10 PDF
10 PDF
10 PDF
O F
ARCHITECTURAL
S H E E T S
ELECTRICAL
PLUMBING
P1 - GROUND FLOOR & TYPICAL 2ND TO 4TH FLOOR
SEWER LINE LAYOUT
P2 - GROUND FLOOR & TYPICAL 2ND TO 4TH FLOOR
WATER LINE LAYOUT
P3 - GROUND FLOOR & TYPICAL 2ND TO 4TH FLOOR
STORM DRAINAGE LAYOUT
P4 - GENERAL NOTES, LEGENDS,CATCH BASIN DETAILS,
AND SEPTIC TANK DETAILS
SUMMARY OF QUANTITIES
STRUCTURAL
A
A 1
SCALE:
NOT TO SCALE
E . JACIN
SITE
TO
VE.
SHOE A
FLOREN
LEGEND :
Z
CIO PA
CONCURRED BY:
V I C I N I T Y
REPUBLIC OF THE PHILIPPINES
NATIONAL CAPITAL REGION
M A P
PROJECT/LOCATION:
DANILO M. MARCIAL
SHEET CONTENT:
CHECKED BY:
DRAWN BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
JERWIN ANDES
DATA ENCODER I
PREPARED BY:
MANUEL Y. MADRID
ENGINEER II
A-1
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
1 28
C
A 10
A
A 10
BLOW UP DET.
B
A 10
BLOW UP DET.
BLOW UP DET.
CONCURRED BY:
DANILO M. MARCIAL
SPECIAL PROJECT ENGINEER
PAGCOR
PROJECT/LOCATION:
SHEET CONTENT:
CHECKED BY:
DRAWN BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
DATA ENCODER I
BLOW UP DETAILS
PREPARED BY:
MANUEL Y. MADRID
ENGINEER II
A - 10
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
10 28
B
A 11
A
A 11
C
A 11
- -
LANDING (F.F.L.)
UP
LANDING
FF1
B
A 11
5
4
3
2
1
CORRIDOR
FOURTH FLOOR
CORRIDOR
CLASSROOMS
UP
LANDING
B
A 11
A
A 11
SCALE:
1:20m
THIRD FLOOR
CORRIDOR
1:75m
D
A 11
LANDING
SECOND FLOOR
CORRIDOR
A 11
UP
- -
FF1
H
A 11
LANDING
DN
K
CORRIDOR
H
A 11
CLASSROOMS
GROUND FLOOR
CORRIDOR
1:20m
I
A 11
1:75m
C
A 11
G
A 11
1:5m
F
A 11
1:5m
PROJECT/LOCATION:
E
A 11
SHEET CONTENT:
BLOW UP PLAN OF STAIRS GROUND
FLOOR, 2ND TO 4TH FLOOR ( FIRE EXIT ),
DETAIL SECTION OF STAIRS, SPOT DETAIL (
CRASH RAILING ), SPOT DETAIL A - A, B- B,
HANDRAIL DETAIL, CROSS SECTION
D
A 11
1:20m
S E C T I O N
SCALE:
SCALE:
1:20m
CONCURRED BY:
HANDRAIL DETAIL
DANILO M. MARCIAL
1:20m
CHECKED BY:
DRAWN BY:
C R O S S
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
DATA ENCODER I
PREPARED BY:
MANUEL Y. MADRID
ENGINEER II
A - 11
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
11 28
1. GENERAL NOTES AND TYPICAL STRUCTURAL DETAILS SHALL BE APPLIED TO ALL DRAWINGS
UNLESS OTHERWISE SHOWN OR NOTED
IF SLABS ARE REINFORCED BOTHWAYS BARS ALONG THE SHORTER SPAN SHALL BE
PLACED BELOW THOSE ALONG THE LONG SPAN AT THE CENTER AND OVER THE LONGER
SPAN FOR REINFORCING BARS NEAR THE SUPPORTS, THE SPACING OF THE BARS AT THE
COLUMN STRIPS SHALL BE APPROXIMATELY ONE AND A HALF (1 1/2) SLAB THICKNESS
OR 45 CENTIMETERS.
TENSION AND SHALL NOT BE LESS THAN 0.0025 BT. ( SEE SCHEDULE BELOW )
5. ALL MATERIAL AND WORKSMASHIP SHALL CONFORM WITH THE LATEST APPLICABLE STANDARDS
OR SPECIFICATIONS ALL WORKS SHALL CONFORM WITH THE BEST PRACTICE PREVAILING IN THE
VARIOUS TRADES.
BEAMS---------------------------------------------------------------------------14 DAYS
COLUMNS-----------------------------------------------------------------------21 DAYS
100 mm
100 mm
125 mm
100 mm
150 mm
100 mm
175 mm
100 mm
200 mm
100 mm
5.
UNLESS OTHERWISE NOTED IN THE PLANS ALL BEDDED SLABS SHALL BE REINFORCED
WITH 10mm O AT 250mm O.C EACH WAY TO CENTER OF SLAB AND. CONSTRUCTION
JOINTS FOR SAME SHALL NOT BE LESS THAN 3.65 METER APART.
6.
EXTERIOR
COLUMN
SUPPORT
7.
NOTES OF FOOTINGS.
DOWN INTO EDGE BEAM EXTENDED 412 @ 1800 LONG TOP BARS BEND BARS
MIN. OF 1,200 (4' - 0") INTO BARS.
1- 12 TOP
& BOTT. &
BARS
4- 12
BOTT. BARS
SHALL BE:
(27.6 Mpa)
20mm
100mm
300
300
12 mm
300
300
300
16 mm
300
400
300
20 mm
400
550
4000 PSI
(27.6 Mpa)
20mm
100mm
SLAB ON GRADE
4000 PSI
(27.6 Mpa)
20mm
100m
2.
NOTES ON COLUMNS
1.
SUSPENDED SLABS--------------------------------------------------------------20mm
SLAB ON GRADE-----------------------------------------------------------------40mm
2.
2.
3.
L 1/3
L 2/4
L 3/4
L 3/3
L 2/3
L 1/3
4.
0.20 MIN.
L 1/4
L 1/3
L 1/3
L1
L 1/3
0.15 MIN.
L 1/3
L 1/3
L 1/3
L2
0.15 MIN.
L 1/3
L 1/3
L3
EDGE BARS
2 BARS
L 1/3
L4
PROJECT/LOCATION:
BAR SIZE
(DEFORMED)
LAPPED
EMBEDMENT
LAPPED
10 mm
225
300
200
300
300
12 mm
275
300
250
300
400
16 mm
350
400
325
400
350
500
20 mm
450
500
475
500
600
800
550
750
25 mm
550
625
550
625
28 mm
750
1000
650
850
28 mm
625
675
625
675
32 mm
950
850
850
850
32 mm
700
775
700
775
4.
WEB BARS
SEE
NOTE
SEE NOTE
SEE NOTE
SEPARATOR
NOTE 1
FIG. B-2
5.
6.
L/4
TOP BARS @ SUPPORT (CONT.)
REQ.D BOTT. BARS @ SUPPORT
20
SPLICE
SLEEVES FOR
UTILITY PIPES
MAX. 1/5 D
7.
TYPICAL COLUMN
ELEV. SHOWING
DOWELS AND
TIES SPACING.
fe'=27.6 MPa,(4000psi)
25 mm
BEAMS, SLABS
(27.6 Mpa)
D. NON- LOAD BEARING WALL PARTITIONS, BEDDED SLABS, FLOOR & ROOF SLABS,
PARAPETS, CATCH BASIN, SIDE WALK----------------------fy = 227.5 Mpa ( 33,000 psi )
IN
4000 PSI
fe'=27.6 MPa,(4000psi)
CROSS TIE
dM
10
COLUMNS
2.
20mm
100mm
300
WITHIN CENTER
4000 PSI
D JOINT REINF.
D
PER
CONF.
REINF.
CONF.
SCHEDULE REINF.
SUSPENDED SLABS
300
JOINT REINF.
AGGREGATE
EXTERIOR
COLUMN
SUPPORT
TABLE "B"
10 mm
350mm. MAX
MAX. SLUMP
COLUMN TIES AS
MAX. SIZE OF
15 MIN.
TENSION BARS
LAPPED
38 mm
CLEAR
JOINT REINF.
D
D
CONF. REINF.
CONF.
REINF.
28 DAYS STRENGTH
60
LOCATION
TABLE "A"
EMBEDMENT
L1/5
INTERIOR
COLUMN
SUPPORT
LAPPED
400
NOTES ON REINFORCEMENT
L1/3
EMBEDMENT
3.
SLAB
OPENING
L1/4
TENSION BARS
BAR SIZE
(DEFORMED)
12 X 1000 LONG
AT MID- DEPTH
OF SLAB AT EACH
CORNER
L2
L1/4
INTERIOR
COLUMN
SUPPORT
END OF TWENTY EIGHT (28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE &
SLUMPS AS FOLLOWS.
L2
L1/3
L1
L1/3
HALF OF "H"
11. THE CONTRACTOR IS GIVEN THE OPTION TO UTILZE ALTERNATIVE METHODS OF DESIGN AND
ALTERNATIVE METHOD OF CONSTRUCTION AS DEEMED SUITABLE PROVIDED THAT SUCH OPTION
IS IN CONFORMANCE TI THE DESIGN CONCEPT OF THE PROJECT AND IN ACCOMPLIANCE WITH THE
INFORMATION GIVEN IN THE CONTRACT DOCUMENTS
WALLS----------------------------------------------------------------------------21 DAYS
60
0
THICKNESS
60
0
9. DO NOT SCALE DRAWINGS, CALLED OUT DIMENSIONS AND STANDARD CODE REQUIREMENTS
SHALL GOVERN OVER UNSCALED DRAWINGS.
20 BAR DIA.
LAPPED SPLICE ON
COMPRESSION BARS
SHOWN
t OR 1/4 D
FOUNDATION-------------------------------------------------------------------24hrs.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF WORK AMING THE
VARIOUS TRADES AS NECESSARY TO AVOID CONFLICTS AND TO INSURE THE INSTALLATION OF
ALL WORKS WITHIN THE AVAILABLE SPACE.
TEMPERATURE BARS FOR SLABS SHALL BE GENERALY PLACED NEAR THE FACE IN
2.
ht
4.
UNLESS, OTHERWISE NOTED IN PLANS, CAMBER ALL BEAMS AND GIRDER ATLEAST
6mm.S, FOR EVERY 4.50M SPAN , EXEPT CANTILEVERS FOR WHICH THE
CAMBER SHALL BE AS NOTED IN PLANS OR AS ORDERED BY THE ENGINEER BUT IN
NO CASE LESS THAN 20mm FOR EVERY 3.0M OF FREE SPAN.
400
3. THE CONTRACTOR SHALL EXAMINE THE DRAWING AND SHALL NOTIFY THE ENGINEER /
ARCHITECTS OF ANY DESCRIPANCIES HE MAY FIND BEFORE PROCEEDING WITH THE WORK OR
DURING THE CONSTRUCTION
1.
3.
GENERAL NOTES
"THE CONSULTANT, ENGR. ROMEO D. ROBLES , SHALL BE HELD FULLY RESPONSIBLE FOR
FAILURE OF THE FACILITY DUE TO FAULTY DESIGN EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONSULTANTS."
CHECKED BY:
PREPARED BY:
DRAWN BY:
GENERAL CONSTRUCTION
NOTES
DESIGNED BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
CHARLES MARIN
S-1
DATA ENCODER I
MANUEL Y. MADRID
ENGINEER II
SHEET NO.:
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
12 28
STRUCTURAL SPECIFICATIONS
125 mm
10 mm
@ 600mm O.C.
10 mm
@ 600mm O.C.
150 mm
10 mm
@ 600mm O.C.
10 mm
@ 600mm O.C.
200 mm
12 mm
@ 600mm O.C.
12 mm
@ 600mm O.C.
HORIZONTAL BARS
125 mm
10 mm
@ 200mm O.C.
10 mm
@ 250mm O.C.
AT CENTERS VERTICAL
150 mm
12 mm
@ 250mm O.C.
12 mm
VERT.
BARS
MAIN REINFORCEMENT TO BE
CONTINUOUS
30 BAR DIA
HOR.
BARS
2.
CARRY VERTICAL BARS AT LEAST 50mm ABOVE FLOOR LEVEL TO PROVIDE FOR SPLICES
WHEN NECESSARY STOP AT 50mm BELOW TOP SLAB OR SOLID BAND WHERE THE WALL
ENDS VERTICAL AND HORIZONTAL BARS SHALL BE SPLICED BY LAPPING A DISTANCE
EQUAL TO 30 DIAMETERS AND WIRED SECURELY WITH 16 G.I. WIRE PROVIDED THAT
SPLICES IN ADJACENT BARS ARE STAGGERED AT LEAST 1.50M.O.C.
3.
VARIES
6mm @ 200 mm
6mm @ 200 mm
6mm @ 200 mm
17.0
250
250
250
1- 12
1- 12
1- 16
1- 10
1- 10
1- 12
6mm @ 200 mm
6mm @ 200 mm
10mm @ 200 mm
300
300
300
1- 16
1- 16
1- 20
1- 12
1- 12
1- 12
10mm @ 200 mm
10mm @ 200 mm
10mm @ 200 mm
400
300
(TYP.)
1-
BEAM
NOTE:
DOOR
OPENING
NOTES ON WELDS
400
(TYP.)
2.
CHB WALL
3-
400
(DOWEL)
400
200
(DOWEL)
D = FOR BEAM
t = FOR SLAB
10 STIRRUPS
@ 150 O.C.
1.
STRUCTURAL STEEL TO BE USED FOR FABRICATION AND ERECTION OF THIS STRUCTURE SHALL
COMPLY WITH ALL THE PERTINENT PROVISION OF AISC SPECIFICATION FOR THE DESIGN.
FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR BUILDING LATEST EDITION.
2.
3.
30 BAR DIA.
(MIN.)
12 TOP BARS
2-
12 TOP BARS
SECTION
ELEVATION
4.
307
BOLTS.
L1
ALL EMBEDDED PIPES FOR UTILITIES, ETC. THAT PASS THRU BEAMS SHALL BE MAXIMUM 100mm
OR D/3 WHICHEVER IS LESS DIAMETER SINGLE RIGID GALVANIZED IRON PIPE UNLESS
OTHERWISE OR APPROVED IN WRITING BY THE STRUCTURAL ENGINEER.
B.
C.
db
4db or 85mm
200(MIN)
1 - 16 VERT.
BARS TYPICAL
WELDS SHALL DEVELOP THE FULL STRENGTH OF MEMBERS JOINED UNLESS OTHERWISE
SHOWN OR DETAILED IN THE DRAWINGS.
L
VERIFY DEPRESSION
INTERSECTION WALL
OPENING
2.
b
6d
400
CHB WALL.
12db
L
16 VERT. BARS
1.
250
1-
(DOWEL)
300
400
(DOWEL)
D db
400
(DOWEL)
CORNER WALL
200(MIN)
1.
db
WINDOW
OPENING
NOTES OF STIRRUPS
16 VERT. BARS
38mm
CLEAR
550
CHB WALL
4 - 16 VERT. BARS
550
400
SLAB
CHB WALL
1-
40
4 - 16 VERT. BARS
16 VERT. BARS
3-
10 x 1000 LONG
@300 O.C.
550
1- 10
1- 10
1- 10
400
1- 10
1- 10
1- 12
3 - 10 BOTT. BARS
30 BAR DIA
50 (MIN.)
(MIN.)
250
14.0
200
200
200
10 BOTT. BARS @
300 O.C.
250
600
(MIN.)
MIN HEIGTH OF
CLEAR
TOTAL
REINFOCEMENT
SPAN
LENGTH
LINTEL
fc'
("L") (L+0.40M) (MPa)
(MM)
BOTTOM TOP
STIRRUPS
(DOWEL)
20.0
@ 300mm O.C.
REINFORCED BAR SHALL HAVE 25mm CLEAR CONCRETE COVER FROM FACE OF WALL EXCEPT
FOR WALLS IN CONTACT WITH THE GROUND WHERE A MINIMUM OF 60mm SHALL BE PROVIDED.
AND FOR EXPOSED FACES OF FORMED WALLS WHERE THE MINIMUM SHALL BE 50mm CLEAR.
3.40 M
3.70 M
4.00M
10 mm
@ 600mm O.C.
3.00 M
3.30 M
3.60M
@ 250mm O.C.
10 mm
2.50 M
2.90 M
3.10 M
10 mm
@ 600mm O.C.
2.10 M
2.40 M
2.70 M
100 mm
t/3
10 mm
1.60M
1.90 M
2.20 M
REMARKS
t/3
VERTICAL
t/3
HORIZONTAL
VERTICAL
SECTION
WALL
THICKNESS
MAIN REINFORCEMENT TO BE
CONTINUOUS (TOP & BOTT BARS.)
75 mm
1.20 M
1.50 M
1.80 M
REINFORCEMENT
1.
WHERE A CONSTRUCTION JOINT IS TO BE MADE. THE SURFACE OF CONCRETE
SHALL BE CLEANED AND ALL LAITANCE AND STANDING WATER REMOVED.
D + 2db
NOTES
REINFORCEMENT
HORIZONTAL
VERTICAL
550
BLOCK THICKNESS
1.
D/3
400
(DOWEL)
PROVIDE 150mm x 300mm STIFFENER COLUMN REINFORCED WITH 4-12mm WITH 6mm TIES AT
150mm ON CENTER WHERE CONCRETE HOLLOW BLOCK TERMINATES AND AT VERY 3.0M LENGTH OF
CONCRETE HOLLOW BLOCK WALLS UNLESS NOTED IN STRUCTURAL PLANS.
VERIFY ARCHITECTURAL
2.
UNLESS OTHERWISE SHOWN IN PLANS ALL CONCRETE BLOCKS AND CERAMIC BLOCKS SHALL BE
REINFORCED AS SHOWN IN THE SCHEDULE OF CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCK
REINFORCEMENT.
400
(DOWEL)
1.
D/3 D/3
D = FOR BEAM
2t = FOR SLAB
30 BAR DIA.
(MIN.)
D + 2db
75
100
125
150
200
300
335
L
125
150
175
200
230
350
450
D + 2db
125
165
200
250
365
L
85
115
140
165
230
L
100
115
150
300
450
"THE CONSULTANT, ENGR. ROMEO D. ROBLES , SHALL BE HELD FULLY RESPONSIBLE FOR
FAILURE OF THE FACILITY DUE TO FAULTY DESIGN EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONSULTANTS."
PROJECT/LOCATION:
SHEET CONTENT:
CHECKED BY:
PREPARED BY:
DRAWN BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
CHARLES MARIN
MANUEL Y. MADRID
ENGINEER II
SHEET NO.:
S-2
DATA ENCODER I
STRUCTURAL SPECIFICATIONS
DESIGNED BY:
SUBMITTED BY:
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
13 28
B
A.1
2
A
S 3
5.A
6.A
SCALE:
1:125m
PROJECT/LOCATION:
2
B
A.1
S 3
SHEET CONTENT:
CHECKED BY:
PREPARED BY:
DRAWN BY:
DESIGNED BY:
5.A
SUBMITTED BY:
"THE CONSULTANT, ENGR. ROMEO D. ROBLES , SHALL BE HELD FULLY RESPONSIBLE FOR
FAILURE OF THE FACILITY DUE TO FAULTY DESIGN EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONSULTANTS."
6.A
1:125m
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
CHARLES MARIN
S-3
DATA ENCODER I
MANUEL Y. MADRID
ENGINEER II
SHEET NO.:
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
14 28
B
A.1
2
A
S 4
5.A
6.A
SCALE:
1:125m
PROJECT/LOCATION:
2
B
A.1
S 4
SHEET CONTENT:
CHECKED BY:
PREPARED BY:
DRAWN BY:
DESIGNED BY:
5.A
SUBMITTED BY:
"THE CONSULTANT, ENGR. ROMEO D. ROBLES , SHALL BE HELD FULLY RESPONSIBLE FOR
FAILURE OF THE FACILITY DUE TO FAULTY DESIGN EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONSULTANTS."
6.A
1:125m
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
CHARLES MARIN
S-4
DATA ENCODER I
MANUEL Y. MADRID
ENGINEER II
SHEET NO.:
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
15 28
DS
DS
DS
DS
DS
DS
T-1
DS
LT - 1
HT
-5
DS
HT
T-1
G-1
DS
T-1
LT - 1
DS
T-1
G-1
DS
LT - 1
DS
HT - 4
HT - 3
DS
G-2
G-1
LT - 1
T-2
T-2
HT - 3
T-2
DS
T-2
DS
T-2
DS
-2
DS
HT
DS
G-3
T-1
G-1
LT - 1
DS
DS
A.1
-1
HT
A.1
HT
A.1
HT - 3
DS
1
1
2
A
S 5
5.A
6.A
A
A 2
DS
DS
R O O F
DS
F R A M I N G
SCALE:
5.A
P L A N
6.A
DS
DS
"THE CONSULTANT, ENGR. ROMEO D. ROBLES , SHALL BE HELD FULLY RESPONSIBLE FOR
FAILURE OF THE FACILITY DUE TO FAULTY DESIGN EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONSULTANTS."
1:125m
1:125m
PROJECT/LOCATION:
CHECKED BY:
PREPARED BY:
DRAWN BY:
DESIGNED BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
CHARLES MARIN
S-5
DATA ENCODER I
MANUEL Y. MADRID
ENGINEER II
SHEET NO.:
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
16 28
0.15
0.30
4. REINFORCING BARS SHALL
COMPLY WITH ASTM A705M.
L1
L2
TOP
BAR
L
1/3
L
1/3
TOP
BAR
L
1/3
SCHEDULE OF SLAB
NOT
SLAB
SLAB
MARK THICKNESS
(mm)
BAR
DIAMETER
(mm)
4S-1
130
12
3S-1
130
12
2S-1
130
12
TB
BB
TB
BB
TB
BB
TO
SCALE
SHORT SPAN
BAR SPACING IN mm
COL STRIP
COL STRIP
DISCONT. MIDDLE
CONT.
150
300
150
300
150
300
150
300
150
300
150
300
150
150
150
BOTTOM
BAR
LONG SPAN
BAR SPACING IN mm
COL STRIP
COL STRIP
DISCONT. MIDDLE
CONT.
150
300
150
300
150
300
REMARKS
150
150
150
300
150
300
150
300
150
BOTTOM
BAR
ABBREVIATIONS:
1:20m
TB - TOP BARS
BB - BOTTOM BARS
O.C. - ON CENTER
TWO-WAY
L
1/6
TWO-WAY
L
1/5
L
2/5
LEGEND:
TWO-WAY
TB - TOP BARS
BB - BOTTOM BARS
NOT
TO
SCALE
NOTES ON FOUNDATION:
2.50
2.25
3.00
1600
1.00
L2/4 OR L3/4
12mm DIA. @
250mm O.C. BOTH
FACES
L2/4 OR L3/4
L1/8
L1/8
L2/8
L2/8
L1/4 OR L2/4
L1/4 OR L2/4
2.00
L1/4
2 - 20mm DIA.
L3/8
2 - 16mm DIA.
600mm MIN.
2 - 16mm DIA.
135
700
12mm dia. TOP BARS @ 250mm O.C.
W/ 10mm dia. @ 300mm O.C. TEMP BARS
LANDING LEVEL
550
550
450
450
700
10mm dia. @ 300mm O.C. CHAIR BARS (TYPICAL)
TOP BAR
WEB BAR
2B2
5 - 20mm DIA.
STIRRUPS
0.25
BEAM SECTION
GB-1
SECTION 2 - 2
500
BOTTOM BAR
B
900
0.60
3200
SCALE:
100
8.00
1.00
SCALE:
1:20m
1:50m
DETAIL OF STAIRS
"THE CONSULTANT, ENGR. ROMEO D. ROBLES , SHALL BE HELD FULLY RESPONSIBLE FOR
FAILURE OF THE FACILITY DUE TO FAULTY DESIGN EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONSULTANTS."
PROJECT/LOCATION:
SHEET CONTENT:
SCHEDULE OF SLAB
TYP. SLAB ELEVATION
TRANSVERSE BEAM
REINFORCEMENTDETAIL
TYP. ARRANGEMENT OF
LONGITUDINALREINFORCEMENT
STAIR DETAILS
CHECKED BY:
PREPARED BY:
DRAWN BY:
DESIGNED BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
CHARLES MARIN
S-6
DATA ENCODER I
MANUEL Y. MADRID
ENGINEER II
SHEET NO.:
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
17 28
MARK/
FLR.
6" CHB
0.65
SPLICING
1.00
Lv
Ln
SCALE:
200
Lo
50
50
50
50
400
500
8 - 20mm DIA.
400
500
3 SETS 10mm DIA. TIES, FIRST 10 @ 100mm,
REST @ 200MM O.C.
40mm CONCRETE COVER
8 - 25mm DIA.
400
500
3 SETS 10mm DIA. TIES, FIRST 10 @ 100mm,
REST @ 200MM O.C.
40mm CONCRETE COVER
8 - 25mm DIA.
470
570
3 SETS 10mm DIA. TIES, FIRST 10 @ 100mm,
REST @ 200MM O.C.
75mm CONCRETE COVER
Lj
0.50
0.50
400
6" CHB
Lo
6" CHB
C2
470
2.00
NGL
COLUMNS
C1
500
GB1
OF
570
FGL
GB1
Lj
GB1
VARIES
SCHEDULE
2.50
SECTION 1 - 1
SCALE:
MARK
ELEVATION OF COLUMN
BEAM SECTION
SCALE:
SCALE:
NTS
LONGITUDINAL REINFORCEMENTS
SPACING
WIDTH (mm) DEPTH (mm) BAR DIAM. DISCONT. END CONT. END MIDSPAN CONT. END DISCONT. END EACH FACE DIAMETER
RB1
200
350
RB2
200
350
4B1
250
600
4B2
250
500
4B3
250
500
4B4
250
450
4B5
200
500
3B1
300
600
3B2
250
500
3B3
250
550
SECTION
1:40m
16 TB
BB
16 TB
BB
20 TB
BB
20 TB
BB
20 TB
BB
20 TB
BB
16 TB
BB
25 TB
BB
25 TB
BB
25 TB
BB
4
2
3
2
5
2
4
2
4
2
4
2
5
2
4
2
3
2
3
2
4
2
3
2
5
2
4
2
4
2
4
2
5
2
4
2
3
2
3
2
2
4
2
3
2
5
2
4
2
4
4
2
2
5
2
4
2
3
2
3
4
2
3
2
5
2
4
2
4
2
4
2
5
2
4
2
3
2
3
2
4
2
3
2
5
2
4
2
4
2
4
2
5
2
4
2
3
2
3
2
10
10
1 - 12
10
1 - 12
10
1 - 12
10
1 - 12
10
1 - 12
10
1 - 16
10
1 - 16
10
1 - 16
10
MARK
FIRST 8 @ 100mm
REST @ 200mm O.C.
FIRST 8 @ 100mm
REST @ 200mm O.C.
FIRST 8 @ 100mm, NEXT 4 @ 150mm
REST @ 200mm O.C.
FIRST 8 @ 100mm, NEXT 4 @ 150mm
REST @ 200mm O.C.
FIRST 8 @ 100mm, NEXT 4 @ 150mm
REST @ 200mm O.C.
FIRST 8 @ 100mm, NEXT 4 @ 150mm
REST @ 200mm O.C.
FIRST 5 @ 100mm, NEXT 4 @ 150mm
REST @ 200mm O.C.
FIRST 10 @ 100mm, NEXT 4 @ 150mm
REST @ 200mm O.C.
FIRST 10 @ 100mm, NEXT 4 @ 150mm
REST @ 200mm O.C.
FIRST 10 @ 100mm, NEXT 4 @ 150mm
REST @ 200mm O.C.
NTS
BEAM SECTION
LONGITUDINAL REINFORCEMENTS
SPACING
WIDTH (mm) DEPTH (mm) BAR DIAM. DISCONT. END CONT. END MIDSPAN CONT. END DISCONT. END EACH FACE DIAMETER
3B4
250
450
3B5
200
500
2B1
300
650
2B2
300
550
2B3
300
550
2B4
300
450
2B5
200
500
GB1
250
500
LB-1
220
400
25 TB
BB
16 TB
BB
25 TB
BB
25 TB
BB
25 TB
BB
25 TB
BB
16 TB
BB
20 TB
BB
TB
BB
3
2
2
2
4
2
3
2
3
2
3
2
5
2
3
3
2
3
3
2
2
2
4
2
3
2
3
2
3
2
5
2
3
3
2
3
2
3
2
2
2
4
2
3
2
3
2
3
2
5
3
3
3
2
3
2
2
2
4
2
3
2
3
2
3
2
5
2
3
3
3
2
3
2
2
2
4
2
3
2
3
2
3
2
5
2
3
3
2
3
10
1 - 12
10
1 - 16
10
1 - 16
10
1 - 16
10
1 - 12
10
1 - 12
10
10
10
"THE CONSULTANT, ENGR. ROMEO D. ROBLES , SHALL BE HELD FULLY RESPONSIBLE FOR
FAILURE OF THE FACILITY DUE TO FAULTY DESIGN EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONSULTANTS."
SCHEDULE OF BEAMS
PROJECT/LOCATION:
SHEET CONTENT:
ELEVATION OF CLOMUN
SECTION - 1
SCHEDULE OF BEAMS
TYPICAL TRUSS ACHORAGE DETAIL
MAT FOOTING SECTION DETAIL
SCHEDULE OF COLUMNS
CHECKED BY:
PREPARED BY:
DRAWN BY:
DESIGNED BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
CHARLES MARIN
S-7
DATA ENCODER I
MANUEL Y. MADRID
ENGINEER II
SHEET NO.:
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
18 28
LEGEND:
A
B
C
C
B
C
C
C
D E T A I L
A
S 8
O F
SCALE:
C
A
1:50m
PLAN
LEGEND:
A
B
C
C
C
B
C
B
C
C
A
C
C
B
C
C
A
D
S 9
D E T A I L
F
S 8
O F
SCALE:
SCALE:
1:10m
1:50m
SECTION
LEGEND:
G.I.
E
S 8
D E T A I L
O F
SCALE:
PLAN
1:50m
C
S 9
C
S 9
PROJECT/LOCATION:
SHEET CONTENT:
SPOT DETAIL OF PARAPET AND TRUSS
DETAIL
SCHEDULE OF SLAB REINFORCEMENT
C2F1 DETAIL
CONCRETE SUNBREAKER DETAIL
DETAIL OF T - 1,DETAIL OF T - 2
DETAIL OF T - 3
DRAWN BY:
DESIGNED BY:
SCALE:
SCALE:
D E T A I L
1:50m
"THE CONSULTANT, ENGR. ROMEO D. ROBLES , SHALL BE HELD FULLY RESPONSIBLE FOR
FAILURE OF THE FACILITY DUE TO FAULTY DESIGN EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONSULTANTS."
CHECKED BY:
PREPARED BY:
C 2 F 1
1:20m
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
CHARLES MARIN
S-8
DATA ENCODER I
MANUEL Y. MADRID
ENGINEER II
SHEET NO.:
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
19 28
UP
LANDING
FF1
A 11
D
1
W
1
W
2
CLASSROOM
FF1
CLASSROOM
FF1
W
2
W
1
CORRIDOR
FF1
CORRIDOR
FF1
W
2
W
1
D
1
PARAPPET WALL LN.
D
1
W
1
D
1
W
1
C
A 2
CLASSROOM
C
A 2
CLASSROOM
W
2
W
2
W
1
D
1
CORRIDOR
FF1
D
1
G
D
1
D
1
FF1
C
A 9
A
A 9
D
1
D
4
D
2
FF1
D
4
D
4
B
B
A 9
UP
A.1
9 10 11 12
STO
W
3
D
2
W
1
W
1
W
3
RAMP UP
STAGE
FF1
UP
A
A 8
1 2
5 4 3
2
1
CORRIDOR
FF1
W
2
W
2
D
1
D
1
W
2
D
1
W
2
MALE (CR)
FF2
D
2
D
2
D
4
8 7 6 5 4 3 2 1
D
4
W
3
D
4
CLASSROOM
CLASSROOM
FF1
FF1
UP
9 10 11 12
A.1
14 15 16
DN
W
3
UP
3 4 5
D
4
W
3
8 7 6 5 4 3 2 1
D
4
W
3
D
S 10
CORRIDOR
FF1
D
1
FEMALE (CR)
FF2
D
3
FF1
B
A 9
D
2
D
1
URINAL
FF2
HE (CR)
FF2
W
3
A
A 9
C
A 9
SHE (CR)
FF2
D
4
W
2
W
1
URINAL
D
4
FF1
UP
W
2
CLASSROOM
W
2
W
2
CLASSROOM
G
W
1
W
1
FF1
FF1
W
1
W
2
W
2
W
1
W
2
D
1
UP
W
1
5
4
3
2
1
D
1
DN
D
A 5
D
A 5
A 11
CORRIDOR
FF1
W
1
W
1
W
3
D
S 5
2 1
W
4
A
A 8
2
1
W
4
W
5
UP
UP
LEGEND:
1
A
G R O U N D
A 1
F L O O R
SCALE:
5.A
6.A
FF1
FF2
- 200mmX200mm VITRIFIED
FLOOR TILES (UNGLAZED)
1
B
P L A N
SHEET CONTENT:
CHECKED BY:
DRAWN BY:
5.A
SCALE:
SUBMITTED BY:
6.A
CONCURRED BY:
A 1
1:125m
PROJECT/LOCATION:
DANILO M. MARCIAL
1:125m
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
DATA ENCODER I
PREPARED BY:
MANUEL Y. MADRID
ENGINEER II
A-2
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
2 28
B
B
LEGEND:
LINE OF T - 1
LINE OF T - 1
A
B
C
C
C
LEGEND:
B
C
C
D E T A I L
S 9
O F
D E T A I L
L T - 1
1:40m
S 9
SCALE:
O F
H T - 1
SCALE:
C
C
D E T A I L
C
S 9
1:50m
O F
SCALE:
H T - 2
1:50m
LEGEND:
B
B
B
C
C
C
C
C
C
C
A
A
D E T A I L
H
S 9
O F
H T - 3
SCALE:
1:50m
D E T A I L
S 9
O F
D E T A I L
H T - 4
SCALE:
D E T A I L
S 9
1:50m
G
S 9
SCALE:
G - 1
F
S 9
1:30m
O F
SCALE:
H T - 5
1:50m
O F
D E T A I L
SCALE:
O F
G - 2
E
S 9
1:30m
D E T A I L
SCALE:
O F
G - 3
1:30m
D
S 9
1:30m
"THE CONSULTANT, ENGR. ROMEO D. ROBLES , SHALL BE HELD FULLY RESPONSIBLE FOR
FAILURE OF THE FACILITY DUE TO FAULTY DESIGN EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONSULTANTS."
PROJECT/LOCATION:
SHEET CONTENT:
DETAIL OF LT - 1
DETAIL OF HT - 1 TO HT -5
DETAIL OF G1 - G3, PARAPPET AND
TRUSS DETAIL
CHECKED BY:
PREPARED BY:
DRAWN BY:
DESIGNED BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
CHARLES MARIN
S-9
DATA ENCODER I
MANUEL Y. MADRID
ENGINEER II
SHEET NO.:
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
20 28
A.1
RAMP UP
C
S 10
8
D
S 10
D
S 10
A
S 10
P L A N
O F
O F
SCALE:
R A M P
C
S 10
1:10m
1:5m
R A M P
SCALE:
1:75m
NON SKID
B
S 10
P L A N
PLAIN CEM
ENT
1:50m
B
S 10
C
S 10
"THE CONSULTANT, ENGR. ROMEO D. ROBLES , SHALL BE HELD FULLY RESPONSIBLE FOR
FAILURE OF THE FACILITY DUE TO FAULTY DESIGN EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONSULTANTS."
1:50m
PROJECT/LOCATION:
SHEET CONTENT:
CHECKED BY:
PREPARED BY:
DRAWN BY:
DESIGNED BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
CHARLES MARIN
S - 10
DATA ENCODER I
MANUEL Y. MADRID
ENGINEER II
SHEET NO.:
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
21 28
LEGEND :
SYMBOLS
GENERAL NOTES:
DESCRIPTION
SYMBOLS
DESCRIPTION
1.
S3W
M
- CIRCUIT HOMERUN
EXISITNG APPLICABLE ORDINANCES, RULES & REGULATIONS OF THELOCAL GOVERNMENT & WITH THE REQUIREMENTS OF THE LOCAL POWER
COMPANY.
2.
THE TYPE OF POWER SUPPLY SHALL BE SINGLE PHASE 220V, 2 - WIRE 60 HZ A.C.
3.
ALL WIRINGS SHALL BE INSTALLED IN STANDARD RIGID STEEL CONDUITS RUN EMBEDDED INSIDE THE CONCRETE AND HOLLOW BLOCKS STRUCTURES,
FACP
- SERVICE ENTRANCE
B
ALL ELECTRICAL WORKS SHALL BE DONE IN ACCORDANCE WITH THE PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE,
SLABS, COLUMNS, WALLS, PARTITIONS AND / OR CONCEALED BETWEEN DOUBLE WALL WOODEN PARTITIONS AND INSIDE THE CEILING SPACES,
- ELECTRIC RISER
WHERE THE USE OF CONCEALED CONDUIT WIRING IS IMPRACTICABLE, SURFACE METAL MOUDLING MAY BE USED.
DIAMETER, RESPECTIVELY.
- EMERGENCY LIGHT
S3
- GROUNDING SYSTEM
UNLESS OTHERWISE INDICATED ON THE PLANS, THE MINIMUM SIZES OF WIRE AND RIGID STEEL CONDUIT TO BE USED SHALL BE 2.0mm2 AND 15mm
5.
ALL LIGHTING CIRCUIT HOMERUNS AND CONVENIENCE OUTLETS SHALL BE WIRED WITH NOT LESS THAN 3.5mm2 TW IN SIZE, UNLESS OTHERWISE
INDICATED ON THE PLANS.
6.
- PUSH BUTTON
WHEREVER REQUIRED AND NECESSARY, PULL BOXES AND JUNCTION BOXES OF PROPER SIZES SHALL BE INSTALLED AT CONVENIENT AND
INCONSPICUOUS LOCATIONS, ALTHOUGH SUCH BOXES ARE NOT SHOWN ON THE PLANS NOR MENTIONED IN THE SPECIFICATIONS.
7.
ALL NON-CURRENT METAL PARTS OF EQUIPMENT / DEVICES SUCH AS PANELBOARD ACB AND THE LIKE SHALL BE PROPERLY GROUNDED IN
ACCORDANCE WITH THE PROVISIONS OF ARTICLE 4, PHILIPPINE ELECTRICAL CODE.
8.
9.
ALL WALL OUTLETS SHALL BE INSTALLED AT THE FOLLOWING HEIGHTS ABOVE THE FINISHED FLOOR LEVEL UNLESS OTHERWISE NOTED:
A. WALL SWITCHES
1200mm
1500mm
B. CONVENIENCE OUTLETS
300mm
1200mm
ALL ELECTRICAL WORKS / INSTALLATIONS SHALL BE DONE IN STANDARD WORKSMANSHIP MANNER WITH SKILLED MANPOWER DULYSUPERVISED BY A
REGISTERED ELECTRICAL ENGINEER.
CEILING LINE
DPD
B
THHN )
SYMBOL
MOUNTINGL /
INSTALLATION
DESCRIPTION
T-5 2-28W FLOURESCENT LAMP
REFLECTORIZED SURFACE
MOUNTED W/OUT LOUVRE
ELECTRONIC BALLAST 220V 60HZ
FS
TO MDP-4
DPC
B
THHN )
SURFACE CEILING
MOUNTED
FS
TO MDP-3
DPB
SURFACE CEILING
MOUNTED
THHN )
FS
TO MDP-2
5400
MDP
DPA
TO MDP LINESIDE
P.B.
1800
TW )
FS
CONNECT TO NEAREST O.C.
FACP
FIRE ALARM
FIRE ALARM
CONCURRED BY:
DANILO M. MARCIAL
SPECIAL PROJECT ENGINEER
PAGCOR
PROJECT/LOCATION:
SHEET CONTENT:
CHECKED BY:
DRAWN BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
DATA ENCODER I
PREPARED BY:
ANTHONY C. GONZALES
ENGINEER II
E-1
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
22 28
2c
3Sabc
3Sabc
2b
1a
2b
2a
3Sabc
2a
DPA
1
2a
2c
3Sabc
3Sabc
1d
G
2c
1e
2Sef
2b
2c
2b
2b
1d
G
2c
2b
2Scd
2Scd
DPA
1
1c
2b
1e
2b
2Sef
2a
2c
1c
I
2c
3Sabc
2a
2a
2c
2b
J
1b
2a
2b
2Sab
2Sab
1a
2c
1b
2c
UP
2b
2a
2c
2b
DN
K
2c
UP
LANDING
UP
1f
2a
2a
1n
Sgh
1 k
2Sjk
1g
2Slm
1i
DPA
2Si
MDD
DPA
3
2Sno
2Spq
2Sab
2Scd
2a
2c
2b
2d
FACP
A.1
1
1m
2a
2c
2b
DPC
1
DPD
1
1 k
A.1
2d
DPC
2
Sgh
j
2Sjk
2Si
DPD
2
1n
URINAL
1g
2Sno
2Spq
2Sabc
2Sdef
2a
2a
A.1
DPB
DPC
S3W
1 l
A.1
DPB
3
DPC
3
1m
STO
S
DPB
1
2a
S3W
1 l
2a
S = 1:16
1 j
2Slm
DPB
2
1f
DPD
3
2c
2b
UP
RAMP UP
UP
UP
TO CONNECT TO S3W @ 2ND FLOOR
STAIRWAY LANDING
4
A
E 2
1:125m
E 2
LIGHTING LAYOUT
SCALE:
1:125m
CONCURRED BY:
DANILO M. MARCIAL
SPECIAL PROJECT ENGINEER
PAGCOR
PROJECT/LOCATION:
SHEET CONTENT:
CHECKED BY:
DRAWN BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
DATA ENCODER I
PREPARED BY:
ANTHONY C. GONZALES
ENGINEER II
E-2
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
23 28
UP
FF
FF
J
WP
FF
FF
2Sef
2Sef
WP
FD
FD
H
WP
RISER UP TO SIMILAR
OUTLET
FS
RISER UP TO SIMILAR
OUTLET
FS
FC
FC
2Scd
2Scd
WP
FB
FB
F
WP
DPC
4
UP
DPD
4
DPA
5
FA
2Sab
DPB
5
DPC
5
DPD
5
D
WP
WP
FACP
A.1
A.1
DPB
6
DPA
7
STO
3Scde
WP
A
E 3
UP
WP
UP
UP
A.1
DPD
6
RAMP UP
UP
DPC
6
WP
3Sfgh
WP
C
DPB
DPC
DPD
A.1
WP
F j
MDD
2Sij
2Sgh
S = 1:16
DPA
WP
FH
WP
WP
FG
URINAL
DPA
6
2Sab
F i
2Sab
FA
DPB
4
F
WP
DN
UP
LANDING
2
E 3
1:125m
1:125m
CONCURRED BY:
DANILO M. MARCIAL
SPECIAL PROJECT ENGINEER
PAGCOR
PROJECT/LOCATION:
SHEET CONTENT:
CHECKED BY:
DRAWN BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
DATA ENCODER I
PREPARED BY:
ANTHONY C. GONZALES
ENGINEER II
E-3
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
24 28
LANDING
UP
DN
UP
SEPTIC
VAULT
UP
(SEE DETAIL)
E
D
FD
PVCSS
WC
WC
FD
LAV
PVCSP
LAV
CO
URI
FD
PVCSS
WC
WC
FD
LAV
WC
PVCSP
LAV
CO
URI
CO
FD
SS
SS
S = 1:16
CO
FD
FD
B
WC
UP
PVCSP
PVCSS
DN
CO
RAMP UP
UP
2
1
4
A
P 1
PVCSS
PVCSP
2 1
2
1
UP
UP
CO
UP
5 4 3
A.1
FD
CO
CO
A.1
STO
PVCSP
UP
PVCSP
WC
WC
FD
CO
CO
A.1
LAV
WC
WC
CO
WC
A.1
FD
SS
LAV
1:125m
P 1
CONCURRED BY:
1:125m
DANILO M. MARCIAL
SPECIAL PROJECT ENGINEER
PAGCOR
PROJECT/LOCATION:
SHEET CONTENT:
CHECKED BY:
DRAWN BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
DATA ENCODER I
PREPARED BY:
MANUEL Y. MADRID
ENGINEER II
P-1
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
25 28
UP
LANDING
DN
UP
F
UP
WC
WC
LAV
WC
URI
PVC CWL
PVC CWL
D
LAV
SS
PVC CWL
WC
LAV
URI
SS
S = 1:16
SS
WC
SS
B
WC
WC
UP
A.1
WC
UP
A.1
LAV
WC
A.1
WC
A.1
F
LAV
WC
STO
RAMP UP
UP
DN
UP
TAP TO MAIN
WATER LINE
5 4 3
2
1
2 1
2
1
UP
UP
4
A
P 2
3
B
P 2
1:125m
1:125m
CONCURRED BY:
DANILO M. MARCIAL
SPECIAL PROJECT ENGINEER
PAGCOR
PROJECT/LOCATION:
SHEET CONTENT:
CHECKED BY:
DRAWN BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
DATA ENCODER I
PREPARED BY:
MANUEL Y. MADRID
ENGINEER II
P-2
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
26 28
LANDING
CB
CB
CB
CB
PVCDS
PVCDS
CB
PVCDS
DN
CB
CDP
UP
PVCDS
TAP TO MAIN
STORM DRAIN
CB
CB
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
UP
A.1
A.1
UP
A.1
F
DN
A
PVCDS
PVCDS
STO
PVCDS
PVCDS
C
B
PVCDS
A.1
F
PVCDS
D
C
CB
LAV
C
B
PVCDS
PVCDS
E
CB
PVCDS
E
D
PVCDS
CB
PVCDS
CB
PVCDS
CB
PVCDS
CB
PVCDS
PVCDS
CB
PVCDS
PVCDS
CB
PVCDS
PVCDS
CB
PVCDS
PVCDS
CB
PVCDS
PVCDS
UP
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
PVCDS
UP
CB
CB
CB
CB
CB
5 4 3
2
1
2
1
UP
CB
CDP
CB
TAP TO MAIN
STORM DRAIN
2
A
P 3
G R O U N D
5
F L O O R
S T O R M
6
D R A I N A G E
3
B
L A Y O U T
SCALE:
1:125m
P 3
CONCURRED BY:
1:125m
DANILO M. MARCIAL
SPECIAL PROJECT ENGINEER
PAGCOR
PROJECT/LOCATION:
SHEET CONTENT:
CHECKED BY:
DRAWN BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
DATA ENCODER I
PREPARED BY:
MANUEL Y. MADRID
ENGINEER II
P-3
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
27 28
CONCURRED BY:
DANILO M. MARCIAL
SPECIAL PROJECT ENGINEER
PAGCOR
PROJECT/LOCATION:
SHEET CONTENT:
CHECKED BY:
DRAWN BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
DATA ENCODER I
PREPARED BY:
MANUEL Y. MADRID
ENGINEER II
P-4
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
28 28
8
1
5.A
6.A
APEX OF ROOF
DS
DS
DS
DS
DS
DS
DS
W
3
W
3
W
3
W
3
W
3
W
3
W
3
W
3
W
5
W
4
W
1
W
1
W
1
W
1
W
1
F R O N T
E L E V A T I O N
SCALE:
1:125m
DS
DS
DS
DS
DS
E
D
W
4
W
1
A 2
DS
W
1
DS
W
1
DS
DS
CEILING LN.
1
APEX OF ROOF
DS
DS
C
B
DS
DS
CEILING LN.
A.1
A
A.1
D
1
W
2
D
1
W
2
D
1
W
2
W
2
D
1
D
1
W
2
D
1
D
1
W
2
D
1
D
1
W
2
W
2
D
1
DS
DS
DS
2
A
A 2
DS
4
P
5
L
SCALE:
DS
5.A
6.A
DS
W
2
W
2
W
2
D
1
D
1
N
CONCURRED BY:
1:125m
C
A 2
W
2
PROJECT/LOCATION:
SHEET CONTENT:
CHECKED BY:
DRAWN BY:
R E A R
E L E V A T I O N
SCALE:
DANILO M. MARCIAL
SPECIAL PROJECT ENGINEER
PAGCOR
1:125m
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
DATA ENCODER I
ROOF PLAN
REAR ELEVATION
FRONT ELEVATION
PREPARED BY:
MANUEL Y. MADRID
ENGINEER II
A-3
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
3 28
5.A
6.A
APEX OF ROOF
CEILING LN.
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
SHE (CR)
SHE (CR)
SHE (CR)
SHE (CR)
STO
EARTHFILL / EMBANKMENT
W
4
DESCRIPTION:
W
5
SETS:
2 SETS
1 SETS
LOCATION:
FACADE
FACADE
A 2
C R O S S
S E C T I O N
SCALE:
1:125m
F.F.L
F.F.L
D
1
DESCRIPTION:
SETS:
LOCATION:
D
2
HOLLOW CORE FLUSH TYPE SWING DOOR ON
50x150mm YACAL GUIJO JAMB W/ MARINE PLYWOOD
FACING INSIDE AND ORDINARY OUTSIDE COMPLETE W/
HARDWARE AND ACCESSORIES
D
3
D
4
TOILET (DISABLED)
W
1
TOILET (CUBICLE)
36 SETS
12 SETS
1 SETS
20 SETS
CLASSROOMS
(SHE/HE) / STAIRS
DISABLED
COMFORT ROOM
S C H E D U L E
O F
DESCRIPTION:
W
2
PROJECT/LOCATION:
SETS:
32 SETS
36 SETS
8 SETS
LOCATION:
@ CLASSROOMS
@ CORRIDOR / CLASSROOMS
D O O R S
A N D
W I N D O W S
SCALE:
W
3
CONCURRED BY:
DANILO M. MARCIAL
1:40m
SHEET CONTENT:
CHECKED BY:
DRAWN BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
DATA ENCODER I
PREPARED BY:
MANUEL Y. MADRID
ENGINEER II
A-4
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO
ROBERTOG.S.TAGUDANDO
NICOLAS
DISTRICT ENGINEER
REGIONAL
DISTRICT ENGINEER
DIRECTOR
4 28
TOP OF BEAM
CEILING LINE
W
3
W
1
W
1
W
1
W
1
W
1
W
3
W
1
W
3
W
1
W
1
W
1
W
1
W
1
W
3
W
1
W
3
W
1
W
1
W
1
W
1
W
1
W
3
W
1
F
W
3
W
1
W
1
W
1
W
1
W
1
A 6
W
3
W
1
EARTHFILL / EMBANKMENT
A.1
L E F T
A 4
SCALE:
S I D E
E L E V A T I O N
1:125m
TOP OF BEAM
CEILING LINE
W
2
D
1
D
1
W
2
W
2
D
1
D
1
W
2
W
2
D
1
A
A 6
W
2
D
1
D
1
W
2
W
2
D
1
D
1
W
2
W
2
D
1
THIRD FLOOR CORRIDOR
FINISH FLOOR LINE
W
2
D
1
D
1
W
2
W
2
D
1
D
1
W
2
W
2
D
1
SECOND FLOOR CORRIDOR
FINISH FLOOR LINE
F
A 6
D
3
W
2
D
3
D
1
D
1
W
2
W
2
D
1
D
1
W
2
W
2
D
1
GROUND FLOOR CORRIDOR
FINISH FLOOR LINE
EARTHFILL / EMBANKMENT
B
A 4
PROJECT/LOCATION:
SHEET CONTENT:
RIGHT
SCALE:
DANILO M. MARCIAL
1:125m
CHECKED BY:
DRAWN BY:
CONCURRED BY:
SIDE ELEVATION
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
DATA ENCODER I
PREPARED BY:
MANUEL Y. MADRID
ENGINEER II
A-5
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
5 28
A.1
D
4
D
4
D
3
D
4
D
3
THIRD FLOOR CORRIDOR
FINISH FLOOR LINE
D
3
SECOND FLOOR CORRIDOR
FINISH FLOOR LINE
F
A 6
D
3
D
3
GROUND FLOOR CORRIDOR
FINISH FLOOR LINE
EARTHFILL / EMBANKMENT
A
A 5
5.A
6.A
LONGIT UDINAL
SCALE:
SECTION
1:125m
5.A
6.A
A 8
W
1
W
1
W
1
W
1
PB
PB
B
STAGE
PLAIN CEMENT FIN
ELEV = + 0.90m
UP
ELEV = + 0.54m
2
1
PB
A 5
5 4 3
PB
ELEV = + 0.54m
3 4 5
1 2
A 8
UP
PLANT BOX
PB
FRONT
ELEVATION
STAGE
SCALE:
SCALE:
1:50m
1:100m
2 1
2
1
PB
UP
UP
ELEV = + 0.00m
ELEV = + 0.00m
D
A 5
CONCURRED BY:
1:75m
DANILO M. MARCIAL
SPECIAL PROJECT ENGINEER
PAGCOR
PROJECT/LOCATION:
SHEET CONTENT:
CHECKED BY:
DRAWN BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
LONGITUDINAL SECTION
BLOW UP PLAN @ STAGE
FRONT ELEVATION @ STAGE
SECTION
DATA ENCODER I
PREPARED BY:
MANUEL Y. MADRID
ENGINEER II
A-6
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
6 28
A
A 6
HANDRAIL ELEVATION
B
A 6
BLOW UP DETAIL
E
A 6
BLOW-UP DET.
C
A 6
F
A 6
D
A 6
REPUBLIC OF THE PHILIPPINES
NATIONAL CAPITAL REGION
PROJECT/LOCATION:
SHEET CONTENT:
CHECKED BY:
DRAWN BY:
DANILO M. MARCIAL
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
ICONIC DESIGN ELEVATION
CURVE PRATT TRUSS DETAIL
HANDRAIL DETAIL
BLOW UP DETAIL
TAPERED COLUMN DETAIL
DATA ENCODER I
PREPARED BY:
MANUEL Y. MADRID
ENGINEER II
A-7
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
7 28
2
B
2
B
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
UP
A.1
UP
A.1
A.1
9 10 11 12
9 10 11 12
STO
D
3
DN
9 10 11 12 13 14 15 16
DN
W
3
W
3
W
3
@ FOURTH FLOOR
@ GROUND FLOOR
A
A 8
B L O W
U P
P L A N
S T A I R S
SCALE:
1:50m
B
A8
C
A8
D
A8
NOSING DETAIL
STAIR DETAIL
CONCURRED BY:
DANILO M. MARCIAL
SPECIAL PROJECT ENGINEER
PAGCOR
PROJECT/LOCATION:
SHEET CONTENT:
CHECKED BY:
DRAWN BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
BLOW UP PLAN @ STAIRS
NOSING DETAIL
CRASH RAILING DETAIL
STAIR DETAIL
DATA ENCODER I
PREPARED BY:
MANUEL Y. MADRID
ENGINEER II
A-8
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
8 28
2
C'
3
B
D
4
A'
A.1
D
3
D
4
D'
B'
A
A9
D
4
W
3
MALE (CR)
FF2
E'
D
3
F'
D'
W
3
D
4
E'
D
4
W
3
FEMALE (CR)
FF2
D
A'
F'
D
3
B'
C
A9
C'
B
A9
W
3
F
A9
W
3
D
A9
E
A9
W
3
G
A9
I
A9
H
A9
C
A 10
DANILO M. MARCIAL
SPECIAL PROJECT ENGINEER
PAGCOR
PROJECT/LOCATION:
SHEET CONTENT:
C.R. DETAIL @GROUND FLOOR DETAIL
(PWD) / C.R. DETAIL @GROUND FLOOR
DETAIL (SHE) / C.R. DETAIL @GROUND
FLOOR DETAIL (HE) / SECTION A' - A' /
SECTION B' - B' / SECTION C' - C' /
SECTION D' - D' / SECTION E' - E' /
SECTION F' - F'
CHECKED BY:
DRAWN BY:
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
SET NO.:
SHEET NO.:
CHARLES MARIN
DATA ENCODER I
PREPARED BY:
MANUEL Y. MADRID
ENGINEER II
A-9
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR
9 28
PREPARED BY:
CHECKED BY:
MANUEL Y. MADRID
ENGINEER II
SUBMITTED BY:
RECOMMENDING APPROVAL:
APPROVED BY:
LUISITO C. PONCIANO
EULOGIO V. YDIO
ROBERTO S. NICOLAS
REYNALDO G. TAGUDANDO
DISTRICT ENGINEER
REGIONAL DIRECTOR