Electric Movement in The Rio Grande Valley
Electric Movement in The Rio Grande Valley
Electric Movement in The Rio Grande Valley
How and Why (Data Resources, Product Parts) ~Provide the infrastructure needed to transition South Texas and Mexico to the Electric grid
Electric Charging Stations within Rio Grande Valley, along Highways 281 and 10
~Provide charging stations for families and local businesses to buy into the EV movement ~Battery Regulation and Coherence ~Big Market Strategic Advantages in existence within the Rio Grande Valley
~Baby Boomers and Winter Texans ~South Padre Island RV parks need charging stations ~R.G.V established mobile home parks
~UQM Technologies, Hydrophase HD Electric engine ~Lithium Nickel Cobalt Aluminum Cobalt Battery, Panasonic, NCR18650A (Matsushita) Used in Tesla Model S *Lies flat on bottom of van for easy battery swap ~Smart Innovation Tesla Battery Factory Possible outreach for battery Use existing success as a model for a future production line
Electric Cargo Vans ~EV Charging stations need to be installed in strategic locations around the RGV such as outlet malls, South Padre Island, Convention Centers as well as popular grocery stores. Electric Bus Fleet along Mexican/ American border ~Daily bus system model in place, transition E buses needed, short route (fitting for electric battery running times) ~To promote a sustainable local business structure for employment opportunities Business Analysis for Vehicle Wraps free marketing for local businesses