Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

PE Pyroprocessing Day 4 Volatilisation Balance Calculation: June 2004

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 18

CENTRE TECHNIQUE EUROPE CENTRALE

PE Pyroprocessing Day 4
Volatilisation Balance Calculation

June 2004

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise : Volatile Balance Calculation

Field work

Calculations

Mass determination
Sampling
Mass balance and corrections
Volatile balance and corrections
Calculation of v and t coefficients

Interpretation

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise : Field work


Sample

Stack gas
& dust

Flow measurement

Kiln
feed
Fuel

Precipitator
Kiln
gas

Kiln load

Clinker

Waste
dust

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise : Definitions

Mass as received M

Mass as measured in the field (T/h)

Mass on dry basis M

Mass without the moisture content (T/h)


%H O

2
M ' M 1

100

Mass at LOI=0 M

Mass without the CO2 from the kiln feed (T/h)


%CO2

M " M ' 1

100

Specific mass

Mass of a component by unit mass of clinker (kg/kg ck or g/kg


ck)

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise : Input data - Mass flow


Flow

Moisture

CO2

(T/h)

(%)

(% dry)

Kiln feed

48,0

0,5%

Coal

4,5

4,0%

Clinker

30,0

0,0%

0,0%

Waste dust

4,8

0,0%

28,0%

Stack dust

0,3

0,0%

30,0%

0,0%

30,0%

Kiln load

33,0%
-,-

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise : Input data - Elements


SO3
(% dry)
Kiln feed
Coal ash

0,55%
-,-

K2O

Na2O

(% dry)

(% dry)

Cl
(% dry)

1,00%

0,05%

0,008%

2,00%

0,10%

0,050%

Clinker

0,50%

1,25%

0,25%

0,002%

Waste dust

4,75%

3,00%

0,25%

2,190%

Stack dust

21,25%

22,00%

3,50%

11,400%

Kiln load

2,20%

1,50%

0,10%

0,460%

Coal:

13% ash (as received)


4,1% S (as received)

Stack:

260,00 kg/h SO2


6

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise: Calculation Mass Balance (1)


On dry basis (T/h):
input

output

Kiln feed

47,76

Clinker

30,000

Coal

4,32

Waste dust

4,800

Stack dust

0,300

Stack gas

0,325

Total

52,08

Total

35,425

Input and output do not match. The difference is CO2

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise: Calculation Mass Balance (2)


On LOI-free basis (T/h):
input

output

Kiln feed

31,999

Clinker

30,000

Coal ash

0,562

Waste dust

3,456

Coal SO3

0,443

Stack dust

0,210

Stack gas

0,325

Total

33,004

Total

33,991

The input and output are much closer but still differ by 0,987 T/h.
A mass correction is therefore needed.
Note: Sulphur is considered on SO3 basis
Conversion:

%SO3 = % S

80 / 32

%SO3 = % SO2 80 / 64
8

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise : Calculation Mass Balance (3)


Mass correction
Mc = M k (Total output - Total input)
Weighting adjustment
coefficients k
Kiln feed

1,00

Coal ash

0,00

Clinker

0,00

Waste dust

0,00

Stack dust

0,00

Stack gas

0,00

1,00

input

output

Kiln feed

32,987

Clinker

30,000

Coal ash

0,562

Waste dust

3,456

Coal SO3

0,443

Stack dust

0,210

Stack gas

0,325

Total

33,991

Total

33,991
9

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise : Calculation Mass Balance (4)


Corrected mass flow (dry basis)
t/h
Kiln feed

kg/kg ck
49,23

1,64

Coal

4,32

0,14

Clinker

30,00

1,00

Waste dust

4,80

0,16

Stack dust

0,30

0,01

Stack gas

0,33

0,01
10

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise : Volatile balance (1)


K2O balance
Corrected mass flows

% K2O

t/h
Kiln feed

49,23

1,00%

Coal ash1

0,56

2,00%

Clinker

30,00

1,25%

Waste dust

4,80

3,00%

Stack dust

0,30

22,00%

Stack gas

0,33

0,00%

%K2O is percentage of ash


11

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise: Volatile Balance (2)

K2O balance (kg/h)


input

output

Kiln feed

492,34

Clinker

375,00

Coal ash

11,23

Waste dust

144,00

Stack dust

66,00

Stack gas

0,00

Total

503,57

Total

It does not balance and differs by 81,43 kg/h!

585,00
Lets correct it!
12

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise : Volatile Balance (3)

K2O balance correction


Mc = M k (Total output - Total input)

Weighting adjustment
coefficients k
Kiln feed

0,45

Coal ash

0,00

Clinker

0,45

Waste dust

0,10

Stack dust

0,00

Stack gas

0,00

1,00

input

output

Kiln feed

528,98

Clinker

338,36

Coal ash

11,23

Waste dust

135,86

Stack dust

66,00

Stack gas

0,00

Total

540,21

Total

540,21
13

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise: Volatile balance (4)


Corrected K2O composition
Corrected mass flows

Corrected

t/h

% K 2O

% K2O

Kiln feed

49,23

1,00%

1,07%

Coal ash

0,56

2,00%

Clinker

30,00

1,25%

1,13%

Waste dust

4,80

3,00%

2,83%

Stack dust

0,30

22,00%

Stack gas

0,33

0,00%
14

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise : Kiln load


An assumption has to be made on the kiln load mass flow rate
Typical values: 1.2 - 2.0 kg/kg ck
ASSUME: 1.6 kg/kg ck
Then
Kiln load = 1.6 30 = 48 T/h
Kiln load K2O = 720.0 kg/h

15

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise : Volatile recirculation model


Losses

trapping

Gas

Fuel

volatilization

Material

Kiln load Clinker

C
v=1K

K-M
t=
vK + F
16

CENTRE TECHNIQUE EUROPE CENTRALE

Exercise : Coefficients
K2O coefficients:

v=1t=
201,86

C
K

=1-

338,36
720,00

720,00 528,98

0,53x720,00 + 11,6
392,88

191,02

= 0,53
= 0,486
11,23
381,64

t = 0,486
528,98

v = 0,53
720,00

338,36
17

CENTRE TECHNIQUE EUROPE CENTRALE

Coating regions

Heavy
coating
Medium
coating
Low
coating

18

You might also like