Deutz 2013 TCD 2V Workshop Manual Level3
Deutz 2013 TCD 2V Workshop Manual Level3
Deutz 2013 TCD 2V Workshop Manual Level3
competence level 3
Th
is
do
i
cu
s
al tr
m
l o ib
en
w u
ed tio
ti
sc
w n
ith in
op
yr
o u e it
ig
t o he
ht
ur r p
pr
pr r i n
ot
io t e
ec
ra d
te
d.
gr or
ee ele
m ct
en ro
t. n i
cf
o
rm
is
no
t
TCD 2013 2V
This document is subject to changes which may become necessary in the course of further development of the engines. Reprinting and reproductions of any kind, even in part, require our
written permission.
0312 2916 en
Printed in Germany
All rights reserved
1st Edition 02/2010
Order No. 0312 2916 en
Workshop Manual
TCD 2013 2V
0312 2916 en
This document is subject to changes which may become necessary in the course of further development of the engines. Reprinting and reproductions of any kind, even in part, require our
written permission.
DEUTZ engines
1
Foreword
General
User notes
3.1
3.2
3.3
3.4
3.5
02/2010
General
Specifications
Operating manual and workshop manual
Job cards
Explanation of symbols
Technical data
4.1
4.2
Table of contents
Sorted alphabetically
Sorted numerically
Job cards
Commercial tools
Special tools
1/2
OBJ_DOKU-21737-001.fm
Table of contents
02/2010
DEUTZ engines
2/2
OBJ_DOKU-21737-001.fm
DEUTZ engines
Foreword
1
05/2005
Foreword
1/4
OBJ_DOKU-21738-001.fm
Foreword
DEUTZ engines
05/2005
2/4
OBJ_DOKU-21738-001.fm
DEUTZ engines
Foreword
Repair of the engine must correspond to its use
for the intended purpose. Only parts released by
the manufacturer for the respective purpose may
be used for conversion work. Unauthorised modifications to the engine exclude manufacturer liability for resulting damages. Failure to observe
this will void the warranty!
Read and observe the information in this documentation. You will avoid accidents, retain the
manufacturer's warranty and possess a fully
functional and ready to operate engine.
This engine is built exclusively for purpose according to the scope of delivery - defined by the
equipment manufacturer (use for the intended
purpose). Any use above and beyond this is considered improper use. The manufacturer will not
be liable for damages resulting from this. The
user bears the sole risk.
Use for the intended purpose also includes observance of the operating, maintenance and repair instructions specified by the manufacturer.
The engine may only be used, maintained and
repaired by persons who are familiar with this
and are aware of the risks involved.
Your DEUTZ AG
05/2005
3/4
OBJ_DOKU-21738-001.fm
Foreword
DEUTZ engines
05/2005
4/4
OBJ_DOKU-21738-001.fm
DEUTZ engines
General
11/2005
General
1/4
OBJ_DOKU-21739-001.fm
General
DEUTZ engines
11/2005
2/4
OBJ_DOKU-21739-001.fm
DEUTZ engines
General
11/2005
3/4
OBJ_DOKU-21739-001.fm
General
DEUTZ engines
11/2005
4/4
OBJ_DOKU-21739-001.fm
DEUTZ engines
User notes
02/2010
User notes
1/8
OBJ_DOKU-21740-001.fm
User notes
DEUTZ engines
02/2010
2/8
OBJ_DOKU-21740-001.fm
DEUTZ engines
User notes
3.1 General
3.2 Specifications
Caution!
The rules for the prevention of accidents and the
safety regulations must be observed during maintenance work.
Only briefed personnel may operate or maintain the engine. Unauthorised persons are
prohibited access to the machine room.
02/2010
3/8
OBJ_DOKU-21740-001.fm
User notes
DEUTZ engines
Remove loose parts (for example paint chips
from assembly work) with an industrial vacuum
cleaner or other suction device. Only suction may
be used in assembly work on the open fuel system.
Only work on the fuel system in a clean environment (no dust, no grinding or welding). Avoid
draughts (dust). Clean the workshop floor regularly. No brake or performance test benches may
be kept or operated in the same room.
02/2010
4/8
OBJ_DOKU-21740-001.fm
DEUTZ engines
User notes
5/8
OBJ_DOKU-21740-001.fm
User notes
DEUTZ engines
5. Maintenance
The job card numbering uses the format W 08-0301. The individual parts of this format are explained
below:
9. Technical data
10.Service
02/2010
W 08-03-01: Module
according to module list
W 08-03-01: Component group
W 08-03-01: Consecutive number
6/8
OBJ_DOKU-21740-001.fm
DEUTZ engines
User notes
3.5 Explanation of symbols
Danger!
of death or to health. Must be observed!
For example: The incorrect use or conversion of the turbocharger can lead to serious
injury.
Caution!
Danger to the component/engine. Noncompliance can lead to destruction of the
component/engine.
Must be observed!
5
16
15
Note
General notes on assembly, environmental
protection etc. No potential danger for man
or machine.
14
8
13
12
Tool
Conventional and special tools required for
the work.
11
10
Auxiliary materials
Working materials required in addition to
the tools for performing the work
(e.g. greases, oils, adhesives, sealants)
References
to important documents or job cards for the
work process.
For example: Job card W 04-05-05
1. DEUTZ AG,
publisher of service documentation
2. Engine type
Reference
to a document or a job card within the work
process.
3. Module
4. Numbering of the job cards
Tightening specification
The necessary values are specified here.
If several values are necessary, a cross
reference is given to the Tightening
Specifications table.
For example:
ID no. A01 001 = cylinder head screws
02/2010
7/8
OBJ_DOKU-21740-001.fm
User notes
DEUTZ engines
02/2010
8/8
OBJ_DOKU-21740-001.fm
Technical data
Testing and setting data
TCD 2013 2V
02/2010
Technical data
4.1
1/18
OBJ_DOKU-21741-001.fm
Technical data
Testing and setting data
TCD 2013 2V
02/2010
2/18
OBJ_DOKU-21741-001.fm
02/2010
ID no.
Name
Information
Series
Value
Unit
Ignition sequence
L4
2V
1-3-4-2
L6
2V
1-5-3-6-2-4
2V
8,98 - 0,05
mm
TCD 2013
2V
0
8,96 - 0,05
mm
TCD 2013
Valve
P01 31
Standard, fit h7
Standard, fit h7
TCD 2013
3/18
P01 32
P01 33
TCD 2013
2V
0,045 - 0,075
mm
P01 34
TCD 2013
2V
0,065 - 0,095
mm
P01 35
TCD 2013
2V
2,62
mm
P01 36
TCD 2013
2V
2,3
mm
mm
mm
P01 37
TCD 2013
2V
+0,1
48 -0,1
P01 38
TCD 2013
2V
42 -0,1
TCD 2013
2V
0,99 - 0,1
mm
TCD 2013
2V
+ 0,15
1 - 0,1
mm
TCD 2013
2V
64,7
mm
4,5
mm
+0,1
TCD 2013 2V
Valve guide
Valve seat
P01 45
P01 46
+ 0,1
P01 51
untensioned, normal
Valve clearance
OBJ_DOKU-21741-001.fm
P01 61
TCD 2013
2V
90
P01 62
TCD 2013
2V
150
Technical data
Testing and setting data
Valve spring
Name
Information
Series
Value
P01 63
TCD 2013
2V
P01 64
TCD 2013
2V
144
Unit
Rocker arm/bracket
+ 0,033
mm
21,02 0
+ 0,033
mm
mm
P01 72
TCD 2013
2V
21,02 0
P01 73
TCD 2013
2V
P01 74
Diameter, fit h7
TCD 2013
2V
0
21 -0,021
Technical data
Testing and setting data
02/2010
ID no.
4/18
P02 03
Standard, diameter
TCD 2013
2V
85,00 - 0,02
mm
P02 04
Underdimension stage
TCD 2013
2V
0,25
mm
TCD 2013
2V
0
84,50 - 0,02
mm
P02 05
P02 06
Pin unroundness
Wear limit
TCD 2013
2V
0,01
mm
P02 07
Standard HRC
TCD 2013
2V
53 -3
HRC
TCD 2013
2V
38
TCD 2013
2V
0,4
mm
TCD 2013
2V
38,46
mm
TCD 2013
2V
68,00 - 0,02
mm
TCD 2013
2V
0,25
mm
TCD 20113
2V
67,50 - 0,02
mm
TCD 2013
2V
0,01
mm
+3
P02 12
P02 13
+0,06
Lifting journal
OBJ_DOKU-21741-001.fm
P02 22
P02 23
P02 24
P02 25
Pin unroundness
TCD 2013 2V
P02 11
02/2010
ID no.
Name
Information
Series
P02 26
TCD 2013
L4
2V
L6
Value
Unit
0,07
mm
0,10
mm
mm
Main bearing
Permissible axial clearance of crankshaft
in installed state
TCD 2013
2V
0,1 - 0,3
P02 35
TCD 2013
2V
2,9 0
+ 0,05
mm
TCD 2013
2V
+ 0,05
3,1 0
mm
P02 36
1. Step = 0.2 mm
Con-rod
5/18
P02 41
Parallelism of the con rod with respect to the pis- permissible deviation
ton bolt
at a distance of 100 mm
TCD 2013
2V
0,05
mm
P02 42
Parallelism of the con rod with respect to the pis- permissible deviation
ton bolt
at a distance of 100 mm
TCD 2013
2V
0,05
mm
P02 43
TCD 2013
2V
42 +0,04
mm
P02 45
TCD 2013
2V
0,034 - 0,056
mm
+ 0,02
installed, unmachined
+0,05
TCD 2013 2V
P02 34
installed
TCD 2013
2V
72,5 0
mm
P02 55
H6
TCD 2013
2V
72,5
mm
P02 56
TCD 2013
2V
0,036 - 0,095
mm
TCD 2013
2V
42 -0,006
mm
Piston bolt
P02 61
Piston
OBJ_DOKU-21741-001.fm
P02 70
Piston
P02 71
TCD 2013
2V
107,700
mm
P02 72
TCD 2013
2V
107,800
mm
Technical data
Testing and setting data
P02 52
Name
Information
Series
Value
Unit
P02 73
TCD 2013
2V
107,660
mm
P02 75
Piston protrusion
TCD 2013
2V
mm
P02 76
Piston protrusion
TCD 2013
2V
mm
P02 77
Piston protrusion
TCD 2013
2V
0,64 - 0,75
mm
P02 78
TCD 2013
2V
42 +0,01
+0,017
mm
Piston rings
6/18
TCD 2013
2V
0,3 - 0,55
mm
P02 85
TCD 2013
2V
1,5 - 2,0
mm
P02 86
TCD 2013
2V
0,3 - 0,6
mm
P02 87
TCD 2013
2V
P02 88
TCD 2013
2V
0,09 - 0,13
mm
P02 89
TCD 2013
2V
0,03 - 0,075
mm
TCD 2013
2V
108
+ 0,02
mm
Crankcase
Cylinder liners
OBJ_DOKU-21741-001.fm
P03 31
Standard
P03 35
Fit depth of collar rest and sealing surface for cylinder liner
TCD 2013
2V
8,92
P03 36
TCD 2013
2V
9 - 0,02
mm
P03 39
TCD 2013
2V
max. 0.080
mm
at least 0.030
mm
+ 0,03
mm
TCD 2013 2V
P02 84
Technical data
Testing and setting data
02/2010
ID no.
02/2010
ID no.
Name
Information
Series
Value
Unit
Standard
TCD 2013
2V
64,2 - 0,2
TCD 2013
2V
0,6 - 0,1
mm
TCD 2013
2V
62
mm
Engine control
Camshaft
Camshaft bearing pin diameter
P05 91
+ 0,2
+ 0,1
mm
Cooling system
P09 11
TCD 2013
2V
83
mm
P09 13
TCD 2013
2V
at least 8
mm
N
TCD 2013 2V
P04 31
Other components
7/18
P12 11
First assembly
TCD 2013
2V
650
P12 21
TCD 2013
2V
400 - 50
+ 50
Technical data
Testing and setting data
OBJ_DOKU-21741-001.fm
Technical data
Testing and setting data
TCD 2013 2V
T01 63
Setting of valve and control piston clearance
4-cylinder
ignition sequence: 1 - 3 - 4 - 2
Valves
overlap
Set to
1
4
Cylinder
3 4 2
2 1 3
1
6
5
2
Cylinder
3 6 2
4 1 5
00000-0
4
3
02/2010
8/18
OBJ_DOKU-21741-001.fm
Technical data
Tightening specifications
TCD 2013 2V
4.2
02/2010
Tightening specifications
9/18
OBJ_DOKU-21741-001.fm
Technical data
Tightening specifications
TCD 2013 2V
02/2010
10/18
OBJ_DOKU-21741-001.fm
02/2010
Name
A00 001
A00 002
A00 003
Screw type
Notes / Remarks
Screw
Nut
Screws
M12x35-10.9
M12x40-10.9
M12x60-10.9
M12x75-10.9
M12x85-10.9
M12x90-10.9
M12x220-10.9
PostPre-tensioclamping
ning value
value
Series
TCD 2013
2V
90 Nm
TCD 2013
2V
90 Nm
TCD 2013
2V
95 Nm
TCD 2013
2V
260 Nm
TCD 2013
2V
90 Nm
TCD 2013 2V
ID no.
Nut
11/18
Holder, engine mounting on crankcase
A00 006
M12x40-10.9
A01 001
TCD 2013
2V
50 Nm
A01 002
2V
30 Nm
A01 003
TCD 2013
2V
20 Nm
Hexagonal socket
130 Nm
+90
Technical data
Tightening specifications
OBJ_DOKU-21741-001.fm
A00 005
M16x40-10.9
M16x45-10.9
M16x75-10.9
M16x85-10.9
M16x110-10.9
M16x140-10.9
M16x155-10.9
M16x220-10.9
2V
13 Nm
A01 011
2V
10 Nm
A01 012
TCD 2013
2V
20 Nm
A01 013
TCD 2013
2V
24 Nm
2V
50 Nm
+60
+60
TCD 2013
2V
30 Nm
+60
+60
A03 020
2V
3 Nm
21 Nm
A03 030
2V
30 Nm
A03 031
Cu sealing ring
TCD 2013
2V
55 Nm
A03 060
TCD 2013
2V
20 Nm
12/18
M18x1.5
Series
30 Nm
TCD 2013 2V
A01 004
A02 020
Notes / Remarks
Technical data
Tightening specifications
02/2010
Name
A02 010
Screw type
PostPre-tensioclamping
ning value
value
ID no.
OBJ_DOKU-21741-001.fm
02/2010
ID no.
Name
Screw type
Notes / Remarks
PostPre-tensioclamping
ning value
value
Series
M16x85-10.9
Connection housing on crankcase/gear case
M12x85-10.9
99 Nm
Observe tightening sequence. TCD 2013
2V
M12x160-10.9
A03 085
99 Nm
Observe assembly specification.
99 Nm
TCD 2013
2V
9 Nm
M8x35-10.9
M8x55-10.9
M8x80-10.9
M16x60
A04 022
M8x55-10.9
M8x60-10.9
TCD 2013
2V
21 Nm
A04 025
M8x80-10.9
TCD 2013
2V
30 Nm
TCD 2013
2V
9 Nm
2V
9 Nm
A03 092
13/18
A05 011
M6x12
30 Nm
Observe tightening sequence. TCD 2013
2V
243 Nm
TCD 2013 2V
A03 080
M16x150-10.9
30 Nm
70 Nm
A05 013
TCD 2013
2V
20 Nm
A05 014
TCD 2013
2V
60 Nm
A06 001
TCD 2013
2V
25 Nm
Technical data
Tightening specifications
OBJ_DOKU-21741-001.fm
A05 012
14/18
Screw type
Notes / Remarks
Series
A06 020
Nut M10
TCD 2013
2V
42 Nm
A06 022
TCD 2013
2V
10 Nm
A06 030
TCD 2013
2V
11 Nm
A06 042
M8x100-10.9
Stage 1:
TCD 2013
2V
3 Nm
A06 042
M8x100-10.9
Stage 2:
TCD 2013
2V
30
A06 046
TCD 2013
2V
30 Nm
A07 001
2V
hand tight
A07 003
Union nut
Stage 1:
Observe assembly specification.
Use new pipe.
TCD 2013
2V
10 Nm
A07 003
Union nut
Stage 2:
TCD 2013
2V
60
A07 024
TCD 2013
2V
20 Nm
A07 031
M10x30-10.9
Screws oiled
TCD 2013
2V
10 Nm
A07 032
M8x75
M8x85
TCD 2013
2V
20 Nm
A07 034
TCD 2013
2V
26 Nm
A07 035
TCD 2013
2V
34 Nm
A07 038
Stage 1:
Observe assembly specification.
TCD 2013
2V
hand tight
A07 038
Stage 2:
TCD 2013
2V
30 Nm
27 Nm
+15
50 Nm
TCD 2013 2V
OBJ_DOKU-21741-001.fm
Name
Technical data
Tightening specifications
02/2010
PostPre-tensioclamping
ning value
value
ID no.
02/2010
Name
A07 039
A07 040
A07 045
PostPre-tensioclamping
ning value
value
Notes / Remarks
Series
TCD 2013
2V
100 Nm
TCD 2013
2V
70 Nm
TCD 2013
2V
Screw type
Hollow screw
49 Nm
39 Nm
15/18
A07 046
Hollow screw
TCD 2013
2V
49 Nm
A07 047
Hollow screw
TCD 2013
2V
29 Nm
A07 087
TCD 2013
2V
30 Nm
A07 090
TCD 2013
2V
30 Nm
A07 099
A08 001
A08 015
A08 040
A08 044
hand tight
approx.10
Nm
approx.10
Nm
TCD 2013
2V
hand tight
TCD 2013
2V
22 Nm
TCD 2013
2V
39 Nm
TCD 2013
2V
20 Nm
TCD 2013
2V
20 Nm
20 Nm
OBJ_DOKU-21741-001.fm
A08 051
M8x50
M8x80
2V
3 Nm
30 Nm
A08 052
Collar screw
TCD 2013
2V
80 Nm
160 Nm
A08 058
TCD 2013
2V
80 Nm
A08 091
TCD 2013
2V
30 Nm
A09 001
TCD 2013
2V
30 Nm
Technical data
Tightening specifications
A08 046
Hollow screw
TCD 2013 2V
ID no.
Name
A09 002
A09 010
Screw type
Notes / Remarks
PostPre-tensioclamping
ning value
value
Series
TCD 2013
2V
30 Nm
2V
30 Nm
TCD 2013
2V
30 Nm
TCD 2013
2V
30 Nm
A09 031
TCD 2013
2V
22 Nm
A09 045
TCD 2013
2V
30 Nm
A09 046
TCD 2013
2V
60 Nm
A09 047
Stage 1:
TCD 2013
2V
30 Nm
A09 047
Stage 2:
TCD 2013
2V
90
A09 048
TCD 2013
2V
30 Nm
A09 015
Technical data
Tightening specifications
02/2010
ID no.
16/18
M10x1x85
M10x1x80
M10x1x75
M10x1x70
A12 001
Flywheel on crankshaft
M10x1x50
M10x1x45
+60
+60
2V
M10x1x40
30 Nm
M10x1x35
OBJ_DOKU-21741-001.fm
+60
+30
M10x1x30
A12 030
TCD 2013
2V
30 Nm
+60
+60
TCD 2013 2V
M10x1x55
30 Nm
02/2010
Name
Screw type
A12 031
M10x70-10.9
A12 035
A12 041
A12 091
A12 092
A12 093
A12 094
17/18
A12 095
Notes / Remarks
PostPre-tensioclamping
ning value
value
Series
TCD 2013
2V
70 Nm
TCD 2013
2V
80 Nm
TCD 2013
2V
30 Nm
TCD 2013
2V
Hollow screw
M12x1.5
TCD 2013
2V
29 Nm
Hollow screw
M14x1.5
TCD 2013
2V
39 Nm
Hollow screw
M16x1.5
TCD 2013
2V
49 Nm
M6
M8
TCD 2013
2V
TCD 2013
2V
60 Nm
M8x25-8.8
Hollow screw
Union nut
18 Nm
20 Nm
13 Nm
20 Nm
A13 012
Generator on holder
M8x75
TCD 2013
2V
30 Nm
A13 015
M8x75
TCD 2013
2V
30 Nm
A13 017
M8x25
TCD 2013
2V
30 Nm
A13 018
TCD 2013
2V
70 Nm
A13 030
TCD 2013
2V
3 Nm
A13 032
TCD 2013
2V
20 Nm
A13 041
M6x16
self-tapping
TCD 2013
2V
8.5 Nm
A13 046
Screw M6
maximum
M5
TCD 2013
2V
A13 051
TCD 2013
2V
4.5 Nm
3.3 Nm
1.5 Nm
Technical data
Tightening specifications
OBJ_DOKU-21741-001.fm
A13 001
M6
TCD 2013 2V
ID no.
Name
A13 065
A49 001
Screw type
Notes / Remarks
PostPre-tensioclamping
ning value
value
Series
2V
20 Nm
TCD 2013
2V
25 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
Technical data
Tightening specifications
02/2010
ID no.
18/18
TCD 2013 2V
OBJ_DOKU-21741-001.fm
TCD 2013 2V
02/2010
5.1
Sorted alphabetically
1/12
OBJ_DOKU-21742-001.fm
TCD 2013 2V
02/2010
2/12
OBJ_DOKU-21742-001.fm
TCD 2013 2V
Activity
Job card
Maintenance group
W 01-02-02
Front cover
W 52-01-02
Connection housing
W 01-13-01
Crankcase
W 08-03-02
Cylinder head
W 05-05-03
Crankshaft
W 10-02-02
Camshaft
W 08-00-01
Cylinder head
W 06-01-02
Connecting rod
W 05-05-02
Crankshaft
W 01-05-01
Crankcase
W 07-01-02
Piston
W 07-02-02
Piston
W 38-01-02
Thermostat housing
W 08-04-03
Cylinder head
W 08-04-04
Cylinder head
W 08-04-02
Cylinder head
Control parts
W 39-02-03
Fan drive
W 49-02-01
Tools
Tools
W 46-00-01
Engine mounting
W 22-01-01
W 63-01-01
Start aid
W 08-03-01
Cylinder head
W 48-05-01
Electrical equipment
W 39-01-01
Fan drive
W 48-01-01
Cable harness
W 10-02-01
Camshaft
W 52-01-01
Connection housing
W 17-01-01
High-pressure pump
02/2010
3/12
OBJ_DOKU-21742-001.fm
TCD 2013 2V
Activity
Job card
Maintenance group
W 37-03-01
Coolant pump
W 01-01-01
Crankcase
W 05-05-01
Crankshaft
W 08-01-01
Cylinder head
W 04-01-01
Cylinder liner
W 47-01-01
Engine mounting
W 41-01-01
Exhaust pipe
Cylinder head
W 39-04-03
Fan console
W 39-02-01
Fan drive
W 05-03-01
Flywheel
W 01-03-01
Front cover
W 20-01-01
Fuel filter
W 48-06-01
Electrical equipment
W 20-02-01
Fuel pump
W 09-02-02
Gearcase
Generator
W 63-02-01
Start aid
W 17-01-04
High-pressure pump
W 17-01-05
High-pressure pump
W 48-02-03
Electrical equipment
W 48-02-01
Electrical equipment
W 19-01-01
Injector
W 15-02-01
W 15-02-02
W 02-01-01
W 48-04-01
Electrical equipment
W 16-01-01
W 06-01-01
Connecting rod
02/2010
4/12
OBJ_DOKU-21742-001.fm
TCD 2013 2V
Activity
Job card
Maintenance group
W 01-08-01
Crankcase
Crankcase
Fuel pipes
W 48-03-01
Electrical equipment
W 21-02-01
Fuel pipes
W 21-02-05
Fuel pipes
W 11-02-01
Control parts
Cylinder head
W 44-03-01
Starter
W 38-01-01
Thermostat housing
W 38-02-01
Thermostat housing
W 43-01-01
W 08-04-01
Cylinder head
W 05-01-01
W 05-02-01
Gearcase
Front cover
Control parts
W 11-01-01
Control parts
W 04-01-02
Cylinder liner
02/2010
5/12
OBJ_DOKU-21742-001.fm
TCD 2013 2V
02/2010
6/12
OBJ_DOKU-21742-001.fm
TCD 2013 2V
5
5.2
02/2010
Sorted numerically
7/12
OBJ_DOKU-21742-001.fm
TCD 2013 2V
02/2010
8/12
OBJ_DOKU-21742-001.fm
TCD 2013 2V
Job card
Activity
Maintenance group
W 01-01-01
Crankcase
W 01-02-01
W 01-02-02
Front cover
W 01-03-01
Front cover
W 01-05-01
Crankcase
W 01-07-03
W 01-08-01
Crankcase
W 01-13-01
Crankcase
W 02-01-01
W 04-01-01
Cylinder liner
W 04-01-02
Cylinder liner
W 05-01-01
W 05-02-01
W 05-03-01
Flywheel
W 05-05-01
Crankshaft
W 05-05-02
Crankshaft
W 05-05-03
Crankshaft
W 06-01-01
Connecting rod
W 06-01-02
Connecting rod
W 07-01-02
Piston
W 07-02-02
Piston
W 08-00-01
Cylinder head
W 08-01-01
Cylinder head
W 08-02-01
W 08-02-02
W 08-03-01
Cylinder head
W 08-03-02
Cylinder head
W 08-04-01
Cylinder head
W 08-04-02
Cylinder head
W 08-04-03
Cylinder head
W 08-04-04
Cylinder head
W 09-01-01
02/2010
9/12
OBJ_DOKU-21742-001.fm
TCD 2013 2V
Job card
Activity
Maintenance group
W 09-02-02
Gearcase
W 10-02-01
Camshaft
W 10-02-02
Camshaft
W 11-01-01
W 11-01-01
Control parts
W 11-02-01
Control parts
W 11-02-02
W 15-02-01
W 15-02-02
W 16-01-01
W 17-01-01
High-pressure pump
W 17-01-04
High-pressure pump
W 17-01-05
High-pressure pump
W 19-01-01
Injector
W 20-01-01
Fuel filter
W 20-02-01
Fuel pump
W 21-02-01
Fuel pipes
W 21-02-03
W 21-02-05
Fuel pipes
W 22-01-01
W 37-03-01
Coolant pump
W 38-01-01
Thermostat housing
W 38-01-02
Thermostat housing
W 38-02-01
Thermostat housing
W 39-01-01
Fan drive
W 39-02-01
Fan drive
W 39-02-03
Fan drive
W 39-04-03
Fan console
02/2010
10/12
OBJ_DOKU-21742-001.fm
TCD 2013 2V
Job card
Activity
Maintenance group
W 41-01-01
Exhaust pipe
W 43-01-01
W 44-02-01
W 44-03-01
Starter
W 46-00-01
Engine mounting
W 47-01-01
Engine mounting
W 48-01-01
Cable harness
W 48-02-01
Electrical equipment
W 48-02-03
Electrical equipment
W 48-03-01
Electrical equipment
W 48-04-01
Electrical equipment
W 48-05-01
Electrical equipment
W 48-06-01
Electrical equipment
W 49-02-01
Tools
W 49-02-02
W 52-01-01
Connection housing
W 52-01-02
Connection housing
W 63-01-01
Start aid
W 63-02-01
Start aid
02/2010
11/12
OBJ_DOKU-21742-001.fm
TCD 2013 2V
02/2010
12/12
OBJ_DOKU-21742-001.fm
DEUTZ engines
11/2005
Job cards
Job cards
1/2
OBJ_DOKU-21743-001.fm
Job cards
DEUTZ engines
11/2005
2/2
OBJ_DOKU-21743-001.fm
Crankcase
W 01-01-01
TCD 2013 2V
Removing and installing the crankcase bleeding
Standard tools:
Hose clip pliers
Spring band pliers
8011
9090
2
44130-0
44131-0
02/2010
1/4
OBJ_DOKU-21744-001.fm
Crankcase
W 01-01-01
TCD 2013 2V
43944-0
X
X
44132-0
44106-0
02/2010
2/4
OBJ_DOKU-21744-001.fm
Crankcase
W 01-01-01
TCD 2013 2V
Mount crankcase bleeding (1).
Tighten screws .
20 Nm
6
44107-0
29 Nm
Use new sealing rings.
30 Nm
M6
13 Nm
Fix the hose clip (4) with the hose clip pliers.
Plug on bleeding hose.
Position the spring band clip (1) with the spring band
pliers.
43944-0
X
X
1
44129-0
02/2010
3/4
OBJ_DOKU-21744-001.fm
Crankcase
W 01-01-01
TCD 2013 2V
02/2010
4/4
OBJ_DOKU-21744-001.fm
Front cover
W 01-02-01
TCD 2013 2V
Renewing the crankshaft sealing ring
(opposite side to flywheel)
Standard tools:
Pricker
Assembly lever
8198
9017
Special tools:
Assembly tool
142820
W 05-01-01
Self-tapping screw
Washer
Attention!
44198-0
44199-0
02/2010
1/6
OBJ_DOKU-21745-001.fm
Front cover
W 01-02-01
TCD 2013 2V
6
44200-0
44201-0
44202-0
02/2010
2/6
OBJ_DOKU-21745-001.fm
Front cover
W 01-02-01
TCD 2013 2V
Mount guide sleeve (1).
Make sure the clamping bushing (2) is in
line with the bore (3).
6
44203-0
44204-0
44205-0
02/2010
3/6
OBJ_DOKU-21745-001.fm
Front cover
W 01-02-01
TCD 2013 2V
44206-0
1
44207-0
2
1
44208-0
02/2010
4/6
OBJ_DOKU-21745-001.fm
Front cover
W 01-02-01
TCD 2013 2V
Tighten nut to the stop of the assembly sleeve (1).
The crankshaft sealing ring is now at the
pre-selected installation depth.
Remove assembly tool.
6
44209-0
44210-0
02/2010
5/6
OBJ_DOKU-21745-001.fm
Front cover
W 01-02-01
TCD 2013 2V
02/2010
6/6
OBJ_DOKU-21745-001.fm
Front cover
W 01-02-02
TCD 2013 2V
Assembling/disassembling shaft sleeve on the crankshaft
(opposite side to flywheel)
Standard tools
W 01-02-01
W 01-03-01
W 16-01-01
Packing compound
DEUTZ DW 74
39876-0
44875-0
02/2010
1/4
OBJ_DOKU-21746-001.fm
Front cover
W 01-02-02
TCD 2013 2V
Attention!
6
39872-0
39891-0
39875-0
02/2010
2/4
OBJ_DOKU-21746-001.fm
Front cover
W 01-02-02
TCD 2013 2V
Removing the shaft sleeve
Remove the crankshaft sealing ring.
W 01-02-01
Remove oil suction pipe
W 16-01-01
6
39871-0
1
1
44542-0
Attention!
39873-0
02/2010
3/4
OBJ_DOKU-21746-001.fm
Front cover
W 01-02-02
TCD 2013 2V
6
39874-0
W 16-01-01
Install a new crankshaft sealing ring.
W 01-02-01
Insert clamping bushing (1).
44875-0
02/2010
4/4
OBJ_DOKU-21746-001.fm
Front cover
W 01-03-01
TCD 2013 2V
Removing and installing the front cover
(opposite side to flywheel)
Standard tools:
Feeler gauges
W 01-02-01
W 05-01-01
W 16-01-01
Locking agent
DEUTZ DW 72
2
44540-0
44541-0
02/2010
1/6
OBJ_DOKU-21747-001.fm
Front cover
W 01-03-01
TCD 2013 2V
1
1
44542-0
44543-0
Attention!
44544-0
02/2010
2/6
OBJ_DOKU-21747-001.fm
Front cover
W 01-03-01
TCD 2013 2V
Fix the new gasket to the crankcase with a little
grease.
Note installation position.
Make sure the clamping bushing (1) is in
place.
6
44545-0
44546-0
44547-0
02/2010
3/6
OBJ_DOKU-21747-001.fm
Front cover
W 01-03-01
TCD 2013 2V
6
44548-0
3 Nm
2
Stage 2:
5
7
21 Nm
10
6
13
9
12
11
14
44550-0
44551-0
02/2010
4/6
OBJ_DOKU-21747-001.fm
Front cover
W 01-03-01
TCD 2013 2V
Turn engine 180.
Lay cable between front cover and coolant pump (arrow).
6
44552-0
W 01-02-01
Install V-belt pulley.
W 05-01-01
44553-0
2
44091-0
02/2010
5/6
OBJ_DOKU-21747-001.fm
Front cover
W 01-03-01
TCD 2013 2V
6
44092-0
Press the impulse transmitter lightly against the feeler gauge blade.
Tighten screws (arrows).
20 Nm
44093-0
44094-0
02/2010
6/6
OBJ_DOKU-21747-001.fm
Crankcase
W 01-05-01
TCD 2013 2V
Checking the overhang of the cylinder liner
Standard tools
8190
Special tools:
Dial gauge
Measuring device
W 08-03-01
100400
100750
44071-0
Apply stylus of the dial gauge to the crankcase sealing surface with pre-tension (arrow).
Adjust dial gauge to "0".
44072-0
02/2010
1/2
OBJ_DOKU-21748-001.fm
Crankcase
W 01-05-01
TCD 2013 2V
Move the measuring beam and spacing washers until the stylus (arrow) is touching the sealing surface of
the cylinder liner.
0,03 - 0,08 mm
Make measurements at at least 3 other
points on the cylinder liner.
When the wear limit is reached, the
cylinder liner must be renewed.
Install cylinder head.
W 08-03-01
6
44073-0
02/2010
2/2
OBJ_DOKU-21748-001.fm
Crankcase
W 01-07-03
TCD 2013 2V
Removing and installing the pressure holding valve
Standard tools
Special tools:
Slide hammer
W 16-01-01
150800
Locking agent
DEUTZ DW 71
44570-0
44571-0
02/2010
1/4
OBJ_DOKU-21749-001.fm
Crankcase
W 01-07-03
TCD 2013 2V
6
44572-0
44573-0
44574-0
02/2010
2/4
OBJ_DOKU-21749-001.fm
Crankcase
W 01-07-03
TCD 2013 2V
Knock in pressure holding valve to the stop with a
suitable tool.
Install oil suction pipe.
W 16-01-01
Insert oil dipstick.
6
44575-0
02/2010
3/4
OBJ_DOKU-21749-001.fm
Crankcase
W 01-07-03
TCD 2013 2V
02/2010
4/4
OBJ_DOKU-21749-001.fm
Crankcase
W 01-08-01
TCD 2013 2V
Removing and installing the piston cooling nozzles
Standard tools
W 05-05-01
44271-0
44272-0
02/2010
1/2
OBJ_DOKU-21750-001.fm
Crankcase
W 01-08-01
TCD 2013 2V
6
44273-0
02/2010
2/2
OBJ_DOKU-21750-001.fm
Crankcase
W 01-13-01
TCD 2013 2V
Checking collar contact for cylinder liner
Standard tools:
Micrometer gauge
Depth-measuring
appliance
W 04-01-01
44076-0
+0.03
mm
44077-0
02/2010
1/2
OBJ_DOKU-21751-001.fm
Crankcase
W 01-13-01
TCD 2013 2V
02/2010
2/2
OBJ_DOKU-21751-001.fm
TCD 2013 2V
Removing and installing the lubricating oil pan
(metal sheet lubricating oil pan)
Attention!
Standard tools:
Wire brush
4 pin bolts M8x70
Special tools:
Separating tool
Packing compound
DEUTZ DW 74
Emptying and filling the engine with operating media must be carried out according to
the operating manual and the appropriate
documentation of the vehicle/equipment
manufacturer.
2
44480-1
45971-0
02/2010
1/6
OBJ_DOKU-21752-001.fm
TCD 2013 2V
Attention!
6
45969-0
Attention!
2
1
45970-0
45968-0
02/2010
2/6
OBJ_DOKU-21752-001.fm
TCD 2013 2V
Visually inspect the component.
6
43450-1
46907-0
Attention!
46908-0
02/2010
3/6
OBJ_DOKU-21752-001.fm
TCD 2013 2V
Attention!
6
45972-0
Apply packing compound evenly to the sealing surface and in the beading of the lube oil tray.
Apply the packing compound in an even
bead (thickness approx. 3.5 mm).
The position of the packing compound is
only partly illlustrated.
43451-0
Attention!
45678-0
02/2010
4/6
OBJ_DOKU-21752-001.fm
TCD 2013 2V
Fasten all screws (1).
Note different screw lengths.
6
45971-0
24 20 16 12 8
9 13 17 21 25 29
32
31
34
27
33
23 19 15 11 7
6 10 14 18 22 26 30
43414-0
16
12
13
17
24
21
26
25
23
22
19
15
11
10
14
18
43413-0
02/2010
5/6
OBJ_DOKU-21752-001.fm
TCD 2013 2V
2
44480-1
02/2010
6/6
OBJ_DOKU-21752-001.fm
Cylinder liner
W 04-01-01
TCD 2013 2V
Removing and installing the cylinder liner
Standard tools
8190
Special tools:
Extraction tool, universal
Tension plate
Assembly lever
Washer
150170
150171
150190
150191
W 01-05-01
W 01-13-01
W 04-01-02
W 06-01-01
Fitting compound
DEUTZ AP1908
44260-0
1
43564-0
02/2010
1/6
OBJ_DOKU-21753-001.fm
Cylinder liner
W 04-01-01
TCD 2013 2V
Fold the plate (1) to the side and insert the disassembly device in the cylinder liner.
Attention!
6
44442-0
44443-0
2
1
44063-0
02/2010
2/6
OBJ_DOKU-21753-001.fm
Cylinder liner
W 04-01-01
TCD 2013 2V
Turn the nut (1) clockwise.
Remove the disassembly device.
6
44064-0
44065-0
Remove O-rings.
Visually inspect the components.
Testing the cylinder liner.
W 04-01-02
44066-0
02/2010
3/6
OBJ_DOKU-21753-001.fm
Cylinder liner
W 04-01-01
TCD 2013 2V
6
43568-0
44441-0
44067-0
02/2010
4/6
OBJ_DOKU-21753-001.fm
Cylinder liner
W 04-01-01
TCD 2013 2V
Select the pressing disc (1) according to the diameter of the cylinder liner and screw to the assembly lever.
6
43610-0
44068-0
Press in the cylinder liner to the stop with the assembly lever.
44069-0
02/2010
5/6
OBJ_DOKU-21753-001.fm
Cylinder liner
W 04-01-01
TCD 2013 2V
6
44070-0
44260-0
02/2010
6/6
OBJ_DOKU-21753-001.fm
Cylinder liner
W 04-01-02
TCD 2013 2V
Testing the cylinder liner
Standard tools:
Micrometer gauge
Internal measuring device
Special tools:
Dial gauge
W 04-01-01
W 06-01-01
W 08-03-01
The crankshaft bearing covers must be
mounted properly for measuring the
cylinders.
100400
44074-0
36094-1
02/2010
1/4
OBJ_DOKU-21754-001.fm
Cylinder liner
W 04-01-02
TCD 2013 2V
1
2
3
6
39100-1
+0.02
mm
44075-0
44078-0
02/2010
2/4
OBJ_DOKU-21754-001.fm
Cylinder liner
W 04-01-02
TCD 2013 2V
Measure collar height in area (X) with micrometer
gauge.
9 -0.02 mm
+0
6
48168-1
44080-0
02/2010
3/4
OBJ_DOKU-21754-001.fm
Cylinder liner
W 04-01-02
TCD 2013 2V
02/2010
4/4
OBJ_DOKU-21754-001.fm
TCD 2013 2V
Removing and installing the V-belt, V-belt pulley
Standard tools:
Feeler gauges
V-belt tension measuring
device
8115
Operation manual
W 01-03-01
Attention!
Locking agent
DEUTZ DW 72
1
44037-1
1
1
44038-0
02/2010
1/12
OBJ_DOKU-21755-001.fm
TCD 2013 2V
6
44039-0
44040-0
44041-0
02/2010
2/12
OBJ_DOKU-21755-001.fm
TCD 2013 2V
Loosen all screws (arrow).
Do not unscrew screws.
6
44526-0
2
44042-0
44043-0
02/2010
3/12
OBJ_DOKU-21755-001.fm
TCD 2013 2V
6
44527-0
2
44528-0
2
44529-0
02/2010
4/12
OBJ_DOKU-21755-001.fm
TCD 2013 2V
Visually inspect the components.
6
44530-0
44531-0
Fix the tooth lock washer with the largest hole (1) to
the V-belt pulley with clamping bushing (2).
Note installation position of the tooth lock
washer.
1
44532-0
02/2010
5/12
OBJ_DOKU-21755-001.fm
TCD 2013 2V
6
44533-0
44534-0
44535-0
02/2010
6/12
OBJ_DOKU-21755-001.fm
TCD 2013 2V
Mount adapter.
Fasten screws.
The centring bolt (1) must face the V-belt
pulley.
6
44536-0
Stage 3:
60
Attention!
44538-0
02/2010
7/12
OBJ_DOKU-21755-001.fm
TCD 2013 2V
6
44043-0
44049-0
44591-0
02/2010
8/12
OBJ_DOKU-21755-001.fm
TCD 2013 2V
Mount V-belt tension measuring device on V-belt.
The V-belt must be between the
guides (arrow).
6
44050-0
44051-0
44052-0
02/2010
9/12
OBJ_DOKU-21755-001.fm
TCD 2013 2V
6
44041-0
44040-0
1
44053-0
02/2010
10/12
OBJ_DOKU-21755-001.fm
TCD 2013 2V
Lower indicator arm (1) into V-belt tension measuring
device.
1
6
44591-0
44054-0
1
44055-0
02/2010
11/12
OBJ_DOKU-21755-001.fm
TCD 2013 2V
30 Nm
Tighten screw (3).
30 Nm
2
44056-0
44057-0
44094-0
02/2010
12/12
OBJ_DOKU-21755-001.fm
TCD 2013 2V
Removing and installing torsional vibration damper
(V-belt drive)
Standard tools
1
44436-0
Attention!
70 Nm
02/2010
1/2
OBJ_DOKU-21756-001.fm
TCD 2013 2V
02/2010
2/2
OBJ_DOKU-21756-001.fm
Flywheel
W 05-03-01
TCD 2013 2V
Removing and installing the flywheel
Standard tools:
Rotation angle disc
Guide pin (self-constructed)
8190
44569-0
44276-0
02/2010
1/4
OBJ_DOKU-21757-001.fm
Flywheel
W 05-03-01
TCD 2013 2V
6
44555-0
34224-2
Fasten screws.
Attention!
44556-0
02/2010
2/4
OBJ_DOKU-21757-001.fm
Flywheel
W 05-03-01
TCD 2013 2V
M10x35 - M10x85
Tighten screws .
Stage 1:
30 Nm
Stage 2:
60
Stage 3:
60
Block flywheel with suitable tool.
6
42826-0
M10x30
Tighten screws .
Stage 1:
30 Nm
Stage 2:
60
Stage 3:
30
Block flywheel with suitable tool.
42826-0
31115-1
02/2010
3/4
OBJ_DOKU-21757-001.fm
Flywheel
W 05-03-01
TCD 2013 2V
02/2010
4/4
OBJ_DOKU-21757-001.fm
Crankshaft
W 05-05-01
TCD 2013 2V
Removing and installing the crankshaft
Standard tools:
Socket wrench insert
8035
Special tools:
Turn-over gear
100380
W 01-03-01
W 05-05-03
W 09-02-02
Removing crankshaft
Remove front cover (opposite side to flywheel).
W 01-03-01
Remove the gear case cover (flywheel side).
W 09-02-02
44220-0
44221-0
02/2010
1/12
OBJ_DOKU-21758-001.fm
Crankshaft
W 05-05-01
TCD 2013 2V
6
44222-0
Place lifting journal of the respective cylinder at bottom dead centre (BDC).
Attention!
44223-0
44224-0
02/2010
2/12
OBJ_DOKU-21758-001.fm
Crankshaft
W 05-05-01
TCD 2013 2V
Make a mark (1) on the camshaft gear wheel for assistance.
Your mark must be on a line between the
marking (2) and the middle (3) of the
camshaft.
6
44225-0
Attention!
44226-0
44227-0
02/2010
3/12
OBJ_DOKU-21758-001.fm
Crankshaft
W 05-05-01
TCD 2013 2V
6
44228-0
44230-0
W 05-05-03
44231-0
02/2010
4/12
OBJ_DOKU-21758-001.fm
Crankshaft
W 05-05-01
TCD 2013 2V
Installing the crankshaft
Insert upper main bearing shells.
Note the assignment of the bearing shells.
The anti-rotation lock (1) must lock in
groove (2).
6
44232-0
44233-0
44234-0
02/2010
5/12
OBJ_DOKU-21758-001.fm
Crankshaft
W 05-05-01
TCD 2013 2V
6
44235-0
44216-0
44236-0
02/2010
6/12
OBJ_DOKU-21758-001.fm
Crankshaft
W 05-05-01
TCD 2013 2V
Position camshaft.
The bore (1) must be facing the cylinder
head.
Lightly oil bearing surfaces.
6
44237-0
Attention!
44238-1
44446-0
02/2010
7/12
OBJ_DOKU-21758-001.fm
Crankshaft
W 05-05-01
TCD 2013 2V
6
42662-0
42663-0
44240-0
02/2010
8/12
OBJ_DOKU-21758-001.fm
Crankshaft
W 05-05-01
TCD 2013 2V
Attention!
50 Nm
Stage 2:
60
Stage 3:
60
44241-0
44242-0
Place lifting journal of the respective cylinder at bottom dead centre (BDC).
Attention!
44243-0
02/2010
9/12
OBJ_DOKU-21758-001.fm
Crankshaft
W 05-05-01
TCD 2013 2V
Attention!
2651
9
26 5 1
9
44244-0
44245-0
44222-0
02/2010
10/12
OBJ_DOKU-21758-001.fm
Crankshaft
W 05-05-01
TCD 2013 2V
Insert oil dipstick (1).
6
44221-0
44187-0
44220-0
02/2010
11/12
OBJ_DOKU-21758-001.fm
Crankshaft
W 05-05-01
TCD 2013 2V
02/2010
12/12
OBJ_DOKU-21758-001.fm
Crankshaft
W 05-05-02
TCD 2013 2V
Checking the crankshaft
Standard tools:
Magnetic measuring stand
Micrometer gauge
Internal measuring device
Prisms
Hardness tester
Special tools:
Dial gauge
W 05-05-01
100400
42602-0
30560-1
02/2010
1/4
OBJ_DOKU-21759-001.fm
Crankshaft
W 05-05-02
TCD 2013 2V
6
44445-0
43515-1
36424-2
02/2010
2/4
OBJ_DOKU-21759-001.fm
Crankshaft
W 05-05-02
TCD 2013 2V
Checking the diameter of the main bearing
pins
Measure main bearing pin with micrometer gauge.
Standard
85,00 -0.02 mm
0
6
42603-0
42604-0
02/2010
3/4
OBJ_DOKU-21759-001.fm
Crankshaft
W 05-05-02
TCD 2013 2V
6
35825-2
Measure bearing width with internal measuring device between thelay-on surfaces of the thrust rings.
Standard
38
+0.06
mm
42606-0
Visual inspection
Check the running surfaces (1) of the crankshaft
sealing rings visually.
Visually inspect gear wheel (2).
Install crankshaft.
W 05-05-01
42607-0
02/2010
4/4
OBJ_DOKU-21759-001.fm
Crankshaft
W 05-05-03
TCD 2013 2V
Checking the axial clearance of the crankshaft
Standard tools:
Magnetic measuring stand
Micrometer gauge
Internal measuring device
Socket wrench insert
8035
8190
Special tools:
Dial gauge
W 01-03-01
W 05-05-01
W 09-02-02
100400
44179-0
44180-0
02/2010
1/6
OBJ_DOKU-21760-001.fm
Crankshaft
W 05-05-03
TCD 2013 2V
44181-0
44182-0
+0.05
mm
43504-0
02/2010
2/6
OBJ_DOKU-21760-001.fm
Crankshaft
W 05-05-03
TCD 2013 2V
Remove crankshaft.
W 05-05-01
Set micrometer gauge to 38 mm.
Push the internal measuring device between the test
surfaces of the micrometer gauge and set to "0".
6
35825-2
42606-0
35827-2
02/2010
3/6
OBJ_DOKU-21760-001.fm
Crankshaft
W 05-05-03
TCD 2013 2V
Install crankshaft.
W 05-05-01
6
35827-2
44183-0
44184-0
02/2010
4/6
OBJ_DOKU-21760-001.fm
Crankshaft
W 05-05-03
TCD 2013 2V
Fix both thrust ring halves with a little grease to the
bearing cap.
Use lower thrust ring halves with guide lug
(arrow).
Install thrust ring halves according to measured axial clearance.
6
42663-0
44185-0
Attention!
02/2010
5/6
OBJ_DOKU-21760-001.fm
Crankshaft
W 05-05-03
TCD 2013 2V
6
44187-0
02/2010
6/6
OBJ_DOKU-21760-001.fm
Connecting rod
W 06-01-01
TCD 2013 2V
Removing and installing the piston and con rod
Standard tools:
Rotation angle disc
8190
Special tools:
Piston ring compressor
Liner holder
W 07-02-02
W 08-03-01
W 16-01-01
130640
150180
Attention!
44260-0
02/2010
1/8
OBJ_DOKU-21761-001.fm
Connecting rod
W 06-01-01
TCD 2013 2V
6
44248-0
44249-0
02/2010
2/8
44250-0
OBJ_DOKU-21761-001.fm
Connecting rod
W 06-01-01
TCD 2013 2V
Removing the piston
Remove locking ring.
Press out piston pin.
Visually inspect the components.
6
44251-0
44252-0
26519
44253-0
02/2010
3/8
OBJ_DOKU-21761-001.fm
Connecting rod
W 06-01-01
TCD 2013 2V
6
44254-0
44211-0
1
44215-0
02/2010
4/8
OBJ_DOKU-21761-001.fm
Connecting rod
W 06-01-01
TCD 2013 2V
Insert bearing shell in the respective big end bearing
cap.
Note the assignment of the bearing shells.
The anti-rotation lock (1) must lock in
groove (2).
6
44216-0
42380-1
44255-0
02/2010
5/8
OBJ_DOKU-21761-001.fm
Connecting rod
W 06-01-01
TCD 2013 2V
6
44256-0
Attention!
44257-0
Attention!
44258-0
02/2010
6/8
OBJ_DOKU-21761-001.fm
Connecting rod
W 06-01-01
TCD 2013 2V
Tighten new screws with rotation angle disc.
Stage 1:
30 Nm
Stage 2:
60
Stage 3:
60
6
44259-0
44260-0
44261-0
02/2010
7/8
OBJ_DOKU-21761-001.fm
Connecting rod
W 06-01-01
TCD 2013 2V
02/2010
8/8
OBJ_DOKU-21761-001.fm
Connecting rod
W 06-01-02
TCD 2013 2V
Checking the con rod
Standard tools:
Micrometer gauge
Internal measuring device
Con rod test device
Rotation angle disc
8190
Special tools:
Dial gauge
W 05-05-02
100400
34768-2
37239-1
02/2010
1/8
OBJ_DOKU-21762-001.fm
Connecting rod
W 06-01-02
TCD 2013 2V
6
34770-2
35908-2
02/2010
2/8
OBJ_DOKU-21762-001.fm
Connecting rod
W 06-01-02
TCD 2013 2V
Checking the con rod bearing bore
Make sure the clamping bushings (1) are
in place.
6
44440-0
Attention!
26519
26519
44212-0
44213-0
02/2010
3/8
OBJ_DOKU-21762-001.fm
Connecting rod
W 06-01-02
TCD 2013 2V
6
36094-1
37239-1
44214-0
02/2010
4/8
OBJ_DOKU-21762-001.fm
Connecting rod
W 06-01-02
TCD 2013 2V
Checking internal diameter of the con rod
bearing shells
Remove screws.
Remove the con rod bearing cover.
Make sure the clamping bushings (1) are
in place.
6
44440-0
Attention!
1
44215-0
Attention!
44216-0
02/2010
5/8
OBJ_DOKU-21762-001.fm
Connecting rod
W 06-01-02
TCD 2013 2V
Attention!
2651
9
2651
9
6
44217-0
44218-0
36094-1
02/2010
6/8
OBJ_DOKU-21762-001.fm
Connecting rod
W 06-01-02
TCD 2013 2V
Diagram for measuring the inside diameter
of the con rod bearing shells at the
points "a" and "b" in the levels "1" and "2".
6
37239-1
+0.02
mm
44219-0
42604-0
02/2010
7/8
OBJ_DOKU-21762-001.fm
Connecting rod
W 06-01-02
TCD 2013 2V
Attention!
6
30579-1
C
D
30580-1
02/2010
8/8
OBJ_DOKU-21762-001.fm
Piston
W 07-01-02
TCD 2013 2V
Checking the piston
Standard tools:
Micrometer gauge
Internal measuring device
Special tools:
Dial gauge
W 06-01-01
100400
44262-0
34768-2
02/2010
1/4
OBJ_DOKU-21763-001.fm
Piston
W 07-01-02
TCD 2013 2V
6
37239-1
43483-0
12 mm
Measuring point 2
64 mm
Measuring point 3
97 mm
37244-2
02/2010
2/4
OBJ_DOKU-21763-001.fm
Piston
W 07-01-02
TCD 2013 2V
Measure piston diameter with micrometer gauge.
Measuring point 1
107,700 mm
Measuring point 2
107,800 mm
Measuring point 3
107,660 mm
See schematic diagram for measuring
points.
Assemble con rod and piston.
W 06-01-01
6
43427-0
02/2010
3/4
OBJ_DOKU-21763-001.fm
Piston
W 07-01-02
TCD 2013 2V
02/2010
4/4
OBJ_DOKU-21763-001.fm
Piston
W 07-02-02
TCD 2013 2V
Checking the piston rings and piston ring grooves
Standard tools:
Feeler gauges
W 06-01-01
Special tools:
Universal piston ring pliers 130300
Trapezoidal groove wear
gauge
130420
44263-0
Clean piston.
Visually inspect piston.
Visually inspect piston ring grooves.
44264-0
02/2010
1/6
OBJ_DOKU-21764-001.fm
Piston
W 07-02-02
TCD 2013 2V
6
33866-2
If there is a gap "S" between the trapezoidal groove wear gauge and piston, the piston can be used again.
33867-2
33868-2
02/2010
2/6
OBJ_DOKU-21764-001.fm
Piston
W 07-02-02
TCD 2013 2V
Checking the piston ring joint clearance
Unscrew screws (1).
Remove the liner holder (2).
2
6
44260-0
1
44265-0
44266-0
02/2010
3/6
OBJ_DOKU-21764-001.fm
Piston
W 07-02-02
TCD 2013 2V
6
44267-0
44268-0
44269-0
02/2010
4/6
OBJ_DOKU-21764-001.fm
Piston
W 07-02-02
TCD 2013 2V
Assemble con rod and piston.
W 06-01-01
6
44270-0
02/2010
5/6
OBJ_DOKU-21764-001.fm
Piston
W 07-02-02
TCD 2013 2V
02/2010
6/6
OBJ_DOKU-21764-001.fm
Cylinder head
W 08-00-01
TCD 2013 2V
Checking the compression pressure
Standard tools:
Compression pressure
tester
Torx tool set
8005
8189
Special tools:
Connector
100190
W 11-01-01
W 19-01-01
44100-0
44101-0
02/2010
1/4
OBJ_DOKU-21765-001.fm
Cylinder head
W 08-00-01
TCD 2013 2V
6
44102-0
X
X
44103-0
No.
Zyl.
Kompression in bar
Compression value in bar
Pression
en bar
Dat. _________
10 15 20 25
30 35 40
1
2
3
4
5
6
7
8
DBGM
Made in Germany
MOTOMETER
33771-5
02/2010
2/4
OBJ_DOKU-21765-001.fm
Cylinder head
W 08-00-01
TCD 2013 2V
Remove the compression pressure tester.
6
44103-0
44101-0
02/2010
3/4
OBJ_DOKU-21765-001.fm
Cylinder head
W 08-00-01
TCD 2013 2V
Technical Data
Tightening specifications
ID no.
Name
Connection piece on cylinder head,
A49 001
clamping shoe
Screw type
Notes / Remark
Value
25 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
02/2010
4/4
OBJ_DOKU-21765-001.fm
Cylinder head
W 08-01-01
TCD 2013 2V
Removing and installing the cylinder head cover
Standard tools:
Spring band pliers
9090
2
44130-0
44126-0
02/2010
1/4
OBJ_DOKU-21766-001.fm
Cylinder head
W 08-01-01
TCD 2013 2V
6
44127-0
44128-0
Attention!
44162-0
02/2010
2/4
OBJ_DOKU-21766-001.fm
Cylinder head
W 08-01-01
TCD 2013 2V
Mount cover (2).
Tighten screws (1).
8.5 Nm
1
6
44126-0
1
44129-0
02/2010
3/4
OBJ_DOKU-21766-001.fm
Cylinder head
W 08-01-01
TCD 2013 2V
Technical Data
Tightening specifications
ID no.
Name
Cylinder head cowling on cylinder
A01 004
head
A13 041 Cover plate on cylinder head cover
Screw type
Notes / Remark
M6
M6x16
Value
13 Nm
self-tapping
8.5 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
02/2010
4/4
OBJ_DOKU-21766-001.fm
Cylinder head
W 08-02-01
TCD 2013 2V
Removing and installing the exhaust return module
Standard tools
W 08-01-01
W 11-01-01
Pull the exhaust return module (2) off the plug element in the direction of the arrow.
Remove exhaust return module (2).
1
1
44097-0
44098-0
02/2010
1/6
OBJ_DOKU-21767-001.fm
Cylinder head
W 08-02-01
TCD 2013 2V
6
44099-0
1
42927-0
42928-0
02/2010
2/6
OBJ_DOKU-21767-001.fm
Cylinder head
W 08-02-01
TCD 2013 2V
Mount exhaust return module for cylinders 1 - 3.
Fasten screws.
6
44108-1
Stage 2:
30 Nm
44109-0
Screws M8 x 55 mm (2)
Screws M8 x 120 mm (3)
2
44274-1
02/2010
3/6
OBJ_DOKU-21767-001.fm
Cylinder head
W 08-02-01
TCD 2013 2V
W 11-01-01
Mount cylinder head cover.
W 08-01-01
6
44275-0
02/2010
4/6
OBJ_DOKU-21767-001.fm
Cylinder head
W 08-02-01
TCD 2013 2V
Technical Data
Tightening specifications
ID no.
Name
A01 011
A01 011
Screw type
Notes / Remark
Stage 1:
Observe tightening
sequence
Stage 2:
Observe tightening
sequence
Value
10 Nm
30 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
02/2010
5/6
OBJ_DOKU-21767-001.fm
Cylinder head
W 08-02-01
TCD 2013 2V
02/2010
6/6
OBJ_DOKU-21767-001.fm
Cylinder head
W 08-02-02
TCD 2013 2V
Removing and installing the solenoid valve (exhaust gas return)
Standard tools
W 01-01-01
44417-0
44418-0
02/2010
1/4
OBJ_DOKU-21768-001.fm
Cylinder head
W 08-02-02
TCD 2013 2V
6
44419-0
42834-0
44420-0
02/2010
2/4
OBJ_DOKU-21768-001.fm
Cylinder head
W 08-02-02
TCD 2013 2V
Plug in the cable plug (1).
Ensure that the connection is perfect.
Install crankcase breather.
W 01-01-01
1
6
44417-0
02/2010
3/4
OBJ_DOKU-21768-001.fm
Cylinder head
W 08-02-02
TCD 2013 2V
02/2010
4/4
OBJ_DOKU-21768-001.fm
Cylinder head
W 08-03-01
TCD 2013 2V
Removing and installing cylinder head
Standard tools:
Torx tool set
Rotation angle disc
8189
8190
W 01-05-01
W 08-01-01
W 08-03-02
W 11-02-01
W 19-01-01
W 21-02-01
W 22-01-01
W 38-02-01
W 41-01-01
W 44-02-01
W 49-02-01
Remove generator.
W 44-02-01
Unscrew screw (1).
Remove clamping strap (2).
Remove thermostat housing.
W 38-02-01
Remove the exhaust pipe.
2
W 41-01-01
44142-0
W 19-01-01
Remove the cylinder head hood.
W 08-01-01
Remove rocker arm brackets and stop rods.
W 11-02-01
Remove the charge air pipe.
W 22-01-01
44143-0
02/2010
1/8
OBJ_DOKU-21769-001.fm
Cylinder head
W 08-03-01
TCD 2013 2V
44144-0
2
44145-0
44146-0
02/2010
2/8
OBJ_DOKU-21769-001.fm
Cylinder head
W 08-03-01
TCD 2013 2V
Hang cylinder head on suitable cross beam (1) and
workshop crane.
Align chains parallel to the cross beam.
6
44147-0
44148-0
44149-0
02/2010
3/8
OBJ_DOKU-21769-001.fm
Cylinder head
W 08-03-01
TCD 2013 2V
44154-0
44155-0
44156-0
02/2010
4/8
OBJ_DOKU-21769-001.fm
Cylinder head
W 08-03-01
TCD 2013 2V
Fit cylinder head.
Oil the cylinder head screws slightly.
Fasten screws.
Attention!
6
44157-0
130 Nm
26
14
18
6
10
4
2
12
8
20
16
24
Stage 3:
90
25
17
21
9
13
1
5
7
3
15
11
23
19
42526-1
44158-0
02/2010
5/8
OBJ_DOKU-21769-001.fm
Cylinder head
W 08-03-01
TCD 2013 2V
6
44159-0
1
44160-0
43986-0
02/2010
6/8
OBJ_DOKU-21769-001.fm
Cylinder head
W 08-03-01
TCD 2013 2V
Install the charge air pipe.
W 22-01-01
Install the exhaust pipe.
W 41-01-01
Install thermostat housing.
W 38-02-01
Mount clamping strap (2).
Fasten screw (1).
Install generator.
W 44-02-01
Remove turning gear.
W 49-02-01
02/2010
6
44142-0
7/8
OBJ_DOKU-21769-001.fm
Cylinder head
W 08-03-01
TCD 2013 2V
02/2010
8/8
OBJ_DOKU-21769-001.fm
Cylinder head
W 08-03-02
TCD 2013 2V
Checking piston overhang
Standard tools
Special tools:
Dial gauge
Measuring device
W 08-03-01
W 49-02-01
100400
100750
44150-0
44151-0
02/2010
1/2
OBJ_DOKU-21770-001.fm
Cylinder head
W 08-03-02
TCD 2013 2V
6
44152-0
2
34151-2
02/2010
44153-0
2/2
OBJ_DOKU-21770-001.fm
Cylinder head
W 08-04-01
TCD 2013 2V
Removing and installing the valves
Standard tools:
Slide gauge
Assembly lever
W 08-03-01
9017
Special tools:
Support bracket
Base plate
120900
120910
2
44163-0
Danger!
Risk of injury! Snap ring springs off.
44164-0
02/2010
1/6
OBJ_DOKU-21771-001.fm
Cylinder head
W 08-04-01
TCD 2013 2V
6
44165-0
44166-0
44167-0
02/2010
2/6
OBJ_DOKU-21771-001.fm
Cylinder head
W 08-04-01
TCD 2013 2V
Clean cylinder head.
Check cylinder head.
Visually inspect the components.
6
44168-0
35856-2
44169-0
02/2010
3/6
OBJ_DOKU-21771-001.fm
Cylinder head
W 08-04-01
TCD 2013 2V
6
44170-0
44171-0
44172-0
02/2010
4/6
OBJ_DOKU-21771-001.fm
Cylinder head
W 08-04-01
TCD 2013 2V
Remove assembly lever.
Insert thrust washer (1).
Ensure that the installation location is free
from faults.
6
44165-0
44173-0
2
44163-0
02/2010
5/6
OBJ_DOKU-21771-001.fm
Cylinder head
W 08-04-01
TCD 2013 2V
02/2010
6/6
OBJ_DOKU-21771-001.fm
Cylinder head
W 08-04-02
TCD 2013 2V
Checking the valves
Standard tools:
Micrometer gauge
Slide gauge
W 08-04-01
42182-1
42183-1
02/2010
1/2
OBJ_DOKU-21772-001.fm
Cylinder head
W 08-04-02
TCD 2013 2V
Exhaust valve
42 -0.1 mm
+0.1
Install valves.
W 08-04-01
6
42184-1
02/2010
2/2
OBJ_DOKU-21772-001.fm
Cylinder head
W 08-04-03
TCD 2013 2V
Checking the valve guide
Standard tools:
Magnetic measuring stand
Special tools:
Dial gauge
W 08-04-01
100400
44168-0
44174-0
02/2010
1/2
OBJ_DOKU-21773-001.fm
Cylinder head
W 08-04-03
TCD 2013 2V
6
44175-0
44176-0
02/2010
2/2
OBJ_DOKU-21773-001.fm
Cylinder head
W 08-04-04
TCD 2013 2V
Checking the valve lag
Standard tools:
Depth-measuring
appliance
Special tools:
Support bracket
Base plate
W 08-03-01
Attention!
120900
120910
44178-0
44177-0
02/2010
1/2
OBJ_DOKU-21774-001.fm
Cylinder head
W 08-04-04
TCD 2013 2V
Exhaust valve
1 -0.1 mm
+0.15
6
42598-0
44177-0
W 08-03-01
44178-0
02/2010
2/2
OBJ_DOKU-21774-001.fm
Gearcase
W 09-01-01
TCD 2013 2V
Renewing the crankshaft sealing ring
(flywheel side)
Standard tools:
Pricker
Assembly lever
8198
9017
Special tools:
Assembly tool
142810
W 05-03-01
Self-tapping screw
Washer
Attention!
44188-0
44189-0
02/2010
1/4
OBJ_DOKU-21775-001.fm
Gearcase
W 09-01-01
TCD 2013 2V
6
44190-0
44191-0
44192-0
02/2010
2/4
OBJ_DOKU-21775-001.fm
Gearcase
W 09-01-01
TCD 2013 2V
Oil the sealing lip of the crankshaft sealing ring lightly.
Push the crankshaft sealing ring carefully onto the
guide sleeve.
Use new crankshaft sealing ring.
The sealing lip faces the crankcase.
6
44193-0
1
44194-0
1
44195-0
02/2010
3/4
OBJ_DOKU-21775-001.fm
Gearcase
W 09-01-01
TCD 2013 2V
6
44196-0
W 05-03-01
44197-0
02/2010
4/4
OBJ_DOKU-21775-001.fm
Gearcase
W 09-02-02
TCD 2013 2V
Removing and installing the gearcase cover
Standard tools
Packing compound
DEUTZ DW 67
Packing compound
DEUTZ DW 48
W 02-01-01
W 05-03-01
W 09-01-01
W 44-03-01
W 48-02-03
W 52-01-01
44448-0
44449-0
02/2010
1/10
OBJ_DOKU-21776-001.fm
Gearcase
W 09-02-02
TCD 2013 2V
Unlock central plug (1) (arrow) and pull off from holder.
Remove connection housing.
W 52-01-01
Remove flywheel.
W 05-03-01
Remove lubricating oil pan.
W 02-01-01
6
44450-0
44451-0
44452-0
02/2010
2/10
OBJ_DOKU-21776-001.fm
Gearcase
W 09-02-02
TCD 2013 2V
Unscrew screws (1).
Remove cover (2).
6
44453-0
44454-0
1
44455-0
02/2010
3/10
OBJ_DOKU-21776-001.fm
Gearcase
W 09-02-02
TCD 2013 2V
6
44456-0
Attention!
44457-0
44456-0
02/2010
4/10
OBJ_DOKU-21776-001.fm
Gearcase
W 09-02-02
TCD 2013 2V
Apply packing compound (arrow).
Attention!
6
44458-0
1
44459-0
Fasten screws.
Note different screw lengths:
Screw M8 x 55 mm (1)
Screws M8 x 35 mm (2)
Do not tighten screws.
1
2
44460-0
02/2010
5/10
OBJ_DOKU-21776-001.fm
Gearcase
W 09-02-02
TCD 2013 2V
6
44461-0
11
10
12
14
5
7
3
44589-2
17
20 Nm
16
15
44590-2
02/2010
6/10
OBJ_DOKU-21776-001.fm
Gearcase
W 09-02-02
TCD 2013 2V
Clean sealing surfaces.
The sealing surfaces must be dry and free
from grease and dirt.
Fill the ring groove (arrows) with packing compound.
Use packing compound DEUTZ DW 48.
Sealing bead thickness approx. 1.5 mm.
6
44462-0
1
44463-0
43983-0
02/2010
7/10
OBJ_DOKU-21776-001.fm
Gearcase
W 09-02-02
TCD 2013 2V
6
44464-0
44465-0
44592-0
02/2010
8/10
OBJ_DOKU-21776-001.fm
Gearcase
W 09-02-02
TCD 2013 2V
Tighten screws (1) alternately.
20 Nm
6
44593-0
44467-0
Push the central plug onto the holder until it snaps in.
44468-0
02/2010
9/10
OBJ_DOKU-21776-001.fm
Gearcase
W 09-02-02
TCD 2013 2V
6
44449-0
44448-0
02/2010
10/10
OBJ_DOKU-21776-001.fm
Camshaft
W 10-02-01
TCD 2013 2V
Removing and installing the camshaft
Standard tools:
Lifting gear
W 05-05-01
W 11-02-01
W 17-01-04
W 17-01-05
44471-0
02/2010
1/4
OBJ_DOKU-21777-001.fm
Camshaft
W 10-02-01
TCD 2013 2V
6
44472-0
44473-0
44474-0
02/2010
2/4
OBJ_DOKU-21777-001.fm
Camshaft
W 10-02-01
TCD 2013 2V
Removing tappets.
Remove all tappets (arrow).
Lay out components in the order in which
they should be installed.
Note order of cylinders.
Visually inspect the components.
6
42711-0
Installing tappets
Oil all tappets (arrow) lightly.
Insert all tappets.
Note assignment!
42711-0
44475-0
02/2010
3/4
OBJ_DOKU-21777-001.fm
Camshaft
W 10-02-01
TCD 2013 2V
6
44472-0
44471-0
Install crankshaft.
W 05-05-01
Install rocker arms and rocker arm brackets.
W 11-02-01
Install high pressure pump and roller tappet (installation position B).
W 17-01-05
Install high pressure pump and roller tappet (installation position A).
W 17-01-04
44220-0
02/2010
4/4
OBJ_DOKU-21777-001.fm
Camshaft
W 10-02-02
TCD 2013 2V
Checking the camshaft
Standard tools:
Micrometer gauge
W 10-02-01
42713-0
36424-2
02/2010
1/2
OBJ_DOKU-21778-001.fm
Camshaft
W 10-02-02
TCD 2013 2V
6
42714-0
42713-0
02/2010
2/2
OBJ_DOKU-21778-001.fm
Control parts
W 11-01-01
TCD 2013 2V
Setting valve clearance
(with or without removal of exhaust return module)
Standard tools:
Rotation angle disc
8190
Screwdriver insert for slotted screws
8191
Screwdriver insert for
hexagon socket head
screws (4 mm)
8194
Open wrench size 13
8196
Special tools:
Socket wrench insert
spanner size 15
W 08-01-01
W 49-02-01
Allow the engine to cool down for at least
30 minutes before setting the valve
clearance. Engine oil temperature < 80 C
In engines without an exhaust return
module, a slotted setting screw must be
installed in place of a hexagon socket head
screw.
103050
44110-0
1-3-4-2
Valves
overlap
set to
1
4
X
Cylinders
3 4 2
2 1 3
02/2010
1/6
OBJ_DOKU-21779-001.fm
Control parts
W 11-01-01
TCD 2013 2V
1-5-3-6-2-4
Valves
overlap
set to
1
6
5
2
Cylinders
3 6 2
4 1 5
4
3
6
00000-0
44111-0
Attention!
EX
IN
44112-0
02/2010
2/6
OBJ_DOKU-21779-001.fm
Control parts
W 11-01-01
TCD 2013 2V
Setting the inlet valve clearance
Loosen lock nut (1).
Press in the adjusting screw (2) to the stop.
The rocker arm must touch the thrust
washer of the spring cap (arrow).
6
44113-0
Set the rotation angle disc with a socket wrench insert at the adjusting screw.
Fix magnet of rotation angle disc on cylinder head.
Set the rotation angle disc in the direction of the arrow to 0.
Do not rotate adjusting screw.
X
X
44114-0
44115-0
02/2010
3/6
OBJ_DOKU-21779-001.fm
Control parts
W 11-01-01
TCD 2013 2V
6
44116-0
44117-0
44118-0
02/2010
4/6
OBJ_DOKU-21779-001.fm
Control parts
W 11-01-01
TCD 2013 2V
Turn back setting screw 150 in direction of arrow.
150
6
44119-0
20 Nm
Remove rotation angle disc.
Set all other valves.
see page:
1, 4 cylinders
2, 6-cylinder
Mount cylinder head cover.
W 08-01-01
Remove turning gear.
W 49-02-01
44120-0
02/2010
5/6
OBJ_DOKU-21779-001.fm
Control parts
W 11-01-01
TCD 2013 2V
Technical Data
Testing and setting data
ID no.
P01 61
P01 62
Name
Valve clearance (inlet)
Valve clearance (outlet)
Additional information
with rotary angle disc
with rotary angle disc
Value
90
150
Tightening specifications
ID no.
Name
Screw type
Locking nut,
A01 003
valve clearance setting screw
Locking nut, setting screw control pisA01 012
ton (exhaust gas return)
Notes / Remark
Value
20 Nm
20 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
02/2010
6/6
OBJ_DOKU-21779-001.fm
Control parts
W 11-01-01
TCD 2013 2V
Setting valve clearance
(with exhaust return module installed)
Standard tools:
Rotation angle disc
8190
Screwdriver insert for slotted screws
8191
Screwdriver insert for
hexagon socket head
screws (4 mm)
8194
Open wrench size 13
8196
W 08-01-01
W 49-02-01
Allow the engine to cool down for at least
30 minutes before setting the valve
clearance. Engine oil temperature < 80 C
The control piston clearance of the exhaust
return line must be set after setting the
valve clearance.
Special tools:
Crowfoot wrench size 15 103140
44110-0
1-3-4-2
Valves
overlap
set to
1
4
X
Cylinders
3 4 2
2 1 3
02/2010
1/8
OBJ_DOKU-21780-001.fm
Control parts
W 11-01-01
TCD 2013 2V
1-5-3-6-2-4
Valves
overlap
set to
1
6
5
2
Cylinders
3 6 2
4 1 5
4
3
43040-0
Attention!
EX
IN
EX
IN
44444-0
02/2010
2/8
OBJ_DOKU-21780-001.fm
Control parts
W 11-01-01
TCD 2013 2V
Setting the inlet valve clearance
Loosen lock nut (1).
Press in the adjusting screw (2) to the stop.
The rocker arm must touch the thrust
washer of the spring cap (arrow).
1
43042-0
48239-0
48240-0
02/2010
3/8
OBJ_DOKU-21780-001.fm
Control parts
W 11-01-01
TCD 2013 2V
6
48241-0
1
43046-0
43047-0
02/2010
4/8
OBJ_DOKU-21780-001.fm
Control parts
W 11-01-01
TCD 2013 2V
Turn back setting screw 150 in direction of arrow.
150
6
43048-0
43049-0
43832-3
02/2010
5/8
OBJ_DOKU-21780-001.fm
Control parts
W 11-01-01
TCD 2013 2V
6
44110-0
X1
44122-0
44123-0
02/2010
6/8
OBJ_DOKU-21780-001.fm
Control parts
W 11-01-01
TCD 2013 2V
Turn back setting screw 144 in direction of arrow.
144
6
44124-0
02/2010
7/8
OBJ_DOKU-21780-001.fm
Control parts
W 11-01-01
TCD 2013 2V
Technical Data
Testing and setting data
ID no.
P01 61
P01 62
P01 64
Name
Valve clearance (inlet)
Valve clearance (outlet)
Clearance between control piston and
rocker arm
Additional information
with rotary angle disc
with rotary angle disc
Value
90
150
144
Tightening specifications
ID no.
Name
Screw type
Locking nut,
A01 003
valve clearance setting screw
Locking nut, setting screw control pisA01 012
ton (exhaust gas return)
Notes / Remark
Value
20 Nm
20 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
02/2010
8/8
OBJ_DOKU-21780-001.fm
Control parts
W 11-02-01
TCD 2013 2V
Removing and installing the rocker arm and rocker arm bracket
Standard tools
W 08-02-01
W 11-01-01
W 49-02-01
43948-0
1
43949-0
02/2010
1/4
OBJ_DOKU-21781-001.fm
Control parts
W 11-02-01
TCD 2013 2V
6
44133-0
1
43949-0
44134-0
02/2010
2/4
OBJ_DOKU-21781-001.fm
Control parts
W 11-02-01
TCD 2013 2V
Align rocker arm bracket symmetrically with the valve
axles.
The bore (arrow) in the rocker arm bracket
must be in line with the threaded bore in
the cylinder head.
Tighten screw (1).
30 Nm
1
Attention!
6
44135-0
44136-0
02/2010
3/4
OBJ_DOKU-21781-001.fm
Control parts
W 11-02-01
TCD 2013 2V
Technical Data
Tightening specifications
ID no.
Name
A01 002
Screw type
Notes / Remark
Value
Assembly note:
Rocker arm symmetrical 30 Nm
to the valve centre axes.
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
02/2010
4/4
OBJ_DOKU-21781-001.fm
Control parts
W 11-02-02
TCD 2013 2V
Disassembling, assembling and checking the rocker arm and rocker arm
bracket
Standard tools:
Internal measuring device
Micrometer gauge
Special tools:
Dial gauge
W 11-02-01
100400
1
44137-0
44138-0
02/2010
1/4
OBJ_DOKU-21782-001.fm
Control parts
W 11-02-02
TCD 2013 2V
+0.033
mm
Outlet
21,02 0
+0.033
mm
6
39032-1
Attention!
42556-0
42557-0
02/2010
2/4
OBJ_DOKU-21782-001.fm
Control parts
W 11-02-02
TCD 2013 2V
Screw in setting screw (1).
Loosen lock nuts (2).
2
6
43011-0
44139-0
44140-0
02/2010
3/4
OBJ_DOKU-21782-001.fm
Control parts
W 11-02-02
TCD 2013 2V
44141-0
02/2010
4/4
OBJ_DOKU-21782-001.fm
TCD 2013 2V
Removing and installing the lubricating oil cooler
Standard tools
W 15-02-02
Fitting compound
DEUTZ AP1908
W 15-02-02
Unscrew screws (1).
Remove sealing rings.
44485-0
2
44486-0
02/2010
1/4
OBJ_DOKU-21783-001.fm
TCD 2013 2V
6
44487-0
1
2
44488-0
44489-0
02/2010
2/4
OBJ_DOKU-21783-001.fm
TCD 2013 2V
Installing the lubricating oil cooler
6
44490-0
44491-0
44501-0
02/2010
3/4
OBJ_DOKU-21783-001.fm
TCD 2013 2V
6
44492-0
160 Nm
2
44486-0
80 Nm
Install oil cooler housing.
W 15-02-02
44485-0
02/2010
4/4
OBJ_DOKU-21783-001.fm
TCD 2013 2V
Operation manual
W 20-01-01
Collect leaking operating substances in
suitable vessels and dispose of according
to regulations.
Operation manual
Pull out oil dipstick (1).
Pull out cable plug (2).
1
44494-0
44495-0
02/2010
1/4
OBJ_DOKU-21784-001.fm
TCD 2013 2V
6
44496-0
M8 x 50 mm (1)
M8 x 80 mm (2).
2
1
44497-0
10
Stage 1:
3 Nm
Stage 2:
30 Nm
12
13
11
9
5
44500-0
02/2010
2/4
OBJ_DOKU-21784-001.fm
TCD 2013 2V
Insert oil dipstick (1).
Plug in the cable plug (2).
Ensure that the connection is perfect.
6
44494-0
02/2010
3/4
OBJ_DOKU-21784-001.fm
TCD 2013 2V
02/2010
4/4
OBJ_DOKU-21784-001.fm
TCD 2013 2V
Removing and installing the oil suction pipe
Standard tools
W 02-01-01
W 02-01-01
1
1
44476-0
44477-0
02/2010
1/2
OBJ_DOKU-21785-001.fm
TCD 2013 2V
Fasten screws.
Ensure that the installation location is free
from faults.
Pay attention to different screw lengths.
M8 x 25 mm (1)
M8 x 20 mm (2)
2
44478-0
1
1
44479-0
02/2010
2/2
OBJ_DOKU-21785-001.fm
High-pressure pump
W 17-01-01
TCD 2013 2V
Removing and installing the control block
Standard tools
Special tools:
Plugs/caps
User notes
Operation manual
170160
Danger!
Wait 30 seconds after switching off the
engine before working on the fuel system.
Attention!
43986-0
02/2010
1/8
OBJ_DOKU-21786-001.fm
High-pressure pump
W 17-01-01
TCD 2013 2V
6
43998-0
2
1
44000-0
1
43999-0
02/2010
2/8
OBJ_DOKU-21786-001.fm
High-pressure pump
W 17-01-01
TCD 2013 2V
Unscrew screws (1).
Remove control block (2).
6
44001-0
44002-0
44002-0
02/2010
3/8
OBJ_DOKU-21786-001.fm
High-pressure pump
W 17-01-01
TCD 2013 2V
M8 x 75 mm (2)
M8 x 85 mm (1)
6
44003-0
Install fuel pipe. Insert hollow screws (1) and (2) with
new sealing rings tension-free.
Use new sealing rings.
Pay attention to different screws:
Hollow screw M14 (1)
Hollow screws M12 (2)
2
1
44004-0
44005-0
02/2010
4/8
OBJ_DOKU-21786-001.fm
High-pressure pump
W 17-01-01
TCD 2013 2V
Tighten hollow screw (1).
39 Nm
Tighten hollow screws (2).
29 Nm
1
44006-0
1
44007-0
Attention!
Attention!
44008-0
02/2010
5/8
OBJ_DOKU-21786-001.fm
High-pressure pump
W 17-01-01
TCD 2013 2V
44009-0
43986-0
02/2010
6/8
OBJ_DOKU-21786-001.fm
High-pressure pump
W 17-01-01
TCD 2013 2V
Technical Data
Tightening specifications
ID no.
Name
Screw type
Union nut
Union nut
A07 032
A12 092
A12 093
A12 094
A12 095
Value
Stage 2:
60
Stage 1:
Screws oiled
High pressure pump to crankcase
M10x30-10.9 Stage 2:
M8x75
Observe tightening
Control block to crankcase
M8x85
sequence.
Pipe union, pipe diameter 8 mm, ring Hollow screw
piece
M12x1.5
Pipe union, pipe diameter 10 mm, ring Hollow screw
piece
M14x1.5
Pipe union, pipe diameter 12 mm, ring Hollow screw
piece
M16x1.5
Pipe clips, fastening
M8
Notes / Remark
Stage 1:
Observe assembly
specification.
Use new pipe.
M10x30-10.9
10 Nm
+15
10 Nm
50 Nm
20 Nm
29 Nm
39 Nm
49 Nm
20 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
02/2010
7/8
OBJ_DOKU-21786-001.fm
High-pressure pump
W 17-01-01
TCD 2013 2V
02/2010
8/8
OBJ_DOKU-21786-001.fm
High-pressure pump
W 17-01-04
TCD 2013 2V
Removing and installing the high-pressure pump
(Installation position A)
Standard tools
Special tools:
Assembly pliers
Special wrench
Assembly case with
assembly sleeves, guides
and disassembly tool
Plugs/caps
User notes
W 17-01-01
W 49-02-01
103220
110500
Danger!
Wait 30 seconds after switching off the
engine before working on the fuel system.
110900
170160
Attention!
Fitting compound
DEUTZ AP1908
43953-1
02/2010
1/10
OBJ_DOKU-21787-001.fm
High-pressure pump
W 17-01-04
TCD 2013 2V
Danger!
Wait 30 seconds after switching off the
engine before working on the fuel system.
Remove control block.
W 17-01-01
6
43954-0
43955-0
43956-0
02/2010
2/10
OBJ_DOKU-21787-001.fm
High-pressure pump
W 17-01-04
TCD 2013 2V
Loosen screws (1) evenly
Loosen screws evenly to avoid jamming
the high-pressure pump.
If necessary, turn the crankshaft with turnover gear in the direction of rotation of the
engine until the high-pressure pump is felt
to release.
6
43957-0
Carefully remove the O-ring (1) from the high-pressure pump with the disassembly tool.
Attention!
1
43328-0
Attention!
43997-0
02/2010
3/10
OBJ_DOKU-21787-001.fm
High-pressure pump
W 17-01-04
TCD 2013 2V
6
42816-0
Oil roller tappet lightly and insert carefully with special pliers.
1
42817-0
43329-0
02/2010
4/10
OBJ_DOKU-21787-001.fm
High-pressure pump
W 17-01-04
TCD 2013 2V
Push the O-ring (1) with assembly sleeve (2) up to
the groove (3).
Coat the O-ring, mounting bore and chamfers in the
crankcase with fitting compound.
2
3
6
43330-0
43959-0
1
1
43958-0
02/2010
5/10
OBJ_DOKU-21787-001.fm
High-pressure pump
W 17-01-04
TCD 2013 2V
6
43979-0
Attention!
43980-0
Attention!
Diameter: 32 mm
(2) Connection rail
(3) Connection high pressure pump
3
48208-0
02/2010
6/10
OBJ_DOKU-21787-001.fm
High-pressure pump
W 17-01-04
TCD 2013 2V
(1) Vibration damper
Dimension I
7,6
+1.5
-1.5
mm
Dimension II
5,4
+0.5
-0.5
mm
II
1
3
6
48217-0
Attention!
43980-1
+15
43981-0
02/2010
7/10
OBJ_DOKU-21787-001.fm
High-pressure pump
W 17-01-04
TCD 2013 2V
6
43982-0
43953-1
02/2010
8/10
OBJ_DOKU-21787-001.fm
High-pressure pump
W 17-01-04
TCD 2013 2V
Technical Data
Tightening specifications
ID no.
Name
Screw type
Union nut
Union nut
Notes / Remark
Stage 1:
Observe assembly
specification.
Use new pipe.
Value
Stage 2:
60
Stage 1:
Screws oiled
A07 031 High pressure pump to crankcase
M10x30-10.9 Stage 2:
Pipe union, pipe diameter 10 mm, ring Hollow screw
A12 093
piece
M14x1.5
A07 031 High pressure pump to crankcase
M10x30-10.9
10 Nm
+15
10 Nm
50 Nm
39 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
02/2010
9/10
OBJ_DOKU-21787-001.fm
High-pressure pump
W 17-01-04
TCD 2013 2V
02/2010
10/10
OBJ_DOKU-21787-001.fm
High-pressure pump
W 17-01-05
TCD 2013 2V
Removing and installing the high-pressure pump
(Installation position B)
Standard tools
Special tools:
Assembly pliers
Special wrench
Assembly case with
assembly sleeves, guides
and disassembly tool
Plugs/caps
User notes
W 49-02-01
103220
110500
Danger!
110900
170160
Attention!
Fitting compound
DEUTZ AP1908
43953-1
02/2010
1/10
OBJ_DOKU-21788-001.fm
High-pressure pump
W 17-01-05
TCD 2013 2V
Danger!
Wait 30 seconds after switching off the
engine before working on the fuel system.
6
43986-0
43988-0
43989-0
02/2010
2/10
OBJ_DOKU-21788-001.fm
High-pressure pump
W 17-01-05
TCD 2013 2V
Unscrew screws (1).
Remove high-pressure pump (2).
Loosen screws evenly to avoid jamming
the high-pressure pump.
If necessary, turn the crankshaft with turnover gear in the direction of rotation of the
engine until the high-pressure pump is felt
to release.
6
43990-0
Carefully remove the O-ring (1) from the high-pressure pump with the disassembly tool.
Attention!
1
43328-0
Attention!
42821-0
02/2010
3/10
OBJ_DOKU-21788-001.fm
High-pressure pump
W 17-01-05
TCD 2013 2V
6
42816-0
Oil roller tappet lightly and insert carefully with special pliers.
The guide pin (1) on the roller tappet must
grip in the groove (2).
1
2
42822-0
43329-0
02/2010
4/10
OBJ_DOKU-21788-001.fm
High-pressure pump
W 17-01-05
TCD 2013 2V
Push the O-ring (1) with assembly sleeve (2) up to
the groove (3).
Coat the O-ring, mounting bore and chamfers in the
crankcase with fitting compound.
2
3
6
43330-0
43992-0
43991-0
02/2010
5/10
OBJ_DOKU-21788-001.fm
High-pressure pump
W 17-01-05
TCD 2013 2V
2
1
43993-0
2
1
43993-0
43994-0
02/2010
6/10
OBJ_DOKU-21788-001.fm
High-pressure pump
W 17-01-05
TCD 2013 2V
Attention!
6
43995-0
Attention!
Diameter: 32 mm
(2) Connection rail
(3) Connection high pressure pump
3
48208-0
Dimension I
7,6
+1.5
-1.5
mm
Dimension II
5,4
+0.5
-0.5
mm
II
1
3
48217-0
02/2010
7/10
OBJ_DOKU-21788-001.fm
High-pressure pump
W 17-01-05
TCD 2013 2V
Attention!
6
43995-1
+15
43996-0
43986-0
02/2010
8/10
OBJ_DOKU-21788-001.fm
High-pressure pump
W 17-01-05
TCD 2013 2V
Remove turning gear.
W 49-02-01
6
43953-1
02/2010
9/10
OBJ_DOKU-21788-001.fm
High-pressure pump
W 17-01-05
TCD 2013 2V
Technical Data
Tightening specifications
ID no.
Name
Union nut
Union nut
Notes / Remark
Stage 1:
Observe assembly
specification.
Use new pipe.
Value
Stage 2:
60
Stage 1:
Screws oiled
A07 031 High pressure pump to crankcase
M10x30-10.9 Stage 2:
Pipe union, pipe diameter 8 mm, ring Hollow screw
A12 092
piece
M12x1.5
Pipe union, pipe diameter 10 mm, ring Hollow screw
A12 093
piece
M14x1.5
A07 031 High pressure pump to crankcase
Screw type
M10x30-10.9
10 Nm
+15
10 Nm
50 Nm
29 Nm
39 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
02/2010
10/10
OBJ_DOKU-21788-001.fm
Injector
W 19-01-01
TCD 2013 2V
Removing and installing the injector
Standard tools:
Assembly pliers
Torx tool set
Special tools:
Special wrench
Lever tool
Assembly case with
assembly sleeves, guides
and disassembly tool
Extraction tool
Slide hammer
Plugs/caps
User notes
8024
8189
Danger!
110500
110620
Attention!
110900
120680
150800
170160
Danger!
Wait 30 seconds after switching off the
engine before working on the fuel system.
With oil dipstick guide pulled up on the side of the
rail:
Pull out oil dipstick.
Close opening.
43954-0
02/2010
1/10
OBJ_DOKU-21789-001.fm
Injector
W 19-01-01
TCD 2013 2V
6
44012-0
44022-0
44023-0
02/2010
2/10
OBJ_DOKU-21789-001.fm
Injector
W 19-01-01
TCD 2013 2V
Unscrew screw (1).
Remove clamping shoe (2).
When removing the injectors on
cylinders 1 to 5, the clamping shoe can
only be removed together with the injector.
1
6
44024-0
Attention!
44025-0
2
48206-0
02/2010
3/10
OBJ_DOKU-21789-001.fm
Injector
W 19-01-01
TCD 2013 2V
Attention!
1
2
43303-0
44028-0
44029-0
02/2010
4/10
OBJ_DOKU-21789-001.fm
Injector
W 19-01-01
TCD 2013 2V
Mount adapter (1) and slide hammer (2) on extraction device.
Remove tight sealing ring.
6
44030-0
Attention!
43028-0
2
1
43030-0
02/2010
5/10
OBJ_DOKU-21789-001.fm
Injector
W 19-01-01
TCD 2013 2V
6
43029-0
42987-1
Attention!
42988-0
02/2010
6/10
OBJ_DOKU-21789-001.fm
Injector
W 19-01-01
TCD 2013 2V
When installing the injectors on
cylinders 1 to 5, the clamping shoe must
be inserted together with the injector.
In version with heating plugs:
Pay attention to perfect cable laying
(arrow).
6
48207-0
44031-0
Attention!
02/2010
7/10
OBJ_DOKU-21789-001.fm
Injector
W 19-01-01
TCD 2013 2V
6
42992-0
Attention!
44034-1
+15
44034-0
02/2010
8/10
OBJ_DOKU-21789-001.fm
Injector
W 19-01-01
TCD 2013 2V
Mount cable on injector.
Tighten nuts (1).
1.5 Nm
6
44035-0
44036-0
02/2010
9/10
OBJ_DOKU-21789-001.fm
Injector
W 19-01-01
TCD 2013 2V
Technical Data
Tightening specifications
ID no.
Name
A07 001
A07 001
Screw type
Notes / Remark
Stage 1:
Observe order of
assembly.
Install injector without
tension.
Value
Stage 2:
27 Nm
Union nut
Stage 1:
Observe assembly
specification.
Use new pipe.
10 Nm
Union nut
Stage 2:
60
M6x16
self-tapping
8.5 Nm
1.5 Nm
hand tight
+15
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
02/2010
10/10
OBJ_DOKU-21789-001.fm
Fuel filter
W 20-01-01
TCD 2013 2V
Removing and installing the fuel filter console
Standard tools
Special tools:
Special wrench
Plugs/caps
User notes
Operation manual
170050
170160
Danger!
Wait 30 seconds after switching off the
engine before working on the fuel system.
Attention!
43960-0
02/2010
1/6
OBJ_DOKU-21790-001.fm
Fuel filter
W 20-01-01
TCD 2013 2V
6
43961-0
43962-1
43963-0
02/2010
2/6
OBJ_DOKU-21790-001.fm
Fuel filter
W 20-01-01
TCD 2013 2V
Unscrew screws (1).
Remove fuel filter console (2).
1
2
6
43963-0
43965-0
43966-0
02/2010
3/6
OBJ_DOKU-21790-001.fm
Fuel filter
W 20-01-01
TCD 2013 2V
6
43968-0
43969-0
43970-1
02/2010
4/6
OBJ_DOKU-21790-001.fm
Fuel filter
W 20-01-01
TCD 2013 2V
Clean sealing surfaces.
Lightly oil sealing ring on new fuel filter cartridge.
Screw on fuel filter cartridge by hand.
The seal must fit evenly.
Operation manual
6
44577-0
02/2010
5/6
OBJ_DOKU-21790-001.fm
Fuel filter
W 20-01-01
TCD 2013 2V
02/2010
6/6
OBJ_DOKU-21790-001.fm
Fuel pump
W 20-02-01
TCD 2013 2V
Removing and installing the fuel supply pump
(V-belt drive)
Standard tools:
Hose clip pliers
8011
V-belt tension measuring
device
8115
User notes
Operation manual
Special tools:
Plugs/caps
Danger!
170160
Attention!
1
44037-1
02/2010
1/6
OBJ_DOKU-21791-001.fm
Fuel pump
W 20-02-01
TCD 2013 2V
1
1
6
44038-0
44039-0
44040-0
02/2010
2/6
OBJ_DOKU-21791-001.fm
Fuel pump
W 20-02-01
TCD 2013 2V
Unscrew screws (1).
Remove V-belt pulley (2).
6
44041-0
2
44042-0
44043-0
02/2010
3/6
OBJ_DOKU-21791-001.fm
Fuel pump
W 20-02-01
TCD 2013 2V
2
1
6
44044-0
1
2
44045-0
44046-0
02/2010
4/6
OBJ_DOKU-21791-001.fm
Fuel pump
W 20-02-01
TCD 2013 2V
Visually inspect the components.
6
44047-0
44046-0
1
2
44045-0
02/2010
5/6
OBJ_DOKU-21791-001.fm
Fuel pump
W 20-02-01
TCD 2013 2V
6
44048-0
44043-0
44049-0
02/2010
6/6
OBJ_DOKU-21791-001.fm
Fuel pipes
W 21-02-01
TCD 2013 2V
Removing and installing the rail
Standard tools:
Rotation angle disc
8190
Special tools:
Special wrench
Plugs/caps
User notes
W 21-02-03
W 21-02-05
110500
170160
Danger!
Wait 30 seconds after switching off the
engine before working on the fuel system.
Attention!
43954-0
11/2010
1/8
OBJ_DOKU-21792-001.fm
Fuel pipes
W 21-02-01
TCD 2013 2V
6
44010-0
44011-0
44012-0
11/2010
2/8
OBJ_DOKU-21792-001.fm
Fuel pipes
W 21-02-01
TCD 2013 2V
Unlock cable plug (1) and remove.
6
44013-0
44014-0
44015-0
11/2010
3/8
OBJ_DOKU-21792-001.fm
Fuel pipes
W 21-02-01
TCD 2013 2V
Mounting rail
Install rail pressure sensor.
W 21-02-05
Install pressure limiting valve.
W 21-02-03
Pre-assemble the rail (2) loosely with screws (1).
hand tight
Do not tighten screws.
6
44014-0
Attention!
Attention!
11/2010
4/8
OBJ_DOKU-21792-001.fm
Fuel pipes
W 21-02-01
TCD 2013 2V
Tighten screws (1).
30 Nm
6
44018-0
Attention!
48222-0
Tighten all union nuts (1) on the rail and on the injectors with a special wrench.
Stage 1:
10 Nm
Use rotaqtion angle disc.
Stage 2:
60
+ 15
44019-0
11/2010
5/8
OBJ_DOKU-21792-001.fm
Fuel pipes
W 21-02-01
TCD 2013 2V
Attention!
6
48223-0
+ 15
44020-0
43982-0
11/2010
6/8
OBJ_DOKU-21792-001.fm
Fuel pipes
W 21-02-01
TCD 2013 2V
Plug in the cable plug (1).
Ensure that the connection is perfect.
6
44021-0
11/2010
7/8
OBJ_DOKU-21792-001.fm
Fuel pipes
W 21-02-01
TCD 2013 2V
Technical Data
Tightening specifications
ID no.
Name
Screw type
Union nut
Union nut
Notes / Remark
Stage 1:
Observe assembly
specification.
Use new pipe.
Value
Stage 2:
60
Stage 1:
Observe assembly
specification
Stage 2:
10 Nm
+ 15
hand tight
30 Nm
39 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
11/2010
8/8
OBJ_DOKU-21792-001.fm
Fuel pipes
W 21-02-03
TCD 2013 2V
Removing and installing the pressure limiting valve
Standard tools
User notes
Special tools:
Disassembly tool
Plugs/caps
110901
170160
Assembly grease
01016496
Danger!
Wait 30 seconds after switching off the
engine before working on the fuel system.
Attention!
43975-0
02/2010
1/4
OBJ_DOKU-21793-001.fm
Fuel pipes
W 21-02-03
TCD 2013 2V
6
43253-1
43335-0
42978-1
02/2010
2/4
OBJ_DOKU-21793-001.fm
Fuel pipes
W 21-02-03
TCD 2013 2V
Screw in pressure limiting valve (1).
Tighten pressure limiting valve.
100 Nm
Bleed the fuel system via the manual fuel
pump on the fuel pre-filter according to the
operation manual.
6
43976-0
02/2010
3/4
OBJ_DOKU-21793-001.fm
Fuel pipes
W 21-02-03
TCD 2013 2V
02/2010
4/4
OBJ_DOKU-21793-001.fm
Fuel pipes
W 21-02-05
TCD 2013 2V
Removing and installing the rail pressure sensor
Standard tools
User notes
Special tools:
Long socket wrench insert 110700
Plugs/caps
170160
Danger!
Assembly grease
01016496
Attention!
43977-0
02/2010
1/2
OBJ_DOKU-21794-001.fm
Fuel pipes
W 21-02-05
TCD 2013 2V
Attention!
6
43017-0
70 Nm
Plug in the cable plug (1).
Ensure that the connection is perfect.
02/2010
43977-0
2/2
OBJ_DOKU-21794-001.fm
TCD 2013 2V
Removing and install the charge air line
Standard tools
W 08-01-01
W 48-03-01
44126-1
2
1
44289-0
02/2010
1/4
OBJ_DOKU-21795-001.fm
TCD 2013 2V
6
44290-0
44291-0
44292-0
02/2010
2/4
OBJ_DOKU-21795-001.fm
TCD 2013 2V
Mount charge air line.
Fasten screws.
Do not move gaskets.
Tighten screws alternately working from the centre to
the outside.
11 Nm
6
44293-0
44294-0
44126-1
02/2010
3/4
OBJ_DOKU-21795-001.fm
TCD 2013 2V
02/2010
4/4
OBJ_DOKU-21795-001.fm
Coolant pump
W 37-03-01
TCD 2013 2V
Removing and installing the coolant pump
(V-belt drive)
Standard tools:
V-belt tension measuring
device
8115
Operation manual
W 38-02-01
Attention!
Packing compound
DEUTZ DW 76
1
1
1
44513-0
02/2010
1/8
OBJ_DOKU-21796-001.fm
Coolant pump
W 37-03-01
TCD 2013 2V
1
1
6
44038-0
44039-0
44040-0
02/2010
2/8
OBJ_DOKU-21796-001.fm
Coolant pump
W 37-03-01
TCD 2013 2V
Unscrew screws (1).
Remove V-belt pulley (2).
6
44041-0
2
44042-0
44043-0
02/2010
3/8
OBJ_DOKU-21796-001.fm
Coolant pump
W 37-03-01
TCD 2013 2V
1
2
6
44514-0
W 38-02-01
44515-0
Remove gasket.
44516-0
02/2010
4/8
OBJ_DOKU-21796-001.fm
Coolant pump
W 37-03-01
TCD 2013 2V
Visually inspect the components.
6
44517-0
44586-0
44246-0
02/2010
5/8
OBJ_DOKU-21796-001.fm
Coolant pump
W 37-03-01
TCD 2013 2V
Tightening order:
screw (1), then screw (2), then the other
screws in any order.
Install thermostat housing.
W 38-02-01
6
44518-0
44515-0
1
2
44514-0
02/2010
6/8
OBJ_DOKU-21796-001.fm
Coolant pump
W 37-03-01
TCD 2013 2V
Mount V-belt (1) for coolant pump.
6
44043-0
44049-0
02/2010
7/8
OBJ_DOKU-21796-001.fm
Coolant pump
W 37-03-01
TCD 2013 2V
02/2010
8/8
OBJ_DOKU-21796-001.fm
Thermostat housing
W 38-01-01
TCD 2013 2V
Removing and installing the thermostat
Standard tools
Fitting compound
DEUTZ AP1908
44508-0
44424-0
02/2010
1/2
OBJ_DOKU-21797-001.fm
Thermostat housing
W 38-01-01
TCD 2013 2V
6
44439-0
Insert thermostat.
Arrow (1) points up.
1
44424-1
44425-0
02/2010
2/2
OBJ_DOKU-21797-001.fm
Thermostat housing
W 38-01-02
TCD 2013 2V
Checking the thermostat (in the removed state)
Standard tools:
Thermometer
W 38-01-01
Danger!
Risk of injury!
Hot water and hot thermostat.
Checking thermostat
Remove thermostat.
W 38-01-01
Measure beginning of stroke, dimension (a).
Note measured value, dimension (a).
44585-0
34680-2
02/2010
1/2
OBJ_DOKU-21798-001.fm
Thermostat housing
W 38-01-02
TCD 2013 2V
6
34679-2
Determine stroke.
Calculation example
Desired:
Stroke
Given:
Measured:
Beginning of stroke, dimension (a)
End of stroke, dimension (b)
Calculation:
Dimension (b) - dimension (a)
Result:
= stroke
34679-1
02/2010
2/2
OBJ_DOKU-21798-001.fm
Thermostat housing
W 38-02-01
TCD 2013 2V
Removing and installing the thermostat housing
8190
Standard tools
Fitting compound
DEUTZ AP1908
Emptying and filling the engine with operating media must be carried out according to
the operating manual and the appropriate
documentation of the vehicle/equipment
manufacturer.
44520-0
44521-0
02/2010
1/4
OBJ_DOKU-21799-001.fm
Thermostat housing
W 38-02-01
TCD 2013 2V
6
44522-0
44523-0
44521-0
02/2010
2/4
OBJ_DOKU-21799-001.fm
Thermostat housing
W 38-02-01
TCD 2013 2V
Clean sealing surfaces.
Insert new sealing ring (arrow).
Coat the sealing ring with fitting compound.
6
44524-0
44525-0
02/2010
3/4
OBJ_DOKU-21799-001.fm
Thermostat housing
W 38-02-01
TCD 2013 2V
02/2010
4/4
OBJ_DOKU-21799-001.fm
Fan drive
W 39-01-01
TCD 2013 2V
Removing and installing the belt tensioner
(V-rib belt)
Standard tools:
Retaining pin, diameter
6 mm
1
2
42852-0
42837-0
02/2010
1/4
OBJ_DOKU-21800-001.fm
Fan drive
W 39-01-01
TCD 2013 2V
6
42853-0
2
42836-0
42838-0
02/2010
2/4
OBJ_DOKU-21800-001.fm
Fan drive
W 39-01-01
TCD 2013 2V
Tighten screw (1).
80 Nm
6
42839-0
42853-0
42840-0
02/2010
3/4
OBJ_DOKU-21800-001.fm
Fan drive
W 39-01-01
TCD 2013 2V
6
43851-1
02/2010
4/4
OBJ_DOKU-21800-001.fm
Fan drive
W 39-02-01
TCD 2013 2V
Removing and installing the fan drive
Standard tools:
Retaining pin, diameter
6 mm
1
42854-0
1
2
42852-0
02/2010
1/4
OBJ_DOKU-21801-001.fm
Fan drive
W 39-02-01
TCD 2013 2V
6
42837-0
42853-0
1
42855-0
02/2010
2/4
OBJ_DOKU-21801-001.fm
Fan drive
W 39-02-01
TCD 2013 2V
Installing the fan drive
Install fan drive with V-rib belt pulley.
1
42856-0
42853-0
42840-0
02/2010
3/4
OBJ_DOKU-21801-001.fm
Fan drive
W 39-02-01
TCD 2013 2V
6
43851-1
2
42857-0
02/2010
4/4
OBJ_DOKU-21801-001.fm
Fan drive
W 39-02-03
TCD 2013 2V
Dismantling and assembling the fan drive
Standard tools
W 39-02-01
W 39-02-01
Mount adapter (1).
Tighten screws (arrows).
30 Nm
42874-0
Attention!
42875-0
02/2010
1/6
OBJ_DOKU-21802-001.fm
Fan drive
W 39-02-03
TCD 2013 2V
6
42874-0
Press off tight V-rib belt pulley from the fan drive with
twon forcing screws (1).
1
42877-0
42878-0
02/2010
2/6
OBJ_DOKU-21802-001.fm
Fan drive
W 39-02-03
TCD 2013 2V
Press out outside ball bearing.
6
42879-0
42880-0
42881-0
02/2010
3/6
OBJ_DOKU-21802-001.fm
Fan drive
W 39-02-03
TCD 2013 2V
6
42882-0
42883-0
42884-0
02/2010
4/6
OBJ_DOKU-21802-001.fm
Fan drive
W 39-02-03
TCD 2013 2V
Press the outside ball bearing into the housing to the
stop.
The press-in tool (1) must touch the outer
ring of the ball bearing (arrow).
6
42885-0
42886-0
42887-0
02/2010
5/6
OBJ_DOKU-21802-001.fm
Fan drive
W 39-02-03
TCD 2013 2V
30 Nm
6
42874-0
Stage 1:
30 Nm
Stage 2:
90
Attention!
42875-0
42874-0
02/2010
6/6
OBJ_DOKU-21802-001.fm
Fan console
W 39-04-03
TCD 2013 2V
Removing and installing the fan console
(V-rib belt drive)
Standard tools
Fitting compound
DEUTZ AP1908
Packing compound
DEUTZ DW 74
W 20-02-01
W 39-01-01
W 39-02-01
W 44-02-01
42900-0
1
42901-0
02/2010
1/6
OBJ_DOKU-21803-001.fm
Fan console
W 39-04-03
TCD 2013 2V
6
42902-0
1
42913-0
42972-0
02/2010
2/6
OBJ_DOKU-21803-001.fm
Fan console
W 39-04-03
TCD 2013 2V
Apply packing compound (arrow).
6
42914-0
Attention!
42915-0
3
42916-0
02/2010
3/6
OBJ_DOKU-21803-001.fm
Fan console
W 39-04-03
TCD 2013 2V
Mount generator.
Tighten screws (1).
Do not tighten screws.
42917-0
42973-0
1
2
02/2010
4/6
1
42918-0
OBJ_DOKU-21803-001.fm
Fan console
W 39-04-03
TCD 2013 2V
Install fuel pump.
W 20-02-01
Install the belt tensioner.
W 39-01-01
Install fan drive.
W 39-02-01
Install generator.
W 44-02-01
6
42919-0
02/2010
5/6
OBJ_DOKU-21803-001.fm
Fan console
W 39-04-03
TCD 2013 2V
02/2010
6/6
OBJ_DOKU-21803-001.fm
Exhaust pipe
W 41-01-01
TCD 2013 2V
Removing and installing the exhaust line
Standard tools
W 43-01-01
Fitting compound
DEUTZ S1
44295-0
44579-0
02/2010
1/4
OBJ_DOKU-21804-001.fm
Exhaust pipe
W 41-01-01
TCD 2013 2V
Remove studs.
Visually inspect the component.
6
44297-0
1
1
44297-1
10 Nm
Clean sealing surfaces.
Mount new seals.
44580-1
02/2010
2/4
OBJ_DOKU-21804-001.fm
Exhaust pipe
W 41-01-01
TCD 2013 2V
Mount exhaust manifold.
6
44578-0
44299-0
44298-0
02/2010
3/4
OBJ_DOKU-21804-001.fm
Exhaust pipe
W 41-01-01
TCD 2013 2V
6
44295-0
02/2010
4/4
OBJ_DOKU-21804-001.fm
TCD 2013 2V
Removing and installing the turbocharger
Standard tools
Fitting compound
DEUTZ S1
Fitting compound
DEUTZ AP1908
Removing turbocharger
Unscrew screw (1).
Remove retainer.
44277-0
44278-0
02/2010
1/6
OBJ_DOKU-21805-001.fm
TCD 2013 2V
6
44279-0
1
2
44280-0
44281-0
02/2010
2/6
OBJ_DOKU-21805-001.fm
TCD 2013 2V
Visually inspect the components.
6
44282-0
44283-1
1
2
44284-0
02/2010
3/6
OBJ_DOKU-21805-001.fm
TCD 2013 2V
2
1
6
44285-0
44286-0
2
1
44285-0
02/2010
4/6
OBJ_DOKU-21805-001.fm
TCD 2013 2V
Clean sealing surfaces.
Push oil return line (1) into crankcase (arrow).
6
44287-0
Attention!
Install tension-free!
44278-0
Mount retainer.
Tighten screw (1).
20 Nm
44277-0
02/2010
5/6
OBJ_DOKU-21805-001.fm
TCD 2013 2V
6
44288-0
02/2010
6/6
OBJ_DOKU-21805-001.fm
Generator
W 44-02-01
TCD 2013 2V
Removing and installing the generator
(V-belt drive)
Standard tools:
V-belt tension measuring
device
8115
Operation manual
Attention!
- (3) = terminal B+
2
44429-0
1
1
44038-0
02/2010
1/4
OBJ_DOKU-21806-001.fm
Generator
W 44-02-01
TCD 2013 2V
6
44039-0
44040-0
44431-0
02/2010
2/4
OBJ_DOKU-21806-001.fm
Generator
W 44-02-01
TCD 2013 2V
Installing the generator
Mount generator (2).
6
44431-0
44040-0
2
44429-0
02/2010
3/4
OBJ_DOKU-21806-001.fm
Generator
W 44-02-01
TCD 2013 2V
44053-0
02/2010
4/4
OBJ_DOKU-21806-001.fm
Starter
W 44-03-01
TCD 2013 2V
Removing and installing the starter
Standard tools
44432-0
44554-0
02/2010
1/2
OBJ_DOKU-21807-001.fm
Starter
W 44-03-01
TCD 2013 2V
6
42898-0
Connect cables.
Connect the battery's negative terminal.
44432-0
02/2010
2/2
OBJ_DOKU-21807-001.fm
Engine mounting
W 46-00-01
TCD 2013 2V
Mounting engine on assembly block and demounting
Standard tools:
Lifting gear
Suspension ropes
W 01-01-01
W 47-01-01
Special tools:
Assembly block incl. adapter plates
6066
Clamping bracket
6066/158
Danger!
When using hoists (workshop crane) the
safety regulations for handling hoists must
be observed.
It is not permitted to stay under moving
loads.
43943-0
90 Nm
3
43945-0
02/2010
1/6
OBJ_DOKU-21808-001.fm
Engine mounting
W 46-00-01
TCD 2013 2V
43946-0
Insert screws.
X
1
42645-0
43947-0
02/2010
2/6
OBJ_DOKU-21808-001.fm
Engine mounting
W 46-00-01
TCD 2013 2V
Demounting engine from assembly block
Hang engine on workshop crane.
6
44105-0
Lift engine.
42740-0
43946-0
02/2010
3/6
OBJ_DOKU-21808-001.fm
Engine mounting
W 46-00-01
TCD 2013 2V
3
43945-0
X
X
02/2010
4/6
OBJ_DOKU-21808-001.fm
Engine mounting
W 46-00-01
TCD 2013 2V
Technical Data
Tightening specifications
ID no.
Name
A00 001 Clamping holder on crankcase
Clamping bracket on adapter for
A00 002
assembly block
Screw type
Screw
Nut
Notes / Remark
Value
90 Nm
90 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
02/2010
5/6
OBJ_DOKU-21808-001.fm
Engine mounting
W 46-00-01
TCD 2013 2V
02/2010
6/6
OBJ_DOKU-21808-001.fm
Engine mounting
W 47-01-01
TCD 2013 2V
Removing and installing the engine mounting
(elastic mounting)
Standard tools
W 01-01-01
W 46-00-01
42641-0
02/2010
1/6
OBJ_DOKU-21809-001.fm
Engine mounting
W 47-01-01
TCD 2013 2V
6
42641-1
1
42640-1
(2) = M12x60
95 Nm
48225-0
02/2010
2/6
OBJ_DOKU-21809-001.fm
Engine mounting
W 47-01-01
TCD 2013 2V
Variant
Mount holder (1).
Fit washers (2).
2
3
6
48226-0
Variant
Fit sleeves (1).
Fit holder (2).
Fit washers (3).
Tighten screws (4).
(4) = M16
260 Nm
3
4
48230-0
3
48231-0
02/2010
3/6
OBJ_DOKU-21809-001.fm
Engine mounting
W 47-01-01
TCD 2013 2V
Variant
Mount holder (1).
Fit mounting bracket (2).
(6) = M12
90 Nm
02/2010
4
48232-0
4/6
OBJ_DOKU-21809-001.fm
Engine mounting
W 47-01-01
TCD 2013 2V
Technical Data
Tightening specifications
ID no.
Name
A00 006
Screw type
Notes / Remark
M12x35-10.9
M12x40-10.9
M12x60-10.9
M12x75-10.9
M12x85-10.9
M12x90-10.9
M12x220-10.9
M16x40-10.9
M16x45-10.9
M16x75-10.9
M16x85-10.9
M16x110-10.9
M16x140-10.9
M16x155-10.9
M16x220-10.9
M12x40-10.9
Value
95 Nm
6
260 Nm
90 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
02/2010
5/6
OBJ_DOKU-21809-001.fm
Engine mounting
W 47-01-01
TCD 2013 2V
02/2010
6/6
OBJ_DOKU-21809-001.fm
Cable harness
W 48-01-01
TCD 2013 2V
Removing and installing the cable harness
Standard tools
44059-0
44448-0
02/2010
1/12
OBJ_DOKU-21810-001.fm
Cable harness
W 48-01-01
TCD 2013 2V
6
44449-0
44433-0
44435-0
02/2010
2/12
OBJ_DOKU-21810-001.fm
Cable harness
W 48-01-01
TCD 2013 2V
Unlock central plug (1) (arrow) and pull off from holder.
6
44450-0
44557-0
44588-0
02/2010
3/12
OBJ_DOKU-21810-001.fm
Cable harness
W 48-01-01
TCD 2013 2V
6
44559-0
44560-0
44561-0
02/2010
4/12
OBJ_DOKU-21810-001.fm
Cable harness
W 48-01-01
TCD 2013 2V
Unscrew screws (1).
Remove the cover (2).
6
44562-0
44563-0
1
44564-0
02/2010
5/12
OBJ_DOKU-21810-001.fm
Cable harness
W 48-01-01
TCD 2013 2V
6
44565-0
44566-0
44563-0
02/2010
6/12
OBJ_DOKU-21810-001.fm
Cable harness
W 48-01-01
TCD 2013 2V
Mount cover (2).
Tighten screws (1).
8,5 Nm
1
6
44562-0
44561-0
44567-0
02/2010
7/12
OBJ_DOKU-21810-001.fm
Cable harness
W 48-01-01
TCD 2013 2V
6
43970-1
44588-1
44568-0
02/2010
8/12
OBJ_DOKU-21810-001.fm
Cable harness
W 48-01-01
TCD 2013 2V
Plug in the cable plug (1).
Control block
Ensure that the connection is perfect.
6
44557-0
Push the central plug onto the holder until it snaps in.
44468-0
44435-0
02/2010
9/12
OBJ_DOKU-21810-001.fm
Cable harness
W 48-01-01
TCD 2013 2V
6
44433-0
44449-0
44448-0
02/2010
10/12
OBJ_DOKU-21810-001.fm
Cable harness
W 48-01-01
TCD 2013 2V
Plug in the cable plug (1).
impulse transmitter (camshaft)
Ensure that the connection is perfect.
Lay cable harness and fix with cable tie (1).
2
6
44059-0
02/2010
11/12
OBJ_DOKU-21810-001.fm
Cable harness
W 48-01-01
TCD 2013 2V
02/2010
12/12
OBJ_DOKU-21810-001.fm
Electrical equipment
W 48-02-01
TCD 2013 2V
Removing and installing the impulse transmitter
(crankshaft)
Standard tools:
Feeler gauges
Locking agent
DEUTZ DW 72
44087-0
44088-0
02/2010
1/6
OBJ_DOKU-21811-001.fm
Electrical equipment
W 48-02-01
TCD 2013 2V
6
44089-0
44090-0
Attention!
44089-0
02/2010
2/6
OBJ_DOKU-21811-001.fm
Electrical equipment
W 48-02-01
TCD 2013 2V
Tighten screw (1).
9 Nm
6
44089-0
2
44091-0
44092-0
02/2010
3/6
OBJ_DOKU-21811-001.fm
Electrical equipment
W 48-02-01
TCD 2013 2V
Press the impulse transmitter lightly against the feeler gauge blade.
Tighten screws (arrows).
20 Nm
6
44093-0
44094-0
44095-0
02/2010
4/6
OBJ_DOKU-21811-001.fm
Electrical equipment
W 48-02-01
TCD 2013 2V
Plug cable plugs (1) together.
Ensure that the connection is perfect.
Lay cable.
Fix cable with cable tie (2).
6
44087-0
02/2010
5/6
OBJ_DOKU-21811-001.fm
Electrical equipment
W 48-02-01
TCD 2013 2V
02/2010
6/6
OBJ_DOKU-21811-001.fm
Electrical equipment
W 48-02-03
TCD 2013 2V
Removing and installing the impulse transmitter
(camshaft)
Standard tools
Locking agent
DEUTZ DW 72
44059-0
2
1
44060-0
02/2010
1/4
OBJ_DOKU-21812-001.fm
Electrical equipment
W 48-02-03
TCD 2013 2V
6
44058-0
42739-0
2
1
44060-0
02/2010
2/4
OBJ_DOKU-21812-001.fm
Electrical equipment
W 48-02-03
TCD 2013 2V
Plug cable plugs (1) together.
Ensure that the connection is perfect.
1
Lay cable.
Fix cable with cable tie (2).
6
44061-0
02/2010
3/4
OBJ_DOKU-21812-001.fm
Electrical equipment
W 48-02-03
TCD 2013 2V
02/2010
4/4
OBJ_DOKU-21812-001.fm
Electrical equipment
W 48-03-01
TCD 2013 2V
Fitting compound
DEUTZ AP1908
44433-0
44435-0
02/2010
1/2
OBJ_DOKU-21813-001.fm
Electrical equipment
W 48-03-01
TCD 2013 2V
6
43271-0
44435-0
44433-0
02/2010
2/2
OBJ_DOKU-21813-001.fm
Electrical equipment
W 48-04-01
TCD 2013 2V
Removing and installing the oil pressure switch
Standard tools
User notes
Special tools:
Long socket wrench insert 110700
Plugs/caps
170160
44510-0
02/2010
1/4
OBJ_DOKU-21814-001.fm
Electrical equipment
W 48-04-01
TCD 2013 2V
6
44511-0
44512-0
44511-0
02/2010
2/4
OBJ_DOKU-21814-001.fm
Electrical equipment
W 48-04-01
TCD 2013 2V
Plug in the cable plug (1).
Ensure that the connection is perfect.
6
44510-0
02/2010
3/4
OBJ_DOKU-21814-001.fm
Electrical equipment
W 48-04-01
TCD 2013 2V
02/2010
4/4
OBJ_DOKU-21814-001.fm
Electrical equipment
W 48-05-01
TCD 2013 2V
Removing and installing temperature transmitter
(coolant)
Standard tools
1
44426-1
44427-0
02/2010
1/2
OBJ_DOKU-21815-001.fm
Electrical equipment
W 48-05-01
TCD 2013 2V
6
44084-0
44428-0
1
44426-1
02/2010
2/2
OBJ_DOKU-21815-001.fm
Electrical equipment
W 48-06-01
TCD 2013 2V
Removing and installing the fuel pressure sensor
Standard tools
User notes
Special tools:
Long socket wrench insert 110700
Plugs/caps
170160
Danger!
Wait 30 seconds after switching off the
engine before working on the fuel system.
Attention!
43972-1
02/2010
1/4
OBJ_DOKU-21816-001.fm
Electrical equipment
W 48-06-01
TCD 2013 2V
6
43973-0
43974-0
43973-0
02/2010
2/4
OBJ_DOKU-21816-001.fm
Electrical equipment
W 48-06-01
TCD 2013 2V
Press the cable plug onto the fuel pressure sensor.
Turn in the locking ring (1) until it snaps in.
1
6
43970-0
02/2010
3/4
OBJ_DOKU-21816-001.fm
Electrical equipment
W 48-06-01
TCD 2013 2V
02/2010
4/4
OBJ_DOKU-21816-001.fm
Tools
W 49-02-01
TCD 2013 2V
Installing and removing turning gear
Standard tools
Special tools:
Turn-over gear
100320
Disassembly
Unscrew screws (1).
Remove holder (2).
Remove sleeve (3).
4
3
43950-1
1
43951-0
02/2010
1/4
OBJ_DOKU-21817-001.fm
Tools
W 49-02-01
TCD 2013 2V
Attention!
1
43952-0
1
43953-0
1
43953-0
02/2010
2/4
OBJ_DOKU-21817-001.fm
Tools
W 49-02-01
TCD 2013 2V
Clean the sealing surface on cover and gearcase.
Insert new O-ring (arrow).
Lightly oil O-ring.
6
43983-0
43984-0
3
2
4
3
2
43950-2
02/2010
3/4
OBJ_DOKU-21817-001.fm
Tools
W 49-02-01
TCD 2013 2V
Technical Data
Tightening specifications
ID no.
Name
Screw type
M8x35-10.9
M8x55-10.9
M8x80-10.9
M8x55-10.9
M8x60-10.9
M8x80-10.9
Notes / Remark
Value
Observe tightening
sequence
30 Nm
21 Nm
30 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
02/2010
4/4
OBJ_DOKU-21817-001.fm
Tools
W 49-02-02
TCD 2013 2V
Installing and removing turning gear
(Torsional vibration damper)
Attention!
Standard tools
Special tools:
Turn-over gear
100380
48243-0
48244-0
02/2010
1/2
OBJ_DOKU-21818-001.fm
Tools
W 49-02-02
TCD 2013 2V
Depending on the installation situation mount the appropriate tool on the turning gear (1) for extension.
Attention!
6
48245-1
02/2010
2/2
48243-0
OBJ_DOKU-21818-001.fm
Connection housing
W 52-01-01
TCD 2013 2V
Removing and installing the connection housing
Standard tools:
Socket wrench insert
Socket wrench insert
8113
8114
42698-0
44081-0
02/2010
1/4
OBJ_DOKU-21819-001.fm
Connection housing
W 52-01-01
TCD 2013 2V
6
44082-0
44083-0
2
1
Fasten screws.
Note different screw lengths:
M12x85-10.9
M12x160-10.9 (1)
M16x85-10.9
M16x150-10.9 (2)
2
2
44421-1
02/2010
2/4
OBJ_DOKU-21819-001.fm
Connection housing
W 52-01-01
TCD 2013 2V
Tighten the screws according to the tightening sequence.
4
6
44085-0
99 Nm
44085-0
243 Nm
44085-1
02/2010
3/4
OBJ_DOKU-21819-001.fm
Connection housing
W 52-01-01
TCD 2013 2V
6
42704-0
02/2010
4/4
OBJ_DOKU-21819-001.fm
Connection housing
W 52-01-02
TCD 2013 2V
Check alignment of connection housing
8190
Attention!
Standard tools:
Magnetic measuring stand
Self-made mandrin guide
Special tools:
Digital dial gauge
Prerequisites:
Radial bearing clearance and axial
clearance of the crankshaft in the permissible tolerance range.
100410
III
Position (I)
Position (II)
Position (III)
II
Position (IV)
IV
47687-0
1
2
47686-0
02/2010
1/6
OBJ_DOKU-21820-001.fm
Connection housing
W 52-01-02
TCD 2013 2V
Position (I)
Set the dial gauge with probe pin to position (I) at a
right angle to the connection housing.
Apply the probe pin to the connection housing with
pre-tension.
I
47688-0
47689-0
Position (II)
Turn the crankshaft slowly to position (II).
Read off measured value.
Note measured value, dimension (a).
II
47690-0
02/2010
2/6
OBJ_DOKU-21820-001.fm
Connection housing
W 52-01-02
TCD 2013 2V
Position (III)
III
6
47691-0
Position (IV)
Turn the crankshaft slowly to position (IV).
Read off measured value.
Note the measured value, dimension (c).
IV
47692-0
I
47688-0
02/2010
3/6
OBJ_DOKU-21820-001.fm
Connection housing
W 52-01-02
TCD 2013 2V
Attention!
I
47688-0
02/2010
4/6
OBJ_DOKU-21820-001.fm
Connection housing
W 52-01-02
TCD 2013 2V
Technical Data
Table 1 (example)
Connection housing SAE3
Position
1 Display on dial gauge 100410
1a Arithmetic value (reversal of the sign)
Correction radial bearing clearance (d)
2
(d) = 0.06 mm
Half of the bearing clearance correction
3
(d/2)
Corrected vertical total dial gauge
4 display (L )
v
5
6
(I)
0
(II)
a = 0.16
a1 = -0.16
(III)
b = -0.08
b1 = +0.08
(IV)
c = 0.23
c1 = -0.23
d = -0.06
d/2 = -0.03
d/2 = -0.03
E1 = -0.19
E2 = -0.26
Lv = 0.02
LH = 0.07
Calculation example on connection housing SAE 03, radial run-out limit value 0.29 mm
Lv = +0.08 + -0.06
Lv = b1 + d
Lv = 0.02
E1 = a1 + d/2
E1 = -0.16 + -0,03
E1 = -0.19
E2 = c1 + d/2
E2 = -0.23 + -0,03
E2 = -0.26
LH = E1 - E2
LH = -0.19 - -0.26
LH = 0.07
LR = 0.0730
Inside diameter
(mm)
647,7
511,18
447,68
409,58
5/6
Connection housing
W 52-01-02
TCD 2013 2V
SAE 4
SAE 5
361,95
314,32
0,25
0,25
(I)
0
(II)
a=
a1 =
(III)
b=
b1 =
(IV)
c=
c1 =
d=
d/2 =
d/2 =
E1 =
E2 =
Lv =
6
Calculation
Lv = b1 + d
LH =
E1 = a1 + d/2
E1 =
E2 = c1 + d/2
E2 =
LH = E1 - E2
LH =
Lv =
LR =
LR = determined radial run-out limit value (t) t =
Connection housing
SAE size
SAE 0
SAE 1
SAE 2
SAE 3
SAE 4
SAE 5
02/2010
6/6
OBJ_DOKU-21820-001.fm
Start aid
W 63-01-01
TCD 2013 2V
Removing and install the heating flange
Attention!
Standard tools
Attention!
46360-0
1
3
44360-1
02/2010
1/4
OBJ_DOKU-21821-001.fm
Start aid
W 63-01-01
TCD 2013 2V
6
44831-0
1
3
44360-1
Stage 1:
3 Nm
Stage 2:
30
Connect cable.
20 Nm
Attention!
46360-0
02/2010
2/4
OBJ_DOKU-21821-001.fm
Start aid
W 63-01-01
TCD 2013 2V
Technical Data
Tightening specifications
ID no.
Name
Screw type Notes / Remark
A06 042 Heating flange on charge air manifold M8x100-10.9 Stage 1:
A06 042 Heating flange on charge air manifold M8x100-10.9 Stage 2:
Hexagonal, pole screw
A13 065 Cable connection on heater flange
locked
Value
3 Nm
30
20 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
02/2010
3/4
OBJ_DOKU-21821-001.fm
Start aid
W 63-01-01
TCD 2013 2V
02/2010
4/4
OBJ_DOKU-21821-001.fm
Start aid
W 63-02-01
TCD 2013 2V
Removing and installing the glow plugs
Standard tools
Special tools:
Assembly tool
User notes
W 19-01-01
120440
Danger!
Wait 30 seconds after switching off the
engine before working on the fuel system.
Attention!
Attention!
42728-0
02/2010
1/4
OBJ_DOKU-21822-001.fm
Start aid
W 63-02-01
TCD 2013 2V
1
2
6
48219-0
48220-0
48220-0
02/2010
2/4
OBJ_DOKU-21822-001.fm
Start aid
W 63-02-01
TCD 2013 2V
Install cable (arrows).
Tighten nuts (1).
3 Nm
6
42728-0
02/2010
3/4
OBJ_DOKU-21822-001.fm
Start aid
W 63-02-01
TCD 2013 2V
Technical Data
Tightening specifications
ID no.
Name
A13 030 Cable shoe on connection bolt
Heating plug / screw cap on cylinder
A13 032
head
Screw type
M6
Notes / Remark
Value
3 Nm
20 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the
tightening torque of +/- 10% is permissible.
02/2010
4/4
OBJ_DOKU-21822-001.fm
Standard tools
W 49-00-01
TCD 2013 2V
Standard tools
7
02/2010
1/8
OBJ_DOKU-21823-001.fm
Standard tools
W 49-00-01
TCD 2013 2V
Orders
The tools can be ordered directly, stating the order
number, from:
WILBAER
Wilhelm Bcker GmbH & Co.KG
Postfach 14 05 80
42826 Remscheid
Germany
Tel.: +49 (0) 2191 9339-0
Fax: +49 (0) 2191 9339-200
E-mail: info@wilbaer.de
Web: http://www.deutz-tools.com
Conventional tools /
special tools:
02/2010
2/8
OBJ_DOKU-21823-001.fm
Standard tools
W 49-00-01
TCD 2013 2V
8002
Pressure pump
Checking cooling system for leak-tightness
35409-2
7
8005
Compression pressure tester
for diesel engines
10 - 40 bar
Checking compression pressure
35410-3
8011
Hose clip pliers
Loosen and fasten hose clips
e. g. fuel return pipe
39426-1
02/2010
3/8
OBJ_DOKU-21823-001.fm
Standard tools
W 49-00-01
TCD 2013 2V
8024
Assembly pliers
Removing valve shaft seals
37509-2
7
8035
Socket wrench insert
reinforced, size 22
removing and installing main bearing
37504-2
8113
Socket wrench insert
Torx - E 14
43022-0
02/2010
4/8
OBJ_DOKU-21823-001.fm
Standard tools
W 49-00-01
TCD 2013 2V
8114
Socket wrench insert
Torx - E 20
35415-1
7
8115
V-belt tension measuring device
150 to 600 N
Check V-belt tension
35416-3
8189
Torx tool set
Contents of case:
- Double-ended ring spanner E6/E8
- Double-ended ring spanner E10/E12
Socket wrench insert E8 and E10 (1/4 inch)
- Socket wrench insert E10 and E12 (3/8 inch)
- Socket wrench insert E18 (1/2 inch)
39432-1
02/2010
5/8
OBJ_DOKU-21823-001.fm
Standard tools
W 49-00-01
TCD 2013 2V
8190
Rotation angle disc
with magnet
Setting valve clearance
42528-1
7
8191
Screwdriver insert
for slotted screw
Valve clearance setting
43060-0
8192
Bowl wrench
Fuel pre-filter (type: Racor)
43193-1
02/2010
6/8
OBJ_DOKU-21823-001.fm
Standard tools
W 49-00-01
TCD 2013 2V
8193
Screwdriver insert
with pressed in hexagonal pin (5 mm),
1/2 inch, long version
(in conjunction with rotation angle disc 8190)
43183-0
7
8194
Screwdriver insert
with pressed in hexagon pin (4 mm),
3/8 inch, long version
(in connection with rotation angle disc 8190 and reducer 1/2 to 3/8 inch)
43183-0
8196
Open end wrench adapter
Size 13,
for torque wrench
Tighten lock nut of the valve clearance setting screw.
43197-0
02/2010
7/8
OBJ_DOKU-21823-001.fm
Standard tools
W 49-00-01
TCD 2013 2V
8198
Pricker
Removing rotary shaft lip seal
43206-1
7
9017
Assembly lever
e. g. removing and installing valves
37511-2
9090
Spring band pliers
320 mm
Tighten spring clamp
35420-3
02/2010
8/8
OBJ_DOKU-21823-001.fm
Special tools
W 49-01-01
TCD 2013 2V
Special tools
02/2010
1/16
OBJ_DOKU-21824-001.fm
Special tools
W 49-01-01
TCD 2013 2V
Orders
The tools can be ordered directly, stating the order
number, from:
WILBAER
Wilhelm Bcker GmbH & Co.KG
Postfach 14 05 80
42826 Remscheid
Germany
Tel.: +49 (0) 2191 9339-0
Fax: +49 (0) 2191 9339-200
E-mail: info@wilbaer.de
Web: http://www.deutz-tools.com
Conventional tools /
special tools:
These must be ordered directly from
WILBAER with specification of the order
number.
02/2010
2/16
OBJ_DOKU-21824-001.fm
Special tools
W 49-01-01
TCD 2013 2V
100190
Connector
(in conjunction with compression pressure tester 8005)
42524-0
100320
Turning gear
flywheel side
35422-1
100380
Turning gear
on hub torsional vibration damper/V-belt pulley
48242-0
02/2010
3/16
OBJ_DOKU-21824-001.fm
Special tools
W 49-01-01
TCD 2013 2V
100400
Dial gauge with fixing wheel
Measuring range 0 - 10 mm / 0.01 mm
35424-1
100410
Digital gauge
Measuring range 0 - 30 mm / 0.01 mm
43205-2
100750
Measuring device
Measuring bar with two shims
(in conjunction with 100400 and 100410)
Checking valve lag dimension
Checking piston projection
39402-1
02/2010
4/16
OBJ_DOKU-21824-001.fm
Special tools
W 49-01-01
TCD 2013 2V
103050
Socket wrench insert
Size 15
for valve clearance setting with removed exhaust return
module
(in connection with 8190)
43023-0
103140
Crowfoot wrench
with installed EGR module
48237-0
103220
Special pliers
for removing the roller tappet
43010-0
02/2010
5/16
OBJ_DOKU-21824-001.fm
Special tools
W 49-01-01
TCD 2013 2V
110500
Special wrench
Wrench size 17
Removing and installing high-pressure lines
35436-1
110620
Lever tool
Removing the injector
45673-0
110640
Lever tool
Removing the injector
with removed rail
43941-0
02/2010
6/16
OBJ_DOKU-21824-001.fm
Special tools
W 49-01-01
TCD 2013 2V
110700
Socket wrench insert
long
Installing and removing pressure sensors
(rail pressure, oil pressure, fuel pressure)
43198-2
110900
Assembly case
Case for O-rings, complete with:
Disassembly tool 110901 and three
assembly sleeves with guide:
- High pressure pump ( 36), 110902
- Injector, 2V motor ( 16), 110903
- Injector, 4V motor ( 23), 110904
Removing and installing O-rings
43208-0
110901
Disassembly tool
Removing and installing the O-rings
45950-1
02/2010
7/16
OBJ_DOKU-21824-001.fm
Special tools
W 49-01-01
TCD 2013 2V
120440
Assembly tool
Removing and installing the glow plugs
48238-0
120680
Puller
(in conjunction with slide hammer 150800)
Removing jammed injector sealing ring
35437-1
120900
Support bracket
pivoting
Clamping cylinder head
35438-3
02/2010
8/16
OBJ_DOKU-21824-001.fm
Special tools
W 49-01-01
TCD 2013 2V
120910
Base plate
(in conjunction with support bracket 120900 if support
bracket is not screwed tightly)
35439-3
130300
Universal piston ring pliers
Removing and installing the piston rings
43021-0
130420
Trapezoidal groove wear gauge
Piston diameter 108 mm
36461-2
02/2010
9/16
OBJ_DOKU-21824-001.fm
Special tools
W 49-01-01
TCD 2013 2V
130640
Piston ring compressor
Piston diameter 108 mm
39408-1
142810
Assembly tool
Installing crankshaft sealing ring
(flywheel side)
35446-1
142820
Assembly tool
Installing crankshaft sealing ring
(opposite side to flywheel)
35445-1
02/2010
10/16
OBJ_DOKU-21824-001.fm
Special tools
W 49-01-01
TCD 2013 2V
150170
Puller, universal
comprising traverse, support and threaded rod
(in conjunction with disc 150171)
Removing cylinder liner
43207-0
150171
Tension plate
(in conjunction with disassembly device 150170)
for liner diameter: 108 mm
Removing cylinder liner
43204-0
150180
Liner holder
(Set comprises 7 holders)
Turning crankshaft with cylinder head removed
43181-0
02/2010
11/16
OBJ_DOKU-21824-001.fm
Special tools
W 49-01-01
TCD 2013 2V
150190
Assembly lever
Lever with bolts
(in conjunction with disc 150191)
Installing cylinder liner
43209-2
150191
Washer
(in conjunction with assembly lever 150190)
for liner diameter: 108 mm
Installing cylinder liner
43203-2
150800
Slide hammer
(in conjunction with disassembly device 120680)
Disassembling injector sealing ring
35449-2
02/2010
12/16
OBJ_DOKU-21824-001.fm
Special tools
W 49-01-01
TCD 2013 2V
151500
Separating tool
Removing metal sheet lubricating oil pan from crankcase
45974-0
170050
Special wrench
Unscrewing the filter cartridges
37629-2
170160
Stoppers/caps
1 set of differently-sized stoppers and caps
Sealing openings on the fuel system
43663-0
02/2010
13/16
OBJ_DOKU-21824-001.fm
Special tools
W 49-01-01
TCD 2013 2V
6066
Assembly block
Engine clamping, double-sided
35451-2
6066/158
Clamping bracket
consisting of:
1 holder 6066/158-1 rear right,
1 holder 6066/158-2 rear left,
1 holder 6066/158-3 front right,
1 holder 6066/158-4 front left
(in connection with assembly block 6066)
Clamping of the engine, double-sided
35452-1
6068
Engine lifting device
Load (2000 kg), 3-point suspension, spindle clamp,
cross member, chains and hooks
43184-0
02/2010
14/16
OBJ_DOKU-21824-001.fm
Special tools
W 49-01-01
TCD 2013 2V
02937495
Control signal transmitter
Testing Common Rail Injectors
48252-0
02937496
Hydraulic pressure generation
48249-0
02937497
Pressure loss tester
Top dead centre gauge
48251-0
02/2010
15/16
OBJ_DOKU-21824-001.fm
Special tools
W 49-01-01
TCD 2013 2V
02937498
High pressure tester
2500 bar
48250-0
02/2010
16/16
OBJ_DOKU-21824-001.fm