Atp 11a
Atp 11a
Atp 11a
Document History
Version
Author
Date
Remarks
Version 1.0
Ashish Shukla
3-Sep-2015
Version 1.1
Ashish Shukla
11-SEP-2015
Agenda
Work Order Assignment Management Flow chart
Example on WO Assignment Management Flow
Procedure to use SITEFORGE using tab in field
WO Assignment Management Flow(ATP-11A)
Install and usage of various Login
Procedure to use SITEFORGE using tab in field
Responsibility:Sam
sung CH;
Notification:Samsun
g AM, RJIL CTO
Responsibility:
Samsung Am
Notification:
Samsung CM
On Hold with
justification
Samsung QE
Accept
On hold with
issue list to eNB
Eng
CH assigns the WO to
respective Samsung AM
Accept
1. AM assign Samsung eNB
engineer & QE for that Site
2. Assign various tasks of that WO
to single or multiple SOLPAR
Reject
Responsibility:
SOLPAR PM
Notification :Samsung
AM & Samsung eNB
er.
RJIL Circle
CTO
Accept/
Reject
Accept
End
Response:Sam
sung QE
Notification:
Samsung-Reg
QM,AM,CM;
SOLPAR-PM,FE
Responsibility:
Samsung AM
Notification:
Regional
QM,SAMS
CM,Circle RJIL
CTO
Responsibility:
Circle RJIL CTO
Notfication:
Samsung
CH,AM;System(
GIS,REIMS)
Responsibility:
SAMSUNG AM
Notification:
SOLPAR PM,
SAMSUNG CH
Login
Login with the new password
How to Login?-FE
Login with your user name from Samsung TAB
Click on Task
Site Information
EDIT
Click On Next
Installation Scenario
EDIT
Enter the Information based on ACE/ROSENBERGER Model Type Used
EDIT
Tilt Information
Azimuth Information
CPRI Length
EDIT
CDU Installation Check List
Grounding Check
Capture 850 Mhz RRH Serial Number for all Three sectors
Capture 850 Mhz Antenna Serial Number for all Three sectors
Capture 850 Mhz Antenna Serial Number for all Three sectors
Site Photograph
Site Photograph
Site Photograph
Site Photograph
Site Photograph
Remarks
Incase of existing antenna are swapped with new antenna then SOLPAR
need to mention the YES/NO , and also confirm that they are sent back to
warehouse .
Click Next
Acceptance Sheet
Thank You!!!