REPUBLIC OF THE PHILIPPINES

NATIONAL CAPITAL REGION

METRO MANILA FIRST DISTRICT ENGINEERING OFFICE


WEST BANK ROAD, MANGGAHAN FLOODWAY
ROSARIO, PASIG CITY

PROJECT/LOCATION:

CONSTRUCTION OF MULTI - PURPOSE BUILDING,


STO.NINO ELEMENTARY SCHOOL,
BRGY. STO. NINO, MARIKINA CITY, 1ST LD
REPUBLIC OF THE PHILIPPINES
NATIONAL CAPITAL REGION

METRO MANILA FIRST ENGINEERING DISTRICT


WEST BANK ROAD, MANGGAHAN FLOODWAY
ROSARIO, PASIG CITY

PROJECT/LOCATION:

CONSTRUCTION OF MULTI - PURPOSE


BUILDING, STO.NINO ELEMENTARY SCHOOL,
BRGY. STO. NINO, MARIKINA CITY, 1ST LD

SHEET CONTENT:

AS SHOWN

PREPARED BY:

CHECKED BY:

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.

SHEET NO.

1
MANUEL B. CRUZ

MANUEL Y. MADRID

LUISITO C. PONCIANO

EULOGIO V. YDIO

ROBERTO S. NICOLAS

ENGINEER II

ENGINEER II

CHIEF, PLANNING & DESIGN SECTION


ENGINEER III

OIC ASST. - DISTRICT ENGINEER

DISTRICT ENGINEER

A
DRESSING
RM

SOUND
SYSTEM/
LIGHT
RM

F1C1

FTB

FTB

1:100m

F2C2
FTB

FTB

F1C1

F1C1

F1C1
FTB

F1C1

F1C1
FTB

FTB

F1C1
FTB

SCALE:

F2C2

FTB

FTB

1:100m

FTB

FTB

SCALE:

FTB

FTB

B1

STAGE

F2C2

B1

FTB

FTB

B1

B1

B1

B1

B1

B1

1:100m

SCALE:

F2C2

FTB

F2C2

FTB

B1

F2C2

FRONT ELEVATION OF STAGE

B1

F2C2

F2C2

STEEL WINDOW CASEMENT

F
G R O U N D

F L O O R

SCALE:

REPUBLIC OF THE PHILIPPINES


NATIONAL CAPITAL REGION

METRO MANILA FIRST ENGINEERING DISTRICT


WEST BANK ROAD, MANGGAHAN FLOODWAY
ROSARIO, PASIG CITY

F2C2

P L A N

PROJECT/LOCATION:

CONSTRUCTION OF MULTI - PURPOSE


BUILDING, STO.NINO ELEMENTARY SCHOOL,
BRGY. STO. NINO, MARIKINA CITY, 1ST LD

P L A N
1:100m

F2C2

F O U N D A T I O N

1:100m

F R A M I N G

SCALE:

FTB

FTB

F L O O R

SCALE:

SHEET CONTENT:

AS SHOWN

P L A N

SIDE ELEVATION OF STAGE

1:100m

PREPARED BY:

SCALE:

CHECKED BY:

1:100m

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.

SHEET NO.

2
MANUEL B. CRUZ

MANUEL Y. MADRID

LUISITO C. PONCIANO

EULOGIO V. YDIO

ROBERTO S. NICOLAS

ENGINEER II

ENGINEER II

CHIEF, PLANNING & DESIGN SECTION


ENGINEER III

OIC ASST. - DISTRICT ENGINEER

DISTRICT ENGINEER

DESIGN CRITERIA
A. DESIGN
1. ROOF
DEAD LOADS
LIVE LOADS

939.83 Pa
166.09 Pa

2. WIND LOADS
CL4.729 X 10- 8 V 2 Ch
V = 200 Kph
WHERE:
CL = BASIC WIND PRESSURE
Ch = HEIGHT CORRECTION FACTOR
3. SEISMIC LOADS
V=ZKCWIC
WHERE:
W = DEAD WEIGHT OF STRUCTURE
Z = ZONE COEFFICIENT
C = NUMERICAL COEFFICIENT
I = OCCUPANCY IMPORTANCE FACTOR
S = NUMERICAL COEFFICIENT FOR SITE RESONANCE
B. DESIGN STRESSES
1. CONCRETE
a. FOR COLUMNS AND FOOTINGS
f'c = 20.684 MPa fc= 9.308 MPa n=9
b. FOR PAVEMENT AT THE GROUND IMPROVEMENT
f'c = 24.60 MPa
c. FOR SLAB ON FILL
f'c = 17.237 MPa fc= 7.757 MPa
2. STEEL REINFORCING BARS
NOTE:
(ALL MILD STEEL SHALL BE STRUCTURAL GRADE
DEFORMED BARS CONFORMING TO ASTM A-615)
Fy=275MPa (40,000 psi)
Fy=415MPa (60,000 psi)
c. STRUCTURAL STEEL fy = 248.211
d. WELDS
E = 70 ELECTRODES
3. FOUNDATION
ASSUMED SOIL BEARING CAPACITY OF 95.76 KPa
NOTE:
1. IN CASE ACTUAL SOIL BEARING CAPACITY IS FOUND LESS
THAN THE NOTIFY THE STRUCTURAL ENGINEER OR PROPER
AUTHORITIES FOR PROPER REVISION OF FOOTINGS

SCALE:

R O O F

1:125m

F R A M I N G

SCALE:

P L A N
1:125m

2. SUBMIT SHOP DETAIL OF STRUCTURAL FRAME TO THE DIRECTOR,


BUREAU OF DESIGN FOR APPROVAL PRIOR TO FABRICATION

MATERIALS SPECIFICATIONS:
1. STRUCTURAL STEEL (CONFORM WITH ASTM A-36)
FOR TRUSS, PURLINS, PLATES, BRACING, ETC.
fy = 248 MPa
2. WELDS (CONFORM WITH AMERICAN WELDING STANDARDS)
USING E 60xx ELECTRODES
fy = 93.77 MPa

2 - 2x2 (MAIN BAR)


2 - 21 x 21 (MEMBER)

PARAPET (METAL CLADDING)

3. ANCHOR BOLTS/BOLTS (CONFORM WITH ASTM A-307)


fy = 96.60 MPa, fv = 69 MPa

CEILING LINE

NOTES ON ROOF CONSTRUCTION

200 x 350 BEAM

1. IN ACTUAL FABRICATION OF STEEL TRUSSES, MEMBERS MEETING


AT A POINT SHALL HAVE THEIR GRAVITY AXIS INTERSECT AS NEARLY
AS PRACTICABLE AT A COMMON POINT.
2. THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION BRACINGS
AND SHORING, MAKE ACTUAL MEASUREMENTS IN THE FIELD PRIOR TO
FABRICATION/INSTALLATION OF ALL TRUSSES.

TRUSS DETAIL OF STAGE


SCALE:

REPUBLIC OF THE PHILIPPINES


NATIONAL CAPITAL REGION

METRO MANILA FIRST ENGINEERING DISTRICT


WEST BANK ROAD, MANGGAHAN FLOODWAY
ROSARIO, PASIG CITY

PROJECT/LOCATION:

CONSTRUCTION OF MULTI - PURPOSE


BUILDING, STO.NINO ELEMENTARY SCHOOL,
BRGY. STO. NINO, MARIKINA CITY, 1ST LD

SHEET CONTENT:

AS SHOWN

PREPARED BY:

CHECKED BY:

1:40m

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.

SHEET NO.

3
MANUEL B. CRUZ

MANUEL Y. MADRID

LUISITO C. PONCIANO

EULOGIO V. YDIO

ROBERTO S. NICOLAS

ENGINEER II

ENGINEER II

CHIEF, PLANNING & DESIGN SECTION


ENGINEER III

OIC ASST. - DISTRICT ENGINEER

DISTRICT ENGINEER

GA. 24 RIDGE ROLL


1.2mm 2"x 6" C-PURLINS
SEE SPOT DETAIL "A"

GA. 26 CORR. LONG SPAN


G.I. ROOFING SHEET

LS - 2

2 - 3" x 3" x 41"


TOP & BOTTOM CHORD

1
4"

GA. 24 CORR. LONG SPAN PRE-PAINTED G.I. ROOFING SHEET


FFL

2 - 41" x 3" x 3" ANGLE BAR


TOP CHORD

x 3" x 3" x 6" PURLIN CONNECTOR

2 - 2 1/2" x 2 1/2" x 41"


DIAGONAL & VERTICAL MEMBER

GA. 24 PRE-PAINTED
GUTTER

NGL
2 - 41" x 3" x 3" ANGLE BAR
BOTTOM CHORD
W/ STIRRUPS TIES SPACED
@ 0.20m O.C.

LS - 1
NUTS & WASHER

2 - 4"x 4" x 41"


MAIN COLUMN BAR

S P O T

D E T A I L

" A "

SCALE:

SECTION

NTS

2 - 3" x 3" x 41"


COLUMN MEMBER

1.2mm 2"x 6" C-PURLINS


2- 41" x 3" x 3" ANGLE BAR (TOP CHORD)
1
4"

S P E C S

NUTS & WASHER

D E T A I L

SCALE:

W/ STIRRUPS TIES SPACED


@ 0.20m O.C.

x 3" x 3" x 6" PURLIN CONNECTOR

1:100m
PLAN

SPOT DETAIL OF SAG ROD


SCALE:

NTS

SCALE:
2 - 2" x 2" x

1
4"

2 - 2" x 2" x

TOP CHORD

1
4"

1
1:40m

TOP CHORD

2 - 1/2" x 1/2" x 1/4"


WEB MEMBERS

2 - 1/2" x 1/2" x 1/4"


WEB MEMBERS

FFL

NGL
2 - 2" x 2" x 41"
BOTTOM CHORD

1
4"

2 - 2" x 2" x
BOTTOM CHORD

W/ STIRRUPS TIES SPACED


@ 0.20m O.C.

DETAIL OF LATERAL STRUTS (LS-2)

DETAIL OF LATERAL STRUTS (LS-1)


SCALE:

SCALE:

NTS

NTS

SECTION

W/ STIRRUPS TIES SPACED


@ 0.20m O.C.

WASHER

20 mm THK. BASE PLATE

SCALE:

2 - 41" x 4" x 4" ANGLE BAR


10mm THK. GUSSET PLATE

1:10m

PLAN

SCALE:

BASE PLATE DETAIL


SCALE:

1:10m

1:10m

1:40m

SCALE:

REPUBLIC OF THE PHILIPPINES


NATIONAL CAPITAL REGION

METRO MANILA FIRST ENGINEERING DISTRICT


WEST BANK ROAD, MANGGAHAN FLOODWAY
ROSARIO, PASIG CITY

PROJECT/LOCATION:

CONSTRUCTION OF MULTI - PURPOSE


BUILDING, STO.NINO ELEMENTARY SCHOOL,
BRGY. STO. NINO, MARIKINA CITY, 1ST LD

SHEET CONTENT:

AS SHOWN

PREPARED BY:

CHECKED BY:

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.

SHEET NO.

4
MANUEL B. CRUZ

MANUEL Y. MADRID

LUISITO C. PONCIANO

EULOGIO V. YDIO

ROBERTO S. NICOLAS

ENGINEER II

ENGINEER II

CHIEF, PLANNING & DESIGN SECTION


ENGINEER III

OIC ASST. - DISTRICT ENGINEER

DISTRICT ENGINEER

GA. 26 CORR. LONG SPAN


G.I. ROOFING SHEET
1.2mm x 2" x 6" C-PURLINS

1
4"

X 3" x 3" x 6" PURLIN CONNECTOR


2 - 2" x 2" x 41"

S2

S2

GA. 24 PRE-PAINTED GUTTER

S
S2

S2
2 - 3" x 3" x 41" WEB MEMBER

2 - 4" x 4" x 41" ANGLE BAR

10 mm THK. GUSSET PLATE

LEGEND:
S

SWITCH
FLOURESCENT
LIGHT
CONVENIENCE
OUTLET

TOP OF PEDESTAL

PIN LIGHT
FINISH FLOOR LINE

ELECTRICAL LAYOUT FOR STAGE


SCALE:

SCALE:

REPUBLIC OF THE PHILIPPINES


NATIONAL CAPITAL REGION

METRO MANILA FIRST ENGINEERING DISTRICT


WEST BANK ROAD, MANGGAHAN FLOODWAY
ROSARIO, PASIG CITY

PROJECT/LOCATION:

CONSTRUCTION OF MULTI - PURPOSE


BUILDING, STO.NINO ELEMENTARY SCHOOL,
BRGY. STO. NINO, MARIKINA CITY, 1ST LD

1:50m

N
NTS

SHEET CONTENT:

AS SHOWN

PREPARED BY:

CHECKED BY:

SUBMITTED BY:

RECOMMENDING APPROVAL:

APPROVED BY:

SET NO.

SHEET NO.

5
ANTHONY C. GONZALES

MANUEL Y. MADRID

LUISITO C. PONCIANO

EULOGIO V. YDIO

ROBERTO S. NICOLAS

ENGINEER II

ENGINEER II

CHIEF, PLANNING & DESIGN SECTION


ENGINEER III

OIC ASST. - DISTRICT ENGINEER

DISTRICT ENGINEER