GRSRG
GRSRG
GRSRG
CD
24
NR
NR
v S .d
(For NR < 1)
4 ( ) d
4 ( ) d
vS2 .g. p
.
.g. p
.
.vs d
3
CD 3
24.
g ( p ) d 2
vS
.
18
vS
4 ( p ) d
.g.
.
3
CD
CD
18.5
( N R ) 0 .6
s
.d
vsc 4. g.
Intake
b
Inlet Channel
Inlet Channel:
h
b
4. 9.81.
(2650 1000)
.(0.0025) 0.805 m/s
1000
VH > Vsc
Inlet Channel
Sludge
b
B
Plan
0.25 m
H
h
h1
0.25 m
Hw
Elevation
0.25 m
Sludge
Inlet Channel
Baffle
Scum Remover
Settling Zone
Sludge
Effluent
Launder
Detention Time (T) = average time for which water stays in the tank = V/Q
V = Volume of the tank;
Q = Flowrate
Vs = Q/(L.B) = Q/As;
In a rectangular sedimentation tank, the critical settling velocity is always numerically equal to the SOR
For a 20 m particle, Vs = 3.56 x 10-4 m s-1, i.e., SOR = 30.77 m3/m2/d
A PST is generally designed with SOR of 30-50 m3/m2/d
VH = Q/(B.D); VH < Vsc