of Incentives Plans
of Incentives Plans
of Incentives Plans
By:
Sheeba Rehman
Incentives Programme
Wage incentives include all the plans that
provide extra pay for extra performance In
addition to regular wages for the job.
Balanced
Scorecard
Productivity /
Gain- Sharing
Team / Group
Incentives
Short Term Pay-for-Performance
Plans
Merit Pay
Lump-Sum Bonuses
Individual Spot Awards
Individual Incentives
Long-Term Incentive Plans
Gain-Sharing Plans
Profit Sharing Plans
Earnings-at-Risk Plans
Individual Incentive Plans
Method of Rate Determination
Units of Time period per
production per unit of production
time period
(1 (2
) )
Pay constant Straight Standard hour
function of
production level
piecework plan plan
=8*0.50=Rs 4.00
Case 2 Output =80 units
Earnings
As the output is equal to the standard, the worker is entitled to time wage plus
20% bonus
Time wages =8*0.50= Rs 4.00
Bonus =20*4 = Re 0.80
100
Total earnings = Rs 4.80
Case 3 Output =110 units
As the output is more than th Std, the worker is entitled to a high piece rate
10*0.10= Rs 11.00
Emerson’s Plan
Up to 67% of efficiency, the workr is determined by dividing the time taken by the Std
Time-rate
Up to 100% efficiency, 20% bonus is paid to workers
An additional bonus of Rs 1% is added for each additional 1% eficiency
Case 1 Output in 10 Hrs: 50 units
Efficiency: 50%( below 67%, the worker is eligible for 50% of the time wae as bonus)
Case 2 Output in 10 Hrs : 100 units
Efficiency : 100% (time-wage + 20% bonus)
Case 3 : Output in 10 Hrs : 130 units
Efficiency : 130%
At the rate of 20% at 100% efficiency and 1% increase for every 1% increase in
Efficiency, the worker is eligible for 50% of the time wage as bonus:
Time wag =10*1 Rs 10.00
Bonus =50*10.00 Rs 5.00
100
Rs 15.00
Conditions for Effective Incentives Plans