Terrazzo / Ceramic Tiles Intallation


Checklist

Project

Replacement of 220 kV Substation at Nurek


HPP

Contract No. KfW Financing 200466144-TAJ


Material / Equipment Description:
Drawing Reference No.:

Project Document 025.011663-09017-&CCA-r0

Building Name/ Specific Location / Details:

Battery Room - Ceramic Floor Tiles

Weather conditions : Rainy


Ambient temperature: 60C
No.

CHECKED

DESCRIPTION

OK

Waterproofing ( type WP-1 ) and floor screed completed and tested.

Work area is clean and free of excessive moisture.

12 mm thk. cement mortar levelling coat applied on wall surface, trowelled to scratch
finish to provide more bonding to adhesive.

Establish line and levels.

Materials samples, colors has been approved.

Adequate protection to surrounding surfacess has been provided.

Check correct materials and color prior to installation.

Check adhesive compatibilty with background / base.

10

Check setting out for line and levels.

11

Check for mixing, colour and application of grout.

12

Check / monitor sequence of fixing tiles.

Check for finished surface regularity.

14

Joints filled completely and tooled to an approved profile.

15

Finish surface made good and clean, free from blemishes and polished by dry cloth.

16

All inspections are completed and recorded.

13

Comments

N/A

Floors sufficiently clean and ready to received mortar for tiles.

Installation

Preparation

NG

Remarks :
Setting out for line and level for ceramic tiles installed on the wall as reference in the floor tiles.

Record Acc.

Checked

Approved

Name
Signature
Date

Form No.: QF05P

Rev.0

08.07.2011