Crackwidth Check

The document provides design calculations for the superstructure of a foot over bridge (FOB). It includes: - Design moments and material properties for the bridge - Crack width calculations to check serviceability for two load cases - Reinforcement assessment to account for temperature differentials The calculations show that the crack widths are within permissible limits under both load cases. Reinforcement sizing is also sufficient to accommodate a temperature drop of 30 degrees Celsius from hydration peak to ambient conditions.

Uploaded by

Sithara Ps
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
122 views

Crackwidth Check

The document provides design calculations for the superstructure of a foot over bridge (FOB). It includes: - Design moments and material properties for the bridge - Crack width calculations to check serviceability for two load cases - Reinforcement assessment to account for temperature differentials The calculations show that the crack widths are within permissible limits under both load cases. Reinforcement sizing is also sufficient to accommodate a temperature drop of 30 degrees Celsius from hydration peak to ambient conditions.

Uploaded by

Sithara Ps
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

HINDUSTAN CONSTRUCTION COMPANY LTD.

HOWE (INDIA) PVT.LTD


CONSULTING ENGINEERS & PROJECT MANAGERS

SUBJECT

DESIGN OF FOB SUPERSTRUCTURE(SOUTH FOB)

Design Data
Limit State of Serviceability

Unit

Reference
Moment M

kNm

Max Mx

Max Mxy Case

Plate 7108 L/c 6

Plate 13960 L/c 6

213.00

156.00

Torsion

kNm

7.00

148.00

Total Serviceability Moment

kNm

219.59

295.29

Material Properties
Grade of Concrete

M40

fck

40

Grade of Steel

Fe500
fy

500

Assumed Width b

1000

Xu, max/d

0.46

Ref. Cl. 38.1, IS-456

Check for crack-width


Units
Width b

mm

1000

1000

Over all depth, D

mm

600

600

HINDUSTAN CONSTRUCTION COMPANY LTD.


HOWE (INDIA) PVT.LTD
CONSULTING ENGINEERS & PROJECT MANAGERS

SUBJECT

DESIGN OF FOB SUPERSTRUCTURE(SOUTH FOB)

Clear Cover to tension


R/F

mm

75

75

Provided Bar Dia

mm

20

20

No: of bars provided

mm

10

10

No: of layers

mm

Effective Cover to
Tension R/f

mm

85

85

mm

515

515

Ast

mm2

Asc

mm2

Service Moment MS

Nmm

Axial Force P

Es

N/mm2

m=Es/Ec

3,142
0

3,142
0

219,588,235

295,294,118

200,000

###

6.32

6.32

cbc

N/mm2

13

13

0.006

0.006

p1

0.242

0.242

k
Neutral Axis Nd

mm

124.561

124.561

Eccentricity e

mm

NA

NA

HINDUSTAN CONSTRUCTION COMPANY LTD.


HOWE (INDIA) PVT.LTD
CONSULTING ENGINEERS & PROJECT MANAGERS

SUBJECT

DESIGN OF FOB SUPERSTRUCTURE(SOUTH FOB)

cb

N/mm2

7.447

10.014

st

N/mm2

147.62

198.52

Aeff.

mm2

ac

N/mm2

0.0000

0.0000

tot

N/mm2

147.624

198.520

a1

mm

600

600

E1

N/mm2

0.000899

0.001209

Em

N/mm2

0.00065

0.00096

mm

Cmin

mm

75

75

acr

mm

88.615

88.615

Wcr

mm

0.16

0.24

Wcr for Diff Temp.

mm

0.05

0.05

Total Crackwidth

mm

0.21

0.29

Permissible. Limit

mm

0.30

0.30

Safe

Safe

Check

144,430

100

144,430

###

Assessment of Reinforcement for temperature differential

HINDUSTAN CONSTRUCTION COMPANY LTD.


HOWE (INDIA) PVT.LTD
CONSULTING ENGINEERS & PROJECT MANAGERS

SUBJECT

DESIGN OF FOB SUPERSTRUCTURE(SOUTH FOB)

Material:
HYSD bars grade Fe 500
Grade of Concrete: M40
Design:

Direct Tensile Strength of Immature Concrete

fct

1.6

Characteristic strength of reinforcement

fy

500

HINDUSTAN CONSTRUCTION COMPANY LTD.


HOWE (INDIA) PVT.LTD
CONSULTING ENGINEERS & PROJECT MANAGERS

SUBJECT

DESIGN OF FOB SUPERSTRUCTURE(SOUTH FOB)

Size of reinforcement Bar- Distribution

20

Spacing in longitudinal direction

50

Slab depth

600

Thickness of surface zone

250

Slab width

1000

Critical Steel Ratio

crit

Steel ratio

fct/fb

Maximum Crack Spacing

Estimated Maximum Crack width,

smax = fct / fb x / 2

0.0032
0.02513274
0.667
265

Wmax = Smax*/2*T1

Fall in temperature between hydration peak and ambieT1

Co-efficient of Thermal Expansion

Wmax

For Mature Concrete,

20

1.170E-05
0.031

HINDUSTAN CONSTRUCTION COMPANY LTD.


HOWE (INDIA) PVT.LTD
CONSULTING ENGINEERS & PROJECT MANAGERS

SUBJECT

DESIGN OF FOB SUPERSTRUCTURE(SOUTH FOB)

T2, Further fall in temperature

Estimated Maximum Crack width,

T2=

10

Wmax = Smax*/2*(T1 +T2)


Wmax

0.047

CALCULATIONS

Job No:

Sheet No:

I-456

R0

Project

File Ref

Dry Dock & Wharves Project at Naval


Dockyard, Mumbai
Prepared By:

Initials
Jibeesh.R

Checked By:

1, IS-456

Rev. No:

DGNP/DFOB/P25S

Date
30-11-12

Initials

Gopal Reddy

Date
29-02-12

Reference

Mu = M+(T*((1+(D/b))/1.7))

CALCULATIONS

Job No:

Sheet No:

Rev. No:

I-456

R0

Project

File Ref

Dry Dock & Wharves Project at Naval


Dockyard, Mumbai
Prepared By:

DGNP/DFOB/P25S

Initials
Jibeesh.R

Checked By:

Date
30-11-12

Initials

Gopal Reddy

Date
29-02-12

Average of 16 dia & 25 dia

Young's Modulus of Steel


Table 21-IS-456 (2000)
p=Ast/bd
p1=Asc/bd
k=(m2p2+2mp)0.5 - mp
Nd = kd
e = M/P

Job No:

CALCULATIONS

Sheet No:

Rev. No:

I-456

R0

Project

File Ref

Dry Dock & Wharves Project at Naval


Dockyard, Mumbai
Prepared By:

DGNP/DFOB/P25S

Initials
Jibeesh.R

Date
30-11-12

Checked By:

Initials

Gopal Reddy

Date
29-02-12

M*P[(e+D/2)-Nd]/{[b/2*Nd(d-Nd/3)]+[(Ndd1)/Nd*Asc(1.5m-1)*(d-d1)]}
m*cb*(d-Nd)/Nd
b*Nd+Ast*m
P/Aeff
st+ac*m
Depth of beam upto the level considered from
compression face
(D-Nd)/(d-Nd)*tot)/Es
E1-[(b*(D-Nd)(a1-Nd))/3(Es*Ast*(D-Nd))]
C/C distance between bars

sqrt[(S/2)^2+(Cmin+Dbar/2)^2)]-Dbar/2
3*acr*Em/(1+2((acr-Cmin)/(D-Nd)))

0.004*Cmin

CALCULATIONS

Job No:

Sheet No:

I-456

Rev. No:
R0

Project

File Ref

Dry Dock & Wharves Project at Naval


Dockyard, Mumbai
Prepared By:

Initials
Jibeesh.R

Checked By:
Gopal Reddy

Refer Cl. A-1.2- IS 3370-2009-Part 2

DGNP/DFOB/P25S

Date
30-11-12

Initials

Date
29-02-12

CALCULATIONS

Job No:

Sheet No:

I-456

R0

Project

File Ref

Dry Dock & Wharves Project at Naval


Dockyard, Mumbai
Prepared By:

Initials
Jibeesh.R

Checked By:
Gopal Reddy

mm
mm

Rev. No:

DGNP/DFOB/P25S

Date
30-11-12

Initials

Date
29-02-12

(As Per Design Data)

mm
Refer Figure 1 IS: 3370-2009 Part 2 for slab thickess less than 500 mm
mm

Refer Cl. A-1.2- IS 3370-2009-Part 2


Ast/BD
Refer Page 7 of IS 3370-2009 Part 2
mm

Refer page 7 of IS 3370-2009 Part 2

Deg

Refer Page 7 IS 3370 - 2009 part 2

*/2*T1

170E-05
mm

CALCULATIONS

Job No:

Sheet No:

I-456

R0

Project

File Ref

Dry Dock & Wharves Project at Naval


Dockyard, Mumbai
Prepared By:

Initials
Jibeesh.R

Checked By:
Gopal Reddy

*/2*(T1 +T2)
mm

Rev. No:

DGNP/DFOB/P25S

Date
30-11-12

Initials

Date
29-02-12