HARINI ENTERPRISES

BARBENDING SCHEDULE JOINTLY ARRIVED BY M/S. DSWE and HARINI ENTERPRISES


PROJECT : 33/11 KVA SUB STATION WORK NORTH CHENNAI.
SITE : KOLATHUR
CLIENT : M/S. DRAKE & SCULL WATER & ENERGY PVT LTD.
BBS DONE ARRIVED BY: Mr.Mohammed Nazer ( Manager Civil,DSWE) and Mr.Rajaraman (Project Engg,Harini),Mr.Anbarasan (Site Engg)
CHECKED & RE-ARRIVED BY : Mr.Sivasubramanian(Engineer Civil,DSWE) and Mr.Anbarasan(Site Engg)
S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

10 mm

12 mm

16 mm

20 mm

25 mm

A.1 Isolated Footings


Foundation F1-Main Rod

12

23

14

322

3.6

1159.20

1159.20

Distribution rod

12

23

14

322

3.6

1159.20

1159.20

Foundationn F2-main rod

12

22

44

3.4

149.60

149.60

Distribution rod

12

22

44

3.4

149.60

149.60

Column C1

25

10

14

140

5.6

784

Ties outer spacing 100mm c/c

10

38

14

532

1.64

872.48

872.48

Ties Inner spacing 100mm c/c

10

38

14

532

1.24

659.68

659.68

column C1 over lap above plinth

25

10

14

140

1.25

175.00

Column C2

20

10

20

5.35

107.00

Ties outer spacing 100mm c/c

38

76

1.28

97.28

97.28

Ties Inner spacing 100mm c/c

38

76

1.12

85.12

85.12

Middle Hook

38

76

0.23

17.48

17.48

Column C2 over Lap above plinth

20

10

20

20.00

Top Main Rod

25

12

96.00

96.00

Top Extra at end support

25

16

4.15

66.40

66.40

2 Column up plinth
784

175
107.00

20.00

3 Grade Beam
GB1

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bottom Main Rod

25

Bottom Extra Rod


2 Leg Stirips c/c 100mm
2 Leg Stirips c/c 200mm

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

12

96.00

8 mm

10 mm

12 mm

16 mm

20 mm

25 mm

25

8.8

70.40

66

264

1.74

459.36

459.36

20

80

1.74

139.20

139.20

Top Main Rod

25

12

24.00

24.00

Over lap at end for stair riser beam GB1

25

3.15

6.30

6.30

Top Extra at end support

25

4.15

8.30

8.30

Top Extra at continious support

25

5.65

11.30

11.30

Bottom Main Rod

25

12

24.00

24.00

Over lap at end for stair riser beam GB1

25

3.15

6.30

6.30

Bottom Extra Rod

25

8.8

17.60

2 Leg Stirips c/c 100mm

81

81

1.74

140.94

140.94

2 Leg Stirips c/c 200mm

20

20

1.74

34.80

34.80

Top Main Rod

16

12

48.00

48.00

Top Extra at end support

16

12

2.475

29.70

29.70

Top Extra at mid support

16

3.95

23.70

23.70

Bottom Main Rod

16

12

72.00

72.00

Bottom Extra Rod for 5750 beam

16

4.425

8.85

8.85

Bottom Extra Rod for 5250 beam

16

3.93

7.86

7.86

2 Leg Stirips c/c 100mm

68

136

1.02

138.72

138.72

2 Leg Stirips c/c 200mm for

16

32

1.02

32.64

32.64

Top Main Rod including GB4

20

24

48.00

Top Extra at end support GB3

20

1.65

1.65

1.65

Top Extra at mid support GB3

20

2.6

10.40

10.40

Bottom Main Rod

16

19.86

39.72

Bottom Extra Rod at intermediate beams

20

2.8

11.20

2 Leg Stirips

34

170

0.96

163.20

20

26.5

53.00

96.00
70.40

GB1 (continious) with stair riser

17.60

GB2(continious)

GB3 continious on grid C


48.00

39.72
11.20
163.20

GB3 continious on grid A


Top Main Rod

53.00

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

1.65

1.65

8 mm

10 mm

12 mm

16 mm

20 mm

Top Extra at end support

20

Top Extra at mid support

20

2.6

15.60

Bottom Main Rod

16

19.86

39.72

Bottom Extra Rod at intermediate beams

20

2.62

15.72

15.72

Bottom Extra Rod at end beam

20

2.8

2.80

2.80

Bottom Extra Rod for cantilever portion

20

0.9

0.90

2 Leg Stirips

34

204

0.96

195.84

195.84

2 Leg Stirips for cantilever portion

16

16

0.96

15.36

15.36

Top Extra at mid support

20

2.6

5.20

5.20

Top Extra at end support

20

1.81

3.62

3.62

Bottom Main Rod

20

4.72

9.44

9.44

Bottom Extra

16

4.72

9.44

2 Leg Stirips

34

34

1.32

44.88

Top for beam in stair area

20

4.72

9.44

9.44

Top Extra at end support

20

1.81

7.24

7.24

Bottom Main Rod

20

4.72

9.44

Bottom Extra

16

4.72

9.44

2 Leg Stirips

34

34

1.32

44.88

Top Main Rod

25

12

24.00

Top Extra Rod

25

4.36

26.16

skin bar at side

16

11.45

22.90

Bottom Main Rod

25

12

24.00

Bottom Extra Rod

25

8.8

26.40

2 Leg Stirips c/c 100

66

66

2.14

141.24

141.24

2 Leg Stirips c/c 200

20

20

2.14

42.80

42.80

PB2 CONTINIOUS
Top Main Rod (L rod)

16

12

72.00

Top Extra at end support

20

2.535

15.21

15.21

Top Extra at mid support

20

12

3.95

47.40

47.40

25 mm

1.65
15.60
39.72

0.90

GB4
Top for cont beam (already considered in GB3)

9.44
44.88

9.44
9.44
44.88

4 PLINTH BEAM
PB1
24.00
26.16
22.90
24.00
26.4

72.00

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

10 mm

12 mm

16 mm

20 mm

Bottom Main L Rod

20

12

72.00

2 Leg Stirips

106

212

1.2

254.40

Top Main Rod

16

19.86

39.72

Top Extra at end support

20

1.7

5.10

5.10

Top Extra mid support

20

15

2.6

39.00

39.00

Bottom Main Rod

16

19.1

57.30

Bottom Extra Rod

16

2.8

14.00

2 Leg Stirips

34

170

1.02

173.40

Top Main Rod from A/6 to A/2

16

12

24.00

Top Extra mid support

20

15

2.6

39.00

Bottom Main Rod

16

16

48.00

48.00

Bottom Extra Rod

16

2.8

11.20

11.20

2 Leg Stirips

34

136

1.02

138.72

Top Main Rod over lap with PB3

20

6.31

37.86

37.86

Top Extra at end support

20

1.8

10.80

10.80

Bottom Main Rod at continious

20

4.4

39.60

39.60

Bottom Extra Rod

20

2.8

16.80

16.80

2 Leg Stirips

33

132

1.32

174.24

Top & Bottom Main

20

4.58

22.90

22.90

Top extra

20

1.65

6.60

6.60

Bottom Extra Rod

20

2.8

5.60

2 Leg Stirips

34

34

1.32

44.88

Top Main Rod

12

4.58

9.16

9.16

Top Extra at end support

12

1.6

6.40

12.4

Bottom Main Rod

12

3.88

7.76

7.76

Bottom extra

12

2.62

5.24

10.48

72.00
254.40

PB3 CONTINIOUS at C grid


39.72

57.30
14.00
173.40

PB3 CONTINIOUS at A grid


24.00
39.00

138.72

PB4

174.24

PB4 AT TOILET AREA

5.60
44.88

PB5

25 mm

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

35

1.32

46.20

46.20

10 mm

12 mm

16 mm

2 Leg Stirips

35

PB6
Top Main Rod continious with PB3

16

4.075

32.60

32.60

Bottom Main Rod

16

12

2.35

28.20

41.3

2 Leg Stirips @ 100 c/c

16

64

1.32

84.48

for short wall

12

2.1

16.80

16.80

long wall

12

4.05

16.20

16.20

ties

40

40

0.71

28.40

beam below battery room wall

12

4.05

16.20

ties

20

20

0.96

19.20

Starter bar outside

12

12

24

1.55

37.20

distribution for above

11

22

1.7

37.40

Starter bar inside face

12

12

24

1.2

28.80

distribution for above

11

22

1.7

37.40

waist slab bottom bar at FGL lvl

12

12

24

4.66

111.84

distribution for above

21

42

1.7

71.40

waist slab top at FGL lvl

12

12

24

1.7

40.80

distribution for above

12

1.7

20.40

scissor bar at FGL lvl

12

12

24

1.7

40.80

40.80

slab short side bar double layer

12

24

48

4.93

236.64

236.64

slab long side bar double layer

44

88

2.36

207.68

Raft bottom along grid A & C- short side & wall external U
shaped bar @125mm c/c for a length 13.285m

10

107

214

5.55

1187.70

1187.70

Distributor for above 200mm c/c- only for full raft

10

10

20

18.135

362.70

362.70

over lap for above

10

10

20

0.5

10.00

Distributor for above18.135m long wall 200mm c/c

10

20

18.135

362.70

84.48

Additional beam at toilet area

28.40
16.20
19.20

5 STAIR FROM 00M To +1.60 M


37.20
37.40
28.80
37.40
111.84
71.40
40.80
20.40

landing at +1.5m lvl


207.68

6 CABLE TRENCH

10.00
362.70

20 mm

25 mm

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

20

0.4

8.00

8.00
249.60

10 mm

10

Distributor for 13.285 m long 2 part walls

10

40

6.24

249.60

Raft top short bar at 175 mmc/c for length 13.285m

10

77

154

2.04

314.16

314.16

Distributor for above 200mm c/c for full raft length

10

10

20

18.135

362.70

362.70

over lap for above

10

10

20

0.5

10.00

10.00

Wall innerface vertical bar on either side for 13.285m

10

77

308

2.1

646.80

Distribution for above for 18.135m length with lap

10

20

18.535

370.70

over lap for above

10

20

0.4

8.00

8.00

Distribution for above for 13.285m length

10

40

6.24

249.60

249.60

Raft bottom along grid 7 & 2- short side & wall external U
shaped bar @125mm c/c for a length (7.10)m

10

58

116

5.55

643.80

643.80

Distributor for above 200mm c/c- only for full raft

10

10

20

10.45

209.00

209.00

Distributor for above 10.5m long wall 200mm c/c

10

20

11.25

225.00

225.00

Distributor for above 7.10m long wall 200mm c/c

10

20

7.5

150.00

150.00

Raft top short bar at 125 mmc/c for length 7.1m

10

58

116

2.04

236.64

236.64

Distributor for above 200mm c/c for full length

10

10

20

10.45

209.00

209.00

wall innerface vertical bar on either side

10

58

232

2.05

475.60

475.60

Distribution for above for 10.5m length with lap

10

20

11.25

225.00

225.00

Distribution for above for 7.1m length with lap

10

20

7.9

158.00

158.00

Chair bar for cable trench raft

10

34

34

1.2

40.50

40.50

Trench at mid of controll room -Raft bottom short side &


wall external U shaped bar @125mm c/c for a length (7.1)m

10

58

58

5.55

321.90

321.90

Distributor for above 200mm c/c- only for raft

10

10

10

7.1

71.00

71.00

Over lap for above on both end

10

10

10

10.00

Distributor for above only for vrtical 200mm c/c

20

40

7.1

284.00

Raft top short bar at 125 mmc/c for length 7.17m

10

58

58

2.04

118.32

118.32

Distributor for above 200mm c/c

10

10

10

7.1

71.00

71.00

Over lap for above on both end

10

10

10

10.00

10.00

wall innerface vertical bar on either side

10

58

116

2.1

243.60

Distribution for above

10

20

7.1

142.00

over lap for above

646.80
370.70

10.00
284.00

243.60
142.00

12 mm

16 mm

20 mm

25 mm

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

10 mm

12 mm

16 mm

20 mm

25 mm

3202.68

651.45

690.17

1486.16

Trench common corner portion for length 1.7m


Raft bottom- L rod

10

15

10

146

3.6

525.60

525.60

Raft top bat -L rod

10

15

10

150

1.95

292.50

292.50

wall inner face vertical bar on only one side

10

15

10

146

292.00

292.00

Both top and bottom for Length 10.5m

10

142

284

568.00

Distributor for both top & bottom

20

40

10.5

420.00

Both top and bottom for Length 7.1m

10

96

196

392.00

Distributor for both top & bottom

20

20

7.1

142.00

142.00

short bar

35

70.7

6.84

483.59

483.59

long bar

33

65.5

7.1

465.05

465.05

All Distributors are considred already


Trench cover slab
568.00
420.00

Mid area trench cover


392.00

SLAB ON GRADE
SIZE-6.84M x7.1M AT 200MM C/C

FIRST STAGE REBAR SUB TOTAL


Total length

7075.18

Unit Wt

0.40

Wt in MT -Dia Wise

2.79

9156.68
0.617
5.650

Total Wt in Mtonne

0.888
2.844

1.58
1.029

2.47
1.705

3.858
5.734

19.756

COLUMN ABOVE PLINTH TO FIRST FLOOR


1 COLUMN
Column C1

25

10

14

140

4.4

616.00

Ties outer spacing 100mm c/c

10

20

14

280

1.64

459.20

459.20

Ties Inner spacing 100mm c/c

10

20

14

280

1.24

347.20

347.20

Normal Ties c/c 250mm (Outer)

10

14

28

1.64

45.92

45.92

Normal Ties c/c 250mm (Inner)

10

14

28

1.24

34.72

34.72

column C1 over lap above ffloor

25

10

14

140

1.25

175.00

Column C2

20

10

20

4.4

88.00

Ties outer spacing 100mm c/c

20

40

1.28

51.20

51.20

Ties Inner spacing 100mm c/c

20

40

1.12

44.80

44.80

616

175
88.00

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

Middle Hook

22

44

0.23

10.12

10.12

Normal ties c/c 200mm (Outer)

1.34

5.36

5.36

Normal ties c/c 200mm (Outer)

1.34

5.36

5.36

Column C2 over Lap above plinth

20

10

20

20.00

10 mm

12 mm

16 mm

20 mm

25 mm

20.00

2 LINTEL & SUNSHADE


Lintel -length-22.6

12

12

23.45

281.40

Ties

23

12

276

0.96

264.96

lintel- length-10.50m

12

12

11.85

142.20

Ties

138

138

0.96

132.48

lintel- length-3.875m

12

18

4.275

76.95

Ties

27

54

0.96

51.84

At door

12

4.05

16.20

ties

20

20

0.71

14.20

Main bar

10

12

12

140

1.44

201.60

Distributor

12

72

1.57

113.04

Top Main from FB6 towards FB1

25

10

12

120.00

120.00

over lap FB1

25

10

3.07

30.70

30.70

Top main from Fb1 towards FB6

25

10

12

120.00

120.00

over lap FB6(cantilever)

25

10

4.5

45.00

45.00

Top Extra at end support

25

20

4.4

88.00

88.00

Top Extra at mid support

25

20

5.55

111.00

111.00

Bottom Main for FB1

25

20

12

240.00

256.4

Bottom Extra For FB1

25

20

8.1

162.00

skin bar at sides

12

10

10.92

109.20

2 Leg Stirips @ 130 c/c

10

52

260

2.1

546.00

546.00

2 Leg Stirips @ 230 c/c

10

18

90

2.1

189.00

189.00

Spacer Bar FB1

25

14

70

0.4

28.00

281.4
264.96
142.20
132.48
76.95
51.84

Lintel at toilet area


16.20
14.20

Sun shade Above windows only-12nos


201.60
113.04

3 GROUND FLOOR ROOF (FIRST FLOOR )SLAB


FB1& FB6continious

162.00
109.20

28.00

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

14

2.45

34.30

8 mm

10 mm

12 mm

16 mm

20 mm

25 mm

FB6 cantilever
Top and extra support is considered in FB1
Bottom Main

20

bottom main
Ties 8 at 130c/c

25

2.45

17.15

12

84

1.24

104.16

Top Main Rod (over laped with FB6)

20

12

72.00

Top Extra at end support

25

2.75

11.00

11.00

Top Extra at mid support

25

4.1

16.40

16.40

Bottom Main Rod

20

12

72.00

41.7

Bottom Extra Rod

20

2.95

11.80

13.8

Bottom Extra Rod

20

3.45

13.80

2 Leg Stirips at 100mm c/c

16

128

1.5

192.00

192.00

2 Leg Stirips at 200mm c/c

10

40

1.5

60.00

60.00

FB6 Grid A1 & A2 Top bar

25

4.55

36.40

36.40

Top Extra FB6 Grid A1 & A2

25

4.45

35.60

35.60

25

14

28

0.4

11.20

11.20

Top Main continious from FB4 To FB5

20

24

48.00

48.00

Top extra at at end support at Fb4 & FB5

20

1.8

7.20

7.20

Top Extra at mid support

20

10

2.7

27.00

27.00

Bottom main continious for FB4

20

12

24.00

24.00

Bottom lap for FB4 up to column at C/2

20

8.12

16.24

16.24

Bottom Extra for FB4

20

10

2.6

26.00

26.00

Bottom Main for FB5

16

4.4

13.20

2 Leg Stirips at 100mm c/c for FB4

24

120

1.1

132.00

132.00

2 Leg Stirips at 150mm c/c for FB4

40

1.1

44.00

44.00

2 Leg Stirips at 100mm c/c for FB5

24

24

1.5

36.00

36.00

2 Leg Stirips at 150mm c/c for FB5

1.5

12.00

12.00

Spacer Bar FB4

25

14

70

0.4

28.00

20

4.93

19.72

34.30
17.15
104.16

FB2/FB3 & FB6


72.00

13.8

ties & bottom bor considered in FB6 cantilever


Spacer Bar FB2
FB4 & FB5 at grid C

13.20

28.00

FB5 STAIR & IN TOILET SUNKEN AREA


Top Main

19.72

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Top extra at end support

20

Bottom main
2 Leg Stirips at 100mm c/c for FB5
2 Leg Stirips at 150mm c/c for FB5

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

1.78

14.24

8 mm

10 mm

12 mm

16 mm

20 mm

16

4.93

19.72

24

48

1.5

72.00

72.00

16

1.5

24.00

24.00

Top Main continious from FB4 To FB8

20

12

24.00

24.00

Top main over lap at FB8

20

12

24.00

24.00

Top extra at at end support at Fb4 & FB8

20

1.8

7.20

7.20

Top Extra at mid support

20

10

2.7

27.00

27.00

Bottom main continious for FB4

20

12

24.00

24.00

Bottom lap for FB4 & FB8

20

12

24.00

24.00

Bottom Extra for FB4 & FB8

20

12

2.6

31.20

2 Leg Stirips at 100mm c/c for FB4

24

120

1.1

132.00

132.00

2 Leg Stirips at 150mm c/c for FB4

40

1.1

44.00

44.00

2 Leg Stirips at 100mm c/c for FB8

24

24

1.3

31.20

31.20

2 Leg Stirips at 150mm c/c for FB8

1.3

10.40

10.40

Top continious from One end

16

12

24.00

24.00

Top over lab from other end

16

12

24.00

24.00

Top Extra at end support

16

1.63

3.26

3.26

Top Extra at mid support

16

2.7

13.50

13.50

Bottom Main Rod from one end

16

12

24.00

24.00

Bottom main from other end

16

12

24.00

24.00

Bottom Extara

16

2.6

15.60

2 Leg Stirips at 100mm c/c

24

144

0.9

129.60

129.60

2 Leg Stirips at 200mm c/c

36

0.9

32.40

32.40

14.24
19.72

FB4 & FB8 atgrid A

31.20

FB7

15.60

ADDITIONAL BEAMS ABOVE ROLLING SHUTTER


DETAIL AS SAME OF PB6 BOTH TOP & BOT

16

16

48.00

2 legged stirrups

18

36

1.14

41.04

10

43

86

4.12

354.32

48.00
41.04

SLAB
FS1end pannel
Short bar at bottom at 125mmc/c

354.32

25 mm

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

5.27

442.68

8 mm

Short bar at bottom at 125mmc/c

10

42

84

long bar at bottom at 175mmc/c

10

20

10.99

219.80

219.80

long bar at bottom at 175mmc/c

10

20

11.575

231.50

231.50

Top extra at end support short side 250mm c/c

10

43

86

1.52

130.72

Distribution for above at 250mmc/c

10

10.95

109.50

109.50

Top extra at end support long side 350mm c/c

10

20

3.5

70.00

70.00

Distribution for above at 350mmc/c

18

72.00

72.00

Top extra at mid support long side 350mm c/c

10

20

4.115

82.30

82.30

Distribution for above at 350mmc/c

18

72.00

72.00

Short bar at bottom at 125mmc/c

10

85

255

5.3

1351.50

long bar at bottom at 175mmc/c

10

30

10.99

329.70

329.70

long bar at bottom at 175mmc/c

10

30

11.575

347.25

347.25

Top extra at mid support short side 250mm c/c

10

43

172

2.7

464.40

Distribution for above at 250mmc/c

32

10.95

350.40

350.40

Top extra at end support long side 350mm c/c

10

30

3.5

105.00

105.00

Distribution for above at 350mmc/c

27

108.00

108.00

Top extra at mid support long side 350mm c/c

10

30

5.03

150.90

150.90

Distribution for above at 350mmc/c

27

108.00

108.00

chair rod

10

20

100

100.00

Bottom short side at 175c/c

19

95

190.00

190.00

Bottom long side at 175c/c for end panells

5.08

25.40

25.40

Bottom long side at 175c/c for end panells

3.93

15.72

15.72

Top extra at short side at end 350mm c/c

10

50

1.13

56.50

56.50

distribution for above

10

40.00

40.00

Top extra at long side at end support 350mmc/c

10

1.58

15.80

15.80

distribution for above

12.00

12.00

Top extra at long side at mid support 50mmc/c

16

2.53

40.48

40.48

Distribution for above

24

48.00

48.00

10

15

15.00

10 mm
442.68

130.72

FS1mid pannel
1351.50

464.40

100.00

FS2

Distribution is already available from FS1


chair rod
FS3

15.00

12 mm

16 mm

20 mm

25 mm

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

Short bar at bottom at 150mm c/c

12

37

37

3.85

142.45

Long bar at bottom at 150mm c/c

10

23

23

5.81

133.63

Top extra at short side

12

18

36

1.38

49.68

8 mm

10 mm

12 mm

16 mm

20 mm

142.45
133.63
49.68

Distribution for above

5.81

46.48

Top extra at long side

10

12

24

1.9

45.60

distribution for above

12

3.85

46.20

chair rod

10

8.00

Balcony drops 120mm c/c

213

213

1.7

362.10

362.10

Distribution for above

26.4

184.80

184.80

slab short side bar double layer

12

24

48

4.93

236.64

slab long side bar double layer

44

88

2.36

207.68

Top bar at +1.5m lvl

16

12

12

2.73

32.76

Distribution for above

10

10

10

1.55

15.50

Scissor bar from top to bottom

16

12

12

1.83

21.96

Bottom bar

16

12

12

6.81

81.72

Distribution for above only for waist vslab

10

23

23

1.55

35.65

Top bar at mid landing

16

12

12

3.38

40.56

40.56

Distribution for above

16

16

16

3.86

61.76

61.76

scissor bar at mid landing from top bottom

16

12

12

2.3

27.60

27.60

distributor for above

16

3.86

23.16

23.16

Top main bar

20

4.57

9.14

9.14

Top extra

20

1.7

3.40

3.40

Bottom main

20

4.57

9.14

9.14

Bottom extra

20

2.98

2.98

Ties

31

31

1.2

37.20

16

12

12

2.59

31.08

46.48
45.60
46.20
8.00

Balcony slab above Rolling shutter


236.64
207.68

Stair case slab


waist slab 1
32.76
15.50
21.96
81.72
35.65

Mid landing Beam

2.98
37.20

waist slab 2
Top bar from mid landing
Distribution for landing area covered already

31.08

25 mm

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

10 mm

12 mm

16 mm

Distribution for lwaist area

10

1.55

7.75

Scissor bar from top to bottom at mid landing

16

12

12

2.485

29.82

29.82

Bottom bar

16

12

12

7.6

91.20

91.20

over lap for above

16

12

12

0.8

9.60

Distribution for above for waist only

10

23

23

1.6

36.80

36.80

Top bar at floor landing

10

12

12

3.63

43.56

43.56

Distribution for above at floor landing

10

11

11

3.76

41.36

41.36

Distribution for above at waist slab

10

1.55

13.95

13.95

scissor bar at floor landing

16

12

12

1.89

22.68

10

11

11

3.76

41.36

41.36

Main bar on short vside

10

23

23

2.2

50.60

50.60

Main bar on long side

10

11

11

44.00

44.00

Extrav rod at to short side


Distribution for above on either side

10
8

23
8

1
1

23
8

0.6
4.05

13.80
32.40

20 mm

25 mm

7.75

9.60

22.68

Floor landing Slab


Distribution only bottom
Floor landing

13.80
32.40

SUB TOTAL FOR SECOND STAGE OF WORKS


8.00
Total length

5507.27

Unit Wt

0.40

Wt in MT -Dia Wise

2.18

10
5213.82
0.617
3.217

Total Wt in Mtonne

12
1054.72

16
683.18

0.888
0.937

1.58
1.079

20
652.06
2.47
1.611

25
1907.85
3.858
7.360

16.379

C FIRST FLOOR TO ROOF SLAB


1 COLUMN
Column C1

25

10

12

120

Column C1

25

10

20

3.5

70.00

Ties outer spacing 100mm c/c

10

20

14

280

1.64

459.20

459.20

Ties Inner spacing 100mm c/c

10

20

14

280

1.24

347.20

347.20

Normal Ties c/c 250mm (Outer)

10

14

84

1.64

137.76

137.76

Normal Ties c/c 250mm (Inner)

10

14

84

1.24

104.16

104.16

4.4

528.00

528
70

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

10 mm

12 mm

16 mm

20 mm

25 mm

Column C2

20

10

20

3.5

70.00

Ties outer spacing 100mm c/c

20

40

1.28

51.20

51.20

Ties Inner spacing 100mm c/c

20

40

1.12

44.80

44.80

Middle Hook

26

52

0.23

11.96

11.96

Normal ties c/c 200mm (Outer)

12

1.28

15.36

15.36

Normal ties c/c 200mm (Outer)

12

1.12

13.44

13.44

12

23.45

140.70

Ties

23

138

0.96

132.48

Lintel -length-18.9m

12

19.75

118.50

Ties

23

115

0.96

110.40

lintel- length-10.50m

12

18

11.85

213.30

Ties

209

209

0.96

200.64

At door d2 of gents

12

2.56

10.24

ties

17

17

0.71

12.07

At door d2 of ladies

12

2.87

11.48

ties

19

19

0.71

13.49

Main bar

10

12

96

1.44

138.24

Distributor

48

1.57

75.36

Short bar for 18 .615m

10

124

248

0.6

148.80

distribution

18.965

151.72

Short bar for 10 .5m

10

62

124

0.6

74.40

distribution

10.45

83.60

Top Main from RB5 towards RB1

25

10

12

120.00

120.00

Top main from RB1 towards FB5

25

10

12

120.00

120.00

70.00

2 LINTEL & SUNSHADE


Lintel -length-22.6 at grid C

140.7
132.48
118.5
110.40
213.30
200.64

Lntel at toilet area


10.24
12.07
11.48
13.49

Sun shade-8nos
138.24
75.36

LOFT
148.80
151.72
74.40
83.60

3 ROOF LVL SLAB


ROOF BEAMS
RB1& RB5 continious

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

3.07

30.70

8 mm

10 mm

12 mm

16 mm

20 mm

over lap RB1

25

10

over lap FB6(cantilever)

25

10

4.6

46.00

Top Extra at end support

20

15

4.35

65.25

65.25

Top Extra at mid support

20

15

5.6

84.00

84.00

Bottom Main for RB1

25

20

12

240.00

Bottom Extra For RB1

20

15

8.4

126.00

skin bar at sides

12

10

10.92

109.20

2 Leg Stirips @ 100 c/c

66

330

2.08

686.40

686.40

2 Leg Stirips @ 200 c/c

20

100

2.08

208.00

208.00

Spacer Bar RB1

25

14

70

0.4

28.00

Bottom Main

20

10

2.77

27.70

bottom main

25

2.77

13.85

Ties 8 at 100c/c

15

75

1.38

103.50

Top Main Rod (over laped with RB6)

20

12

48.00

over lap RB6(cantilever)

25

4.6

36.80

Top Extra at end support for RB6

25

2.65

10.60

Top Extra at mid support at RB5

20

4.55

27.30

Bottom Main Rod from RB6 to RB5

12

12

72.00

Bottom Extra Rod at RB6

16

3.2

25.60

2 Leg Stirips at 100mm c/c

18

144

1.24

178.56

178.56

2 Leg Stirips at 200mm c/c

10

40

1.24

49.60

49.60

Bottom Main RB5

20

2.77

11.08

Bottom main RB5

25

2.77

5.54

Ties 8 at 100c/c

15

30

1.38

41.40

Spacer Bar RB6

25

13

26

0.4

10.40

Top Main continious from one end

12

12

24.00

24.00

Top main continious from other end

12

12

24.00

24.00

Top extra at at end supports

16

1.8

7.20

25 mm
30.70
46.00

256.4
126.00
109.20

28.00

RB5 cantilever
Top and extra support is considered in RB1
27.70
13.85
103.50

RB6 & RB5


48.00
36.80
10.60
27.30
72.00
25.60

11.08
5.54
41.40
10.40

RB4 ALONG GRID C

7.20

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

10 mm

12 mm

16 mm

Top Extra at mid support

16

10

2.7

27.00

Bottom main continious from one end

12

12

24.00

24.00

Bottom main continious from other end

12

12

24.00

24.00

Bottom Extra

16

12

1.4

16.80

2 Leg Stirips at 100mm c/c

12

12

144

1.04

149.76

149.76

2 Leg Stirips at 200mm c/c

48

1.04

49.92

49.92

Spacer Bar RB4

25

13

65

0.4

26.00

Top Main continious from RB4 To RB7

12

12

24.00

24.00

Top main over lap at RB7

12

12

24.00

24.00

Top extra at at end support at RB4

16

1.8

3.60

3.60

Top Extra at mid support for RB4

16

2.7

21.60

21.60

Top extra at at end support at RB7

20

1.8

3.60

Top Extra at mid support for RB7

20

2.7

5.40

Bottom main continious from RB4 to RB7

12

12

24.00

24.00

Bottom Main from RB7 to RB4

12

12

24.00

24.00

Bottom Extra for RB4

16

10

1.4

14.00

Bottom Extra for RB7

16

4.05

4.05

2 Leg Stirips at 100mm c/c for RB4

24

120

1.04

124.80

124.80

2 Leg Stirips at 200mm c/c for RB4

25

1.04

26.00

26.00

2 Leg Stirips at 100mm c/c for RB7

24

24

1.24

29.76

29.76

2 Leg Stirips at 2000mm c/c for FB7

1.24

6.20

6.20

Top Main

12

4.48

8.96

Top extra at end support

16

1.65

6.60

Bottom main

12

4.48

17.92

Bottom Extra

16

1.4

5.60

2 Leg Stirips at 100mm c/c for FB5

12

24

1.04

24.96

24.96

2 Leg Stirips at 200mm c/c for FB5

1.04

5.20

5.20

Top continious from One end

12

12

24.00

24.00

Top over lab from other end

12

12

24.00

24.00

Top Extra at end support

16

1.55

3.10

20 mm

25 mm

27.00

16.80

26.00

RB4 & RB7 ALONG GRID A

3.60
5.40

14.00
4.05

RB4 SUNKEN AREA


8.96
6.60
17.92
5.60

RB3

3.10

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

10 mm

12 mm

Top Extra at mid support

16

2.53

12.65

Bottom Main Rod from one end

12

12

24.00

24.00

Bottom main from other end

12

12

24.00

24.00

Bottom Extara

16

1.4

8.40

2 Leg Stirips at 100mm c/c

24

144

0.9

129.60

129.60

2 Leg Stirips at 200mm c/c

10

60

0.9

54.00

54.00

Short bar at bottom at 150mmc/c

10

36

72

4.1

295.20

Short bar at bottom at 150mmc/c

10

35

70

5.25

367.50

long bar at bottom at 175mmc/c

10

20

11

220.00

220.00

long bar at bottom at 175mmc/c

10

20

11.585

231.70

231.70

Top extra at end support short side 300mm c/c

10

36

72

1.52

109.44

Distribution for above at 350mmc/c

10.95

87.60

87.60

Top extra at end support long side 350mm c/c

10

20

3.5

70.00

70.00

10

20

4.115

82.30

82.30

10

20

40

40.00

40.00

Short bar at bottom at 150mmc/c

10

71

213

5.25

1118.25

1118.25

long bar at bottom at 175mmc/c

10

30

11

330.00

330.00

long bar at bottom at 175mmc/c

10

30

11.585

347.55

347.55

Top extra at mid support short side 300mm c/c

10

36

144

2.7

388.80

Distribution for above at 300mmc/c

32

10.95

350.40

350.40

Top extra at end support long side 350mm c/c

10

30

3.5

105.00

105.00

10

30

4.115

123.45

123.45

10

20

60

60.00

Bottom short side at 175c/c

20

40

80.00

80.00

Bottom long side at 175c/c for end panells

10

5.15

51.50

51.50

12.65

8.40

SLAB
RS1end pannel
295.20
367.50

109.44

distribution for above given below seperately


Top extra at mid support long side 350mm c/c
distribution for above given below seperately
chair rod
RS1mid pannel

388.80

distribution for above given below seperately


Top extra at mid support long side 350mm c/c
distribution for above given below seperately
chair rod

16 mm

60.00

RS2 END PANNEL

20 mm

25 mm

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

Bottom long side at 175c/c for end panells

10

3.76

37.60

37.60

Top extra at short side at end 350mm c/c

10

20

0.9

18.00

18.00

Top extra at long side at end support 350mmc/c

10

1.55

15.50

15.50

distribution for above

1.95

11.70

11.70

10

12

12.00

Bottom short side at 175c/c

20

80

160.00

160.00

Bottom long side at 175c/c for end panells

20

5.15

103.00

103.00

Bottom long side at 175c/c for end panells

20

3.76

75.20

75.20

Top extra at short side at end 350mm c/c

10

60

0.9

54.00

54.00

Top extra at long side at mid support 350mmc/c

25

2.53

63.25

63.25

distribution for above

40

1.95

78.00

78.00

10

24

24.00

RS 1 -5 pannels on either side

22

22

19.25

423.50

423.50

RS 2 -6 pannels on either side

22.95

91.80

91.80

Short bar at bottom at 150mm c/c

10

18

18

3.93

70.74

Short bar at bottom at 150mm c/c

10

19

19

5.08

96.52

Long bar at bottom at 175mm c/c

20

20

5.865

117.30

117.30

Top extra at short side at end support 300mmc/c

18

1.75

31.50

31.50

Distribution for above

10

5.9

59.00

59.00

Top extra at long side mid support

18

18

2.53

45.54

45.54

Top extra at long side end support

18

18

1.38

24.84

24.84

distribution for above

5.815

34.89

34.89

Chair rod

10

10

10

10.00

Balcony drops 120mm c/c

213

213

1.7

362.10

362.10

Distribution for above

26.4

184.80

184.80

10 mm

distribution for above given below seperately

Distribution is already available from RS1


chair rod

12.00

RS2

distribution for above given below seperately

Distribution is already available from RS1


chair rod

24.00

DISTRIBUTION

RS3
70.74
96.52

10.00

12 mm

16 mm

20 mm

25 mm

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

10 mm

12 mm

16 mm

20 mm

Stair case slab


waist slab 3
Top bar at first floor lvl

16

12

12

24.00

Distribution for above

10

12

12

1.55

18.60

Scissor bar at floor lvl

16

12

12

2.8

33.60

33.60

Bottom bar

16

12

12

5.55

66.60

66.60

over lap for above

16

12

12

0.8

9.60

Distribution for above

10

17

17

1.6

27.20

27.20

Distribution for above at floor lavl

10

1.6

9.60

9.60

Distribution for above at mid landing floor lvl

16

3.93

35.37

35.37

Bottom bar from mid landing to top

16

12

12

3.2

38.40

38.40

Distribution for above at landing

16

3.93

35.37

35.37

scissor bar at mid landing lvl

16

12

12

2.35

28.20

28.20

Top main bar

20

4.75

9.50

9.50

Top extra

20

1.73

3.46

3.46

Bottom main

20

4.75

4.75

4.75

Bottom extra

20

2.98

2.98

2.98

Ties

22

22

1.2

26.40

Top bar at mid landing lvl

16

12

12

2.56

30.72

30.72

Scissor bar at mid landing lvl

16

12

12

2.25

27.00

27.00

Distribution for above at waist slab

10

1.55

6.20

Bottom bar

16

12

12

5.92

71.04

71.04

over lap for above

16

12

12

0.8

9.60

9.60

Distribution for above at waist slab

10

16

16

1.6

25.60

Top bar of waist slab at second floor landing lvl

16

12

12

2.7

32.40

Distribution for above at waist slab

10

10

10

1.55

15.50

15.50

distribution at floor slab lvl

10

3.93

19.65

19.65

scissor bar at floor landing

16

12

12

1.86

22.32

chairs rod for stair area

12

7.00

24.00
18.60

9.60

Mid landing Beam

26.40

waist slab 4

Distribution for above at landing considered


25.60
32.40

22.32
7.00

25 mm

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

10 mm

12 mm

16 mm

20 mm

25 mm

HEAD ROOM COLUMNS, BEAMS & SLAB


COLUMN
Column C1

25

10

20

2.7

54.00

Ties outer spacing 100mm c/c

10

22

44

1.64

72.16

72.16

Ties Inner spacing 100mm c/c

10

22

44

1.24

54.56

54.56

Column C2

20

10

20

2.7

54.00

Ties outer spacing 100mm c/c

22

44

1.28

56.32

56.32

Ties Inner spacing 100mm c/c

22

44

1.12

49.28

49.28

Middle Hook

22

44

0.23

10.12

10.12

Top main bar

12

4.63

27.78

Bottom main bar

12

4.53

27.18

Stirrups @ 100mm c/c

24

48

1.24

59.52

59.52

Stirrups @ 200mm c/c

14

1.24

17.36

17.36

Spacer bar

25

0.23

1.38

Top main bar

12

7.8

31.20

Top extra at end support

16

2.45

9.80

9.80

Top extra at mid support with cantilever

16

3.8

15.20

15.20

Bottom main bar

16

7.8

31.20

31.20

Bottom extra

16

3.75

7.50

7.50

Stirrups @ 100mm c/c

47

94

1.24

116.56

116.56

Stirrups @ 200mm c/c

15

30

1.24

37.20

37.20

Spacer bar

25

10

0.23

2.30

Top main bar

12

4.33

8.66

Top main bar

16

4.33

4.33

Bottom main bar

12

4.33

8.66

Bottom main bar

16

4.33

4.33

Stirrups @ 100mm c/c

24

24

0.96

23.04

54.00

54.00

HB1
27.78
27.18

1.38

HB2
31.20

2.30

HB3
8.66
4.33
8.66
4.33
23.04

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm
6.72

Stirrups @ 200mm c/c

0.96

6.72

Spacer bar

25

0.23

0.69

Short side bar @ 150mm c/c

10

43

43

4.1

176.30

Short side extra @ 300mm c/c

10

43

86

1.5

129.00

Distributors for above

16

7.065

113.04

Long side bar @ 150mm c/c

10

22

22

7.115

156.53

Long side extra @ 300mm c/c

10

22

44

1.33

58.52

Distributors for above

16

4.05

64.80

Chairs

10

6.00

10 mm

12 mm

16 mm

20 mm

25 mm

0.69

HS1
176.30
129.00
113.04
156.53
58.52
64.80
6.00

SUB TOTAL FOR SECOND STAGE OF WORKS


8.00
Total length

7435.56

Unit Wt

0.395

Wt in MT -Dia Wise

2.94

10
4771.43
0.617
2.944

Total Wt in Mtonne
D

12
1100.78

16
692.78

0.888
0.977

1.580
1.095

14.544

WORKS AT YARD
Raft for transformer plinth
Short side top & bottom bar at 120mmc/c

12

78

156

3.38

527.28

Long Side Top & bottom bar at 120mmc/c

10

28

56

9.48

530.88

Both Top & bottom

16

16

9.58

153.28

153.28

Top Extra at end support

16

2.625

10.50

10.50

Top Extra at mid support

16

0.91

7.28

7.28

527.28
530.88

strab beam 2nos

Top Extra at mid support

16

1.48

5.92

5.92

Bottom extra at end

16

1.55

12.40

12.40

Bottom extra at miid support

16

12

1.7

20.40

20.40

Ties at 150mmc/c

12

63

126

1.98

249.48

249.48

chairs at raft

12

14

14

14.00

14.00

Main Bar

16

32

2.9

92.80

Main Bar

12

32

2.9

92.80

Column C1
92.80
92.80

20
543.02
2.470
1.341

25
1360.66
3.858
5.249

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

10 mm

12 mm

16 mm

20 mm

Ties at 150mmc/c

10

14

112

1.04

116.48

116.48

Ties diagonal at 150mmc/c

10

14

112

1.04

116.48

116.48

Main bar

16

16

6.8

108.80

Ties at 150mm c/c

10

40

80

1.5

120.00

120.00

Ties at 150mm c/c

10

40

80

1.44

115.20

115.20

Main Bar at both Bottom & top

20

24

3.4

81.60

Ties

30

120

1.38

165.60

Main bar both bottom & top

20

32

3.4

108.80

Ties

20

160

1.44

230.40

Extra at Top

20

32

1.4

44.80

44.80

Extra at Bottom

20

16

32.00

32.00

Beam

12

24

4.9

117.60

ties

37

111

1.2

133.20

133.20

wall rood vertical

31

62

5.05

313.10

313.10

wall rood horizondal

26

52

4.55

236.60

236.60

u bar for stability

16

16.00

16.00

4.61

774.48

774.48
192.00

Column C2
108.80

Grade beam
B1
81.60
165.60

B2
108.80
230.40

Fire Wall
117.60

Cable tyrench arround Trs Plinth


Raft bottom short side & wall external U shaped bar @150mm
c/c for a length 3.0m

10

21

168

Distributor for above 200mm c/c- only for full raft

10

64

192.00

Distributor for vertical 6m long wall 200mm c/c

56

6.35

355.60

355.60

Distributor for verrtical 3 m long wall

56

3.15

176.40

176.40

Raft top short bar at 150 mmc/c for length 3m

10

21

168

1.65

277.20

Distributor for above 200mm c/c for full raft length

64

192.00

192.00

Wall innerface vertical bar

20

16

320

1.8

576.00

576.00

Distribution for above in external wall

64

6.15

393.60

393.60

277.20

25 mm

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm
214.40

10 mm

64

3.35

214.40

Raft bottom- L rod

10

10

16

160

3.55

568.00

568.00

Raft top mat -L rod

10

10

16

160

2.14

342.40

342.40

wall inner face vertical bar on only one side

16

128

1.8

230.40

Both top and bottom for Length 6m

10

242

484

1.61

779.24

Distributor for both top & bottom

64

4.8

307.20

bottom main- u Shape 125mm c/c

10

21

21

6.5

136.50

distribution for above

34

34

2.9

98.60

inner face main vertical bars outer

10

15

30

1.75

52.50

distribution for above

16

2.9

46.40

inner face main vertical bars middle

10

21

42

1.75

73.50

distribution for above

10

16

2.5

40.00

40.00

cover slab main T & B

10

14

112

1.96

219.52

219.52

distribution ring shape for above

15

14

210

0.9

189.00

10

26

52

4.75

247.00

distribution for above at 200mmc/c

24

48

3.7

177.60

inner face main vertical bars 175mm c/c

10

22

88

1.75

154.00

distribution for above at 200mm c/c

32

3.7

118.40

cover slab main T & B at 150mm c/c

10

26

104

1.91

198.64

distribution for above at 200mm c/c

10

40

3.7

148.00

Coth vertical bars 125 mm c/c

10

-24

-48

1.75

-84.00

distribution

-8

-16

3.6

-57.60

Distribution for above in external wall


Trench common corner portion for length 1.5m

230.40

Distributors are considred already


Trench cover slab
779.24
307.20

Trench from Yard to Controll Room


Length 2.5m
136.50
98.60
52.50
46.40
73.50

189.00

Incoming Cable trench Avg length 3.7m


bottom main- u Shape 150mm c/c

247.00
177.60
154.00
118.40
198.64
148.00

Deductions at the junction of Cable duct


At control room and yard for 3.6m width
-84.00
-57.60

12 mm

16 mm

20 mm

25 mm

S.
No

Member Details

Dia of
No of
No of
Total
Bar
Mem
Bar
Nos
mm
ber

Bar
Bending
Schedule

Cutting
Length

Total
Cutting
Length

8 mm

10 mm

12 mm

16 mm

20 mm

25 mm

At cable trench in transformer plinth


vertical wall bar at 150mm c/c

10

-10

-20

1.45

-29.00

disortributor

-8

-16

3.6

-57.60

vertical wall bar at 150mm c/c

10

-10

-40

1.45

-58.00

disortributor

-8

-32

1.95

-62.40

-29.00
-57.60

At at cable trench Entry


-58.00
-62.40

Prepared By
Dia of Bar

8.00
Total length

4140.90

Unit Wt

0.40

Wt in MT -Dia Wise

1.64

Total Wt in Mtonne

Total Steel for the project in M.Tonne

10
4883.02
0.617
3.013

12
1001.16

16
411.38

0.888
0.889

1.58
0.650

6.847

57.527

20
267.20
2.47
0.660

25
0.00
3.858
0.000