-The warehouse in Sohag has a big area about 31,500 m2 divided into three main
areas as following:1-Tank farm area includes eight petroleum product storage tanks.
2-Boilers area contains two water-tube boiler units .
3-workshop area contains miscellaneous forming machines .
4- Stowage area where spare parts and materials are stored.
Executive Summary
It was pleasing to observe an aesthetic and clean administration building ,
good lighting and many facilities of welfare.Twenty negative observations were
observed during inspection in Sohag warehouse of Misr Petroleum Co.
Many different risks such as fire, falling, ergonomics, biological, physical and
chemical were observed. Fire risks and manual handling injury were frequent
inside the warehouse. Many other important observations were discussed in the
finding part of this report. All details of these observations seen during this
inspection are attached at the end of this report.Also mentioned below the
conclusion and the most urgent recommendations that are to be done.
Main findings of the inspection
3, 1-Observation 1,3:- risk of fire,
-Dealing with about 8,000 litres of petroleum products, stored in storage tanks
inside the tank farm,Any leakage around those tanks from the
feeding(marketing) valve can lead to catastrophe while presence of any possible
spark .Also,workers carrying non explosion proof light battery to determine the
petrol tank level at night, can increase the risk of causing fire
-For control measure,following immediate and long term measures should be put
into action:
workers must be informed by risk of fire
Petrol Pumping shall be stopped till maintenance takes place
Provide Explosion proof light batteries.
Change the system of manual determination by another automatic one.
Followed by monitoring for correct operation
Clean the area from petrol spillage.
- this observation violates the Egyptian labor law number 12 of 2003year and not
comply with its items for safe workplace, this can charge the organization with
penalties and legislation actions.
-the cost of the suggested control measures is about 10,000 L.E(Egyptian pounds)
3, 2-Observation 2,20- risk of falling,
-it is observed that many activities happen on the roof of the tank such as getting
a sample from the stored product or determine the product level inside the tank
and this requires climbing stairs of the tank so, if the stairs of the storage tank are
broken, it will risk the workers to fall and this which already been observed in
stairs of (tank 4).
-this observation violates the Egyptian labor law number 12 of 2003year and not
comply with its items for safe workplace, this can charge the organization with
penalties and legislation actions.
-the cost of this corrective action is 2000 L.E.
3, 3 observation 9,10-risk of health hazard of chemical fumes
It is observed that exposure to vapour of petrol on the platform may lead to
chronic effect on health.Also noticed chemical laboratory is used in check and
analysis the products of petroleum for quality assurance and this laboratory
includes many chemical materials with different quantities .However, different
containers contain a kind of acidic substances which lead to fumes inside the
laboratory, and exposure to those fumes of acidic substances may lead to irritant
and allergic dermatitis to workers of laboratory so workers must be informed of
the risk of health hazard of acidic fumes immediately, also providing them with
personal protective equipments. Try to eliminate the acidic substances or reduce
its amount within working hours also the duration of exposure to chemical fumes
shall be reduced and providing workers with instructions, trainings and
supervision. this observation violates the Egyptian labor law number 12 of
2003year and not comply with its items for safe workplace, this can charge the
organization with penalties and legislation actions.
- Cost of control action is about 7000L.E
- this observation violates the Egyptian labor law number 12 of 2003year and not
comply with its items for safe workplace, this can charge the organization with
penalties and legislation actions.
and compensation claims which can only have an a adverse effect on the
warehouse In sohag .
So i suggest that the below recommendations are to be implemented as
soon as possible according to company's priorities.
-the advantages which company can get when applying the corrective
actions are that decreasing the number of accidents , increasing workers
moral and decreasing the loss of equipments also decreasing illness of
health and increasing of company reputation finally company will get
high profit which also benefit all workers.
Likely resource
implications
Priority
Target date
10,000 LE
High
One week
30,000
High
2 months
20,000 LE
medium
2 months
8,000 LE
medium
One month
200,000 LE
low
One year