Virginia Wastewater Treatment Examination Formula Sheet
Virginia Wastewater Treatment Examination Formula Sheet
Virginia Wastewater Treatment Examination Formula Sheet
1.Circumference,Area,Volume
a.Circumference
C=3.1416Diameter
b.Perimeter
P=[2Length]+[2Width]
c.Area
Rectangle
Area=LengthWidth
Circle
Area=0.785DiameterDiameter
Triangle
Area=BaseHeight
d.Volume
Rectangle
Volume=LengthWidthDepth
Cylinder
Volume=0.785DiameterDiameter
Depth
Cone
Volume=0.262DiameterDiameter
Height
Sphere
Volume=0.524DiameterDiameter
Diameter
2.ConversionFactors
a.fttogallons
Volume,Gallons=Volume,ft37.48gallons/ft3
b.Gallonstopounds
Pounds=Gallons8.34lbs/gallon
c.mg/Ltopounds
Pounds=Concentration,mg/LTAnkVolume,MG
8.34lbs/MG/mg/L
d.mg/Ltopounds/day
Pounds/Day=Concentration,mg/LFlow,MGD
8.34lbs/MG/mg/L
e.mg/Ltokilograms/day
Kilograms/Day=Conc.,mg/LFlow,MGD3.785
lbs/MG/mg/L
f.mg/Kgtopounds/ton
Pounds/Ton=Concentration,mg/KG0.002
lbs/ton/mg/KG
g.Poundstomg/L
h.Pounds/Daytomg/L
i.Pounds/DaytoMGD
3.Flow
a.MGDtoGPD
Flow,GPD=Flow,MGD1,000,000gallons/MG
b.MGDtoGPM
c.MGDtoCFS
Flow,cfs=Flow,MGD1.55cfs/MGD
4.ChemicalWeight
UsingSpecificGravity
Weight/lbs/gallon=Specificgravity8.34lbs/gallon
5.PopulationEquivalent
6.PercenttoDecimalPercent
7.PercentRemoval(Wastewater)
a.BasedonConcentration
b.BasedonQuantity(lbs,
lbs/day,KGorKG/day)
8.HydraulicDetentionTime
a.HDT,Minutes
b.HDT,Hours
c.HDT,Days
9.FlowMeasurement
a.Flow,(FillandDraw),GPM
b.Flow(Velocity),cfs
Flow(Q),cfs=ChannelWidth,ftWaterDepth,ftVelocity,
fps
10.GritRemoval
a.Velocity(float
method)
b.Velocity
c.SettlingTime*
d.RequiredChannel
Length*
*Thesettlingvelocitymustbegivenordeterminedexperimentally.
11.Settling
a.WeirOverflowRate
b.SurfaceLoadingRate
c.SolidsLoadingRate
12.Ponds
a.AreainAcres
b.VolumeinAcre
Feet
c.FlowinAcre
Feet/Day
Flow,AcreFeet/Day=Flow,MGD3.069AcreFeet/MG
d.Flow,Acre
Inches/Day
Flow,AcreInches/Day=Flow,MGD36.8AcreInches/MG
e.HydraulicDetention
Time,Days
f.HydraulicLoading
g.OrganicLoading
h.PopulationLoading
13.TricklingFilter
a.TotalFlow(given
flows)
TotalFlow,MGD=InfluentFlow,MGD+RecirculationFlow,MGD
b.TotalFlow(given
ratio)
TotalFlow,MGD=InfluentFlow,MGD(1.0+RecirculationRate)
c.HydraulicLoading
TotalFlowalwaysincludesrecirculatedflow.
d.OrganicLoading
Organicloadingdoesnotincluderecirculatedflows.
14.RotatingBiologicalContactors
a.Soluble
BOD
b.Total
Media
c.Hydraulic
Loading
d.Soluble
Organic
Loading
SBOD,mg/L=TotalBOD5,mg/L('K'FactorInfluentTSSmg/L)
e.Total
Organic
Loading
15.ActivatedSludge
a.
Settled
Sludge
Volume
b.
Settled
Sludge
Volume
c.
Return
Rate(By
SSV)
d.
Return
Rate(By
SVI)
e.
Return
Rate
(Clarifier
Mass
Balance)
f.
Clarifier
Solids
(Core
Sample)
Solids C,lbs=CoreSampleTSS,mg/LVolumeCMG8.34lbs/mg/L/MG
g.
Clarifier
Solids
(MLSS)
SolidsC=MLSS,mg/LVolumeC,MG8.34lbs/mg/L/MG
h.
Clarifier
Solids
(MLSS
and
RASSS)
C=ClarifierorSettlingTank
MLSS=MixedLiquorSuspendedSolidsinmilligrams/Liter
RASSS=ReturnActivatedSludgeSuspendedSolidsinmilligrams/Liter
i.Sludge
Volume
Index
j.F:M
Ratio
k.
Desired
MLVSS,
(lbs)
l.
Desired
MLVSS
(mg/L)
m.
Waste
Volatile
Solids
(Based
onF:M)
n.
Waste
Rate,
MGD
(Based
onF:M)
o.
MCRT,
Days
p.
Waste
Solids,
lbs/day
(Based
on
MCRT)
q.
Waste
Rate,
MGD
(Based
on
MCRT)
r.Waste
Rate,
GPM
Waste,lbs=ActualMLVSS,lbsRequiredMLVSS,lbs
16.ChemicalAddition
a.
Demand
Demand,mg/L=Dose,mg/LResidual,mg/L
b.Dose,
mg/L
c.
Required
Chemical
(Feed
Rate,
lbs/day)
d.Feed
Rate,gpd
e.Feed
Rate,gpm
f.Feed
Rate,
mL/minute
g.Supply
Required
h.Supply
onHand
i.
Increases,
(price,
usage,or
forsafety)
Increase=CurrentAmount[1.0+%(decimal)Increase]
j.
Chemical
Cost
k.
Chemical
Makeup
(dry
chemical)
l.
Chemical
Makeup
(solution)
m.Active
Ingredient
ChemicalUsedActiveIngredient=ChemicalUsed,lbs%ActiveIngredient
17.SolidsPumping
a.EstimatedPumpRate
(gallons/minute)
b.GallonpumpedGPD
GPD=PumpRate,gpmCycles,Cycles/dayCycleTime,
minutes/cycle
c.SolidsPumpedlbs/day
Solids,lbs/day=SolidsVolume,gpd8.34lbs/gal%
(decimal)Solids
d.VolatileSolidsPumped,
lbs/day
VolatileSolids,lbs/day=SolidsVolume,gpd8.34lbs/gal
%Solids%VolatileMatter
*All%valuesmustbeindecimalform.
18.Thickening
a.SolidsLoadingRate(SLR)
lbs/day/ft2
b.SolidsLoadingRate(SLR)
lbs/hour/ft2
c.SolidsVolumeRatio(SVR)
d.HydraulicLoading
e.Air:SolidsRatio
f.ConcentrationFactor
19.AerobicDigestion
a.Volatile
SolidsLoading
lbs/day/ft3
b.Digestion
Time(basedon
flow)
c.Digestion
Time(basedon
solids)
d.Chemical
Requirement
e.Volatile
Matter
Reduction
20.AnaerobicDigestion
a.SeedVolume
Seed,gallons=DigesterVolume,gallonsDesired%SeedVolume
b.Volatile
SolidsLoading
c.Volatile
Acids/Alkalinity
Ratio
d.Chemical
Requirement
e.Volatile
Matter
Reduction
f.Gas
Production
ft3/Day
Gas,ft3=VolatileSolids In,lbs/day%V.M.ReductionRate,ft3/lbV.M.Destroyed
21.LandApplication
a.Solids
Production(dry
tons/year)
b.Solids
Production(wet
tons/year)
c.Plant
Available
Nitrogen(PAN)
(lbs/dryton)
[(OrganicN,mg/kgf1)+(AmmoniaN,mg/kgV1)]0.002
f1=MineralizationRate(assume0.20)
V1=VolatilizationRate
InjectedSludge=1.0
IncorporatedWithin24hours=0.85
IncorporatedWithin7days=0.70
d.Application
Rate(nitrogen
basis)
e.Metals
Loading
lbs/acre
f.Allowable
Applications
(MetalsBasis)
Loading,lbs/Acre=Concentration,mg/kgApplicationRate,D.T./acre0.002
mg/kg/dryton
g.SiteLIfe
(metalbasis)
22.Pumping
a.HeadtoPressure
b.TotalDynamicHead
TDH,ft=StaticHead,ft+FrictionHead,ft+VelocityHead,ft
c.WaterHorsepower
d.BrakeHorsepower
e.MotorHorsepower
23.ElectricalEnergy
a.Hptokilowatts(kW)
Kilowatts=Horsepower0.746Kw/hp
b.kWtokilowatthrs
KilowattHour=KilowattsUsedHoursOperated
c.PowerCost
Cost=KilowatthoursusedCost/Kilowatt
24.Sampling
a.CompositeSample
Volume,mL
T=SampleCollectionTime
b.ProportioningFactor
(PF)
c.SampleVolume(Using
PF)
SampleVolume,mL=FlowTPF
T=Timesampleiscollected
25.Alkalinity
Conventional
A=VolumeofStandardAcidUsed
N=NormalityofStandardAcid
LowLevel
B=VolumeofStandardAcidUsedtoreachpH4.34.5
C=TotalVolumeofStandardAcidfortitration
N=NormalityofStandardAcid
26.Hardness
a.EDTA
Standardization
b.Hardness,mg/L
CalciumCarbonate
A=EDTAusedinTitration,mL
B=EDTACaCO3Equivalence,mL/mL
27.AmmoniaNitrogen
a.Nesslerization
A=MicrogramsofNfromcalibrationcurve
B=Volumeofdistillatecollected
C=Volumeofdistillateusedfornesslerization
SampleVolume=Originalsamplevolumeplacedindistillationflask
b.Titration
A=Volumeoftitrantusedforsample
B=Volumeoftitrantusedforblank
SampleVolume=Volumeofsampleusedfortitration
28.BiochemicalOxygenDemand
a.Unseeded
Samples
b.Seed
CorrectionFactor
c.Seeded
Samples
29.ChemicalOxygenDemand
a.FASStandardization(OpenReflux)
b.FASStandardization(ClosedReflux)
c.COD
A=FASUsedforBlank,mL
B=FASUsedforSample,mL
C=FASMolarity
30.TotalResidualChlorine
a.IodometricDirectTitration
b.IodometricBackTitration(No
Iodinecorrection)
c.IodineCorrection
d.IodometricBackTitration
(WithIodinecorrection)
e.IodometricBackTitration
IodateTitrant
31.DissolvedOxygen
WinklerTitration
IfN=0.0250&SampleVolume=200mL
then:TitrantUsed=D.O.,mg/L
32.FecalColiform
a.MultipleTube
b.MembraneFiltration
33.NitrateNitrogen
a.BrucineSulfate
b.CadmiumReduction
34.NitriteNitrogen
DiazotizationDilutedSample
C=NO2NConcentration,mg/L
V=Totalvolumeafterdilution,mL
S=SampleVolumeindilution,mL
35.Phosphorous
Phosphorous
36.TotalSuspendedSolids
TSS,mg/L
37.TotalKjeldahlNitrogen
a.Nesslerization
A=MicrogramsofNfromcalibrationcurve
B=Volumeofdistillatecollected
C=Volumeofdistillateusedfornesslerization
SampleVolume=Originalsamplevolumeplacedindistillationflask
b.Titration
A=Volumeoftitrantusedforsample
B=Volumeoftitrantusedforblank
SampleVolume=Volumeofsampleusedfortitration
38.TotalVolatileSuspendedSolids
TVSS,mg/L
A=WeightofDriedSolids&Support
C=WeightofAsh&Support
39.Residual(Sludge)SolidsTests
a.%Solids
b.%VolatileMatter
c.%Moisture
40.VPDESReporting
a.AverageMonthly
Concentration
b.AverageWeekly
Concentration
c.AverageDaily
Concentration
d.AverageHourly
Concentration
e.DailyQuantity
f.AverageMonthly
Quantity
g.AverageWeekly
Quantity
h.GeometricMean(Xy)
i.GeometricMean(log)
DailyQuantity,KG/Day=Conc.,mg/LFlow,MGD3.785lbs/MG/mg/L
Conc.=IndividualTestResultinmg/L
Flow=FlowondaysamplewascollectedinMGD