Interco Rice Husk Power Plant Project: Preparation of PDD
Interco Rice Husk Power Plant Project: Preparation of PDD
Interco Rice Husk Power Plant Project: Preparation of PDD
PREPARATION OF PDD:
INTERCO
RICE HUSK POWER PLANT PROJECT
PROJECT DESIGN DOCUMENT
CONTENTS:
PURPOSE:
PROPONENT: INTERCO
CDM ADVISER: NONE YET
A.4. TECHNICAL DESCRIPTION OF THE
PROJECT ACTIVITY:
B. APPLICATION OF A BASELINE
METHODOLOGY
B. APPLICATION OF A BASELINE METHODOLOGY
NAME OF ORGANIZATIION
AND ADDRESS
PROJECT DESIGN DOCUMENT
25 YEARS
DECEMBER 1, 2006
MINIMUM 25 YEARS
C. DURATION OF THE PROJECT ACTIVITY/
CREDITING PERIOD
LENGTH: ? YEARS
PROJECT DESIGN DOCUMENT
D. APPLICATION OF A MONITORING
METHODOLOGY AND PLAN
D. APPLICATION OF A MONITORING
METHODOLOGY AND PLAN
APPLICABLE EQUATIONS
D.2.1.1 DATA TO BE COLLECTED IN ORDER TO
MONITOR EMISSIONS FROM THE BASE LINE ACTIVITY
AND HOW THESE DATA WILL BE ARCHIVED
ELECTRICITY
GRID
28,350 t CO2
REPORT/DATA
INTERPRETATION AND
IN CASE OF VISIIBLE RECOMMENDATION BY
PROBLEMS, CORRECTIVE TECHNICAL GRO UP
ACTION IMMEDIATELY
DONE BY ENG’G AND
MAINTENANCE GROUP
MANAGEMENT ACTION
FOR LONG TERM
SOLUTION
D. APPLICATION OF A MONITORING
METHODOLOGY AND PLAN
INTERCO PERSONNEL
PROJECT DESIGN DOCUMENT
F. ENVIRONMENTAL IMPACTS
F. ENVIRONMENTAL IMPACTS
F.1 DOCUMENTATION ON THE ANALYSIS OF THE ENVIRONMENTAL
IMPACTS, INCLUDING TRANSBOUNDARY IMPACTS
Domingo Perez
Christian Alvin Ong
Art Torralba
Angelito David
Merlyn Rivera