Bill of Quantity (BQ)

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 12

Lampiran 2

REKAPITULASI
BILL OF QUANTITY (BQ)
PEMBUATAN PERSEMAIAN PERMANEN BPTH MALUKU PAPUA

No
1
2
3
4
5
6
7
8
9

NAMA PEKERJAAN

JUMLAH

Persiapan
Rooting Green House 13m x 20m dan
Germination House 13m x 5m
Shaded Area, 30m x 20m, 2 unit
Open Area Ukuran 30 x 30 m, 4 unit
Control Panel Room 4 X 4 m
Bangunan Pendukung Persemaian 10mx12m
Reservoar, 4m x 5m x 1,5m
Jalan Lingkungan, Parit, dan pagar kawat
Parkir area (20mX10m)
Jumlah
PPN 10%
Total + PPN
Dibulatkan
Terbilang

Rp

Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp

Rp

.....................................................................................
.....................................................................................

Ambon,
Dibuat Oleh :
PT/CV/Fa

(NAMA JELAS)
JABATAN

2012

RINCIAN RENCANA ANGGARAN BIAYA


Nama Kegiatan
Nama Pekerjaan

: Pembangunan Persemaian Permanen


: Persiapan
JENIS PEKERJAAN

NO

SAT.

VOLUME

JUMLAH (Rp)

HARGA SAT (Rp)

Mobilisasi dan demobilisasi

ls

Pengukuran Ulang

ls

Penyiapan Lahan

ls

Administrasi dan Dokumentasi

ls

Papan Nama Proyek 1 x 1,5 m

m2

1.5

Pagar Proyek

300

Direksi Keet 4x5 m

m2

20

Listrik Kerja

ls

Air Kerja

ls

Total

RINCIAN RENCANA ANGGARAN BIAYA


Nama Kegiatan

Pembangunan Persemaian Permanen

Nama Pekerjaan

1. Rooting Green House 10m x 20 m


2. Germination House 10m x 5m

JENIS PEKERJAAN

NO

PART

SATUAN

VOLUME

JUMLAH (Rp)

HARGA SAT (Rp)

BASE FRAME

I
1

Foundation tube

RHS 40x40x1,8 x 900 mmt

pcs

28.00

Main Coloum

RHS 50x50x1,8 x3000 mmt

pcs

14.00

Wind Bracing

RHS 25x50x1,8x4100 mmt

pcs

14.00

Structur Frame

RHS 50x50x1,8 mmt + RHS 40x40x1,8 mmt

unit

7.00

Structur bracing

dia 3/4 '' x 1,8 x 700 mmt SGP

pcs

14.00

Wall bracing (wide side)

RHS 40x40x1,8x4000 mmt

pcs

4.00

Main frame

RHS 50x50x1,8 mmt + RHS 25x50x1,8 mmt

pcs

16.00

Door Frame

RHS 50x50x1,8 x8000 mmt

pcs

4.00

Sliding Door + Accessories for Rooting Green House (2mx2m)

RHS 40x40x1,8x11500 mmt

set

1.00

10

Sliding Door + Accessories for Germination House (1,5mx1,5m)

RHS 40x40x1,8x11500 mmt

set

1.00

11

Gordign

RHS 40x40x1,8x4000 mmt

pcs

24.00

12

Top Gordign

RHS 40x40x1,8x4000 mmt

Unit

12.00

13

Spring Clip

Clip (aluminium)

Set

224.00

14

Rail Bracing Down

RHS 40x40x1,8x4000 mmt

bt

14.00

15

Bolt & Nut, Electro Plating (for Green house)

M10

Ls

1.00

16

Ceilling frame for irrigation + Bracket

RHS 40x40x1,8 mmt

m'

140.00

SUB TOTAL
II

ROOFING / WALL

1 Shading net
2 UV Protected Film

50%

rool

4.00

12 mikron

m2

621.28

set

650.00

3 25mm Roofing teks


SUB TOTAL

III

STEEL BENCHES (0,8mX1,2mX8,0 m ) for Rooting Green House

Coloum + Flange

40x40x3x800 mmt Angle

pcs

12.00

Rail (length side)

40x40x3x4000 mmt Angle

pcs

12.00

Rail (Wide side)

40x40x3x1200 mmt Angle

pcs

6.00

Rail ( Down side)

30x30x3x4000 mmt Angle

pcs

4.00

Bracket 51

40x40x3x510 mmt Angle

pcs

12.00

Bracket 100

40x40x3x1000 mmt Angle

pcs

4.00

Bolt, Nut, W, SW

M8x25mm,w,sw

Lot

1.00

Coating

Zincromate

Set

1.00

Sub Total

SUB TOTAL

Total 10 Unit
IV

STEEL RACK ( 1.70mX1,34mX8,00m )

Coloum + Flange

40x40x3x1700 mmt Angle

pcs

12.00

Rail (length side)

40x40x3x4000 mmt Angle

pcs

34.00

Rail (Wide side)

40x40x3x1340 mmt Angle

pcs

6.00

Rail for irigation

40x40x3x4000 mmt Angle

pcs

4.00

Bracket 51

40x40x3x510 mmt Angle

pcs

12.00

Bracket 70

40x40x3x700 mmt Angle

pcs

4.00

Bolt, Nut, W, SW

M8x25mm,w,sw

Lot

1.00

Coating

Zincromate

Set

1.00

Sub Total

SUB TOTAL

Total 2 Unit

PEKERJAAN TANGGULAN

Pek. Pas. Bouwplank

73.2

Pek. Galian tanah Pondasi tanggulan

m3

1.09

Pek. Urugan pasir bawah tanggulan t. 5 cm

m3

0.36

Pek. Lantai kerja bawah tanggulan t. 5 cm

m3

0.36

Pek Cor beton bertulang dia. 6mm (10cmx15cm)

m3

2.28

Pek. Pas. Sulingan

bh

39.00

Pek. Plesteran + Acian tanggulan

m2

34.20

SUB TOTAL

JENIS PEKERJAAN

NO

SATUAN

VOLUME

Galian Tanah main coloum

m3

1.51

Pek. Urugan pasir bawah Pondasi main coloum t. 5 cm

m3

0.13

Pek. Lantai kerja bawah Pondasi tapak t. 5 cm

m3

0.13

pek. Cor Beton K.175

m2

1.26

VI

PEKERJAAN BETON

1
2

PART

HARGA SAT (Rp)

JUMLAH (Rp)

SUB TOTAL
VII
1

PEKERJAAN LANTAI
Pek. Hampar Split 3-5 tb. 5 cm

m3

26.00

SUB TOTAL

VIII PEKERJAAN IRIGASI FOGGING


1

High Pressure Compressor

unit

1.00

Ball valve 1 1/4''

unit

1.00

Disc Filter 1 1/4''

bh

1.00

PVC AW 1 1/4 '

m'

8.00

PVC AW 1 '

m'

8.00

PVC AW 3/4'

m'

4.00

PVC AW 1/2'

m'

4.00

Block sock 1 1/4''x1''

bh

1.00

Block sock 1''x3/4''

bh

1.00

10

Block sock 3/4''x1/2''

bh

1.00

11

High Pressure Pipe

m'

3.00

12

End Fitting

pcs

2.00

13

Pipe Fitting Straight 1/4

pcs

1.00

14

Elbow

pcs

3.00

15

Tee Conector

pcs

7.00

16

Cooper Tubing

m'

110.00

17

Central Nozzle

pcs

50.00

18

Nozzle

pcs

50.00

19

End Connector

pcs

1.00

20

Tanki air 1200 L

bh

1.00

3/8''

SUB TOTAL
IX

PEKERJAAN IRIGASI MISTING GERMINATION HOUSE

Watermur 1''

pcs

2.00

Check valved 1''

pcs

2.00

High Pressure Pump min 4 bar

unit

1.00

Disc Filter 1''

unit

1.00

Electric Valve 24 V

pcs

1.00

Control Panel

unit

1.00

Pressure swith

unit

1.00

Pressure gauge

unit

1.00

Mister Agridor

pcs

32.00

10

HDPE 13 mm

56.00

11

Suction & Discharge

ls

1.00

12

Ball valve 1''

unit

2.00

13

PVC AW + Accessories

Lot

1.00

SUB TOTAL
X

PEKERJAAN LAIN-LAIN

Pek. Perapihan dan pemberesan

Ls

SUB TOTAL
TOTAL

1.00

0.00
0.00

RINCIAN RENCANA ANGGARAN BIAYA


Nama Kegiatan
Nama Pekerjaan

:
:

Pembangunan Persemaian Permanen


Shaded Area Ukuran 30 m x 20 m, 2 Unit
JENIS PEKERJAAN

NO
I

PART

SATUAN

VOLUME

HARGA SATUAN
(Rp)

JUMLAH (Rp)

BASE FRAME

Foundation tube

RHS 40x40x1,8 mmt

pcs

102.00

Main Coloum

RHS 50x50x1,8x3000 mmt

pcs

54.00

Wind Bracing

RHS 25x50x1,8x4100 mmt

pcs

48.00

Structure Bracing

dia 3/4 '' x 1,8 x 700 mmt SGP

pcs

48.00

Wire Rope

12mm

m'

312.00

Clam wire rope

12mm

pcs

69.00

Spanskrup 12mm

12mm

bh

12.00

Wire Rope

8mm

m'

292.00

Clam wire rope

8mm

pcs

48.00

10

Spanskrup 8mm

8mm

bh

8.00

11

Rail Bracing down

RHS 40x40x1,8x3000 mmt

bt

24.00

12

Bolt & Nut, Electro Plating (for Shaded)

M10

set

1.00

SUB TOTAL
II

ROOFING

Shading net

25mm Roofing teks

50%

Rool
set

8.00

400.00

SUB TOTAL

III

PEKERJAAN TANGGULAN

Pek. Pas. Bouwplank

212.00

Pek. Galian tanah Pondasi tanggulan

4.77

Pek. Urugan pasir bawah tanggulan t. 5 cm

m3

1.59

Pek. Lantai kerja bawah tanggulan t. 5 cm

1.59

Pek Cor beton bertulang dia. 6mm (10cmx15cm)

m3

6.36

Pek. Pas. Sulingan

bh

107.00

Pek. Plesteran + Acian tanggulan

95.40

SUB TOTAL

IV

PEKERJAAN BETON

Galian Tanah main coloum

5.51

Pek. Urugan pasir bawah Pondasi main coloum t. 5 cm

m3

0.46

Pek. Lantai kerja bawah Pondasi tapak t. 5 cm

0.46

pek. Cor Beton K.175

4.59

SUB TOTAL
V

PEKERJAAN LANTAI

Pek. Hampar Split 3-5 tb. 5 cm

m3

69

SUB TOTAL
VI

PEKERJAAN IRIGASI SHADED AREA

High Pressure Pump min 6 bar

unit

1.00

Watermur 1 1/4 ''

bh

4.00

Ball Valve 1 1/4''

unit

2.00

Check valved 1 1/4''

unit

2.00

Pressure swith

bh

1.00

Pressere gauge

bh

1.00

12 Van Spray

pcs

66.00

Disc Filter 1 1/4 ''

unit

1.00

Pipa PVC AW 1 1/4''

m'

40.00

Pipa PVC AW 1 ''

m'

30.00

10

Pipa PVC AW 3/4''

m'

402.00

11

Pipa PVC VP 1/2''

120 cm

bt

24.00

12

Pipa PVC VP 1/2''

80 cm

bt

42.00

13

Tee 3/4'' x 1/2''

bh

66.00

14

Tee 3/4''

bh

14.00

15

Elbow 3/4''

bh

8.00

16

Sock drat dalam 1/2 ''

bh

66.00

17

Block sock 1 1/4''x1''

bh

2.00

18

Block sock 1''x3/4''

bh

2.00

19

Block sock 3/4''x1/2''

bh

2.00

SUB TOTAL
VII
1

PEKERJAAN LAIN-LAIN
Pek. Perapihan dan pemberesan

Ls

1.00

SUB TOTAL

TOTAL

0.00

RINCIAN RENCANA ANGGARAN BIAYA

Nama Kegiatan

Pembangunan Persemaian Permanen

Nama Pekerjaan

Open Area Ukuran 30 x 30 m, 4 unit

JENIS PEKERJAAN

NO
I

PEKERJAAN TANGGULAN

Pek. Pas. Bouwplank

2
3
4
5
6
7

SATUAN

VOLUME

HARGA SAT (Rp)

JUMLAH (Rp)

120.00

Pek. Galian tanah Pondasi tanggulan

10.80

Pek. Urugan pasir bawah tanggulan t. 5 cm

m3

3.60

Pek. Lantai kerja bawah tanggulan t. 5 cm

3.60

Pek Cor beton bertulang dia. 6mm (10cmx15cm)

m3

14.40

Pek. Pas. Sulingan

bh

241.00

Pek. Plesteran + Acian tanggulan

m2

216.00

SUB TOTAL

II

PEKERJAAN LANTAI
1

Pek. Hampar Split 3-5 lantai tbl. 5cm

M3

180.00

SUB TOTAL

III

PEKERJAAN IRIGASI

High Pressure Pump min 6 bar 3 phase

2
3

unit

1.00

Watermur 1 1/2 ''

bh

2.00

Ball Valve 1 1/2''

unit

2.00

Check valved 1 1/2''

unit

2.00

Control Panel

unit

1.00

Disc Filter 1 1/2 ''

unit

1.00

Pressure swith

bh

1.00

Pressere gauge

bh

1.00

Sprinkler

pcs

30.00

10

Pipa PVC AW 1 1/2''

m'

30.00

11

Pipa PVC AW 1 1/4''

m'

8.00

12

Pipa PVC AW 1'

m'

4.00

13

Pipa PVC AW 3/4'

m'

480.00

14

Pipa PVC VP 1/2'' p= 80cm

bt

30.00

15

Tee 3/4'' x 1/2''

bh

30.00

16

Tee 3/4''

bh

4.00

17

Elbow 3/4''

bh

8.00

18

Sock drat luar 1/2 ''

bh

30.00

19

Block sock 1 1/2''x1 1/4''

bh

2.00

20

Block sock 1 1/4''x1''

bh

2.00

21

Block sock 1''x3/4''

bh

2.00

22

Block sock 3/4''x1/2''

bh

2.00

SUB TOTAL
VI

PEK. LAIN-LAIN

Pek. Perapihan dan pemberesan

Ls

1.00

SUB TOTAL

TOTAL

RINCIAN RENCANA ANGGARAN BIAYA

Nama Kegiatan

: Pembangunan Persemaian Permanen

Nama Pekerjaan

: Control Panel Room 4 X 4 m

PEKERJAAN

NO

SATUAN

VOLUME

HARGA SATUAN
(Rp)

JUMLAH (Rp)

PEKERJAAN PONDASI DAN PASANGAN

Pek. Bouwplank

16.00

Galian tanah

m3

8.10

Pek. Pasir urug

m3

0.68

Pek. Lantai Kerja

m3

0.68

Pondasi batu belah ad. 1:4

m3

5.40

Kolom 25 x 25

m3

0.75

Kolom Praktis

m3

0.28

Sloof Bertulang dia. 8mm

m3

0.81

Pek. Pas. Ring balk bertulang dia. 8mm

m3

0.36

10

Pek. Pasangan Bata

m2

46.40

11

Pek. Plesteran dan Acian

m2

92.80

SUB TOTAL

II

PEKERJAAN LANTAI

Pek. Urugan pasir bawah lantai t. 10 cm Peninggian Lantai

m3

1.60

Pek. Urugan pasir bawah lantai t. 5 cm Selasar

m3

0.21

Pek. Cor Lantai Termasuk Selasar

m3

1.18

Pek. Acian Lantai Termasuk Selasar

m2

23.52

SUB TOTAL

III

PEKERJAAN ATAP DAN PLAFON

Pas. Rangka Atap baja ringan

m2

23.52

Pas. Atap Asbes

m2

23.52

SUB TOTAL

IV

PEKERJAAN KAYU DAN KUSEN

Pek. Kusen pintu

unit

1.00

Pek. Daun pintu panel Papan kelas II lengkap

unit

1.00

Pas. Kusen dan Kawat Ram, 200 x 50

unit

3.00

SUB TOTAL

PEKERJAAN PENGECETAN

Pek. Cat dinding tembok 3xcat

m2

92.80

Pek. Cat kilat pintu, jendela dan kusen 2xcat

m2

8.55

SUB TOTAL

VI

PEKERJAAN INSTALASI LISTRIK

Pek. Instalasi listrik

titik

3.00

Pek. Lampu SL 20 watt

bh

1.00

Pek. Lampu SL 5 watt

bh

1.00

Pek. Stop kontak

bh

1.00

Pek. Saklar Tunggal

bh

2.00

Pek. MCB + sekring

bh

1.00

SUB TOTAL

VII PEKERJAAN LAIN-LAIN


1

Pek. Perapihan dan pemberesan

Ls

1.00

SUB TOTAL

TOTAL

RINCIAN RENCANA ANGGARAN BIAYA


Nama Kegiatan

Pembangunan Persemaian Permanen

Nama Pekerjaan

Bangunan Pendukung Persemaian 10mx12m

Ruang Produksi 8mx5m

Gudang alat 4mx5m

Ruang administrasi 4mx5m

Ruang serbaguna 4mx5m

Ruang jaga 3,5mx4m

Toilet

PEKERJAAN

NO
I
1
2
3
4
5
6
7
8
9
10
11

BASE FRAME
Coloum
Main frame
Structur Frame
Flanges
Bracket
Gording
Roofing
decra bond
Screw roofing
Stressing
Bolt, Nut, S,Sw

II
1
2

PEKERJAAN PONDASI DAN PASANGAN


Pek. Bouwplank
Galian tanah

3
4
5
6

PART

SATUAN

VOLUME

IWF 150x75x3500
IWF 150x75x6000
IWF 150x75x12000
SPHC 220x270x10 mm
SPHC 10 mm
C Channel 100
Zinc Alume 0.35mm
Zinc Alume 0.,35mm
50 mm
dia. 14 mmt KS

bt
bt
unit
pcs
lot
unit
m2
m'
Ls
set
Ls

6.00
4.00
3.00
6.00
1.00
16.00
173.60
12.00
1.00
4.00
1.00
SUB TOTAL

HARGA SATUAN (Rp)

JUMLAH (Rp)

52.00
17.10

Pek. Pasir urug

1.43

Pek. Lantai Kerja

m3

1.43

Pondasi batu belah ad. 1:4

m3
m3
m3

Cor beton K-175


Sloof Bertulang dia. 8mm

11.40
0.27

8
9

Pek. Pasangan Bata


Pek. Pas. Ring balk bertulang dia. 8mm

m2

10

Pek. Plesteran dan Acian

III

PEKERJAAN LANTAI BANGUNAN UTAMA

Pek. Urugan pasir bawah lantai t. 10 cm Peninggian


Lantai

Pek. Urugan pasir bawah lantai t. 5 cm Selasar

3
4
5

pek. Pembesian wire mesh 6 mm


Pek. Cor lantai Beton K.175
Pek. Acian lantai

IV

PEKERJAAN GUDANG

1
2
3

Pek. Pintu dan kusen kayu kelas III lengkap

4
5

1.71

28.00
0.86

56.00
SUB TOTAL

16.80

m3

1.90

m2
m3
m2

168.00
16.80
84.00
SUB TOTAL

Pek, pasangan bata adukan 1 : 4

m2

87.50

Pek. Cor kolom praktis 10cmx12cm

m3

0.17

Ls

1.00

Pek. Tralis pengaman sisi atas

m2

13.50

Pek. Ringbalk 10cmx12cm

0.31

m
m2

Terpasang

SUB TOTAL

PEKERJAAN RUANG ADMINISTRASI

Pek, pasangan bata adukan 1 : 4

m2

7.00

Pek. Cor kolom praktis 10cmx12cm t=1m

m3

0.05

Pek. Ringbalk 10cmx12cm

m3

0.08

Pek. Lantai kramik 30cmx30cm anti slip

m2

20.00

SUB TOTAL

VI

PEKERJAAN RUANG SERBAGUNA

Pek, pasangan bata adukan 1 : 4

m2

7.00

Pek. Cor kolom praktis 10cmx12cm t=1m

m3

0.05

Pek. Ringbalk 10cmx12cm

m3

0.08

SUB TOTAL
VII

PEKERJAAN RUANG JAGA

Pek, pasangan bata adukan 1 : 4

m2

9.50

Pek. Cor kolom praktis 10cmx12cm t=1m

m3

0.04

Pek. Ringbalk 10cmx12cm

m3

0.11

SUB TOTAL

VIII

PEKERJAAN TOILET

Pek, pasangan bata adukan 1 : 4

m2

22.75

Pek. Cor kolom praktis 10cmx12cm

m3

0.17

Pek. Pintu dan kusen PVC lengkap

Ls

1.00

Pek. Ringbalk 10cmx12cm

m3

0.10

Pek. Kloset jongkok kramik

bh

2.00

Pek. Lantai kramik 20cmx20cm

6.00

Pek. Dinding kramik 20cmx20cm

m2

24.80

Pek. Bak Fiber 70cmx70cm

bh

2.00

Pek. Septicktank

m3

6.00

10

Pek. Instalasi air kotor

8.00

11

Pek. Instalasi air bersih

20.00

12

Pek. Floordrain

bh

2.00

Terpasang

SUB TOTAL

IX

PEKERJAAN RUANG PRODUKSI

Pek, pasangan bata adukan 1 : 4

m2

9.00

Pek. Cor kolom praktis 10cmx12cm t=1m

0.02

Pek. Ringbalk 10cmx12cm

m3

0.11

SUB TOTAL

PEKERJAAN INSTALASI LISTRIK

1
2

Pek. Instalasi listrik


Pek. Lampu SL 20 watt

titik
bh

7.00
7.00

3
4

Pek. Stop kontak


Pek. Saklar tunggal

bh
bh

5.00
7.00

Pek. MCB + Box sekring

bh

1.00

XI
1

PEKERJAAN CAT-CATAN
Pekerjaan cat dinding 3x cat

XII
1

PEKERJAAN LAIN-LAIN
Pembersihan lapangan

SUB TOTAL

m2

Ls

259.80
SUB TOTAL

1.00
SUB TOTAL

TOTAL

RINCIAN RENCANA ANGGARAN BIAYA


Nama Kegiatan

: Pembangunan Persemaian Permanen

Nama Pekerjaan

: Reservoar Ukuran 4 x 5 x 1,5 m

URAIAN PEKERJAAN

No

SAT

VOLUME

HARGA SAT. (Rp)

JUMLAH (Rp)

Pek. Pas. Bouwplank

14.00

Pek. Galian tanah >1 m

m3

30.35

m3

0.02

0.02

STRUKTUR
3

Pek. Pas. Pasir Urug Bawah Pondasi tapak

Pek. Pas. Lantai Kerja bawah Pondasi tapak

Pek. Kolom Pondasi tapak 30/30 tul. dia. 8mm

m3

0.18

Pek. Kolom 15/15 dia. 8mm

m3

0.14

Pek. Kolom Praktis 10 x 15

m3

0.09

Pek. Pas. Sloof 20/15 dia. 8mm

m3

0.54

PEK. DINDING
11

Pek. Pas. Bata

m2

22.68

12

Pek. Pas. Ring balok bertulang 10/15 dia. 8mm

m3

0.41

35.10

13

Pek. Pas. Plesteran + Acian dinding

PEK. LANTAI
14

Pek. Cor Lantai K.175

m3

2.00

15

Pek. Pas. Pasir Urug Bawah Lantai

m3

1.00

16

Pek. Pas. Lantai Kerja bawah Lantai

m3

1.00

17

Pek. Pas. Plesteran + Acian Lantai

m3

20.00

rool

1.00

Ls

1.00

PEK. LAIN-LAIN
18

Penutup Shading Net dengan bingkai kayu

19

Pek. Perapihan dan pemberesan

TOTAL

RINCIAN RENCANA ANGGARAN BIAYA

Nama Kegiatan

: Pembangunan Persemaian Permanen

Nama Pekerjaan

: Jalan Lingkungan, Parit, dan pagar kawat

JENIS PEKERJAAN

NO
I

PEKERJAAN JALAN DAN PARIT

Pek. Pas. Bouwplank

SATUAN

VOLUME

HARGA SAT

113.13

JUMLAH

SUB TOTAL

PEKERJAAN JALAN
1

Pas. Paving Block t= 6 cm

Abu Batu, T. 5 cm

Pas. Lantai kerja

m2

348.20

17.41

17.41

m
m

SUB TOTAL

PEKERJAAN PARIT
1

Pek. Galian tanah

m3

216

Pek. Pasir urug

m3

21.6

Pek. Pas. Bata

m2

345.6

Pek. Cor beton k-175 Lantai parit

25.92

Pek. Plesteran + Acian Dinding Parit

432

m
m

SUB TOTAL
II

PEKERJAAN PAGAR KELILING


PASANGAN KAWAT DURI

Galian tanah Tiang Pagar

m3

6.16

Pas. Pasir Urug

m3

0.51

Pas. Lantai kerja

m3

0.51

Tiang Galvanis dia. 2" P= 2m + Dop + Pengikat Kawat Duri

bh

114.00

Cor Tiang K-175

m3

5.64

Bekisting

m2

6.84

Pas. Kawat Duri 5 susun T= 1,5 m

1,900.00

SUB TOTAL

PASANGAN PINTU PAGAR


1

Galian tanah Pilar

m3

0.30

Pas. Pasir Urug

m3

0.01

Pas. Lantai kerja

m3

0.01

Cor Kolom Beton bertulang K-175 30 x 30 cm

m3

0.32

Pek. Plester dan Acian

m2

3.06

Pas. Pintu Pagar Dorong L=6m, T=1,5m

Ls

1.00

Pengecatan Kolom dan Pintu Pagar

Ls

1.00

SUB TOTAL

III

PEK. LAIN - LAIN

Pek. Perapihan dan pemberesan

Ls

1.00

SUB TOTAL

TOTAL

RINCIAN RENCANA ANGGARAN BIAYA


Nama Kegiatan

: Pembangunan Persemaian Permanen

Nama Pekerjaan

: Parkir Area 20 m x 10 m

JENIS PEKERJAAN

NO

Pek. Pas. Paving Block Natural 6cm

SATUAN

VOLUME

HARGA SAT (Rp)

JUMLAH

m2

200.00

PEK.OPRIT PARKIR
2

Pek. Galian tanah tanggulan

m3

0.94

Pek. Pas. Pasir urug

m3

0.23

0.23

9.36

0.70

Pek. Pas. Lantai kerja


Pek. Wire Mesh 6 2 lapis

Pek. Cor beton K-225

You might also like