STAGE 1

DATA TAPAK
A Luas lahan
Luas lantai dasar 4000
C 1.6
Luas total bangunan 16000
D Ketinggian bangunan 8
Rata-rata luas lantai 2000
STAGE 4
ORGANISASI RUANG DALAM
1
Hidroponik
1.1.1 Persiapan
1.1.2 Pemeliharaan
1.1.3 Gudang peralatan
1.1.4 Cool storage
1.1.5 Thermostat room
1.1.6 Humidistat room
1.1.7 Sun reflector area
1.1.8
KEGIATAN BERTANAM
Bak air
C
D
1.1
m2
B KDB 40%
10000
KLB
A
B
1.1.9
1.1.10
1.2.1 Taman konservasi
1.2.8
2
2.1 Pembibitan
2.2 Pemeliharaan
Penampungan
2.3.1 Kolam induk jantan
2.3.2 Kolam induk betina
2.4 Cold storage
2.5 Pompa
2.6 Tandon air bersih
2.7 Gudang peralatan
2.8 Gudang makanan
3
Pertanian
3.1.1 Laboratorium Agronomi
3.1.2 Laboratorium fisik tanah
3.1.3
3.1.4
3.1.5
Hama
3.2.1 Laboratorium penelitian hama
3.2.2
3.2.3
3.2.4
Penyakit
3.3.1 Laboratorium penelitian penyakit
3.3.2
3.3.3
3.3.4
Pemuliaan
3.4.1 Laboratorium pemuliaan
3.4.2
3.4.3
3.4.4
Perikanan
3.5.1 Laboratorium karantina
3.5.2 Laboratorium penelitian air
3.5.3 R. prasitologi
3.5.4 R. sterilisasi
3.5.5 R. anatomi-morfologi
3.5.6
3.5.7
KEGIATAN BERTERNAK
KEGIATAN PENELITIAN
R. alat dan bahan
Gudang
Cold storage
Pompa
Toilet
Toilet
Cold storage
Gudang
R. alat dan bahan
Cold storage
Gudang
R. panthologi
R. autopsi
R. alat dan bahan
Cold storage
Gudang
R. alat dan bahan
3.1
3.2
3.3
3.4
3.5
1.1
1.2
2.3
3.5.8
3.5.9
3.5.10
3.5.11
4
4.1
4.2
5
5.1
5.2
5.3
5.4
5.5
5.6
5.7.1
5.7.2
5.7.3
5.7.4
5.7.5 P. perkebunan & perikanan
5.7.6
5.8.1
5.8.2
5.8.3
5.8.4
5.8.5
5.8.6
5.9
5.10
5.11
5.12
5.13
5.14
5
5.1
5.2
5.4
5.5
5.6.1
5.6.2
AREA SERVIS
KANTOR PENGELOLA
KEGIATAN WASTE MANAGEMENT
Distribusi
5.6
5.3
Hall
Gudang alat dan mesin
Bengkel alat
Pertanian
R. genset
R. PLN
R. panel listrik
Utama
Pantry
Gudang
Toilet
5.8
5.7
Perikanan
P. perkebunan & perikanan
Umum
R. rapat
R. arsip
R. istirahat
Perikanan
Umum
R. staff
Adm & keuangan
Pemasaran
Perkebunan
R. sekretaris
R. general manajer
R. kabag
Adm & keuangan
Pemasaran
Perkebunan
Penampungan sampah
Pengolahan sampah
Hall
Resepsionis
R. tamu
R. direktur
Cold storage
R. alat dan bahan
R. arsip
Pompa
3.5
5.7
5.8
5.9
5.10
5.11
5.12
5.13
5.14
5.15
5.16
5.17
5.18.1
5.18.2
5.19 Toilet
5.18
Bank ATM
Telepon umum
Musholla
R. wudhu
Pria
Wanita
R. tandon air
R. pompa air
R. STP
R. security
R. staff ME
R. mesin AC
R. bahan bakar
R. trafo listrik
STAGE 2
TOTAL AREA REQUIREMENTS
AREA REQUIREMENTS (INDOOR) 40%
By space type
By time
By location
PARKING REQUIREMENTS 20%
Parkir mobil
Parkir motor
Parkir sepeda
Parkir mobil servis
OUTDOOR SPACE REQUIREMENTS 30%
Taman outdoor
Kolam
Area pembibitan
Penangkaran ikan
Vendors
FUNCTIONAL ALTERNATIVES 10%
Selasar
Rumah genset
Pos satpam
dll
TOTAL 100%
1 2 3 4
Jumlah staff/ unit Jumlah unit Luas @ unit standar (m2) Luas @ unit (m2)
3321.4 3852
3 1 500 576 24
3 1 1000 1152 48
2 1 30 32 8
4 1 16 128 16
2 1 30 32 8
2 1 30 32 8
0 1 190 256 16
0 1 4 8 4
By organization
5
Ukuran @ unit (m2)
0 1 0.6 4 2
8 2 20.8 32 8
2 1 1500 1600 40
8 2 20.8 32 8
18
554 288
1 3 32 64 8
2 12 400 64 8
0 2 16 16 4
0 2 16 16 4
2 1 16 32 8
0 1 12 16 4
0 1 16 16 4
2 1 30 32 8
2 1 16 32 8
788.4 664
1 1 18 32 8
2 1 64 64 8
0 1 16.4 16 4
0 1 6 8 4
0 1 16 16 8
4 1 80 64 8
0 1 16 16 4
0 1 6 8 4
0 1 16 16 8
2 1 80 64 8
0 1 16 16 4
0 1 6 8 4
0 1 16 16 8
2 1 80 64 8
0 1 16 16 4
0 1 6 8 4
0 1 16 16 8
1 1 7 8 4
1 1 15 16 4
1 1 15 16 4
1 1 15 16 4
1 1 30 32 8
2 1 45 64 8
0 0 120 0 0
2 1 9 16 4
2 1 30 32 8
0 0 12 0 0
2 1 16 16 4
128
0 1 64 64 8
2 1 64 64 8
919.8 1168
20 1 50 64 8
2 1 12 16 4
4 1 12 16 4
1 1 37 32 8
1 1 9 16 4
1 1 25 32 8
1 1 20 16 4
1 1 20 16 4
1 1 20 16 4
1 1 20 16 4
1 1 20 16 4
1 1 20 16 4
2 1 45 32 8
2 1 45 32 8
2 1 36 32 8
2 1 36 32 8
2 1 36 32 8
2 1 36 32 8
25 1 125 256 16
0 1 30 32 8
10 1 150 256 16
5 1 45 64 8
2 1 50 64 8
8 2 20.8 32 8
805.8 1552
50 1 20 128 16
2 1 30 64 8
4 1 10 64 8
0 1 100 128 16
0 1 50 128 16
0 1 25 32 8
0 1 60 64 8
0 1 9 16 4
0 1 100 128 16
0 1 50 64 8
0 1 25 32 8
0 1 100 128 16
2 1 20 32 8
2 1 20 256 16
0 1 100 128 16
2 1 12 32 8
2 1 12 32 8
8 1 30 32 8
4 1 6 16 4
4 1 6 16 4
8 2 20.8 32 8
6389.4 7524
STAGE 3
m2 BUILDING INDOOR AREA PROGRAMMING
4000 AREA REQUIREMENTS (ALL LEVELS)
By organization
1 KEGIATAN BERTANAM
KEGIATAN BETERNAK
KEGIATAN PENELITIAN
2 KEGIATAN WASTE MANAGEMENT
3 KEGIATAN ADMINISTRATIF
2000 4 KEGIATAN PENUNJANG
5 KEGIATAN PENDUKUNG
NETT SQUARE METERS (NSM)
3000 6 SIRKULASI
NETT OCUPIABLE SQUARE METERS (NOSM)
7 TAO with efficiency
1000 9 EKSTERIOR WALL
GROSS SQUARE METERS (GSM)
TOTAL
10000
6
Luas total (m2) Keterangan
3884
24 576 #REF!
24 1152
4 32
8 128
4 32
4 32
16 256 85.33333 2284 761.3333
2 8
5
Ukuran @ unit (m2)
2 4
4 64
40 1600
4 64
1152
8 192 3
8 768
4 32
4 32
4 32
4 16
4 16
4 32
4 32
664
4 32 3
8 64
4 16
2 8
2 16
8 64 4
4 16
2 8
2 16
8 64 2
4 16
2 8
2 16
8 64 2
4 16
2 8
2 16
2 8 216 7
4 16
4 16
4 16
4 32
8 64
0 0
4 16
4 32
0 0
4 16
128
8 64 2
8 64
1200
8 64
4 16
4 16
4 32 3
4 16
4 32
4 16 6
4 16
4 16
4 16
4 16
4 16
4 32 12
4 32
4 32
4 32
4 32
4 32
16 256
4 32
16 256
8 64
8 64
4 64
1584
8 128
8 64
8 64
8 128
8 128
4 32
8 64
4 16
8 128
8 64
4 32
8 128
4 32
16 256
8 128
4 32
4 32
4 32
4 16
4 16
4 64
8612 #REF!
m2
100% 16000
25% 4000
7% 1120
4% 640
1% 160
6% 960
5% 800
5% 800
53% 8480
25% 2120
10600 (NSM + sirkulasi)
75% 14133.33 (NOSM / 75%)
2% #REF! (2%+(TAO + mekanikal)
#REF! (poin 7 + poin 8 + poin 9)