Month Wise Work Target 20-07-15 To 20-09-15
Month Wise Work Target 20-07-15 To 20-09-15
Month Wise Work Target 20-07-15 To 20-09-15
S.NO
1
STRUCTURE
ITEM OF WORK
ALL BUILDING
QTY FOR
21-Jul-15 TO 20- Aug-15
358
CONCRETE
2
UOM
CUM
ALL FOUNDATION
497
TOTAL
CUM
855
ALL BUILDING
BLOCK WORK
SQM
1318
ALL BUILDING
PLASTER WORK
SQM
ET
848
1714
571
STRUCTRE
FOR FOUNDATION
FOR BUILDINGS
CARPENTER
STEEL FIXER
HELPER
MASON
SCAFFOLDER
PAINTER
TOTAL
54
42
39
42
23
26
31
32
25
27
0
0
172
169
STRUCTRE
FOR FOUNDATION
FOR BUILDINGS
CARPENTER
STEEL FIXER
56
42
46
42
HELPER
MASON
27
26
32
32
SCAFFOLDER
29
27
PAINTER
0
0
TOTAL
190
169
STRUCTRE
FOR FOUNDATION
FOR BUILDINGS
AIR COMPRESSOR
JCB TELESCOPIC
JCB 3CX,4DX
FORK LIFT
CRANE
2
2
0
1
1
1
STRUCTRE
FOR FOUNDATION
FOR BUILDINGS
AIR COMPRESSOR
JCB TELESCOPIC
JCB 3CX,4DX
FORK LIFT
CRANE
2
2
0
1
1
1
Sl No
4
5
Sl No
###
UEB#1 INTERNAL WALL PLASTER
a
UEB#2 INTERNAL WALL PLASTER
UEB# 2 EXTERNAL WALL PLASTER
b
GTP INNER WALL PLASTERING
UNIT
ITEM
CUM
UNIT
SQM
QTY
238
238
10
20
28
10
10
28
45
10
45
10
SQM
###
UNIT ELECTRICAL BUILDING #1
a
ELECTRICAL CONCEALED CONDUIT & SWITCH BOX FIXING
UNIT ELECTRICAL BUILDING #2
a
ELECTRICAL CONCEALED CONDUIT & SWITCH BOX FIXING
GTP BUILDING
a
ELECTRICAL CONCEALED CONDUIT & SWITCH BOX FIXING
TOTAL QTY IN BUILDINGS =
ITEM
ELECTRICAL
CONDUIT WORK
UNIT
21
2
21
2
28
45
30
28
45
30
10
30
32
17
12
5
20
12
358
190
200
QTY
QTY
QTY
QTY
146
40
146
40
550
200
550
200
QTY
QTY
RESPONSIBLE
SUPERVISOR/ ENGINEER
584
SAYEED GILL
SAMSHER GULL
A. KAMBLE
RESPONSIBLE
SUPERVISOR/ ENGINEER
584
180
180
600
600
350
32
350
350
1318
1714
1714
QTY
QTY
QTY
RESPONSIBLE
SUPERVISOR/ ENGINEER
378
378
193
193
SAYEED GILL
SAMSHER GULL
A. KAMBLE
MAHESH
571
571
QTY
QTY
QTY
368
1318
UNIT
QTY
17
350
32
ITEM
QTY
17
CONCRETE
HRSG BUILDING GRID 1-8 ROOF SLAB CONCRETING BOTH (PART 1 & PART 2 )
HRSGa PARAPET WALL FRO PART 1 AND PART 2
HRSGbPEDESTALS FOR FOUNDATIONS (OVER HEAD WATER TANK & SHED )
UEB#1 PARAPET CONCETING
UEB#1
a PEDESTALS FOR FOUNDATIONS (GCB/BUS DUCTS / HVAC / CROSSOVERS )
UEB#1
b ROOF SCREED CONCRETING ( PANEL WISE)
UEB#1
c STAIR CASE CONCRERETING
UEB#2 STUB COLUMN AND DOOR LINTEL
UEB#2
a STAIR CASE CONCRETING (3-4)
UEB#2
b ROOF PEDESTALS CONCRETING
UEB#c2 SCREED CONCRETING ( PANEL WISE) FLOOR WORK
UEB#2
d ROOF SCREEDING CONCRETING
GTP BUILDING PARAPET CONCRETING
GTP SCREED
a
CONCRETING ( PANEL WISE) ROOF
GTP 3bNOS STAIRCASE CIVIL CONSTRUCTION UPTO ELEVATED SLAB LEVEL
c
TOTAL QTY IN BUILDINGS =
ITEM
Block Work
Plaster Work
Sl No
QTY
SAYEED GILL
SAMSHER GULL
A. KAMBLE
MAHESH
RESPONSIBLE
SUPERVISOR/ ENGINEER
ITEM
UNIT
21-Aug-15 to
20-Sep-15
21-Jul-15 to
20-Aug-15
QTY
QTY
VARGHESE K.A
GSUT FOUNDATIONS
1.1
CONCRETE
CUM
1.2
CONCRETE
CUM
FIREWALL #2
CONCRETE
CUM
2.2
FIREWALL #1
CONCRETE
CUM
CONCRETE
CUM
3.2
CONCRETE
CUM
SUB TOTAL =
CUM
4.1
CONCRETE
CUM
4.2
CONCRETE
CUM
4.3
CONCRETE
CUM
4.4
CONCRETE
CUM
4.5
CONCRETE
CUM
4.6
CONCRETE
CUM
4.7
CONCRETE
CUM
4.8
CONCRETE
CUM
5.1
F1+F2+F3 FOUNDATIONS #1
CONCRETE
CUM
5.2
F1+F2+F3 FOUNDATIONS #2
CONCRETE
CUM
5.3
CONCRETE
CUM
5.4
CONCRETE
CUM
5.5
CONCRETE
CUM
5.6
CONCRETE
CUM
5.7
CONCRETE
CUM
CONCRETE
CUM
CONCRETE
CUM
SUB TOTAL =
CUM
CONCRETE
CUM
13
24
75
65
24
14
20
20
60
20
14
22
62
20
14
22
62
12
VARGHESE K.A.
12
175
10
20
20
12
12
12
40
12
12
12
15
21
149
15
10
10
15
30
18
30
20
20
0
0
TARASHANKAR RATH
+
SANJIV SHARMA
110
55
55
18
18
6
33
0
7.5
12.5
272
219
50
100
CHOUDHARY
80
SUB TOTAL =
10
TOTAL
PAINTER
GT OFFBASE FOUNDATIONS
MASON
P. CHOUDHARY
3.1
HELPER
AUXILLIARY
##
TRASNFORMERS FOUDATION
STEEL
FIXER
30
TARASHANKAR / SANJIV
2.1
CARPENTER
100
FIREWALL
##
STAFF NAME
CUM
50
180
100
SUB TOTAL =
PERIODIC TOTAL QTY IN EQUIPMENT FOUNDATIONS =
CUM
50
280
497
648
HAKIM / S/C ,