depth reinforced concrete (Grade 30) including all
excavation work and formwork; all details as per Drawing No: TT/R/7/08 - 4/7 M 97
G 65mm Thick of 40mm asphalthic concrete mix binder coarse ; rolled to the
required camfers and gradients. M2 2,667
H 40mm Thick of 20mm asphalthic concrete mix wearing coarse ; rolled to the
required camfers and gradients. M2 2,667
J Bituminous prime and tack coat applied at the rate of 0.55 litres/m2 each M2 2,667
Road Resurfacing
K Allow for scraping to existing surfaces prior to laying of the wearing course
and remove all debris to Contractor's own dump. M2 3,674
New Pavement
Q 40mm Thick of 20mm asphalthic concrete mix wearing coarse ; rolled to the
required camfers and gradients. M2 665
C/F:
ROAD AND CARPARK (Cont'd) B/F:
(ALL QUANTITIES ARE PROVISIONAL)
A Precast concrete (Grade 20) as described kerb overall size 450mm wide x
325mm high; tapered, chamfered, finishing fair on exposed faces, including all
moulds, bedding and jointing in cement sand (1:3) mortar, haunching on and
including 525mm x 75mm thick concrete base slab, and all necessary formwork,
excavation, backfilling and removal of surplus earth all details as per Drawing
No: TT/R/7/08 M 472
C Concrete outlet channel with precast slabs over (at 10m interval) M 73
D Prepare and apply one undercoat and two finishing coats of approved external
gloss paint, in alternate black and white colours 1000mm long bands, to new
road kerbs. M 472
Road Marking
Prepare and apply two coats of approved themo-plastic road paint on road
surfaces; all details as per Drawing No: TT/R/7/08
M Allow for all other necessary items not mentioned above but shown in the
drawings and / or required to suit the actual work at the site and necessary
for the proper completion of the Element in accordance with the intent of
the Contract and the Contractor shall state and price in the space provided
below :-
Concrete Drain
A 750mm Wide concrete drains exceeding 600mm deep but not exceeding 750mm
deep constructed of 300mm glazed ware channel on 225mm thick reinforced
concrete (Grade 20) base with two layers of BRC B6 ; raised vertically with
188mm (average) thick reinforced concrete (Grade 20) wall, all reinforced with
two layers BRC B6; complete with 100mm diameter uPVC weep holes with
gravel at 3m centres bothside complete with broken stones including
excavation, backfilling and removal of surplus excavated material off site; all
as per Engineer's Drawings No.: TT/R/7/08 M 25
B Ditto; exceeding 900mm deep but not exceeding 1,050mm deep; ditto. M 87
C 380mm Wide concrete drains exceeding 300mm deep but not exceeding 450mm
deep constructed of 380mm half round glazed ware channel on 150mm thick
reinforced concrete (Grade 20) base with one layer of BRC B8 ; raised
vertically with 188mm (average) thick reinforced concrete (Grade 20) wall, all
reinforced with one layer BRC B8; complete with 100mm diameter uPVC weep
holes with gravel at 6m centres bothside complete with broken stone,
including excavation, backfilling and removal of surplus excavated material off
site; all as per Engineer's Drawings No.: TT/R/7/08 M 24
D Ditto; exceeding 600mm deep but not exceeding 750mm deep; ditto. M 87
E Ditto; exceeding 750mm deep but not exceeding 900mm deep; ditto. M 88
F Ditto; exceeding 900mm deep but not exceeding 1,050mm deep; ditto. M 27
G Ditto; exceeding 1,050mm deep but not exceeding 1,200mm deep; ditto. M 32
H 225mm Wide concrete drains exceeding 450mm deep but not exceeding 600mm
deep constructed of 225mm half round glazed ware channel on 137.5mm thick
reinforced concrete (Grade 20) base with one layer of BRC B8 ; raised
vertically with 150mm thick reinforced concrete (Grade 20) wall, all reinforced
with one layer BRC B8; complete with 100mm diameter uPVC weep holes with
gravel at 6m centres bothside complete with broken stone, including
excavation, backfilling and removal of surplus excavated material off site; all
as per Engineer's Drawings No.: TT/R/7/08 M 107
J Ditto; exceeding 750mm deep but not exceeding 900mm deep; ditto. M 110
K 450mm x 450mm x 75mm thick precast concrete cover reinforced with one
layer of BRC A6; all as per engneer's detail. No 55
Entrance culvert
L 175mm thick reinforced concrete removable slab reinforced with 4 nos 16mm
diameter high tensile bar top and bottom and 16mm diameter stirr bar at 125mm
c/c ; supported at both ends with 225mm and 338mm thick brickwall ; 225mm
thick concrete base reinforced with 12mm diameter high tensile bar at 100mm
c/c at bothways on 50mm thick lean concrete, finishing fair on exposed
surfaces, complete with 600mm x 600mm hinged ms grating; including all
necessary excavation backfilling, all as per Engineer's Drawing No: TT/R/7/08 M 127
C/F:
PRIMARY STORMWATER DRAINAGE (Cont'd) B/F:
(ALL QUANTITIES ARE PROVISIONAL)
Supply and lay "HUME" or approved equivalent precast concrete box culvert
complete with lid laid to falls, jointed grouted and bedded in cement and sand
(1:3); 50mm thick lean concrete and 150mm thick concrete bases reinforced
with 2 layers of BRC A7 and Y12 @ 150mm centres bothways , including all
necessary excavation backfilling, etc all as shown in the engineer's drawing:
TT/R/7/08
Sump
Sump pit constructed of 225mm thick burnt clay brickworks in cement mortar
1:3 & 12mm thick fairface internally and abutment wall mortar on exposed
faces; 150 mm thick concrete base reinforced with a layer of BRC A6 complete
on 50mm thick lean concrete, complete with GI trash sceen fabricated with Y25
bars at 50mm gaps welded on 50 x 50 x 6mm L angle iron frame and hinged ms
grating with Y25 bars, ditto; including excavation,backfilling and removal of
surplus excavated material off site; all as per Engineer's Drawing No:
TT/R/7/08
Supply and install water main piping including all electrofusion / screwed,
socketted and welded joints, bends, tees, elbows, diminishing pieces, plugs,
short lengths, jointing to dissimilar pipes with approved gaskets, concrete
anchor blocks, and all necessary fixing accessories including all excavation
and back filling of suitable materials of required covers, all as per Engineer's
drawings
J Stopcock as specified No 32
K Allow for capped off with one length at stop end. Sum
L 20mm Diameter stainless steel meter position with 20mm lockable valve
and stopcock as per Engineer's Drawing No. TT/W/7/08 No 33
M 100mm Diameter double way DI pillar hydrant, 1095.25mm high with outlet
complete with cap and chain, with concrete slab and anchor block, sluice
valve and chamber including all the necessary joints and fittings, finished
with approved yellow paint, all details as per Engineer's Drawing No:
TT/W/7/08 No 3
N Connection to existing water mains including making good all works disturbed Sum
P Allow for providing all labour, material and equipment in carring out pressure
tests on completed External Water Supply System in the presence and to the
satisfaction of the S.O. and the Authorities Sum
Q Allow for all other necessary items not mentioned above but shown in the
drawings and / or required to suit the actual work at the site and necessary
for the proper completion of the Element in accordance with the intent of
the Contract and the Contractor shall state and price in the space provided
below :-
A Excavate trenches to falls for 225mm diameter pipes, exceeding 1.20m but not
exceeding 1.50m deep, get out, part return, fill in and ram, dispose off site
surplus excavated materials M 77
B Ditto; exceeding 1.50m but not exceeding 1.80m deep; diito. M 30
F Excavate trenches 150mm diameter pipe, exceeding 1.20m not exceeding 1.50m
deep; dito. M 267
H Excavate trenches 100mm diameter pipe, exceeding 1.20m not exceeding 1.50m
deep; dito. M 8
K 225mm Diameter extra strength vitrified clay pipes and fittings, in Class "B"
bedding, laid to fall in trenches, joined with rubber ring flexible joint
in accordance with manufacturers instruction. M 267
Gully Trap
House Manhole
Manholes constructed of 225mm thick well burnt clay bricks in cement mortar
(1:3), and 12mm thick internal lining of high alumina cement mortar on 150mm
thick concrete base slab with 2 layers BRC B8 and 100mm thick concrete top
slab with a layer of BRC B8 and complete with 24" x 18" x 84 lbs manhole
cover and frame ; including all necessary excavation, formwork and part
return, fill in and ram and removal of surplus excavated material off site; all
details as per Engineers Drawing: TT/SAN/7/08
C/F:
EXTERNAL SEWER RETICULATION (Cont'd) B/F:
(ALL QUANTITIES ARE PROVISIONAL)
G Allow for providing all labour, material and equipment in carrying out
pressure tests on completed External Sewer System in the presence and
to the satisfaction of the S.O. and the Local Authorities Sum
H Allow for CCTV survey to the completed piping and submit to local
authority for approval. Sum
J Allow for all other necessary items not mentioned above but shown in the
drawings and / or required to suit the actual work at the site and necessary
for the proper completion of the Element in accordance with the intent of
the Contract and the Contractor shall state and price in the space provided
below :-
SUMMARY
* no detail; assumption
* no detail; assumption
* no detail; assumption
* no detail; assumption