Shift Hand-Over Report: REV 00 SEPTEMBER 1, 2011 Form No: HQS-OPS-PP-01 FM 04

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

SHIFT HAND-OVER REPORT

Installation / Facility: CS 1

Crew / Department: Drilling

Date: July 26, 2015

Time: 0600 Hrs.

Mud Status: Red


Present Operations:
- M/up Cameron washing tool.

Upcoming Operations:
- Wash housing bore and seal areas of hanger neck area with sea water.
Equipment Status (Including Equipment Under Repair)
- SCR#10 selected with 4 Engines online.
- Mud Pumps lined up to pit# 3. Pit#3 filled up with sea water.
- Standpipe lined up for drilling.
Permits and/or Isolations in Place:
- As required

Other Comments:
- Riser filled up with clean up detergent.
- Trip tank also filled up with clean up detergent.
- Cont. with m/up 5 GPDS stands.
- Mix pump1 to trip tank line filled with detergent.
- Detergent in trip tank and Riser.
- Flow line flushed, emergency kill line flushed , scalpers cleaned with sea water.
Incoming Supervisor
(Name): Daniel

Position:
Driller

Signature:
Signature:

Outgoing Supervisor
(Name): Sandeep

Position:
Driller

Signature:

REV 00

SEPTEMBER 1, 2011

Form No:

HQS-OPS-PP-01 FM 04