BSR-latest
BSR-latest
BSR-latest
Materials
Trade
Description
Unit
cube.
cube.
S. ft
L. ft
L. ft
kg.
CONCRETE
Cement
bag
CONCRETE
Sand
cube.
CONCRETE
cube.
CONCRETE
Metal 1 "
cube.
CONCRETE
Metal 2 "
cube.
CONCRETE
Water
gal.
S. ft
L. ft
L. ft
L. ft
kg.
ltr
Nr
REINFORCEM
Tor Steel
ENT
REINFORCEM
25mm
ENT
kg.
Basic Price
850.00
12,500.00
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
REINFORCEM
ENT
RUBBLE &
CEMENT
BLOCKS
RUBBLE &
CEMENT
BLOCKS
RUBBLE &
CEMENT
BLOCKS
RUBBLE &
CEMENT
BLOCKS
RUBBLE &
CEMENT
BLOCKS
RUBBLE &
CEMENT
BLOCKS
RUBBLE &
CEMENT
BLOCKS
BRICK WORK
20mm
kg.
16mm
kg.
12mm
kg.
10mm
kg.
binding wire
kg.
Mild steel
10mm
kg.
6mm
kg.
Rubble
cube.
cement
bag
sand
cube.
water
gal.
Nr
Nr
Nr
Cement
bag
cube.
gal.
BRICK WORK
WATER
PROOFING
WATER
PROOFING
WATER
PROOFING
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
Nr
Bricks
Cement
bag
Sand
cube.
DPC tar
ltr
L. ft.
L. ft.
s. ft.
Nr
L. ft.
5mm.glaze sheet.
s. ft.
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
DOORS &
WINDOWS
4" Brush
Nr
Sand paper
Nr
Wood primer
ltr.
Enamel paint
ltr.
pair.
pair.
Nr
Nr
Nr
Nr
Mortice lock
Nr
Hold fast
Nr
casement fastner
Nr
casement stay
Nr
ROOF
s. ft.
ROOF
s. ft.
ROOF
Class 1 timber
c. ft.
ROOF
Calicut tile
Nr
ROOF
Nr
ROOF
Nr
ROOF
s. ft.
ROOF
l. ft.
ROOF
Wire nails
kg.
ROOF
Colouring powder
kg.
ROOF
Cement
bag
ROOF
Sand
cube
ROOF
Lime
kg.
ROOF
Nr
ROOF
Wood primer
ltr
ROOF
Enamel paint
ltr
ROOF
Wood preservative
ltr
ROOF
S. ft.
ROOF
pair
ROOF
Roofing screws
Nr
ROOF
Nr
FLOOR
Lime
kg.
FLOOR
Cement
cube.
FLOOR
Sand
cube.
FLOOR
water
gall.
FLOOR
Bricks
Nr
FLOOR
Nr
FLOOR
Nr
FLOOR
Nr
FLOOR
Tile grout
kg.
WALL
Cement
bag
WALL
Sand
cube
WALL
Lime
kg.
WALL
water
gal
WALL
Nr
WALL
Nr
WALL
Nr
WALL
Tile grout
kg.
CEILING
Cement
bag
CEILING
Sand
cube
CEILING
Lime
kg.
CEILING
water
gal
CEILING
l. ft.
CEILING
l. ft.
CEILING
l. ft.
CEILING
l. ft.
CEILING
l. ft.
CEILING
s. ft.
CEILING
s. ft.
CEILING
Wire nails
kg.
CEILING
Emulsion paint
ltr
PAINTING
Emulsion paint
ltr
PAINTING
Weathersheild paint
ltr
PAINTING
Brush 4"
Nr
PAINTING
Acrylic filler
ltr
PAINTING
Sand paper
Nr
PAINTING
Water
gal
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Nr
PLUMBING
Solvent cement
kg.
Labour
Description
Unit
Plant
Basic Price
Description
Skilled
day
1,000.00 Tractor
Un skilled
day
Skilled Labour
day
Un Skilled Labour
day
1,000.00 Vibrator
Vibrator Operator
day
1,200.00
Concrete Mixer
operator
day
1,000.00
Skilled Labour
day
1,000.00
Un Skilled Labour
day
600.00
Skilled labour
day
700.00
Un skilled labour
day
450.00
600.00
Unit
Basic Price
Skilled labour
day
1,000.00
Un skilled labour
day
600.00
Skilled Labour
day
1,000.00
Un Skilled Labour
day
600.00
Skilled Labour
day
1,000.00
Un Skilled Labour
day
600.00
Painter
day
1,000.00
Carpenter
day
1,000.00
Skilled labour
day
1,000.00
Un skilled labour
day
600.00
Skilled Labour
day
1,000.00
Un Skilled Labour
day
600.00
Skilled Labour
per day
1,000.00
Un Skilled Labour
per day
600.00
Skilled Labour
per day
1,000.00
Un Skilled Labour
per day
600.00
Skilled Labour
per day
1,000.00
Un Skilled Labour
per day
600.00
Skilled Labour
per day
1,000.00
Un Skilled Labour
per day
600.00
Skilled Labour
per day
1,000.00
Un Skilled Labour
per day
600.00
Basic Prices
MATERIALS
Item
No.
Description
LABOUR
Price
( Rs.)
Item
No.
PLANT
Code
No.
Unit
Gal
254.00
Painter
L-001
Day
1,200.00
Hire of Mixer
P-001
Day
1,500.00
Description
Code No.
Price
Unit
( Rs.)
Item
No.
Description
Price
( Rs.)
Acid
M-001
M-002
litre
245.00
Plumber
L-002
Day
1,200.00
Hire of Vibrator
P-002
Day
1,000.00
M-003
Sq.ft
42.00
SK Labour
L-003
Day
1,200.00
Vibrating Rammer
P-003
Day
1,000.00
Barrel Bolt
M-004
No
75.00
SK Labour (Vibrator)
L-004
Day
1,200.00
Binding Wire - 16 BW
M-005
Lbs
200.00
Tinker
L-005
Day
1,200.00
Bitumen
M-006
Gal
500.00
Tiler
L-006
Day
1,200.00
Blasting Powder
M-007
Lbs
200.00
U / SK Labourer
L-007
Day
1,000.00
Blue
M-008
Ozs
10.00
Carpenter
L-008
Day
1,200.00
Boild Lime
M-009
Cwt
300.00
Mason
L-009
Day
1,200.00
10
M-010
No
75.00
10
Glazier
L-010
Day
1,200.00
11
M-011
No
45.00
12
M-012
Lbs
50.00
13
M-013
Doz
1.00
14
M-014
No
2.50
15
M-015
No
3.75
16
M-016
No
1.30
17
M-017
No
1.25
18
M-018
No
7.50
19
Bricks
M-019
No
6.00
20
Brush - 3"
M-020
No
210.00
21
Brush - 6"
M-021
No
495.00
22
Brush 2"
M-022
No
165.00
23
Butt Hinges
M-023
No
70.00
24
Casement Fasteners
M-024
No
55.00
25
Casement Stays
M-025
No
55.00
26
Cement
M-026
Bag
850.00
27
M-027
Sq.ft
25.00
28
M-028
No
7.00
29
M-029
No
10.50
30
M-030
No
8.75
31
M-031
No
10.75
32
M-032
No
34.00
33
M-033
Lbs
25.00
34
M-034
No
45.00
35
Coloured Pigment
M-035
Lbs
175.00
36
Colouring Powder
M-036
Lbs
175.00
37
Cotton Waste
M-037
Lbs
12.50
38
D. D. T. Powder
M-038
Lbs
25.00
39
Diesel Fuel
M-039
Ltr
70.00
40
Door Closer
M-040
No
1,850.00
41
Draw Rings
M-041
No
42
M-042
Cube
1,500.00
43
Emulsion Paint
M-043
litre
280.00
44
Enamel Paint
M-044
litre
354.00
45
M-045
No
1.50
46
Fire Wood
M-046
Lbs
250.00
47
Flannel Cloth
M-047
Yards
70.00
48
M-048
Sq.ft
15.00
49
Floor Brush
M-049
No
210.00
50
Fuel Forge
M-050
Ltr
100.00
51
Fuse wire
M-051
L.ft
10.00
52
M-052
No
2,200.00
53
M-053
Cube
2,000.00
54
Gutter Brackets
M-054
No
55
Gutter joiner
M-055
No
56
M-056
No
5.00
57
M-057
No
30.00
22.50
58
M-058
No
27.00
59
M-059
No
22.00
60
M-060
Kg.
25.00
61
M-061
No
0.55
62
Jumper Steel
M-062
Lbs
65.00
63
Jute Hessian
M-063
Sq.ft
3.50
64
Metal - 1 "
M-064
Cube
8,000.00
65
M-065
Cube
3,500.00
66
M-066
Cube
9,000.00
67
M-067
No
6.00
68
M-068
Kg.
109.00
69
M-069
litre
80.00
70
M-070
No
960.00
71
Mould Oil
M-071
litre
35.00
72
Nails - 2"
M-072
Lbs
50.00
73
Nails - 3/4"
M-073
Lbs
20.00
74
M-074
No
2,000.00
75
Primer
M-075
litre
180.00
76
M-076
No
15.00
77
M-077
No
14.00
78
M-078
No
79
M-079
No
80
M-080
No
69.00
81
M-081
No
42.00
82
M-082
No
21.00
83
M-083
No
10.50
84
M-084
No
350.00
85
M-085
No
110.00
86
M-086
No
580.00
87
M-087
No
88
M-088
No
89
M-089
No
90
M-090
No
91
M-091
No
92
M-092
L.ft
46.00
93
M-093
L.ft
32.00
94
M-094
L.ft
21.00
95
M-095
L.ft
7.50
96
M-096
L.ft
79.00
97
M-097
L.ft
185.00
98
M-098
L.ft
14.00
99
PVC Shoe
M-099
No
100
M-100
No
29.50
101
M-101
No
19.50
102
M-102
No
48.00
103
M-103
No
192.00
104
PVC Straps
M-104
No
105
M-105
No
35.00
106
M-106
Pair
245.00
107
M-107
No
500.00
108
M-108
No
16.00
109
M-109
No
3.50
110
M-110
No
3.50
111
M-111
Cube
112
Salt
M-112
Lbs
2,500.00
113
Sand
M-113
Cube
114
Sand Papers
M-114
No
3.50
115
Slaked Lime
M-115
Lbs
275.00
116
Soldering Lead
M-116
Lbs
13.75
117
Solvent Cement
M-117
Grms
1.40
118
Spur Stone
M-118
No
15.00
10.00
12,500.00
119
Tarnap
M-119
Gal
120
M-120
No
450.00
31.25
121
M-121
No
102.00
122
M-122
No
15.50
123
M-123
No
165.50
124
M-124
No
526.00
125
M-125
No
875.00
126
M-126
No
21.50
127
M-127
No
63.50
128
Tee Hinges
M-128
Pair
165.00
129
M-129
No
180.00
130
M-130
No
125.00
131
M-131
No
100.00
132
M-132
No
150.00
133
M-133
L.ft
1.50
134
M-134
L.ft
12.00
135
M-135
Sq.ft
28.00
136
Timber Class I
M-136
Cu.ft
1,200.00
137
M-137
L.ft
45.00
138
M-138
Cu.ft
1,300.00
139
M-139
Sq.ft
140.00
M-139a
Sq.ft
110.00
140
Timber Class II
M-140
Cu.ft
750.00
141
M-141
Sq.ft
65.00
142
M-142
L.ft
12.00
143
M-143
L.ft
22.00
144
M-144
L.ft
65.00
145
M-145
Sq.ft
35.00
146
M-146
L.ft
65.00
147
M-147
Sq.ft
65.00
148
Timber Purlins
M-148
L.ft
100.00
149
M-149
L.ft
12.00
150
M-150
L.ft
5.00
151
Timber Wedges
M-151
No
5.00
152
M-152
Kg.
109.00
153
M-153
No
145.00
154
Varnish
M-154
Ltr
355.00
155
M-155
No
75.00
156
M-156
No
100.00
157
Water
M-157
Gal
0.30
158
Wax Polish
M-158
Lbs
150.00
159
M-159
Lbs
17.50
160
Wire Brush
M-160
No
65.00
161
Wire Nails
M-161
Lbs
50.00
162
M-162
Lbs
25.00
163
M-163
Lbs
25.00
164
Wirecut Bricks
M-164
No
8.75
165
Wood Preservative
M-165
Gal
450.00
166
Yellow Ochre
M-166
Lbs
15.00
Activity
1
Concrete Work
Formwork
Note
Reinforcement
Block Work
Brick Work
10
Roof
11
12
13
Plastering
14
Tiling
15
Ceiling
16
Painting
Downs of all trades are according to the Building Schedule of Rates of the Department of Buildings except the
Downs of Concrete Works
Page 23 Of 142
SDS
06/09/2015
Page 24 Of 142
01.B.03
Excavation in trenches for walls column pits in ordinary soil from 0' 0" to 5' 0" deep and depositing
excavated material not exceeding 30' 0"
Analysis for
No
1
Item Description
U / SK Labourer
Item Ref
Unit
Quantity
L-007
Day
2.25
Cube
Rate
1,000.00
01.B.04
Total for
Rate for 1
Cube
Cube
2,306.25
2,306.25
Rate(Say)
1Cube
2,306.25
Rate(Say)
1ft3
23.06
Rate(Say)
1m3
815.00
Excavation in trenches for walls / column pits in hard/dense soil up to a depth of 5' 0" and depositing
excavated material to distance not exceeding 30' 0"
Item Description
U / SK Labourer
Item Ref
Unit
Quantity
L-007
Day
3.5
Cube
Rate
1,000.00
01.B.05
Total for
Rate for 1
Cube
Cube
3,587.50
Rate(Say)
1Cube
3,587.50
Rate(Say)
1ft3
35.88
Rate(Say)
1m3
1,268.00
Excavation in trenches for walls column pits in mud/wet soil upto the depth of 5' 0" and depositing
excavated material not exceeding 30' 0"
Item Description
U / SK Labourer
Item Ref
Unit
Quantity
L-007
Day
Cube
Rate
1,000.00
SDS
Amount
3,000.00
75.00
Total for
Rate for 1
Cube
Cube
3,000.00
3,000.00
Rate(Say)
1Cube
3,000.00
Rate(Say)
1ft3
30.00
Rate(Say)
1m3
1,060.00
Excavation in trenches for walls column pits in soft disintegrated rock (not requiring blasting)upto
depth of 5' 0" and depositing excavated material to a distance not exceeding 30' 0"
Analysis for
No
3,500.00
3,587.50
01.B.06
Amount
87.50
Analysis for
No
2,250.00
56.25
Analysis for
No
Amount
Item Description
Item Ref
Unit
1
Quantity
Cube
Rate
Amount
06/09/2015
Page 25 Of 142
U / SK Labourer
L-007
Day
2.5
1,000.00
01.B.07
62.50
Total for
Rate for 1
Cube
Cube
2,562.50
2,562.50
Rate(Say)
1Cube
2,562.50
Rate(Say)
1ft3
25.63
Rate(Say)
1m3
905.48
Excavation in trenches for walls column pits in Hard rock requiring Blasting upto depth of 5' 0" and
depositing excavated material to a distance not exceeding 30' 0"
Analysis for
No
Cube
Unit
Quantity
M-007
Lbs
0.75
200.00
150.00
M-051
L.ft
10
10.00
100.00
M-062
Lbs
65.00
65.00
1.03
Item Description
Item Ref
Blasting Powder
Rate
Amount
63.00
1.04 SK Labour
L-003
Day
1,200.00
1,200.00
1.05 U / SK Labourer
L-007
Day
1,000.00
2,000.00
Total for
Cube
Rate for 1
Cube
01.B.08
1.01
Item Description
SK Labour
1Cube
3,578.00
Rate(Say)
1ft3
35.78
Rate(Say)
1m3
1,264.00
10
Sq.ft
Item Ref
Unit
Quantity
L-003
Day
1.5
Rate
1,200.00
1.02 U / SK Labourer
01.B.09
3,578.00
No
1
3,578.00
Rate(Say)
Analysis for
Amount
1,800.00
450.00
L-007
Day
0.5
Total for
10
Sq.ft
Rate for 1
Sq.ft
1,000.00
500.00
2,750.00
275.00
Rate(Say)
1 Sq.ft
275.00
Rate(Say)
1m2
2,959.00
SDS
2,500.00
Cube
06/09/2015
Page 26 Of 142
No
Item Description
Item Ref
Unit
Quantity
L-003
Day
Rate
1,200.00
SDS
Amount
3,600.00
90.00
M-050
Ltr
0.25
100.00
25.00
M-007
lbs
0.68
200.00
136.00
M-051
L.ft
3.05
10.00
30.50
M-062
lbs
0.45
46.00
20.70
Total for
Cube
Rate for 1
Cube
3,902.20
3,902.20
Rate(Say)
1Cube
3,902.20
Rate(Say)
1ft3
39.02
Rate(Say)
1m3
1,379.00
06/09/2015
Page 27 Of 142
Item Description
Item Ref
Unit
Quantity
L-007
Day
U / SK Labourer
Cube
Rate
1,000.00
Amount
1,000.00
25.00
Total for
Rate for 1
Cube
Cube
1,025.00
1,025.00
Rate(Say)
1Cube
1,025.00
Rate(Say)
1 ft3
10.25
Rate(Say)
1m3
362.00
Item Description
Earth Delivered at Site
Item Ref
Unit
Quantity
M-042
Cube
Cube
Rate
1,500.00
Amount
1,500.00
02.A.03
225.00
L-007
Day
1.25
Total for
Cube
Rate for 1
Cube
2,975.00
2,975.00
1Cube
2,975.00
Rate(Say)
1 ft3
29.75
Rate(Say)
1m3
1,051.00
Filling under floors including levelling, watering & compacting in 3" layers with available and
selected earth at site
Item Description
1.02 U / SK Labourer
Item Ref
Unit
Quantity
L-007
Day
Cube
Rate
1,000.00
SDS
1,250.00
Rate(Say)
Analysis for
No
1,000.00
Amount
2,000.00
50.00
Total for
Rate for 1
Cube
Cube
2,050.00
2,050.00
Rate(Say)
1Cube
2,050.00
Rate(Say)
1 ft3
20.50
06/09/2015
Page 28 Of 142
Rate(Say)
SDS
1m3
724.00
06/09/2015
Page 29 Of 142
B.
DPC
Sqr
Item Ref
Unit
Quantity
M-038
Lbs
16
25.00
1.01 Water
M-157
Gal
20
0.30
1.02 U / SK Labourer
L-007
Day
0.5
1,000.00
Sqr
Item Description
D. D. T. Powder
Total for
Rate for 1
Rate
Sqr
Rate(Say)
1Sqr
Rate(Say)
1ft2
Rate(Say)
1m2
DPC
03.B.01
3/4" thick DPC in cement sand 1:2 finished with 2 coats hot tar and blinded with
sand.
Analysis for
1
Sqr
No
Item Description
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
2.25
1.02 Sand
M-113
Cube
0.11
1.03 Bitumen
M-006
Gal
1.5
500.00
M-046
Lbs
10
250.00
1.05 Water
M-157
Gal
10
0.30
1.06 Mason
L-009
Day
1.25
1.07 U / SK Labourer
L-007
Day
2.5
Sqr
Total for
Rate for 1
Rate
850.00
###
1,200.00
1,000.00
Sqr
Rate(Say)
1Sqr
Rate(Say)
1ft2
Rate(Say)
1m2
Page 30 Of 142
under floors.
Amount
400.00
6.00
500.00
906.00
906.00
906.00
9.06
97.49
Amount
1,912.50
1,375.00
750.00
2,500.00
3.00
1,500.00
2,500.00
10,540.50
10,540.50
10,541.00
105.41
1,134.21
Page 31 Of 142
No
Item Ref
Unit
Quantity
M-111
Cube
1.3
1.02 Cement
M-026
Bag
1.03 Sand
M-113
Cube
1.04 Water
M-157
1.05 Mason
1.06 U / SK Labourer
04.02
Item Description
Rate
Amount
2,500.00
3,250.00
850.00
4,250.00
0.3
12,500.00
3,750.00
Gal
100
0.30
30.00
L-009
Day
1,200.00
4,800.00
L-007
Day
1,000.00
6,000.00
Total for
Cube
Rate for 1
Cube
22,080.00
22,080.00
Rate(Say)
1Cube
22,080.00
Rate(Say)
1ft3
220.80
Rate(Say)
1m3
7,802.12
No
Item Description
Analysis for
1
Item Ref
Unit Quantity
M-111
Cu
1.3
1.02 Cement
M-026
Bag
1.03 Sand
M-113
Cu
1.04 Water
M-157
1.05 Mason
1.06 U / SK Labourer
1.07
Cube
Cube
Rate
Amount
2,500.00
3,250.00
850.00
4,250.00
0.3
12,500.00
3,750.00
Gal
100
0.30
30.00
L-009
Day
4.5
1,200.00
5,400.00
L-007
Day
1,000.00
7,000.00
Total for
Cube
Rate for 1
Cube
372.00
24,052.00
24,052.00
Rate(Say)
1Cube
24,052.00
Rate(Say)
1ft3
240.52
Rate(Say)
1m3
8,498.94
Page 32 Of 142
Page 33 Of 142
Mixing Concrete
B.
Screed
C.
Mass Concrete
D.
Column
E.
Beam
F.
Slab
G.
Lintol
Mixing Concrete
05.A.01 Mixing Concrete 1:1-1/2:3(3/4")
Analysis for
No.
Item Description
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
23
1.02 Sand
M-113
Cube
M-066
Cube
Rate
Amount
850.00
19,550.00
0.42
12,500.00
5,250.00
Cube
0.82
9,000.00
7,380.00
P-001
Day
0.333
1,500.00
499.50
1.05 Water
M-157
Gal
150
0.30
45.00
1.06 SK Labour
L-003
Day
0.333
1,200.00
399.60
1.07 U / SK Labourer
L-007
Day
1,000.00
2,000.00
Total for
Cube
Rate for 1
Cube
35,124.10
35,124.10
Rate(Say)
1Cube
35,120.00
Rate(Say)
1m3
12,409.89
Item Description
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
13
1.02 Sand
M-113
Cube
M-065
Cube
Rate
Amount
850.00
11,050.00
0.53
12,500.00
6,625.00
Cube
0.92
3,500.00
3,220.00
P-001
Day
0.333
1,500.00
499.50
1.05 Water
M-157
Gal
110
0.30
33.00
1.06 SK Labour
L-003
Day
0.333
1,200.00
399.60
1.07 U / SK Labourer
L-007
Day
1,000.00
2,000.00
Total for
Cube
Rate for 1
Cube
23,827.10
23,827.10
Rate(Say)
1Cube
Rate(Say)
1m3
Page 34 Of 142
23,830.00
8,420.49
Item Description
Cube
Item Ref
Unit
Quantity
Rate
Amount
1.01 Cement
M-026
Bag
14
850.00
11,900.00
1.02 Sand
M-113
Cube
0.6
12,500.00
7,500.00
M-064
Cube
0.9
8,000.00
7,200.00
P-001
Day
0.333
1,500.00
499.50
1.05 Water
M-157
Gal
100
0.30
30.00
1.06 SK Labour
L-003
Day
0.333
1,200.00
399.60
1.07 U / SK Labourer
L-007
Day
1,000.00
2,000.00
Total for
Cube
Rate for 1
Cube
29,529.10
29,529.10
Rate(Say)
1Cube
29,530.00
Rate(Say)
1m3
10,434.63
Item Description
Cube
Item Ref
Unit
Quantity
Rate
Amount
1.01 Cement
M-026
Bag
18
850.00
15,300.00
1.02 Sand
M-113
Cube
0.5
12,500.00
6,250.00
M-066
Cube
0.88
9,000.00
7,920.00
P-001
Day
0.333
1,500.00
499.50
1.05 Water
M-157
Gal
120
0.30
36.00
1.06 SK Labour
L-003
Day
0.333
1,200.00
399.60
1.07 U / SK Labourer
L-007
Day
1,000.00
2,000.00
Total for
Cube
Rate for 1
Cube
32,405.10
32,405.10
Rate(Say)
1Cube
32,410.00
Rate(Say)
1m3
11,452.30
Item Description
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
31
1.02 Sand
M-113
Cube
0.44
Cube
Rate
Amount
850.00
26,350.00
12,500.00
5,500.00
Page 35 Of 142
M-066
Cube
0.96
9,000.00
8,640.00
P-001
Day
0.333
1,500.00
499.50
1.05 Water
M-157
Gal
200
0.30
60.00
1.06 SK Labour
L-003
Day
0.333
1,200.00
399.60
1.07 U / SK Labourer
L-007
Day
1,000.00
2,000.00
Total for
Cube
Rate for 1
Cube
43,449.10
43,449.10
Rate(Say)
1Cube
43,450.00
Rate(Say)
1m3
15,353.36
Screed Concrete
05.B.01 2" thick Cement Concrete screed 1:3:6 (1 1/2) in foundation at depth not exceed in 5' 0"
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
05.A.02
Cube
0.1667
23,830.00
3,972.46
1.02 SK Labour
L-003
Day
0.125
1,200.00
150.00
1.03 U / SK Labourer
L-007
Day
0.5
1,000.00
500.00
Total for
Sqr
Rate for 1
Sqr
Rate
Amount
4,622.46
4,622.46
Rate(Say)
1 Sqr
4,620.00
Rate(Say)
1ft2
46.20
Rate(Say)
1m2
497.11
05.B.02 3" Thick cement concrete 1:3:6(1-1/2") screed in foundation at depths not exceeding 5' 0"
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
05.A.02
Cube
0.25
23,830.00
5,957.50
1.02 SK Labour
L-003
Day
0.125
1,200.00
150.00
1.03 U / SK Labourer
L-007
Day
0.75
1,000.00
750.00
Total for
Sqr
Rate for 1
Sqr
Rate
Amount
6,857.50
6,857.50
Rate(Say)
1 Sqr
6,860.00
Rate(Say)
1ft2
68.60
Rate(Say)
1m2
738.14
Mass Concrete
05.C.01 6" Thick cement concrete 1:2-1/2:5(1") in floor (Mass concrete)
Analysis for
No
Item Description
Item Ref
Unit
Quantity
Rate
Amount
05.A.03
Cube
0.5
29,530.00
14,765.00
1.025 Water
M-157
Gal
200
0.30
60.00
1.03 SK Labour
L-003
Day
0.5
1,200.00
600.00
1.04 U / SK Labourer
L-007
Day
1.25
1,000.00
1,250.00
Total for
Sqr
Rate for 1
Sqr
16,675.00
16,675.00
Rate(Say)
1 Sqr
16,680.00
Rate(Say)
1ft2
166.80
Rate(Say)
1m2
1,794.77
Column Concrete
05.D.01 Cement concrete 1:11/2 : 3(3/4") in 13-1/2" X 13-1/2" columns in ground floor.
Analysis for
No
Item Description
0.51
Item Ref
Unit
Quantity
05.A.01
Cube
0.51
Cube
Rate
35,120.00
Amount
17,911.20
895.56
P-002
Day
0.5
1,000.00
500.00
1.03 Mason
L-009
Day
0.5
1,200.00
600.00
1.04 U / SK Labourer
L-007
Day
1.5
1,000.00
1,500.00
L-004
Day
0.5
1,200.00
600.00
M-063
Sq.ft
45
3.50
157.50
1.07 Water
M-157
Gal
100
0.30
30.00
L-007
Day
0.5
1,000.00
500.00
Total for
0.51
Cube
Rate for 1
Cube
22,694.26
44,498.55
Rate(Say)
1Cube
44,499.00
Rate(Say)
1m3
15,724.03
1m3
15,724.03
1m3
17,296.43
1m3
19,026.07
1m3
20,928.68
Page 37 Of 142
06.A.01 Sawn timber formwork to 9" x 9" cement concrete column in ground floor.
No
1.01
Item Description
Sawn timber formwork to 9" x 9" cement concrete
column in ground floor - Making Mould
Analysis for
0.15
Item Ref
Unit Quantity
Sq
Rate
Amount
06.A.02
1 Use
731.00
731.00
M-010
No
0.6
75.00
45.00
M-071
litre
0.5
35.00
17.50
M-144
L.ft
3.5
65.00
227.50
L-008
Day
0.25
1,200.00
300.00
L-007
Day
0.25
1,000.00
250.00
L-008
Day
0.25
1,200.00
300.00
L-007
Day
0.25
1,000.00
250.00
Total for
0.15
Sq
Rate for 1
Sq
1.08
2,121.00
14,140.00
Rate(Say)
1Sq
14,140.00
Rate(Say)
1ft2
141.40
Rate(Say)
1m2
1,521.46
1m2
1,521.46
1m2
1,673.61
1m2
1,840.97
1m2
2,025.07
06.A.02 Sawn timber formwork to 9" x 9" cement concrete column in ground floor - Making Mould
Analysis for
No
Item Description
Uses
Item Ref
Unit
Quantity
M-141
Sq.ft
18.15
65.00
1,179.75
M-143
L.ft
17.1
22.00
376.20
M-142
L.ft
16.12
12.00
193.44
M-161
Lbs
1.5
50.00
75.00
1.05 Carpenter
L-008
Day
0.5
1,200.00
600.00
1.06 U / SK Labourer
L-007
Day
0.5
1,000.00
500.00
Total for
Uses
Rate for 1
Uses
Rate(Say)
Rate
Amount
2,924.39
731.10
1 Use
731.00
Beam
SDS
06/09/2015
Page 38 Of 142
Item Description
Analysis for
0.55
Item Ref
Unit Quantity
Sq
Rate
Amount
1.01
1 Use
2,757.00
2,757.00
1.02
06.B.03
1 Use
1,568.00
1,568.00
L-008
Day
1,200.00
1,200.00
L-007
Day
1,000.00
2,000.00
M-071
litre
0.5
35.00
17.50
M-161
Lbs
0.5
65.00
32.50
L-008
Day
0.5
1,200.00
600.00
L-007
Day
1,000.00
2,000.00
Total for
0.55
Sq
Rate for 1
Sq
1.09
156.80
10,331.80
18,785.09
Rate(Say)
1Sq
18,785.00
Rate(Say)
1ft2
187.85
Rate(Say)
1m2
2,021.27
Ground floor
1m2
2,021.27
First Floor
1m2
2,223.39
Second Floor
1m2
2,445.73
Third Floor
1m2
2,690.31
06.B.02 Sawn timber formwork for 9" x 12" concrete beams in ground floor - Making the mould
No
Item Description
Analysis for
4
Item Ref
Unit Quantity
Uses
Rate
Amount
M-141
Sq.ft
60
65.00
3,900.00
M-142
L.ft
24
12.00
288.00
M-143
L.ft
45
22.00
990.00
M-144
L.ft
30
65.00
1,950.00
M-161
Lbs
50.00
100.00
1.06 Carpenter
L-008
Day
1.5
1,200.00
1,800.00
1.07 U / SK Labourer
L-007
Day
1,000.00
2,000.00
Total for
Uses
Rate for 1
Uses
Rate(Say)
SDS
11,028.00
2,757.00
1 Use
2,757.00
06/09/2015
Page 39 Of 142
06.B.03 Sawn timber formwork for concrete beams in ground floor-Assembling - Materials
No
Item Description
Analysis for
6
Item Ref
Unit Quantity
Uses
Rate
Amount
M-144
L.ft
110
65.00
7,150.00
M-143
L.ft
80
22.00
1,760.00
M-141
Sq.ft
65.00
390.00
M-151
No
22
5.00
110.00
Total for
Uses
Rate for 1
Uses
9,410.00
1,568.33
Rate(Say)
1 Use
1,568.00
Slab
06.C.01 Sawn timber formwork for underside of first floor slab
Analysis for
2
Item Ref
Unit Quantity
Rate
06.C.02
1 Use
7,241.00
06.C.03
Sq
L-008
Day
1,200.00
1,200.00
L-007
Day
1,000.00
4,000.00
M-071
litre
4.54
35.00
158.90
M-161
Lbs
50.00
100.00
L-008
Day
0.5
1,200.00
600.00
L-007
Day
1,000.00
2,000.00
Total for
Sq
Rate for 1
Sq
No
1.01
Item Description
Sawn timber formwork for 20" x 10" concrete slab
in ground floor - Making panels
1.09
Sq
Amount
7,241.00
1,448.20
8,176.00
-
8,176.00
1,635.20
26,559.30
13,279.65
Rate(Say)
1Sq
13,280.00
Rate(Say)
1ft2
132.80
Rate(Say)
1m2
1,428.93
Ground floor
1m2
1,428.93
First Floor
1m2
1,571.82
Second Floor
1m2
1,729.00
Third Floor
1m2
1,901.90
06.C.02 Sawn timber formwork for 20" x 10" concrete slab in ground floor - Making panels
Analysis for
No
SDS
Item Description
Item Ref
Unit
4
Quantity
Uses
Rate
Amount
06/09/2015
Page 40 Of 142
M-141
Sq.ft
220
65.00
14,300.00
M-144
L.ft
121
65.00
7,865.00
M-161
Lbs
50.00
200.00
1.04 Carpenter
L-008
Day
1,200.00
3,600.00
1.05 U / SK Labourer
L-007
Day
1,000.00
3,000.00
Total for
Uses
Rate for 1
Uses
28,965.00
7,241.25
Rate(Say)
7,241.00
06.C.03 Sawn timber formwork for underside of first floor slab - Assembling
Analysis for
No
Item Description
Uses
Item Ref
Unit
Quantity
M-144
L.ft
690
65.00
44,850.00
M-143
L.ft
66
22.00
1,452.00
M-151
No
122
5.00
610.00
M-141
Sq.ft
33
65.00
2,145.00
Total for
Uses
Rate for 1
Uses
Rate(Say)
SDS
Rate
Amount
49,057.00
8,176.17
8,176.00
06/09/2015
Page 41 Of 142
07. Reinforcement
7.01
Tor steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied
with G.I. Wire as directed.
Analysis for
No
Item Description
Cwt.
Item Ref
Unit
Quantity
M-152
kg
50
M-005
Lbs
1.5
1.05 SK Labour
L-003
Day
1,200.00
1,200.00
1.06 U / SK Labourer
L-007
Day
1,000.00
1,000.00
Total for
Cwt.
Rate for 1
Cwt.
7.02
Rate
109.00
Amount
5,450.00
817.50
200.00
300.00
81.75
8,849.25
8,849.25
Rate(Say)
1Cwt
8,849.00
Rate(Say)
1Kg
176.98
Mild Steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied
with G.I. Wire as directed.
Analysis for
No
Item Description
Item Ref
Unit
Quantity
M-068
kg
50
M-005
Lbs
1.5
1.04 SK Labour
L-003
Day
1.05 U / SK Labourer
L-007
Cwt.
Rate
109.00
Amount
5,450.00
817.50
200.00
300.00
1,200.00
1,200.00
Day
1,000.00
1,000.00
Total for
Cwt.
Rate for 1
Cwt.
8,767.50
8,767.50
Rate(Say)
1Cwt
8,768.00
Rate(Say)
1Kg
175.36
Page 42 Of 142
Page 43 Of 142
8" Thick hollow block work in cement and sand mortar 1:5 in ground floor (Cavities unfilled)
Analysis for
No
Item Description
Item Ref
Unit
Quantity
M-057
No
112
1.03 Cement
M-026
Bag
1.04 Sand
M-113
1.05 Mason
1.06 U / SK Labourer
08.02
Sqr
Rate
Amount
30.00
3,360.00
168.00
0.75
850.00
637.50
Cube
0.06
12,500.00
750.00
L-009
Day
1.5
1,200.00
1,800.00
L-007
Day
2.5
1,000.00
2,500.00
Total for
Sqr
Rate for 1
Sqr
129.00
9,344.50
9,344.50
Rate(Say)
1 Sq
9,345.00
Rate(Say)
1ft2
93.45
Rate(Say)
1m2
1,005.52
Ground floor
1m2
1,005.52
First Floor
1m2
1,106.07
Second Floor
1m2
1,216.68
3rd floor
1m2
1,338.35
6" Thick hollow block work in cement and sand mortar 1:5 with cavities unfilled.
Analysis for
No
Item Description
Item Ref
Unit
Quantity
M-059
No
112
1.03 Cement
M-026
Bag
1.04 Sand
M-113
1.05 Mason
1.06 U / SK Labourer
Sqr
Rate
22.00
Amount
2,464.00
123.20
0.65
850.00
552.50
Cube
0.07
12,500.00
51.00
L-009
Day
1.5
1,200.00
1,800.00
L-007
Day
1,000.00
2,000.00
Total for
Sqr
Rate for 1
Sqr
114.00
7,104.70
7,104.70
Rate(Say)
1 Sq
7,104.70
Rate(Say)
1ft2
71.05
08.03
Page 44 Of 142
Rate(Say)
1m2
764.47
Ground floor
1m2
764.47
First Floor
1m2
840.91
Second Floor
1m2
925.00
Third Floor
1m2
1,017.50
4" Thick hollow block work in cement and sand mortar 1:5 with cavities unfilled.
Analysis for
No
Item Description
Item Ref
Unit
Quantity
M-058
No
112
1.03 Cement
M-026
Bag
1.04 Sand
M-113
1.05 Mason
1.06 U / SK Labourer
Sqr
Rate
27.00
Amount
3,024.00
151.20
0.4
850.00
340.00
Cube
0.03
12,500.00
51.00
L-009
Day
1,200.00
1,200.00
L-007
Day
1,000.00
2,000.00
Total for
Sqr
Rate for 1
Sqr
160.00
6,926.20
6,926.20
Rate(Say)
1 Sq
6,926.20
Rate(Say)
1ft2
69.26
Rate(Say)
1m2
745.26
Ground floor
1m2
745.26
First Floor
1m2
819.79
Second Floor
1m2
901.76
Third Floor
1m2
991.94
Page 45 Of 142
Page 46 Of 142
Page 47 Of 142
Brick Work in cement sand 1:5 in 4-1/2" thick walls in ground floor
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
M-019
No
550
1.03 Cement
M-026
Bag
1.3
850.00
1,105.00
1.04 Sand
M-113
Cu
0.1
12,500.00
1,250.00
1.05 Water
M-157
Gal
50
0.30
15.00
1.06 Mason
L-009
Day
1.5
1,200.00
1,800.00
1.07 U / SK Labourer
L-007
Day
1,000.00
2,000.00
Total for
Sqr
Rate for 1
Sqr
1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for Wastage
1.08
09.02
Rate
Amount
6.00
-
3,300.00
165.00
190.00
9,825.00
9,825.00
Rate(Say)
1 Sq
9,825.00
Rate(Say)
1ft2
98.25
Rate(Say)
1m2
1,057.17
Ground floor
1m2
1,057.17
First Floor
1m2
1,110.03
Second Floor
1m2
1,165.53
Third Floor
1m2
1,223.81
No
Item Description
Sqr
Item Ref
Unit
Quantity
M-019
No
1090
1.03 Cement
M-026
Bag
850.00
2,550.00
1.04 Sand
M-113
Cu
0.2
12,500.00
2,500.00
1.05 Water
M-157
Gal
115
0.30
34.50
1.06 Mason
L-009
Day
2.25
1,200.00
2,700.00
1.07 U / SK Labour
L-007
Day
3.75
1,000.00
3,750.00
Total for
Sqr
Rate for 1
Sqr
1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for Wastage
1.08
Rate(Say)
Rate
6.00
Amount
6,540.00
327.00
193.50
18,595.00
18,595.00
1 Sq
18,595.00
09.03
Page 48 Of 142
Rate(Say)
1ft2
185.95
Rate(Say)
1m2
2,000.82
Ground floor
1m2
2,000.82
First Floor
1m2
2,100.86
Second Floor
1m2
2,205.91
Third Floor
1m2
2,316.20
No
Item Description
Cube
Item Ref
Unit
Quantity
M-019
No
1450
1.03 Cement
M-026
Bag
850.00
3,400.00
1.04 Sand
M-113
Cu
0.25
12,500.00
3,125.00
1.05 Water
M-157
Gal
150
0.30
45.00
1.06 Mason
L-009
Day
1,200.00
3,600.00
1.07 U / SK Labourer
L-007
Day
1,000.00
4,000.00
Total for
Cube
Rate for 1
Cube
1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for Wastage
09.04
Rate
6.00
Amount
8,700.00
435.00
23,305.00
23,305.00
Rate(Say)
1 Cu
23,305.00
Rate(Say)
1ft3
233.05
Rate(Say)
1m3
8,234.98
No
Item Description
Cube
Item Ref
Unit
Quantity
M-019
No
1450
1.03 Cement
M-026
Bag
2.333
850.00
1,983.05
1.04 Sand
M-113
Cu
0.375
12,500.00
4,687.50
1.05 Water
M-157
Gal
150
0.30
45.00
1.06 Mason
L-009
Day
1,200.00
3,600.00
1.07 U / SK Labourer
L-007
Day
1,000.00
4,000.00
Total for
Cube
Rate for 1
Cube
1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for Wastage
Rate(Say)
Rate
6.00
-
Amount
8,700.00
435.00
23,450.55
23,450.55
1 Cu
23,451.00
09.05
Page 49 Of 142
Rate(Say)
1ft3
234.51
Rate(Say)
1m3
8,286.57
Brick Work 13 1/2" thick in cement sand 1:5 in superstructure in ground floor
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
M-019
No
1630
1.03 Cement
M-026
Bag
4.5
850.00
3,825.00
1.04 Sand
M-113
Cu
0.3
12,500.00
3,750.00
1.05 Water
M-157
Gal
170
0.30
51.00
1.06 Mason
L-009
Day
3.5
1,200.00
4,200.00
1.07 U / SK Labourer
L-007
Day
5.5
1,000.00
5,500.00
Total for
Sqr
Rate for 1
Sqr
1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for wastage
1.08
09.06
Rate
Amount
6.00
-
9,780.00
489.00
194.00
27,789.00
27,789.00
Rate(Say)
1 Sq
27,789.00
Rate(Say)
1ft2
277.89
Rate(Say)
1m2
2,990.10
Ground floor
1m2
2,990.10
First Floor
1m2
3,289.11
Second Floor
1m2
3,618.02
Third Floor
1m2
3,979.82
No
Item Description
Sqr
Item Ref
Unit
Quantity
M-019
No
1090
1.03 Cement
M-026
Bag
1.75
850.00
1,487.50
1.04 Sand
M-113
Cu
0.3
12,500.00
3,750.00
1.05 Water
M-157
Gal
115
0.30
34.50
1.06 Mason
L-009
Day
2.25
1,200.00
2,700.00
1.07 U / SK Labourer
L-007
Day
1,000.00
3,000.00
Total for
Sqr
1.01 Bricks
1.02 Allow 5% of Items ( 1.01 ) for Wastage
1.08
Rate
6.00
-
Amount
6,540.00
327.00
171.00
18,010.00
Rate for 1
09.07
Page 50 Of 142
Sqr
18,010.00
Rate(Say)
1 Sq
18,010.00
Rate(Say)
1ft2
180.10
Rate(Say)
1m2
1,937.88
Ground floor
1m2
1,937.88
First Floor
1m2
2,131.66
Second Floor
1m2
2,344.83
Third Floor
1m2
2,579.31
4 1/2" Thick Brick Walls (wire cut) in cement sand 1:5 in superstructure in ground floor (facing to
brickwork measured separately)
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
M-164
No
550
1.03 Cement
M-026
Bag
1.2
850.00
1,020.00
1.04 Sand
M-113
Cu
0.08
12,500.00
1,000.00
1.05 Water
M-157
Gal
30
0.30
9.00
1.06 Mason
L-009
Day
1.5
1,200.00
1,800.00
1.07 U / SK Labourer
L-007
Day
1,000.00
2,000.00
Total for
Sqr
Rate for 1
Sqr
1.08
09.08
Rate
Amount
8.75
-
4,812.50
96.25
114.00
10,851.75
10,851.75
Rate(Say)
1 Sq
10,852.00
Rate(Say)
1ft2
108.52
Rate(Say)
1m2
1,167.68
Ground floor
1m2
1,167.68
First Floor
1m2
1,284.44
Second Floor
1m2
1,412.89
Third Floor
1m2
1,554.18
9" Thick in Cement and Sand 1:5 with wire cut Bricks (Facing to brickwork measured separately)
Analysis for
No
Item Description
Item Ref
Unit
Quantity
M-164
No
1060
M-026
Bag
2.5
Sq
Rate
8.75
850.00
Amount
9,275.00
371.00
2,125.00
Page 51 Of 142
1.04 Sand
M-113
Cu
0.18
12,500.00
2,250.00
1.05 Water
M-157
Gal
100
0.30
30.00
1.06 Mason
L-009
Day
2.25
1,200.00
2,700.00
1.07 U / SK Labourer
L-007
Day
3.75
1,000.00
3,750.00
Total for
Sq
Rate for 1
Sq
1.08
09.10
193.50
20,694.50
20,694.50
Rate(Say)
1 Sq
20,695.00
Rate(Say)
1ft2
206.95
Rate(Say)
1m2
2,226.78
Ground floor
1m2
2,226.78
First Floor
1m2
2,449.46
Second Floor
1m2
2,694.41
Third Floor
1m2
2,963.85
13 1/2" Thick Brick wall (wire cut) in cement and sand 1:5 in ground floor (Facing to brickwork
measured separately)
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
M-164
No
1630
1.03 Cement
M-026
Bag
4.5
850.00
3,825.00
1.04 Sand
M-113
Cu
0.3
12,500.00
3,750.00
1.05 Water
M-157
Gal
50
0.30
15.00
1.06 Mason
L-009
Day
3.75
1,200.00
4,500.00
1.07 U / SK Labourer
L-007
Day
5.5
1,000.00
5,500.00
Total for
Sqr
Rate for 1
Sqr
1.08
Rate
8.75
-
Amount
14,262.50
285.25
200.00
32,337.75
32,337.75
Rate(Say)
1 Sq
32,338.00
Rate(Say)
1ft2
323.38
Rate(Say)
1m2
3,479.57
Ground floor
1m2
3,479.57
First Floor
1m2
3,827.53
Second Floor
1m2
4,210.28
Third Floor
1m2
4,631.31
09.11
Page in
52 ground
Of 142
Extra over for facing including raised pointing 1/8" thick in cement and sand 1:1 mixture
floor
Analysis for
No
Sqr
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
0.5
850.00
425.00
1.02 Sand
M-113
Cu
0.01
12,500.00
125.00
1.03 Acid
M-001
Gal
0.1
254.00
25.40
1.04 Water
M-157
Gal
10
0.30
3.00
1.05 Mason
L-009
Day
1,200.00
6,000.00
1.06 U / SK Labourer
L-007
Day
3.5
1,000.00
3,500.00
Total for
Sqr
Rate for 1
Sqr
09.12
Item Description
1
Rate
Amount
10,078.40
10,078.40
Rate(Say)
1 Sq
10,078.00
Rate(Say)
1ft2
100.78
Rate(Say)
1m2
1,084.39
No
Sqr
Item Ref
Unit
Quantity
1.01 Bricks
M-019
No
350
6.00
2,100.00
M-115
Lbs
1.2
275.00
330.00
1.03 Sand
M-113
Cu
0.11
12,500.00
1,375.00
1.04 Water
M-157
Gal
45
0.30
13.50
1.05 Mason
L-009
Day
1.25
1,200.00
1,500.00
1.06 U / SK Labourer
L-007
Day
2.5
1,000.00
2,500.00
Total for
Sqr
Rate for 1
Sqr
09.13
Item Description
1
Rate
Amount
7,818.50
7,818.50
Rate(Say)
1 Sq
7,819.00
Rate(Say)
1ft2
78.19
Rate(Say)
1m2
841.32
Steps 1' -1 1/2" x 0' 6" in brick in cement and sand 1:5 with 1/2" thick cement and sand 1:2
rendering including necessary excavation.
Analysis for
No
Item Description
10
L.ft
Item Ref
Unit
Quantity
Rate
Amount
1.01 Bricks
M-019
No
120
6.00
720.00
1.02 Cement
M-026
Bag
0.5
850.00
425.00
1.03 Sand
M-113
Cu
0.05
12,500.00
625.00
Page 53 Of 142
1.04 Water
M-157
Gal
15
0.30
4.50
1.05 Mason
L-009
Day
0.5
1,200.00
600.00
1.06 U / SK Labourer
L-007
Day
0.5
1,000.00
500.00
Total for
10
L.ft
Rate for 1
L.ft
09.14
2,874.50
287.45
Rate(Say)
1 ft
287.45
Rate(Say)
1m
942.84
Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
rendering 1/2" thick 1:2 to exposed faces with 1' 6" ramp including necessary excavation.
Analysis for
No
L.ft
Item Ref
Unit
Quantity
1.01 Bricks
M-019
No
140
6.00
840.00
1.02 Cement
M-026
Bag
0.8
850.00
680.00
1.03 Sand
M-113
Cu
0.05
12,500.00
625.00
1.04 Water
M-157
Gal
20
0.30
6.00
1.05 Mason
L-009
Day
1.25
1,200.00
1,500.00
1.06 U / SK Labourer
L-007
Day
1.25
1,000.00
1,250.00
Total for
10
L.ft
Rate for 1
L.ft
09.15
Item Description
10
Rate
Amount
4,901.00
490.10
Rate(Say)
1 ft
490.10
Rate(Say)
1m
1,607.53
Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
rendering 1/2" thick 1:2 to exposed faces without ramp including necessary excavation.
Analysis for
No
Item Description
10
L.ft
Item Ref
Unit
Quantity
Rate
Amount
1.01 Bricks
M-019
No
110
6.00
660.00
1.02 Cement
M-026
Bag
0.7
850.00
595.00
1.03 Sand
M-113
Cu
0.04
12,500.00
500.00
1.04 Water
M-157
Gal
15
0.30
4.50
1.05 Mason
L-009
Day
1,200.00
1,200.00
1.06 U / SK Labourer
L-007
Day
1.25
1,000.00
1,250.00
Total for
10
L.ft
Rate for 1
L.ft
4,209.50
420.95
Rate(Say)
1 ft
420.95
Rate(Say)
1m
1,380.72
Page 54 Of 142
Page 55 Of 142
Page 56 Of 142
Page 57 Of 142
Page 58 Of 142
Page 59 Of 142
Page 60 Of 142
Page 61 Of 142
B.
Roof Plumbing
Timber framework for culicut pattern tile hip roof in single storey building consisting of wall plate ,
beam, ridge plate, rafters etc.(Preservative treatment to be measured separately)
Analysis for
No
Item Description
Sqrs
Item Ref
Unit
Quantity
M-136
Cu.ft
34
M-149
L.ft
660
396.00
M-163
Lbs
25.00
200.00
M-162
Lbs
25.00
50.00
1.07 Carpenter
L-008
Day
1,200.00
8,400.00
1.08 U / SK Labourer
L-007
Day
1,000.00
8,000.00
Total for
Sqrs
Rate for 1
Sqrs
Rate
1,200.00
Amount
40,800.00
4,080.00
12.00
7,920.00
69,846.00
11,641.00
Rate(Say)
11,641.00
10.A.02 Roof Covering With calicut pattern clay tiles in single storeyed building
Analysis for
No
Item Description
Item Ref
Unit
Quantity
1.01 Tiles
M-108
No
750
1.02 Carpenter
L-008
Day
1.03 U / SK Labourer
L-007
Sqrs
Rate
Amount
16.00
12,000.00
1,200.00
3,600.00
Day
1,000.00
3,000.00
Total for
Sqrs
Rate for 1
Sqrs
18,600.00
3,100.00
Rate(Say)
3,100.00
10.A.03 Timber framework for corrugated asbestos sheet roof in single storeyed building
Analysis for
No
Item Description
3.6
Item Ref
Unit
Quantity
M-136
Cu.ft
13.25
Sqrs
Rate
1,200.00
-
Amount
15,900.00
1,590.00
1.03 Carpenter
L-008
Day
2.5
1,200.00
1.04 U / SK Labourer
L-007
Day
1,000.00
Total for
3.6
Sqrs
Rate for 1
Sqrs
3,000.00
3,000.00
23,490.00
6,525.00
Rate(Say)
10.A.04
Page 62 Of 142
6,525.00
Roof covering with corrugated asbestos sheets (Timber frame work and ridge covering measured
separately)
Analysis for
No
Item Description
3.6
Sqrs
Item Ref
Unit
Quantity
Rate
Amount
M-003
Sq.ft
420
42.00
17,640.00
M109
No
72
3.50
252.00
1.03 Carpenter
L-008
Day
1,200.00
1,200.00
1.04 U / SK Labourer
L-007
Day
1,000.00
2,000.00
Total for
3.6
Sqrs
Rate for 1
Sqrs
21,092.00
5,858.89
Rate(Say)
5,859.00
10.A.05 One layer half round clay tiles over corrugated asbestos roof covering
Analysis for
No
Item Description
Item Ref
Unit
Quantity
M-056
No
650
1.02 U / SK Labourer
L-007
Day
Total for
Sqr
Rate for 1
Sqr
Sqr
Rate
Amount
5.00
3,250.00
1,000.00
2,000.00
5,250.00
5,250.00
Rate(Say)
1 Sqr
5,250.00
10.A.06 Asbestos close fittings ridging fixed complete with roofing screws or bolts (hook)
Analysis for
No
Item Description
13.33
L.ft.
Item Ref
Unit
Quantity
M-106
Pair
245.00
980.00
M-110
No
16
3.50
56.00
1.03 Carpenter
L-008
Day
0.25
1,200.00
300.00
1.04 U / SK Labourer
L-007
Day
0.25
1,000.00
250.00
Total for
13.33
L.ft.
Rate for 1
L.ft.
Rate(Say)
Rate
Amount
1,586.00
118.98
1 L.ft
119.00
Page 63 Of 142
10.A.07 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4
Analysis for
No
Item Description
12
L.ft.
Item Ref
Unit
Quantity
Rate
Amount
M-105
No
35.00
315.00
1.02 Cement
M-o26
Bag
0.333
850.00
283.05
1.03 Sand
M-113
Cu
0.02
12,500.00
250.00
M-115
Lbs
15
275.00
4,125.00
M-036
Lbs
0.5
175.00
87.50
1.06 Mason
L-009
Day
0.25
1,200.00
300.00
1.07 U / SK Labourer
L-007
Day
0.25
1,000.00
250.00
Total for
12
L.ft.
Rate for 1
L.ft.
5,610.55
467.55
Rate(Say)
468.00
10.A.08 3/4" X 9" high valance board fixed with brass screws to ends of rafters (For tile roofing)
Analysis for
No
Item Description
100
Item Ref
Unit
Quantity
M-147
Sq.ft
75
M-015
No
100
1.04 Carpenter
L-008
Day
1.05 U / SK Labourer
L-007
L.ft.
Rate
65.00
-
Amount
4,875.00
243.75
3.75
375.00
1,200.00
3,600.00
Day
1,000.00
3,000.00
Total for
100
L.ft.
Rate for 1
L.ft.
330.00
12,423.75
124.24
Rate(Say)
124.00
10.A.09 3/4" X 9" high barge board fixed with brass screws at 2 ft. 0"centres to side of rafters
Analysis for
No
Item Description
100
L.ft.
Item Ref
Unit
Quantity
M-147
Sq.ft
75
M-015
No
50
3.75
187.50
1.04 Carpenter
L-008
Day
1,200.00
3,600.00
1.05 U / SK Labourer
L-007
Day
1,000.00
3,000.00
Rate
65.00
-
Amount
4,875.00
243.75
1.06
Total for
100
L.ft.
Rate for 1
L.ft.
Page 64 Of 142
330.00
12,236.25
122.36
Rate(Say)
122.00
Roof Plumbing
18 B.W.G (1.2 mm) galvanised iron sheet valley gutter 3' 0" girth over all once bent with end laps
10.B.01 not less than 9" width including 3/4" tongued and grooved planks laid to slope and profile on timber
members.
Analysis for
No
Item Description
15
Item Ref
Unit
Quantity
M-052
Sheet
M-165
Gal
1.03 Cement
M-026
L.ft.
Rate
Amount
2,200.00
4,400.00
0.25
450.00
112.50
Bag
0.1
850.00
85.00
M-115
Lbs
0.05
275.00
13.75
1.05 Sand
M-113
Cu
0.01
12,500.00
125.00
M-141
Sq.ft
50
65.00
3,250.00
M-072
Lbs
50.00
100.00
1.08 Carpenter
L-008
Day
1,200.00
1,200.00
1.09 U / SK Labourer
L-007
Day
1,000.00
1,000.00
1.10 Tinker
L-005
Day
0.5
1,200.00
600.00
1.11 U / SK Labourer
L-007
Day
0.5
1,000.00
500.00
1.12 Mason
L-009
Day
0.25
1,200.00
300.00
1.13 U / SK Labourer
L-007
Day
0.25
1,000.00
250.00
Total for
15
L.ft.
Rate for 1
L.ft.
11,936.25
795.75
Rate(Say)
796.00
18 B.W.G (1.2 mm) GI Flashing 1' 6" girth overall 3 thies bent with end laps not less than 6",
10.B.02 soldered, turned and tucked up to not less than 6" into chase cut in wall and pointed in 1:2 mortar,
lower end dressed over roof covering not less than 1' 0" wide
Analysis for
No
Item Description
15
Item Ref
Unit
Quantity
M-052
Sheet
1.02 Cement
M-026
Bag
1.03 Sand
M-113
L.ft.
Rate
Amount
2,200.00
2,200.00
0.05
850.00
42.50
Cu
0.01
12,500.00
125.00
M-116
Lbs
13.75
13.75
L-005
Day
0.5
1,200.00
600.00
1.06 Mason
L-009
Day
0.125
1,200.00
1.07 U / SK Labourer
L-007
Day
0.75
1,000.00
Total for
15
L.ft.
Rate for 1
L.ft.
150.00
750.00
3,881.25
258.75
Rate(Say)
10.B.03
Page 65 Of 142
259.00
6" half round PVC eave gutter fixed to timber valance board including gutter joiner and brackets
fixed at 18" centres (other specials paid seperately)
Analysis for
No
L.ft.
Item Ref
Unit
Quantity
M-088
No
0.00
1.02 Joiner
M-055
No
0.00
M-054
No
17
0.00
M-017
No
34
1.25
42.50
M-117
grms
20
1.40
28.00
1.06 Plumber
L-002
Day
0.5
1,200.00
600.00
1.07 U / SK Labourer
L-007
Day
0.5
1,000.00
500.00
1.08
Item Description
24
Rate
Amount
55.00
Total for
24
Rate for 1
L.ft.
L.ft.
1,225.50
51.06
Rate(Say)
1 L.ft.
51.00
No.
Item Ref
Unit
Quantity
M-089
No
0.00
M-055
No
0.00
M-054
No
0.00
M-017
No
1.25
5.00
M-117
grms
12
1.40
16.80
1.06 Plumber
L-002
Day
0.125
1,200.00
150.00
1.07 U / SK Labourer
L-007
Day
0.125
1,000.00
125.00
1.08
Item Description
Rate
Amount
13.75
Total for
Rate for 1
No.
Rate(Say)
No.
310.55
310.55
1 No.
311.00
Page 66 Of 142
No.
Item Ref
Unit
Quantity
M-091
No
0.00
M-055
No
0.00
M-054
No
0.00
M-017
No
1.25
5.00
M-117
grms
12
1.40
16.80
1.06 Plumber
L-002
Day
0.125
1,200.00
150.00
1.07 U / SK Labourer
L-007
Day
0.125
1,000.00
125.00
1.08
Item Description
Rate
Amount
13.75
Total for
Rate for 1
No.
No.
310.55
310.55
Rate(Say)
1 No.
311.00
No.
Item Ref
Unit
Quantity
M-087
No
0.00
M-117
grms
12
1.40
16.80
1.06 Plumber
L-002
Day
0.0625
1,200.00
75.00
1.07 U / SK Labourer
L-007
Day
0.0625
1,000.00
62.50
1.08
Item Description
Amount
-
6.88
Total for
Rate for 1
No.
No.
161.18
161.18
Rate(Say)
10.B.07
Rate
1 No.
161.00
3 1/2" PVC rain water down pipes fixed to brick wall with wooden plugs buried in wall (other
specials paid seperately)
Analysis for
No
Item Description
24
L.ft.
Item Ref
Unit
Quantity
Rate
Amount
M-078
No
0.00
M-090
No
0.00
M-104
No
0.00
M-014
No
2.50
20.00
M-117
grms
30
1.40
42.00
1.06 Plumber
L-002
Day
0.33
1,200.00
1.07 U / SK Labourer
L-007
Day
0.33
1,000.00
1.08
Page 67 Of 142
400.00
333.33
36.67
Total for
24
Rate for 1
L.ft.
L.ft.
832.00
34.67
Rate(Say)
1 L.ft.
35.00
No.
Item Ref
Unit
Quantity
1.01 elbow
M-079
No
0.00
M-117
grms
32
1.40
44.80
1.06 Plumber
L-002
Day
0.0625
1,200.00
75.00
1.07 U / SK Labourer
L-007
Day
0.0625
1,000.00
62.50
1.08
Item Description
Rate
Amount
-
6.88
Total for
Rate for 1
No.
No.
189.18
189.18
Rate(Say)
1 No.
189.00
No.
Item Ref
Unit
Quantity
1.01 Shoe
M-099
No
0.00
M-117
grms
15
1.40
21.00
1.06 Plumber
L-002
Day
0.0625
1,200.00
75.00
1.07 U / SK Labourer
L-007
Day
0.0625
1,000.00
62.50
1.08
Item Description
Rate
Amount
-
6.88
Total for
Rate for 1
No.
Rate(Say)
No.
165.38
165.38
1 No.
165.00
Page 68 Of 142
Page 69 Of 142
Page 70 Of 142
valance board
barge board
Page 71 Of 142
Page 72 Of 142
Page 73 Of 142
Page 74 Of 142
Page 75 Of 142
B.
Ironmongery
11.A.01
Door Single Hung 3' 3" X7' 0" high overall with frame having 1 1/4" thick sash and 3
1/4" X 2 1/4 ft. timber frame(glazing, ironmongery & painting measured separately)
Analysis for
No
Item Description
22.75
Item Ref
Unit
Quantity
M-138
Cu.ft
1.5
M-118
No
M-045
Sq.ft
Rate
Amount
1,300.00
1,950.00
15.00
30.00
No
1.50
9.00
M-018
No
7.50
45.00
M-067
No
6.00
12.00
M-139
Sq.ft
14
140.00
1,960.00
M-139a
Sq.ft
110.00
550.00
1.08 Carpenter
L-008
Day
1,200.00
6,000.00
1.09 U / SK Labourer
L-007
Day
1.5
1,000.00
1,500.00
Total for
22.75
Sq.ft
Rate for
Sq.ft
12,056.00
529.93
Rate(Say)
530.00
Door glazed and paneled double hung 4' 0" x 7' 0" high overall with frame including
11.A.02 1 1/4" thick sash and 3 1/4 x 2 1/4" frame (Glazing, Ironmongory and painting
measured separately)
Analysis for
No
Item Description
28
Item Ref
Unit
Quantity
M-138
Cu.ft
1.66
M-118
No
M-045
Sq.ft
Rate
Amount
1,300.00
2,158.00
15.00
30.00
No
1.50
9.00
M-018
No
7.50
45.00
M-067
No
6.00
12.00
M-139
Sq.ft
16
140.00
2,240.00
M-139a
Sq.ft
110.00
770.00
1.08 Carpenter
L-008
Day
1,200.00
1.09 U / SK Labourer
L-007
Day
1,000.00
Total for
28
Sq.ft
Rate for
Sq.ft
Page 76 Of 142
7,200.00
2,000.00
14,464.00
516.57
Rate(Say)
517.00
Plywood door single hung 3' 1-1/2" x 6' 11-1/2" overall with frame having 1-1/4"
11.A.03 thick sash and 3 1/4" x 2 1/4" frame (Glazing, Ironmongory and painting measured
separately)
Analysis for
No
Item Description
21.75
Item Ref
Unit
Quantity
M-138
Cu.ft
1.8
M-118
No
M-045
Sq.ft
Rate
Amount
1,300.00
2,340.00
15.00
30.00
No
1.50
9.00
M-018
No
7.50
45.00
M-074
No
2,000.00
2,000.00
1.06 Carpenter
L-008
Day
0.75
1,200.00
900.00
1.07 U / SK Labourer
L-007
Day
0.375
1,000.00
375.00
L-009
Day
0.25
1,200.00
300.00
L-007
Day
0.25
1,000.00
250.00
Total for
21.75
Sq.ft
Rate for
Sq.ft
6,249.00
287.31
Rate(Say)
287.00
Door Ledged, braced and battened single hung 2' 6" x 6' 6" overall,with frame
11.A.04 having 7/8" thick tongued & Grooved planks and 3-1/4" x 2-3/4"frame (Glazing,
Ironmongory and painting measured separately)
Analysis for
No
Item Description
16.25
Item Ref
Unit
Quantity
M-138
Cu.ft
1.7
M-118
No
M-045
Sq.ft
Rate
Amount
1,300.00
2,210.00
15.00
30.00
No
1.50
9.00
M-018
No
7.50
45.00
M-067
No
6.00
12.00
M-139a
Sq.ft
21
110.00
2,310.00
M-015
No
36
3.75
135.00
1.08 Carpenter
L-008
Day
2.25
1,200.00
2,700.00
1.09 U / SK Labourer
L-007
Day
1,000.00
1,000.00
L-009
Day
0.25
1,200.00
L-007
Day
0.25
1,000.00
Total for
16.25
Sq.ft
Rate for
Sq.ft
Page 77 Of 142
300.00
250.00
9,001.00
553.91
Rate(Say)
554.00
window, Glazed 7'. 0" x 4' 0" High overall with frame comprising 3 No openable
11.A.05 sashes and 3 1/4" x 2 1/4" frame and mullions (Glazing, Ironmongory and painting
measured separately)
Analysis for
No
Item Description
28
Item Ref
Unit
Quantity
M-138
Cu.ft
3.2
M-018
No
M-045
Sq.ft
Rate
Amount
1,300.00
4,160.00
7.50
30.00
No
1.50
6.00
M-139
Sq.ft
9.25
140.00
1,295.00
1.05 Carpenter
L-008
Day
1,200.00
7,200.00
1.06 U / SK Labourer
L-007
Day
2.5
1,000.00
2,500.00
L-009
Day
0.5
1,200.00
600.00
L-007
Day
0.5
1,000.00
500.00
Total for
28
Sq.ft
Rate for
Sq.ft
16,291.00
581.82
Rate(Say)
11.A.06
582.00
1/8" clear sheet glass panes exceeding 1' 0" but not exceeding 4 squere feet cut
and fixed with timber beadings to doors and windows.
Analysis for
No
Item Description
Item Ref
Unit
Quantity
M-027
Sq.ft
M-133
L.ft
M-013
1.04 Glazier
1.05 U / SK Labourer
Sq.ft
Rate
Amount
25.00
225.00
30
1.50
45.00
Doz
1.00
4.00
L-010
Day
0.5
1,200.00
600.00
L-007
Day
0.5
1,000.00
500.00
Total for
Sq.ft
Rate for
Sq.ft
Rate(Say)
Ironmongery
1,374.00
152.67
153.00
Page 78 Of 142
Item Description
1.5
Item Ref
Unit
Quantity
M-023
No
M-017
No
24
1.03 Carpenter
L-008
Day
1.04 U / SK Labourer
L-007
Pair
Rate
Amount
70.00
210.00
1.25
30.00
0.25
1,200.00
300.00
Day
0.25
1,000.00
250.00
Total for
1.5
Pair
Rate for
Pair
790.00
526.67
Rate(Say)
527.00
Item Description
1.5
Item Ref
Unit
Quantity
M-128
Pair
M-061
No
18
1.03 Carpenter
L-008
Day
1.04 U / SK Labourer
L-007
Pair
Rate
Amount
165.00
165.00
0.55
9.90
0.25
1,200.00
300.00
Day
0.25
1,000.00
250.00
Total for
1.5
Pair
Rate for
Pair
724.90
483.27
Rate(Say)
483.00
Item Description
Item Ref
Unit
Quantity
M-070
No
1.02 Carpenter
L-008
Day
1.03 U / SK Labourer
L-007
No
Rate
Amount
960.00
960.00
0.5
1,200.00
600.00
Day
0.5
1,000.00
500.00
Total for
No
Rate for
No
2,060.00
2,060.00
Rate(Say)
2,060.00
Item Description
Item Ref
Unit
Quantity
M-025
No
M-016
No
16
No
Rate
Amount
55.00
220.00
1.30
20.80
1.03 Carpenter
L-008
Day
0.25
1,200.00
1.04 U / SK Labourer
L-007
Day
0.25
1,000.00
Total for
No
Rate for
No
Page 79 Of 142
300.00
250.00
790.80
197.70
Rate(Say)
198.00
Item Description
No
Item Ref
Unit
Quantity
Rate
Amount
M-040
No
1,850.00
1,850.00
M-017
No
1.25
10.00
1.03 Carpenter
L-008
Day
0.25
1,200.00
300.00
1.04 U / SK Labourer
L-007
Day
0.25
1,000.00
250.00
Total for
No
Rate for
No
2,410.00
2,410.00
Rate(Say)
2,410.00
Item Description
Item Ref
Unit
Quantity
M-153
No
M-016
No
10
1.03 Carpenter
L-008
Day
1.04 U / SK Labourer
L-007
No
Rate
Amount
145.00
145.00
1.30
13.00
0.063
1,200.00
75.60
Day
0.063
1,000.00
63.00
Total for
No
Rate for
No
296.60
296.60
Rate(Say)
297.00
Item Description
No
Item Ref
Unit
Quantity
Rate
Amount
M-004
No
75.00
75.00
M-016
No
1.30
10.40
1.03 Carpenter
L-008
Day
0.063
1,200.00
75.60
1.04 U / SK Labourer
L-007
Day
0.063
1,000.00
63.00
Total for
No
Rate for
No
224.00
224.00
Page 80224.00
Of 142
Rate(Say)
Item Description
Item Ref
Unit
Quantity
M-024
No
M-016
No
1.03 Carpenter
L-008
1.04 U / SK Labourer
No
Rate
Amount
55.00
330.00
24
1.30
31.20
Day
0.5
1,200.00
600.00
L-007
Day
0.5
1,000.00
500.00
Total for
No
Rate for
No
1,461.20
243.53
Rate(Say)
244.00
Item Description
Item Ref
Unit
Quantity
M-011
No
M-016
No
1.03 Carpenter
L-008
1.04 U / SK Labourer
No
Rate
Amount
45.00
270.00
24
1.30
31.20
Day
0.5
1,200.00
600.00
L-007
Day
0.5
1,000.00
500.00
Total for
No
Rate for
No
1,401.20
233.53
Rate(Say)
234.00
Item Description
Item Ref
Unit
Quantity
M-041
No
M-016
No
12
1.03 Carpenter
L-008
Day
1.04 U / SK Labourer
L-007
No
Rate
Amount
22.50
135.00
1.30
15.60
0.125
1,200.00
150.00
Day
0.125
1,000.00
125.00
Total for
No
Rate for
No
Rate(Say)
425.60
70.93
71.00
Page 81 Of 142
Page 82 Of 142
Page 83 Of 142
Page 84 Of 142
Page 85 Of 142
Page 86 Of 142
Page 87 Of 142
Item Description
10
L.ft
Item Ref
Unit
Quantity
Rate
Amount
M-095
L.ft
13
7.50
97.50
M-028
No
7.00
21.00
M-117
Grms
1.40
2.80
1.04 Plumber
L-002
Day
0.125
1,200.00
150.00
1.05 U / SK Labourer
L-007
Day
0.125
1,000.00
125.00
Total for
10
L.ft
Rate for
L.ft
396.30
39.63
Rate(Say)
1 L.ft
40.00
12.02 3/4 " Diameter PVC pipes fixed to walls (Specials paid separately)
Analysis for
No
Item Description
10
Item Ref
Unit
Quantity
M-098
L.ft
13
M-028
No
M-117
1.04 Plumber
1.05 U / SK Labourer
L.ft
Rate
Amount
14.00
182.00
7.00
21.00
Grms
1.40
4.20
L-002
Day
0.125
1,200.00
150.00
L-007
Day
0.125
1,000.00
125.00
Total for
10
L.ft
Rate for
L.ft
482.20
48.22
Rate(Say)
1 L.ft
48.00
12.03 1 " Diameter PVC pipes fixed to walls (Specials paid separately)
Analysis for
No
Item Description
100
L.ft
Item Ref
Unit
Quantity
M-094
L.ft
100
105.00
M-077
No
14.00
112.00
M-117
Grms
32
1.40
44.80
M-028
No
35
7.00
245.00
1.06 Plumber
L-002
Day
0.5
1,200.00
600.00
1.07 U / SK Labourer
L-007
Day
0.5
1,000.00
500.00
Rate
21.00
Amount
2,100.00
Total for
100
Rate for
L.ft
Page 88 Of 142
L.ft
3,706.80
37.07
Rate(Say)
1 L.ft
37.00
Item Description
100
L.ft
Item Ref
Unit
Quantity
M-093
L.ft
100
160.00
M-101
No
19.50
156.00
M-117
Grms
48
1.40
67.20
M-030
No
35
8.75
306.25
1.06 Plumber
L-002
Day
0.75
1,200.00
900.00
1.07 U / SK Labourer
L-007
Day
0.75
1,000.00
750.00
Total for
100
L.ft
Rate for
L.ft
Rate
32.00
Amount
3,200.00
5,539.45
55.39
Rate(Say)
1 L.ft
55.00
12.05 1 1/2" Diameter PVC pipes fixed to walls (Specials paid separately)
Analysis for
No
Item Description
100
L.ft
Item Ref
Unit
Quantity
M-092
L.ft
100
230.00
M-100
No
29.50
236.00
M-117
Grms
64
1.40
89.60
M-029
No
35
10.50
367.50
1.06 Plumber
L-002
Day
0.75
1,200.00
900.00
1.07 U / SK Labourer
L-007
Day
0.75
1,000.00
750.00
Total for
100
L.ft
Rate for
L.ft
Rate
46.00
4,600.00
7,173.10
71.73
Rate(Say)
12.06
Amount
1 L.ft
72.00
No
Item Description
100
Item Ref
Unit
Quantity
M-096
L.ft
100
L.ft
Rate
79.00
-
Amount
7,900.00
395.00
M-102
No
M-117
Grms
112
M-031
No
35
1.06 Plumber
L-002
Day
1.07 U / SK Labourer
L-007
48.00
Page 89 Of 142
384.00
1.40
156.80
10.75
376.25
0.75
1,200.00
900.00
Day
0.75
1,000.00
750.00
Total for
100
L.ft
Rate for
L.ft
10,862.05
108.62
Rate(Say)
1 L.ft
109.00
12.07 3" Diameter PVC pipes fixed to walls (Specials paid separately) Type 1000
Analysis for
No
Item Description
100
Item Ref
Unit
Quantity
M-097
L.ft
100
M-103
No
M-117
Grms
200
M-032
No
35
1.06 Plumber
L-002
Day
1.07 U / SK Labourer
L-007
Amount
185.00
18,500.00
925.00
1,536.00
1.40
280.00
34.00
1,190.00
1,200.00
1,200.00
Day
1,000.00
1,000.00
Total for
100
L.ft.
Rate for
L.ft.
24,631.00
246.31
1 L.ft
246.00
Excavation for laying 1/2 " to 3" dia meter PVC pipes in ground not less than 1' 6"
Deep, Backfilling & Compacting
Analysis for
No
Item Description
1.01 U / SK Labourer
100
Item Ref
Unit
Quantity
L-007
Day
2.25
Total for
100
L.ft
Rate for
L.ft
L.ft
Rate
1,000.00
Amount
2,250.00
2,250.00
22.50
Rate(Say)
12.09
Rate
192.00
Rate(Say)
12.08
L.ft.
1 L.ft
23.00
Chasing brickwork for laying 1/2" to 1 1/2 " dia PVC pipes and making good average
depth 2" (Pipes and specials paid separately)
Analysis for
No
Item Description
100
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
0.1
1.02 Sand
M-113
Cu
0.01
1.06 Mason
L-009
Day
L.ft
Rate
Amount
850.00
85.00
12,500.00
125.00
1,200.00
3,600.00
1.07 U / SK Labourer
L-007
Day
Total for
100
L.ft
Rate for
L.ft
Page 90 Of 142
3,000.00
6,810.00
68.10
Rate(Say)
12.10
1,000.00
1 L.ft
68.00
Chasing brickwork for laying 1 1/2" to 3 " dia PVC pipes in ground and floor and
making good. average depth 3" (Pipes and specials measured paid separately)
Analysis for
No
Item Description
100
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
0.2
1.02 Sand
M-113
Cu
0.03
1.06 Mason
L-009
Day
1.07 U / SK Labourer
L-007
L.ft
Rate
Amount
850.00
170.00
12,500.00
375.00
3.5
1,200.00
4,200.00
Day
3.5
1,000.00
3,500.00
Total for
100
L.ft
Rate for
L.ft
8,245.00
82.45
Rate(Say)
1 L.ft
82.00
Item Description
10
No
Item Ref
Unit
Quantity
Rate
Amount
M-083
No
10
10.50
105.00
M-117
Grms
20
1.40
28.00
1.06 Plumber
L-002
Day
0.25
1,200.00
300.00
Total for
10
No
Rate for
No
433.00
43.30
Rate(Say)
No
43.00
Item Description
10
No
Item Ref
Unit
Quantity
M-076
No
10
15.00
150.00
M-117
Grms
30
1.40
42.00
1.06 Plumber
L-002
Day
0.25
1,200.00
300.00
Total for
10
No
Rate for
No
Rate(Say)
Rate
Amount
492.00
49.20
No
49.00
Analysis for
No
Item Description
No Page 91 Of 142
10
Item Ref
Unit
Quantity
Rate
Amount
M-082
No
10
21.00
210.00
M-117
Grms
40
1.40
56.00
1.06 Plumber
L-002
Day
0.25
1,200.00
300.00
Total for
10
No
Rate for
No
566.00
56.60
Rate(Say)
No
57.00
Item Description
10
No
Item Ref
Unit
Quantity
Rate
Amount
M-081
No
10
42.00
420.00
M-117
Grms
60
1.40
84.00
1.06 Plumber
L-002
Day
0.25
1,200.00
300.00
Total for
10
No
Rate for
No
804.00
80.40
Rate(Say)
No
80.00
Item Description
10
No
Item Ref
Unit
Quantity
Rate
Amount
M-080
No
10
69.00
690.00
M-117
Grms
80
1.40
112.00
1.06 Plumber
L-002
Day
0.5
1,200.00
600.00
Total for
10
No
Rate for
No
1,402.00
140.20
Rate(Say)
No
140.00
Item Description
10
Item Ref
Unit
Quantity
M-085
No
10
M-117
Grms
1.06 Plumber
L-002
No
Rate
Amount
110.00
1,100.00
140
1.40
196.00
Day
0.5
1,200.00
600.00
Total for
10
No
Rate for
No
Rate(Say)
1,896.00
189.60
No
190.00
Page 92 Of 142
Item Description
10
Item Ref
Unit
Quantity
M-084
No
10
M-117
Grms
1.06 Plumber
L-002
No
Rate
Amount
350.00
3,500.00
200
1.40
280.00
Day
0.5
1,200.00
600.00
Total for
10
No
Rate for
No
4,380.00
438.00
Rate(Say)
No
438.00
Item Description
10
Item Ref
Unit
Quantity
M-086
No
10
M-117
Grms
1.06 Plumber
L-002
No
Rate
Amount
580.00
5,800.00
240
1.40
336.00
Day
0.5
1,200.00
600.00
Total for
10
No
Rate for
No
6,736.00
673.60
Rate(Say)
No
674.00
Item Description
10
No
Item Ref
Unit
Quantity
Rate
Amount
M-122
No
10
15.50
155.00
M-117
Grms
30
1.40
42.00
1.06 Plumber
L-002
Day
0.5
1,200.00
600.00
Total for
10
No
Rate for
No
797.00
79.70
Rate(Say)
No
80.00
Item Description
10
No
Item Ref
Unit
Quantity
Rate
Amount
M-126
No
10
21.50
215.00
M-117
Grms
45
1.40
63.00
1.06 Plumber
L-002
Day
0.5
1,200.00
600.00
Total for
10
Rate for
No
Page 93 Of 142
No
878.00
87.80
Rate(Say)
No
88.00
Item Description
10
No
Item Ref
Unit
Quantity
Rate
Amount
M-120
No
10
31.25
312.50
M-117
Grms
60
1.40
84.00
1.06 Plumber
L-002
Day
0.5
1,200.00
600.00
Total for
10
No
Rate for
No
996.50
99.65
Rate(Say)
No
100.00
Item Description
10
No
Item Ref
Unit
Quantity
Rate
Amount
M-127
No
10
63.50
635.00
M-117
Grms
90
1.40
126.00
1.06 Plumber
L-002
Day
0.5
1,200.00
600.00
Total for
10
No
Rate for
No
1,361.00
136.10
Rate(Say)
No
136.00
Item Description
10
Item Ref
Unit
Quantity
M-121
No
10
M-117
Grms
120
1.06 Plumber
L-002
Day
Total for
10
No
Rate for
No
No
Rate
Amount
102.00
1,020.00
1.40
168.00
1,200.00
1,200.00
2,388.00
238.80
Rate(Say)
No
239.00
Item Description
Item Ref
Unit
10
Quantity
No
Rate
Amount
M-123
No
10
M-117
Grms
210
1.06 Plumber
L-002
Day
Total for
10
No
Rate for
No
165.50
Page 94 Of 142
1,655.00
1.40
294.00
1,200.00
1,200.00
3,149.00
314.90
Rate(Say)
No
315.00
Item Description
10
Item Ref
Unit
Quantity
M-124
No
10
M-117
Grms
1.06 Plumber
L-002
No
Rate
Amount
526.00
5,260.00
300
1.40
420.00
Day
1.5
1,200.00
1,800.00
Total for
10
No
Rate for
No
7,480.00
748.00
Rate(Say)
No
748.00
Item Description
10
Item Ref
Unit
Quantity
M-125
No
10
M-117
Grms
1.06 Plumber
L-002
No
Rate
Amount
875.00
8,750.00
360
1.40
504.00
Day
1.5
1,200.00
1,800.00
Total for
10
No
Rate for
No
Rate(Say)
11,054.00
1,105.40
No
1,105.00
Page 95 Of 142
1/2 "
3/4"
1"
11/4"
11/2"
2"
21/2"
3"
Page 96 Of 142
Page 97 Of 142
Page 98 Of 142
Page 99 Of 142
13. Plastering
A.
Wall Plastering
B.
Rendering
C.
Sofit Plastering
D.
Skirting
Wall Plastering
13.A.01 5/8" thick plastering to wall in Cement and sand 1:3 including Cement floating
Analysis for
No
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
1.4
1.02 Sand
M-113
Cu
0.06
1.03 Water
M-157
Gal
10
1.04 Mason
L-009
Day
1.05 U / SK Labourer
L-007
1.06
Item Description
Sqr
Rate
Amount
850.00
1,190.00
12,500.00
750.00
0.30
3.00
1,200.00
1,200.00
Day
1.5
1,000.00
1,500.00
Total for
Sqr
Rate for
Sqr
81.00
4,724.00
4,724.00
Rate(Say)
1Sq
4,724.00
Rate(Say)
1ft2
47.24
Rate(Say)
1m2
508.30
13.A.02 5/8" thick to wall in cement and sand 1:5 finished semi-rough with wooden float.
Analysis for
No
Item Description
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
0.8
1.03 Sand
M-113
Cu
0.07
1.04 Water
M-157
Gal
10
1.05 Mason
L-009
Day
1.06 U / SK Labourer
L-007
Sqr
Rate
Amount
850.00
680.00
12,500.00
875.00
0.30
3.00
1,200.00
1,200.00
Day
1.25
1,000.00
1,250.00
Total for
Sqr
Rate for
Sqr
4,008.00
4,008.00
Rate(Say)
1Sq
4,008.00
Rate(Say)
1ft2
40.08
Rate(Say)
1m2
431.26
1m2
431.26
13.A.03
1m2
474.39
1m2
521.83
1m2
574.01
5/8" thick to wall in lime cement and sand 1:1:5 finished semi-rough with wooden
float.
Analysis for
1
Sq
No
Item Description
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
0.8
850.00
680.00
M-115
Lbs
44
275.00
12,100.00
1.03 Sand
M-113
Cu
0.07
12,500.00
875.00
1.04 Water
M-157
Gal
10
0.30
3.00
1.05 Mason
L-009
Day
1,200.00
1,200.00
1.06 U / SK Labourer
L-007
Day
1.25
1,000.00
1,250.00
Total for
Sqr
Rate for
Sqr
13.A.04
Rate
Amount
73.50
16,181.50
16,181.50
Rate(Say)
1Sq
16,182.00
Rate(Say)
1ft2
161.82
Rate(Say)
1m2
1,741.18
1m2
1,741.18
1m2
1,915.30
1m2
2,106.83
1m2
2,317.51
5/8" thick Plastering to wall in lime cement and sand 1:1:5 finished smooth with
lime putty floating.
Analysis for
No
Sqr
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
0.8
850.00
680.00
M-115
kg
30
275.00
8,250.00
1.03 Sand
M-113
Cu
0.07
12,500.00
875.00
1.04 Water
M-157
Gal
10
0.30
3.00
1.05 Mason
L-009
Day
1.5
1,200.00
1,800.00
1.06 U / SK Labourer
L-007
Day
1.5
1,000.00
1,500.00
Total for
Sqr
Rate for
Sqr
1.07
Item Description
Rate(Say)
Rate
Amount
99.00
13,207.00
13,207.00
1Sq
13,207.00
Rate(Say)
1ft2
132.07
Rate(Say)
1m2
1,421.07
1m2
1,421.07
1m2
1,563.18
1m2
1,719.50
1m2
1,891.45
13.A.05 5/8" thick plastering to wall in lime and sand 2:5 including floating with lime putty.
Analysis for
No
Item Ref
Unit
Quantity
M-115
kg
65
1.02 Sand
M-113
Cu
0.07
1.03 Water
M-157
Gal
10
1.04 Mason
L-009
Day
1.05 U / SK Labourer
L-007
1.06
Item Description
Sqr
Rate
Amount
275.00
17,875.00
12,500.00
875.00
0.30
3.00
1,200.00
1,200.00
Day
1.75
1,000.00
1,750.00
Total for
Sqr
Rate for
Sqr
88.50
21,791.50
21,791.50
Rate(Say)
1Sq
21,792.00
Rate(Say)
1ft2
217.92
Rate(Say)
1m2
2,344.82
Rendering
13.B.01 3/4" thick rendering in cement and sand 1:3 finished smooth
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
Rate
Amount
1.01 Cement
M-026
Bag
1.75
850.00
1,487.50
1.02 Sand
M-113
Cu
0.08
12,500.00
1,000.00
1.03 Water
M-157
Gal
10
0.30
3.00
1.04 Mason
L-009
Day
1.25
1,200.00
1,500.00
1.05 U / SK Labourer
L-007
Day
1,000.00
2,000.00
L-007
Day
0.25
1,000.00
250.00
Total for
Sqr
Rate for
Sqr
6,240.50
6,240.50
Rate(Say)
1Sq
6,241.00
Rate(Say)
1ft2
62.41
Rate(Say)
1m2
671.53
Ground floor
1m2
671.53
First Floor
1m2
738.68
Second Floor
1m2
812.55
Third Floor
1m2
893.81
13.B.02 1/2" thick rendering in cement and sand 1:3 finished smooth
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
Rate
Amount
1.01 Cement
M-026
Bag
1.07
850.00
909.50
1.02 Sand
M-113
Cu
0.05
12,500.00
625.00
1.03 Water
M-157
Gal
10
0.30
3.00
1.04 Mason
L-009
Day
1,200.00
1,200.00
1.05 U / SK Labourer
L-007
Day
1.5
1,000.00
1,500.00
Total for
Sqr
Rate for
Sqr
4,237.50
4,237.50
Rate(Say)
1Sq
4,238.00
Rate(Say)
1ft2
42.38
Rate(Say)
1m2
456.01
13.B.03 1/2" thick rendering in cement and sand 1:2 in floors, finished smooth
Analysis for
No
Item Description
Item Ref
Unit
Quantity
` 1.01 Cement
M-026
Bag
1.5
1.02 Sand
M-113
Cu
0.05
1.03 Water
M-157
Gal
10
1.04 Mason
L-009
Day
1.05 U / SK Labourer
L-007
Sq
Rate
Amount
850.00
1,275.00
12,500.00
625.00
0.30
3.00
1,200.00
1,200.00
Day
1.5
1,000.00
1,500.00
L-007
Day
0.25
1,000.00
250.00
Total for
Sq
Rate for
Sq
4,853.00
4,853.00
Rate(Say)
1Sq
4,853.00
Rate(Say)
1ft2
48.53
Rate(Say)
1m2
522.18
13.B.04 3/4" thick rendering in cement and sand 1:2 in floors finished smooth
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
Rate
Amount
1.01 Cement
M-026
Bag
2.25
850.00
1,912.50
1.02 Sand
M-113
Cu
0.08
12,500.00
1,000.00
1.03 Water
M-157
Gal
10
1.04 Mason
L-009
Day
1.05 U / SK Labourer
L-007
13.B.05
0.30
3.00
1.25
1,200.00
1,500.00
Day
1,000.00
2,000.00
L-007
Day
0.25
1,000.00
250.00
Total for
Sqr
Rate for
Sqr
6,665.50
6,665.50
Rate(Say)
1Sq
6,666.00
Rate(Say)
1ft2
66.66
Rate(Say)
1m2
717.26
3/4" thick rendering in cement and sand 1:2 in colored cement floors finished
smooth
Analysis for
1
Sqr
No
Item Description
Item Ref
Unit
Quantity
Rate
Amount
1.01 Cement
M-026
Bag
2.25
850.00
1,912.50
1.02 Sand
M-113
Cu
0.08
12,500.00
1,000.00
M-035
Lbs
175.00
875.00
1.04 Water
M-157
Gal
10
0.30
3.00
1.05 Mason
L-009
Day
1.25
1,200.00
1,500.00
1.06 U / SK Labourer
L-007
Day
1,000.00
2,000.00
L-007
Day
0.25
1,000.00
250.00
Total for
Sqr
Rate for
Sqr
7,540.50
7,540.50
Rate(Say)
1Sq
7,541.00
Rate(Say)
1ft2
75.41
Rate(Say)
1m2
811.41
Sofit Plastering
13.C.01
3/8" thick plastering to Soffit Slab in Cement and sand 1:3 including floating with
Lime putty
Analysis for
No
Sqr
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
0.8
850.00
680.00
M-115
kg
275.00
2,200.00
1.03 Sand
M-113
Cu
0.05
12,500.00
625.00
1.04 Water
M-157
Gal
0.30
1.50
1.05 Mason
L-009
Day
2.5
1,200.00
3,000.00
1.06 U / SK Labourer
L-007
Day
2.5
1,000.00
2,500.00
Total for
Sqr
1.07
Item Description
Rate
Amount
165.00
8,491.50
Rate for
13.C.02
Sqr
8,491.50
Rate(Say)
1Sq
8,492.00
Rate(Say)
1ft2
84.92
Rate(Say)
1m2
913.74
Ground floor
1m2
913.74
First Floor
1m2
1,005.11
Second Floor
1m2
1,105.62
Third Floor
1m2
1,216.19
3/8" thick plastering to sides and softfit of beams in Cement and sand 1:3 including
floating with Lime putty
Analysis for
No
Sq
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
0.8
850.00
680.00
M-115
kg
275.00
2,200.00
1.03 Sand
M-113
Cu
0.05
12,500.00
625.00
1.04 Water
M-157
Gal
0.30
1.50
1.05 Mason
L-009
Day
1,200.00
2,400.00
1.06 U / SK Labourer
L-007
Day
1,000.00
2,000.00
Total for
Sqr
Rate for
Sqr
1.07
Item Description
Rate
Amount
132.00
7,358.50
7,358.50
Rate(Say)
1Sq
7,359.00
Rate(Say)
1ft2
73.59
Rate(Say)
1m2
791.83
Ground floor
1m2
791.83
First Floor
1m2
871.01
Second Floor
1m2
958.11
Third Floor
1m2
1,053.92
Skirting
13.D.01
1/2" x 6" Skirting in cement and sand 1:3 projected or flush to walls finished with
floating including forming groove
Analysis for
No
Item Description
10
Item Ref
Unit
Quantity
1.01 Cement
M-026
Bag
0.1
1.02 Sand
M-113
Cu
0.003
M-035
Lbs
0.25
1.04 Mason
L-009
Day
0.375
L.ft
Rate
Amount
850.00
85.00
12,500.00
37.50
175.00
43.75
1,200.00
450.00
1.05 U / SK Labourer
L-007
Day
0.312
Total for
10
L.ft
Rate for
L.ft
1,000.00
312.00
928.25
92.83
Rate(Say)
1ft
93.00
Rate(Say)
1m
305.04
Ground floor
1m
305.04
First Floor
1m
335.54
Second Floor
1m
369.10
3rd floor
1m
406.01
0.074349
14. Tilling
A.
Wall Tilling
B.
Floor Tilling
Wall Tilling
14.A.01
Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground floor.
(Specials measured separately)
No
Item Description
Analysis for
1
Item Ref
Unit Quantity
Sqr
Rate
Amount
M-155
No
400
1.03 Cement
M-026
Bag
2.5
850.00
2,125.00
1.04 Sand
M-113
Cu
0.11
12,500.00
1,375.00
M-159
Lbs
17.50
17.50
1.06 Mason
L-009
Day
1,200.00
4,800.00
1.07 U / SK Labourer
L-007
Day
1,000.00
4,000.00
1.08 U / SK Labourer
L-007
Day
0.25
1,000.00
250.00
Total for
Sqr
Rate for 1
Sqr
14.A.02
75.00
-
30,000.00
3,000.00
45,567.50
45,567.50
Rate(Say)
1Sq
45,568.00
Rate(Say)
1ft2
455.68
Rate(Say)
1m2
4,903.12
Ground floor
1m2
4,903.12
First Floor
1m2
5,393.43
Second Floor
1m2
5,932.77
Third Floor
1m2
6,526.05
Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground floor.
(Specials measured separately)
No
Item Description
Analysis for
1
Item Ref
Unit Quantity
Sqr
Rate
M-156
No
150
1.03 Cement
M-026
Bag
2.5
850.00
2,125.00
1.04 Sand
M-113
Cu
0.11
12,500.00
1,375.00
M-159
Lbs
17.50
17.50
1.06 Mason
L-009
Day
1,200.00
4,800.00
1.07 U / SK Labourer
L-007
Day
1,000.00
4,000.00
1.08 U / SK Labourer
L-007
Day
0.25
1,000.00
250.00
100.00
Amount
15,000.00
1,500.00
Total for
Rate for 1
Sqr
Sqr
29,067.50
29,067.50
Rate(Say)
1Sq
29,068.00
Rate(Say)
1ft2
290.68
Rate(Say)
1m2
3,127.72
Ground floor
1m2
3,127.72
First Floor
1m2
3,440.49
Second Floor
1m2
3,784.54
Third Floor
1m2
4,162.99
Floor Tilling
14.B.01
Terrazzo floor tiles on 1/2" thick cement and sand 1:2 in ground floor
No
Item Description
Analysis for
1
Item Ref
Unit Quantity
Sqr
Rate
Amount
M-132
No
100
1.03 Cement
M-026
Bag
1.25
850.00
1,062.50
1.04 Sand
M-113
Cu
0.07
12,500.00
875.00
M-035
Lbs
175.00
350.00
M-158
Lbs
0.5
150.00
75.00
M-037
Lbs
12.50
25.00
1.08 Mason
L-009
Day
1,200.00
4,800.00
1.09 U / SK Labourer
L-007
Day
1,000.00
3,000.00
1.10 U / SK Labourer
L-007
Day
0.5
1,000.00
500.00
Total for
Sqr
Rate for 1
Sqr
150.00
-
15,000.00
750.00
26,437.50
26,437.50
Rate(Say)
1Sq
26,438.00
Rate(Say)
1ft2
264.38
Rate(Say)
1m2
2,844.73
Ground floor
1m2
2,844.73
First Floor
1m2
3,129.20
Second Floor
1m2
3,442.12
Third Floor
1m2
3,786.33
14.B.02 Pressed floor tiles bedded in 1/2" cement mortar 1:2 and pointing in neat cement in ground floor
No
Item Description
Analysis for
1
Item Ref
Unit Quantity
M-130
No
225
Sqr
Rate
125.00
-
Amount
28,125.00
1,406.25
1.03 Cement
M-026
Bag
1.25
850.00
1,062.50
1.04 Sand
M-113
Cu
0.07
12,500.00
875.00
M-036
Lbs
0.25
175.00
43.75
M-037
Lbs
12.50
25.00
1.07 Mason
L-009
Day
1,200.00
4,800.00
1.08 U / SK Labourer
L-007
Day
1,000.00
4,000.00
1.09 U / SK Labourer
L-007
Day
0.5
1,000.00
500.00
Total for
Sqr
Rate for 1
Sqr
40,837.50
40,837.50
Rate(Say)
1Sq
40,838.00
Rate(Say)
1ft2
408.38
Rate(Say)
1m2
4,394.17
Ground floor
1m2
4,394.17
First Floor
1m2
4,833.59
Second Floor
1m2
5,316.94
Third Floor
1m2
5,848.64
15. Ceiling
15.01
Timber Framework for 4' 0"x4' 0" flat asbestos ceiling (Sheet Measured separately)
Comprising of 4"x2" joists and 2"x2" bearers in class 1 timber
Analysis for
No
Sqrs
Item Ref
Unit
Quantity
M-136
Cu.ft
1,200.00
9,600.00
M-072
Lbs
50.00
50.00
M-045
No
26
1.50
39.00
1.04 Cement
M-026
Bag
0.23
850.00
195.50
1.05 Sand
M-113
Cu
0.02
12,500.00
250.00
M-022
No
0.25
165.00
41.25
1.07 Tarnap
M-119
Gal
0.333
450.00
149.85
1.08 Carpenter
L-008
Day
2.5
1,200.00
3,000.00
1.09 Mason
L-009
Day
0.5
1,200.00
600.00
1.10 U / SK Labourer
L-007
Day
1.5
1,000.00
1,500.00
Total for
1.95
Sqrs
Rate for 1
Sqrs
1.11
Item Description
1.95
Rate
153.00
15,578.60
7,989.03
Rate(Say)
15.02
7,989.00
Horizontal ceiling lining using 4' 0"x4' 0" flat asbestos cement sheets fixed with and including
beading and cove mouldings on timber framework(Timber, framework, painting m/separately)
Analysis for
No
Amount
Item Description
1.95
Sqrs
Item Ref
Unit
Quantity
Rate
Amount
M-048
Sq.ft
210
15.00
3,150.00
M-145
Sq.ft
60
35.00
2,100.00
M-134
L.ft
125
12.00
1,500.00
M-033
lbs
0.25
25.00
6.25
M-015
No
96
3.75
360.00
1.06 Carpenter
L-008
Day
1.5
1,200.00
1,800.00
1.07 U / SK Labourer
L-007
Day
1,000.00
2,000.00
Total for
1.95
Sqrs
Rate for 1
Sqrs
1.08
114.00
11,030.25
5,656.54
Rate(Say)
15.03
5,657.00
3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on 4"X2" class I
timber Joists at 2' 0" centres with 1 1/2 " Brass Nails
Analysis for
No
Item Description
1.95
Sqrs
Item Ref
Unit
Quantity
M-146
L.ft
115
65.00
7,475.00
M-135
Sq.ft
215
28.00
6,020.00
1.03 Cement
M-026
Bag
0.027
850.00
22.95
1.04 Sand
M-113
Cu
0.04
12,500.00
500.00
M-012
lbs
50.00
440.53
Rate
Amount
1.06
L-009
Day
1,200.00
1,200.00
1.07
L-008
Day
1,200.00
1,200.00
1.08
L-007
Day
1,000.00
3,000.00
L-008
Day
1,200.00
3,600.00
1.10
L-007
Day
1,000.00
4,000.00
1.11
Total for
1.95
Sqrs
Rate for 1
Sqrs
390.00
27,848.48
14,281.27
Rate(Say)
15.04
14,281.00
3/4" X 6" wide tongued and grooved Lunumidella ceiling boards fixed to underside of roof
rafters. (Existing) with 1 1/2" brass nails including levelling with timber strips where necessary
Analysis for
1.8
Sq
No
Item Description
6" x 3/4" Lunumidella Ceiling
1.01
Planks.
Item Ref
Unit
Quantity
M-135
Sq.ft
220
28.00
6,160.00
M-150
L.ft
40
5.00
200.00
M-073
Lbs
4.5
20.00
90.00
M-012
Lbs
50.00
440.53
1.05 Carpenter
L-008
Day
1,200.00
3,600.00
1.06 U / SK Labourer
L-007
Day
1,000.00
6,000.00
Total for
1.8
Sq
Rate for 1
Sq
1.07
Rate(Say)
Rate
Amount
288.00
16,778.53
9,321.40
9,321.00
16. Painting
A.
Wall
B.
Sofit
C.
Wood
D.
Steel
Wall
16.A.01 Preparing and apply one coat of Alkali resistant primer and two coats of emulsion paint to walls.
No
Item Description
Analysis for
1
Item Ref
Unit Quantity
Sqr
Rate
Amount
1.01 Primer
M-075
litre
0.9
180.00
162.00
M-043
litre
1.4
280.00
392.00
1.03 Water
M-157
Gal
0.1
0.30
0.03
M-021
No
0.1
495.00
49.50
M-114
Sheet
3.50
7.00
1.06 Painter
L-001
Day
1.25
1,200.00
1,500.00
Total for
Sqr
Rate for 1
Sqr
45.00
2,155.53
2,155.53
Rate(Say)
1 Sq
2,156.00
Rate(Say)
1ft2
21.56
Rate(Say)
1m2
231.99
Ground floor
1m2
231.99
First Floor
1m2
255.18
Second Floor
1m2
280.70
Third Floor
1m2
308.77
Analysis for
1
Item Ref
Unit Quantity
Sqr
Item Description
Rate
Amount
M-043
litre
0.757
280.00
211.96
M-043
litre
0.649
280.00
181.72
M-021
No
0.1
495.00
49.50
1.04 Water
M-157
Gal
0.1
0.30
0.03
1.05 Painter
L-001
Day
0.75
1,200.00
900.00
Total for
Sqr
Rate for 1
Sqr
27.00
1,370.21
1,370.21
Rate(Say)
1 Sq
1,370.00
Rate(Say)
1ft2
13.70
Rate(Say)
1m2
147.41
Ground floor
1m2
147.41
First Floor
1m2
162.15
Second Floor
1m2
178.37
Third Floor
1m2
196.21
Item Description
Analysis for
10
Item Ref
Unit Quantity
Sqr
Rate
Amount
M-009
Cwt
0.5
300.00
150.00
1.02 Salt
M-112
Lbs
10.00
20.00
M-166
Lbs
0.5
15.00
7.50
1.04 Blue
M-008
Ozs
10.00
20.00
M-021
No
0.333
495.00
165.83
1.06 Water
M-157
Gal
10
0.30
3.00
1.07 Painter
L-001
Day
2.5
1,200.00
687.50
1.08 U / SK Labourer
L-007
Day
2.5
1,000.00
500.00
Total for
10
Sqr
Rate for 1
Sqr
35.63
1,589.46
158.95
Rate(Say)
1 Sq
159.00
Rate(Say)
1ft2
1.59
Rate(Say)
1m2
17.11
Item Description
Analysis for
10
Item Ref
Unit Quantity
Sqr
Rate
Amount
M-009
Cwt
0.5
300.00
150.00
1.02 Salt
M-112
Lbs
10.00
20.00
M-166
Lbs
0.5
15.00
7.50
1.04 Blue
M-008
Ozs
10.00
20.00
M-021
No
0.333
495.00
164.84
1.06 Water
M-157
Gal
10
0.30
3.00
1.07 Painter
L-001
Day
1,200.00
3,600.00
1.08 U / SK Labourer
L-007
Day
1,000.00
3,000.00
Total for
10
Sqr
198.00
7,163.34
Rate for 1
Sqr
716.33
Rate(Say)
1 Sqr
716.00
Rate(Say)
1ft2
7.16
Rate(Say)
1m2
77.04
Analysis for
10
Item Ref
Unit Quantity
Item Description
Sqr
Rate
Amount
1.01 Cement
M-026
Bag
0.625
850.00
531.25
M-034
No
45.00
45.00
1.03 Water
M-157
Gal
0.30
1.50
1.04 Painter
L-001
Day
1,200.00
2,400.00
1.05 U / SK Labourer
L-007
Day
1,000.00
2,000.00
Total for
10
Sqr
Rate for 1
Sqr
132.00
5,109.75
510.98
Rate(Say)
1 Sq
511.00
Rate(Say)
1ft2
5.11
Rate(Say)
1m2
54.98
Ground floor
1m2
54.98
First Floor
1m2
60.48
Second Floor
1m2
66.53
Third Floor
1m2
73.18
Soffit
16.B.01
No
Preparing and apply one coat of alkali resistant primer and two coats of emulsion paint to soffit of
slabs
Analysis for
1
Sq
Item Description
Item Ref
Unit Quantity
Rate
Amount
1.01 Primer
M-075
litre
0.9
180.00
162.00
M-043
litre
1.5
280.00
420.00
1.03 Water
M-157
Gal
0.1
0.30
0.03
M-021
No
0.1
495.00
49.50
1.05 Painter
L-001
Day
1.75
1,200.00
2,100.00
Total for
Sq
Rate for 1
Sq
63.00
2,794.53
2,794.53
Rate(Say)
1 Sq
2,795.00
Rate(Say)
1ft2
27.95
Rate(Say)
1m2
300.74
Ground floor
1m2
300.74
First Floor
1m2
330.82
Second Floor
1m2
363.90
Third Floor
1m2
400.29
Wood
16.C.01
No
Prepare and apply one coat of preservative (oil type) to structural timber including touching up cut
ends etc. after fixing.
Analysis for
1
Sqr
Item Description
Item Ref
Unit Quantity
Rate
Amount
M-165
Gal
0.605
450.00
272.25
M-020
No
0.1
210.00
21.00
1.03 Painter
L-001
Day
0.75
1,200.00
900.00
1.04 U / SK Labourer
L-007
Day
0.5
1,000.00
500.00
Total for
Sqr
Rate for 1
Sqr
1,693.25
1,693.25
Rate(Say)
1 Sq
1,693.00
Rate(Say)
1ft2
16.93
Rate(Say)
1m2
182.17
16.C.02 Painting new timber work with two coats wood preservative
No
Item Description
Analysis for
1
Item Ref
Unit Quantity
Sqr
Rate
Amount
M-165
Gal
0.5
450.00
225.00
M-022
No
0.2
165.00
33.00
1.03 Painter
L-001
Day
0.5
1,200.00
600.00
Total for
Sqr
Rate for 1
Sqr
858.00
858.00
Rate(Say)
1 Sq
858.00
Rate(Say)
1ft2
8.58
Rate(Say)
1m2
92.32
16.C.03 Preparing and painting wood work with primer and 2 coats Enamel paint
No
Item Description
Analysis for
1
Item Ref
Unit Quantity
Sqr
Rate
Amount
1.01 Primer
M-075
litre
0.75
180.00
135.00
M-044
litre
2.5
400.00
354.00
M-022
No
0.1
60.00
165.00
M-114
No
3.50
7.00
1.05 Painter
L-001
Day
1.5
1,200.00
1,800.00
1.06 U / SK Labourer
L-007
Day
0.5
1,000.00
500.00
Total for
Sqr
Rate for 1
Sqr
2,961.00
2,961.00
Rate(Say)
1 Sq
2,960.00
Rate(Say)
1ft2
29.60
Rate(Say)
1m2
318.50
Item Description
Analysis for
1
Item Ref
Unit Quantity
Sqr
Rate
Amount
1.01 Varnish
M-154
litre
1.8
355.00
639.00
M-020
No
0.33
210.00
70.00
1.03 Painter
L-001
Day
0.5
1,200.00
600.00
1.04 U / SK Labourer
L-007
Day
0.5
1,000.00
500.00
Total for
Sqr
Rate for 1
Sqr
1,809.00
1,809.00
Rate(Say)
1 Sq
1,810.00
Rate(Say)
1ft2
18.10
Rate(Say)
1m2
194.76
Item Description
Analysis for
1
Item Ref
Unit Quantity
M-158
Lbs
0.75
M-114
Sheet
M-049
No
M-047
1.05 U / SK Labourer
Sqr
Rate
Amount
150.00
112.50
3.50
21.00
0.1
210.00
21.00
Yards
0.5
70.00
35.00
L-007
Day
0.375
1,000.00
375.00
Total for
Sqr
Rate for 1
Sqr
564.50
564.50
Rate(Say)
1 Sq
560.00
Rate(Say)
1ft2
5.60
Rate(Say)
1m2
60.26
Steel
16.D.01 Prepare surface of steel trusses and apply two coats of anticorrosive primer.
No
Item Description
Analysis for
1
Item Ref
Unit Quantity
Sqr
Rate
Amount
M-002
litre
2.25
245.00
551.25
M-069
litre
0.15
80.00
12.00
M-160
No
65.00
65.00
M-022
No
0.125
165.00
20.63
1.05 Painter
L-001
Day
1.5
1,200.00
1,800.00
1.06 U / SK Labourer
L-007
Day
1.5
1,000.00
1,500.00
Total for
Sqr
Rate for 1
Sqr
16.D.02
No
3,948.88
3,948.88
Rate(Say)
1 Sq
3,950.00
Rate(Say)
1ft2
39.50
Rate(Say)
1m2
425.02
Apply one coat of anti-Corrosive primer and two coat enamel paint on already shop primed and
erected steel roof truss.
Analysis for
1
Sqr
Item Description
Item Ref
Unit Quantity
Rate
Amount
M-002
litre
0.2
245.00
49.00
M-044
litre
1.33
354.00
470.82
M-069
litre
0.2
80.00
16.00
M-022
No
0.2
165.00
165.00
1.05 Painter
L-001
Day
2.5
1,200.00
687.50
1.06 U / SK Labourer
L-007
Day
1,000.00
200.00
Total for
Sqr
Rate for 1
Sqr
26.63
1,614.95
1,614.95
Rate(Say)
1 Sq
1,610.00
Rate(Say)
1ft2
16.10
Rate(Say)
1m2
173.24
16.D.03 Prepare and apply two coats primer and finishing soat of enamel paint to mild steel (angle/flat) gate.
No
Item Description
Analysis for
50
Item Ref
Unit Quantity
Sq.ft
Rate
Amount
M-002
litre
1.5
245.00
367.50
M-044
litre
0.67
354.00
237.18
M-069
litre
0.2
80.00
16.00
M-160
No
0.5
65.00
32.50
M-022
No
0.2
165.00
33.00
1.06 Painter
L-001
Day
0.5
1,200.00
600.00
1.07 U / SK Labourer
L-007
Day
0.75
1,000.00
750.00
Total for
50
Rate for 1
Sq.ft
Sq.ft
2,036.18
40.72
Rate(Say)
1 Sq. ft
40.00
Rate(Say)
1ft2
40.00
Rate(Say)
1m2
430.40
Item Description
Analysis for
1
Item Ref
Unit Quantity
Sqr
Rate
Amount
M-002
litre
0.667
245.00
163.42
M-022
No
0.2
165.00
33.00
1.03 Painter
L-001
Day
1.5
1,200.00
1,800.00
Total for
Sqr
Rate for 1
Sqr
1,996.42
1,996.42
Rate(Say)
1 Sqr
2,000.00
Rate(Say)
1ft2
20.00
Rate(Say)
1m2
215.20