400KV Protection
400KV Protection
400KV Protection
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)
gk_aptransco@yahoo.co.in,
Mobile:9440336984
BASICS
OF
ONE AND HALF
CIRCUIT BREAKER
SCHEME
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)
ONE & HALF BREAKER DESCRIPTION
BUS-1 1. IN THIS TWO BUSES ARE PRIOVIDED.
BUS-1 BUS-2
BUS-2
ONE & HALF BREAKER DESCRIPTION
BUS-1 2. THESE TWO BUSES ARE INTER-CONNECTED BY THREE CIRCUIT BREAKERS.
BUS-1 BUS-2
BUS-2
ONE & HALF BREAKER DESCRIPTION
BUS-1 3. THEY ARE DESIGNATED AS 1-52 CB, 2-52 CB, 3-52 CB.
1-52 CB
BUS-1 BUS-2
1-52 CB 3-52 CB
2-52 CB
2-52 CB
3-52 CB
BUS-2
ONE & HALF BREAKER DESCRIPTION
BUS-1 4. LINE - 1 IS CONNECTED IN BETWEEN 1-52 CB & 2-52 CB.
5. LINE - 2 IS CONNECTED IN BETWEEN 3-52 CB & 2-52 CB.
1-52 CB
BUS-1 BUS-2
LINE-1
1-52 CB 3-52 CB
2-52 CB
LINE-2
2-52 CB
3-52 CB
LINE-1 LINE-2
BUS-2
ONE & HALF BREAKER DESCRIPTION
BUS-1 6. LINE-1 HAVING TWO FEEDING PATHS i.e
A. VIA BUS-1 & 1-52 CB
B. VIA BUS-2, 3-52 CB & 2-52 CB
1-52 CB 7. LINE-2 HAVING TWO FEEDING PATHS i.e
A. VIA BUS-2 & 3-52 CB
B. VIA BUS-1, 1-52 CB & 2-52 CB
BUS-1 BUS-2
LINE-1
1-52 CB 3-52 CB
2-52 CB
LINE-2 2-52 CB
3-52 CB
LINE-1 LINE-2
BUS-2
ONE & HALF BREAKER DESCRIPTION
BUS-1
8. FOR INTURUPTING LINE-1 THE 1-52CB AND 2-52CB IS TO BE TRIPPED.
9. FOR INTURUPTING LINE-2 THE 3-52CB AND 2-52CB IS TO BE TRIPPED.
1-52 CB
BUS-1 BUS-2
LINE-1
1-52 CB 3-52 CB
2-52 CB
LINE-2
2-52 CB
3-52 CB
LINE-1 LINE-2
BUS-2
ONE & HALF BREAKER DESCRIPTION
BUS-1 10. FOR ANY PROBLEM IN LINE-1 OR LINE-2 ALONG WITH MAIN BREAKER
THE MIDDLE BREAKER OR SAY TIE BREAKER (2-52 CB) MUST TRIP.
1-52 CB
BUS-1 BUS-2
LINE-1
1-52 CB 3-52 CB
2-52 CB
LINE-2
2-52 CB
3-52 CB
LINE-1 LINE-2
BUS-2
ONE & HALF BREAKER DESCRIPTION
BUS-1 11. NORMALLY IN ALL TYPES OF BUSBAR CONFIGUARATIONS ONE BREAKER
IS SUFFICIENT FOR ONE FEEDER.
12. HERE TWO FEEDERS ARE CONTROLED BY THREE BREAKERS.
13. SO THESE TWO FEEDERS CONTROLLED BY THREE CIRCUIT BREAKERS
1-52 CB IT IS CALLED ONE & HALF BREAKER SYSTEM.
BUS-1 BUS-2
LINE-1
1-52 CB 3-52 CB
2-52 CB
LINE-2
2-52 CB
3-52 CB
LINE-1 LINE-2
BUS-2
ONE & HALF BREAKER DESCRIPTION
BUS-1
1-52 CB
BUS-1 BUS-2
LINE-1
LINE-2
2-52 CB
3-52 CB
LINE-1 LINE-2
BUS-2
ONE & HALF BREAKER DESCRIPTION
BUS-1
1-52 CB
BUS-1 BUS-2
LINE-1
TIE BAY (2ND BAY ) FOR FEEDER-1 & 2
LINE-2
2-52 CB
3-52 CB
LINE-1 LINE-2
BUS-2 TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.
ONE & HALF BREAKER DESCRIPTION
BUS-1
1-52 CB
BUS-1 BUS-2
LINE-1
TIE BAY (2ND BAY ) FOR FEEDER-1 & 2
LINE-2
MAIN BAY(3RD BAY) FOR FEEDER-2
2-52 CB
3-52 CB
LINE-1 LINE-2
BUS-2 TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.
ONE & HALF BREAKER DESCRIPTION
BUS-1 17. IN THIS SYSTEM FULL DIA MEANS 2 FEEDERS CONTROLLED BY 3 CBs.
1-52 CB
BUS-1 BUS-2
LINE-1
TIE BAY (2ND BAY ) FOR FEEDER-1 & 2
LINE-2
MAIN BAY(3RD BAY) FOR FEEDER-2
2-52 CB
3-52 CB
LINE-1 LINE-2
BUS-2 TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.
ONE & HALF BREAKER DESCRIPTION
BUS-1 GOPALA KRISHNA PALEPU
BUS-1 BUS-2
LINE-1
TIE BAY (2ND BAY ) FOR FEEDER-1 & 2
LINE-2
MAIN BAY(3RD BAY) FOR FEEDER-2
2-52 CB
3-52 CB
LINE-1 LINE-2
BUS-2 TIE BAY (2ND BAY ) FOR FEEDER-1 & 2.
SUBSTATION DESIGN/LAYOUT
(I-CONFIGUARATION)
FEEDER1 FEEDER3 FEEDER5 FEEDER7 FEEDER9 FEEDER11
BAY10
BAY13
BAY16
BAY4
BAY7
BAY1
BAY11
BAY14
BAY17
BAY8
BAY2
BAY5
BAY12
BAY18
BAY15
BAY9
BAY3
BAY6
BUS-2
BAY13
BAY15
BAY3
BAY9
BAY1
BAY7
DIA1 DIA3 DIA5
BUS-1
BUS-2
BAY18
BAY10
BAY12
BAY6
BAY16
BAY4
BUS-1
BAY2
BAY6
BAY1
BAY5
BAY7
BAY1
BAY3
BAY5
BUS-1
BUS-2
BAY4
BAY6
BAY8
BAY2
BAY4
BAY8
BAY3
BAY7
BUS-2
1-52 CB 2-52 CB
8-52 CB 3-52 CB
FEEDER 7
MESH / RING FEEDER 3
LAYOUT
7-52 CB 4-52 CB
6-52 CB 5-52 CB
T/F-1 T/F-2
BUS-1
BUS COUPLER
BUS-2
TRANSFER BUS
COUPLER
BAY3 BAY4 BAY5
BAY1 BAY2 TRANSFER BUS BAY6 BAY7 BAY8
FOR ECONOMICAL& RELIABULITY PURPOSE THIS SYSTEM ADOPTED IN 400 & 220 KV SYSTEM
SUBSTATION DESIGN/LAYOUT
(DOUBLE MAIN BUS & CB BYPASS ISO SYSTEM)
T/F-1 T/F-2
T/F-1 T/F-2
TRANSFER BUS
FOR ECONOMICAL& RELIABULITY PURPOSE THIS SYSTEM ADOPTED IN 220 & 132 KV SYSTEM
CT METHODS
IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)
DIFFERENT CT METHODS OF ONE & HALF BREAKER SYSTEM
CB CB CB
3 CT METHOD
LINE AT/F
CB CB CB
4 CT METHOD
LINE AT/F
CB CB CB
5 CT METHOD
LINE AT/F
CB CB CB
LINE 6 CT METHOD
AT/F
CB CB CB
6 CT METHOD
LINE AT/F
CB CB CB
6 CT METHOD
LINE AT/F
ONE & HALF BREAKER SYSTEM
(3CT METHOD)
BUS-1 BUS-2
1-89 3-89
1-52CB 3-52CB
P2 P2
1-CT 3P1 3
P1
3-CT
1-89A 3-89A
2-CT
3
3
P1 P2
2-89A 2-52CB 2-89B
1-89L 3-89T
LINE 1
T/F-1
ONE & HALF BREAKER SYSTEM
(4CT METHOD)
BUS-1 BUS-2
1-89 3-89
1-52CB 3-52CB
P2 P2
1-CT 3P1 3
P1
3-CT
1-89A 3-89A
2-ACT 2-BCT
3
3
P2 P1 P1 P2
2-89A 2-52CB 2-89B
1-89L 3-89T
LINE 1
T/F-1
ONE & HALF BREAKER SYSTEM
(5CT METHOD)
BUS-1 BUS-2
1-89 3-89
1-52CB 3-52CB
P2 P2
1-CT 3P1 3 3-CT
P1
1-89A 3-89A
2-CT
3
P1 P2
2-89A 2-52CB 2-89B
1-89L 3-89T
P2 P2
1L-CT 3P1 P1
3 3T-CT
LINE 1
T/F-1
ONE & HALF BREAKER SYSTEM
(6CT METHOD)
BUS-1 BUS-2
1-89 3-89
P2 P2
P1
3 1A-CT 3A-CT 3 P1
1-52CB 3-52CB
P1 P1
P2
3 1B-CT 3B-CT 3
P2
1-89A 3-89A
2A-CT 2B-CT
3
3
P2 P1 P1 P2
2-89A 2-52CB 2-89B
1-89L 3-89T
T/F-1
LINE 1
ONE & HALF BREAKER SYSTEM
(6CT METHOD)
BUS-1 BUS-2
1-89 3-89
1-52CB 3-52CB
P2 P2
P1
3 1-CT 3-CT 3
P1
1-89A 3-89A
2A-CT 2B-CT
3
3
P2 P1 P1 P2
2-89A 2-52CB 2-89B
1-89L 3-89T
P2
P2
3 1L-CT
3T-CT 3 P1
P1
T/F-1
LINE 1
ONE & HALF BREAKER SYSTEM
(6CT METHOD)
BUS-1 BUS-2
1-89 3-89
P2 P2
P1
3 1-CT P1
3 3-CT
1-52CB 3-52CB
1-89A 3-89A
2A-CT 2B-CT
3
3
P2 P1 P1 P2
2-89A 2-52CB 2-89B
1-89L 3-89T
P2
P2
3 1L-CT
3T-CT 3 P1
P1
T/F-1
LINE 1
ONE & HALF BREAKER SYSTEM
(8CT METHOD)
BUS-1 BUS-2
1-89 3-89
P2 P2
P1
3 1A-CT 3A-CT 3 P1
1-52CB 3-52CB
P1 P1
P2
3 1B-CT 3B-CT 3
P2
1-89A 3-89A
2A-CT 2B-CT
3
3
P2 P1 P1 P2
2-89A 2-52CB 2-89B
3-89T
1-89L
P2
P2
31L-CT 3T-CT 3 P1
P1
T/F-1
LINE 1
TYPICAL ONE & HALF BREAKER
SYSTEM ADOPTED IN GIS
DS : DISCONNECTOR SWITCH, GS: GROUNDING SWITCH, CT: CURRENT TRANSFORMER, VD: VOLTAGE DIVIDER
TYPICAL ONE & HALF BREAKER
SYSTEM ADOPTED IN GIS
DS : DISCONNECTOR SWITCH, GS: GROUNDING SWITCH, CT: CURRENT TRANSFORMER, VD: VOLTAGE DIVIDER
1-1/2 CB SYSTEM
(SIEMENS VATECH)
VD VD
VD VD
GS
GS
GS
GS
GS
GS
GS
GS
CT CT CT CT CT CT
DS CB DS DS CB DS DS CB DS
CORE WISE
APLICATION OF
CTs IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)
CURRENT TRANSFORMER
CONNECTIONS IN 3CT METHOD
1 – CT 2 – CT 3 – CT
CORE – 1 BUSBAR-1 2CT’s SECONDARIES ARE CONNECTED IN PARALLEL AND
( PS) PROTECTION CONNECTED TO MAIN PROTECTION FOR TRANSFORMER
2CT’s SECONDARIES ARE CONNECTED IN PARALLEL AND
CORE – 2 BUSBAR-1 CHECKUP
CONNECTED TO BACKUP PROTECTION AFTER LBB/BFR
( PS) PROTECTION (SPARE)
FOR TRANSFORMER
CORE – 3 SPARE METERING & ENERGY METER FOR AT/F
( 0.5 / 0.2)
CORE-5 TEED PROT-1 MAIN-1 TEED PROT-1 TEED PROT-1 MAIN TEED PROT-1
(BAY 1&2) PROTECTION (BAY 2&3) (BAY 1&2) PROTECTION (BAY 2&3)
(PS)
CURRENT TRANSFORMER
CONNECTIONS IN 8CT METHOD
1B-CT 1A-CT 1L-CT 2B-CT 2A-CT 3T-CT 3A-CT 3B-CT
BUSBAR-1 BUSBAR-2
CORE-1 MAIN-1
LBB PROT TEED PROT-1 LBB PROT LBB PROT TEED PROT-1 LBB PROT
MAIN-1
(BAY-1) (BAY 1&2) (BAY-2) (BAY-2) (BAY 2&3) (BAY-3)
(PS) PROTECTION PROTECTION
BUSBAR-1 BUSBAR-2
CORE-2 MAIN-2
LBB PROT TEED PROT-2 TEED PROT-1 TEED PROT-2 TEED PROT-2 LBB PROT
MAIN-2
(BAY-1) (BAY 1&2) (BAY 2&3) (BAY 2&3) (BAY 2&3) (BAY-3)
(PS) PROTECTION PROTECTION
CORE-3 TEED PROT-2 TEEDPROT-1 MAIN-2 TEED PROT-2 TEED PROT-1 BACKUP TEED PROT-1 TEED PROT-2
(PS) (BAY 1&2) (BAY 1&2) PROTECTION (BAY 1&2) (BAY 1&2) PROTECTION (BAY 2&3) (BAY 2&3)
CORE-4 TEED-1 FOR BAY-1 & 2 IS: MAIN-1 MAIN TEED-1 FOR BAY-2 & 3 IS:
SOME TIMES DUPLICATED
(PS) 1L-CT, 1A-CT & 2A-CT PROTECTION
BUSBAR PROTECTION WITH
PROTECTION 3T-CT, 3A-CT & 2B-CT
3
3
3
3
1-89
/ CVT
3 2 1
BB-EVT
1-52CB
P2
1
METERING 3
1-CT
CORES
4
MAIN-2/BACKUP PROTECTION 3
5
MAIN-1 PROTECTION 3
P1
SINGLE BUS SYSTEM
1-89L
3
2
3
3
3
3
1-CVT
ONE & HALF BREAKER ( 3 CT METHOD) WITH PROTECTION SCHEME
87BB1
BUSBAR-1
79
CVT 21M1 VL1
VBB1 VBB1 25
VL1 / VL2 BF
OR VBB2
VL1
87L 21M2 CVT VL1
FEEDER1 / LINE1
79
VL1 / VBB1
25
VL2 / VBB2
BF
FEEDER2 / LINE2
BF PROTECTION OF LINE2
MAIN-2
(OR TRANSFORMER, IF APPLICABLE)
VL2 / VL1 79
VBB2 OR VBB1
CVT
25
VBB2
FOR TRANSFORMER PROTECTION &
BUSBAR-2 METERING VOLTAGE SELECTION RELAYS
87BB2 FOR BUS-1, BUS-2& LINE ARE PROVIDED .
ONE & HALF BREAKER ( 4 CT METHOD) WITH PROTECTION SCHEME
87BB1
BUSBAR-1
79
CVT 21M1 VL1
VBB1 VBB1 25
VL1 / VL2 BF
OR VBB2
VL1
87L 21M2 CVT VL1
FEEDER1 / LINE1
79
VL1 / VBB1
25 BF
VL2 / VBB2
FEEDER2 / LINE2
VBB1 25 VL1
87L 21M2 CVT VL1
VL1 / VL2
OR VBB2 FEEDER1 / LINE1
79
VL1 / VBB1
25 BF
VL2 / VBB2
FEEDER2 / LINE2
CVT VL2
MAIN-1
PROTECTION OF LINE2
(OR TRANSFORMER, IF APPLICABLE)
VL2 / VL1 79 BF MAIN-2
VBB2 OR VBB1
CVT
25
VBB2
FOR TRANSFORMER PROTECTION &
BUSBAR-2 METERING VOLTAGE SELECTION RELAYS
87BB2 FOR BUS-1, BUS-2& LINE ARE PROVIDED .
ONE & HALF BREAKER ( 5 CT METHOD) WITH PROTECTION SCHEME
87BB1
BUSBAR-1
21M1 VL1
79
CVT 87 TD1 HZ
VBB1 VBB1 25
VL1
VL1 / VL2 87L 21M2
.
BF 87 TD2 LZ
OR VBB2
CVT VL1
FEEDER1 / LINE1
79
VL1 / VBB1
25
VL2 / VBB2
BF
FEEDER2 / LINE2
. MAIN-1
CVT VL2
BF 87 TD2 LZ
PROTECTION OF LINE2
VL2 / VL1 79 (OR TRANSFORMER, IF APPLICABLE)
VBB2 OR VBB1 MAIN-2
CVT 87 TD1 HZ
25
VBB2
FOR TRANSFORMER PROTECTION &
BUSBAR-2 METERING VOLTAGE SELECTION RELAYS
87BB2 FOR BUS-1, BUS-2& LINE ARE PROVIDED .
ONE & HALF BREAKER ( 6 CT METHOD) WITH PROTECTION SCHEME
87BB1
BUSBAR-1
21M1 VL1
79
CVT 87 TD1 HZ
VBB1 VBB1 25
VL1
VL1 / VL2 87L 21M2
.
BF 87 TD2 LZ
OR VBB2
CVT VL1
FEEDER1 / LINE1
79
VL1 / VBB1
25
VL2 / VBB2 BF
FEEDER2 / LINE2
. MAIN-1
CVT VL2
BF 87 TD2 LZ
PROTECTION OF LINE2
VL2 / VL1 79 (OR TRANSFORMER, IF APPLICABLE)
VBB2 OR VBB1 MAIN-2
CVT 87 TD1 HZ
25
VBB2
FOR TRANSFORMER PROTECTION &
BUSBAR-2 METERING VOLTAGE SELECTION RELAYS
87BB2 FOR BUS-1, BUS-2& LINE ARE PROVIDED .
ONE & HALF BREAKER ( 6 CT METHOD) WITH PROTECTION SCHEME
87BB1
BUSBAR-1
21M1 VL1
CVT 87 TD1 HZ
VBB1
BF VL1
87L 21M2
87 TD2 LZ
79
CVT VL1
VBB1 25
VL1 / VL2 FEEDER1 / LINE1
OR VBB2
79
VL1 / VBB1
25
VL2 / VBB2 BF
FEEDER2 / LINE2
VL2 / VL1 79
OR VBB1
CVT VL2
25 MAIN-1
VBB2 87 TD2 LZ
PROTECTION OF LINE2
BF (OR TRANSFORMER, IF APPLICABLE)
VBB2
MAIN-2
CVT 87 TD1 HZ
FOR TRANSFORMER PROTECTION &
BUSBAR-2 METERING VOLTAGE SELECTION RELAYS
87BB2 FOR BUS-1, BUS-2& LINE ARE PROVIDED .
ONE & HALF BREAKER ( 6 CT METHOD) WITH PROTECTION SCHEME
CVT VBB1 (WITH LATEST CONCEPT)
BUSBAR-1
VL1 / VL2
OR VBB2 VL1
25 21M1
VBB1
79
BF VL1
87L 21M2 CVT VL1
FEEDER1 / LINE1
87BB
VL1 / VBB1
VL2 / VBB2
IN THIS CONCEPT FOR ONE & HALF BREAKER SYSTEM
A NEW RELAY DEVELOPED WHICH INCLUDES
25 AUTO RECLOSURE + CHECK SYN + LBB RELAY(79+25+50).
FROM THIS RELAY TO BUSBAR RELAY
79 ONLY FIBRE OPTIC CONNECTION(NO PHYSICAL).
THE DATA WILL BE COMMUNICATED BETWEEN 87BB & LBB.
BF IN THIS 1+1 DUPLICATED BUSBAR PROTECTION IS ADOPTED.
87BB
FEEDER2 / LINE2
CVT VL2
BF MAIN-1
PROTECTION OF LINE2
79 (OR TRANSFORMER, IF APPLICABLE)
MAIN-2
VBB2
25
VL2 / VL1
OR VBB1 FOR TRANSFORMER PROTECTION &
BUSBAR-2 METERING VOLTAGE SELECTION RELAYS
FOR BUS-1, BUS-2& LINE ARE PROVIDED .
CVT VBB2
NEW CONCEPT
NUMERICAL BUSBAR SCHEME INCL LBB/BFR/CBF
(DECENTRALISED & CENTRALISED CONCEPTS)
DECENTRALISED CONCEPT CENTRALISED CONCEPT
OR
(7 SS 52) SIEMENS
FO
OR LBB OR
TIE CB LBB
OR
(MICOM P740) AREVA
MAIN CB LBB
FO LBB
LBB TO BUSBAR
DIGITAL COMMUNICATION LBB INBUILT FEATURE
COMPARISION BETWEEN DIFFERENT CT METHODS
CT 3 CT 4 CT 6 CT (S) 5 CT 6 CT (T1) 6 CT (T2)
PURPOSE METHOD METHOD METHOD METHOD METHOD METHOD
BUSBAR & 1 CT 1 CT 1B CT 1 CT 1 CT 1 CT
BUSBAR
ABOVE FOR BUS-1 & BELOW FOR BUS-2
CHECKUP
PROTECTION 3 CT 3 CT 3B CT 3 CT 3 CT 3 CT
MAIN-1 1 - CT & 2 - CT 1 CT & 2 B - CT 1 A – CT & 2 B – CT 1 L - CT 1 L - CT 1 L - CT
MAIN-2
ABOVE CT SECONDARIES ARE CONNECTED PARALLEL FOR FEEDER-1 ABOVE FOR FEEDER-1
PROTECTION
&
BELOW CT SECONDARIES ARE CONNECTED PARALLEL FOR FEEDER-2 BELOW FOR FEEDER-2
METERING 3 - CT & 2 – CT 3 - CT & 2 A - CT 3 A - CT & 2 A - CT 3 L - CT 3 L - CT 3 L – CT
STUB-1 & STUB-2 PROTECTION TEED-1 & TEED-2 PROTECTION
FOR LINE & AT/F FOR LINE & AT/F
ADDITIONAL
PROTECTION STUB-1 & STUB-2 PROTECTION IS A NORMALLY INBUILT TEED–1 IS NORMALLY HIGH IMPEDENCE DIFFERENTIAL RELAY &
AVAILABLE PROTECTION FOR MAIN-1 & MAIN-2 RELAYS, IN CASE OF LATEST TEED-2 IS NORMALLY LOW IMPEDENCE DIFFERENTIAL RELAY.
NUMERICAL RELAYS. STUB PROTECTION WORKS WHEN LINE THESE ARE NOT INBUILT FUNCTIONS OF MAIN-1 & MAIN-2
ISOLATOR OPEN CONDITION ONLY. RELAYS.
A FAULT BETWEEN CIRCUIT BREAKERS AND CT (END FAULT) MAY THEN STILL BE FED FROM ONE SIDE
BLIND EVEN WHEN THE BREAKER HAS BEEN OPENED. CONSEQUENTLY, FINAL FAULT CLEARING BY CASCADED
ZONE TRIPPING HAS TO BE ACCEPTED IN THIS CASE. THIS SITUATION LBB/BFR OPERATES AND TIME TAKEN TO
CLEAR FAULT IS ABOUT 300 mSECs. THIS IS BLIND ZONE AREA.
MINIMUM CT TIE CB BLIND ZONE MAIN CB & TIE CB BLIND ZONE FOR TIE CB BLIND ZONE TIE CB BLIND ZONE
METHOD. REDUCING AREA IS TAKEN BLIND ZONE AREA IS MAIN CB & TIE CB AREA IS TAKEN CARE AREA IS TAKEN CARE
THE COST OF CTs CARE. TAKEN CARE
ADVANTAGES WHEN THE FAULT IS TAKEN PLACE BETWEEN THE WHEN THE FAULT IS TAKEN PLACE BETWEEN THE MAIN CB, TIE CB &
MAIN CB, TIE CB & LINE ISOLATOR, DURING SERVICE LINE ISOLATOR DURING SERVICE ONLY, TEED PROTECTION IN
ONLY, DISTANCE SCHEME SHOULD TAKE CARE. ADDITION TO DISTANCE SCHEME SHOULD TAKE CARE.
400KV C.T. INFORMATION
P1 P2
PRIMARY CONNECTIONS : P1 – P2
CURRENT RATING : 2000 AMPS
SECONDARY CONNECTIONS P1 P2
CORES CLASS PURPOSE CURRENT RATING : 1A
2000/ 1A 1000/ 1A 500/ 1A
BUSBAR 1S1 – 1S2 __ 5S1
CORE-1 PS 1S1 – 1S3
U
3
1S1
3
5S2
PROTECTION 1S2 – 1S3 1S2
1S3
5S3
5S4
3
4S1
BUSBAR
U
2S1 3
2S2 4S2
2S1 – 2S2 2S3 4S3
CORE-2 PS CHECKUP 2S1 – 2S3 __ U 4S4
3
2S2 – 2S3 1 1
5S S2
PROTECTION
3
1S S1
3S4
3S2
3S3
3S1
1S 2
3 5 S3
5 S4
U
3
U
PIN /
3
3 4S2
3S4 – 3S2 3S4 – 3S3 2S12
2S 3
4S3
2S
U 4S4
U SHAPE
3
MAIN-2 4S1 – 4S3 4S1 – 4S2 DESIGN
CORE-4 PS 4S1 – 4S4
3S4
3S2
3S3
3S1
PROTECTION 4S4 – 4S2 4S4 – 4S3
EYE BOLT
MAIN-1 5S1 – 5S3 5S1 – 5S2 DESIGN
CORE-5 PS 5S1 – 5S4
PROTECTION 5S4 – 5S2 5S4 – 5S3 DEAD TANK DESIGN
MAIN-1, MAIN-2
PROTECTION &
METERING
FOR LINE
ADOPTED IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)
NORMS OF PROTECTION FOLLOWED IN APTRANSCO
FOR TRANSMISIION LINES & DISTRIBUTION LINES ( FEEDER / LINE PROTECTION )
Sr.No VOLTAGE MAIN- 1 PROTECTION MAIN-2 PROTECTION/ BACKUP PROTECTION
1. 11 KV LINES 2 O/L + E/F ( 51 + 51N ) -
2. 33 KV LINES 3 O/L + E/F ( 51 + 51N ) -
3. 66 KV LINES SWITCHED DISTANCE SCHEME OR DIRECTIONAL O/L & E/F RELAYS WITH HIGH
4. 132 KV LINES NUMERICAL DISTANCE SCHEME (21P+ 21N) SET ( 67 + 67N )
NON SWITCHED DISTANCE SCHEME OR SWITCHED DISTANCE SCHEME OR
5. 220 KV LINES NUMERICAL DISTANCE SCHEME (21P + 21N) NUMERICAL DISTANCE SCHEME (21P+ 21N)
6. 400 KV LINES NUMERICAL DISTANCE SCHEME (21P + 21N) NUMERICAL DISTANCE SCHEME (21) OR LINE
+ in BUILT DEF RELAY(67N) DIFFERENTIAL SCHEME (87L) WITH 67N
7. 765 KV LINES NUMERICAL DISTANCE SCHEME (21P + 21N) NUMERICAL DISTANCE SCHEME (21) OR LINE
+ in BUILT DEF RELAY(67N) DIFFERENTIAL SCHEME (87L) WITH 67N
IF MAIN-1 & MAIN-2 ARE NUMERICAL RELAYS, BOTH SHOULD BE SEPARATE MEASURING PRINCIPLES (CHARECTERESTICS), MODELS
AND ALGORITHAMS (SHOULD NOT BE DUPLICATED) AND ALL FEATURES SHOULD BE AVAILABLE IN BOTH SCHEMES AND BOTH RELAYS
SHOULD BE 100% REDENDENCY IN ALL ASPECTS ( COMPLEMENTARY TO EACH OTHER ) . DISSIMILAR CARRIER SCHEMES ARE TO BE
SELECTED ( POTT & PUTT or BLOCK & UNBLOCK). OTHER WISE MAIN-2 MAY BE DIFFERENT MAKE OR PHASE COMPARISION
PROTECTION/LINE DIFFERENTIAL PROTECTION WITH BACKUP DISTANCE PROTECTION IS TO BE ADOPTED. BOTH M1 & M2 SHOULD
CONTAIN DIRECTIONAL EARTH FAULT PROTECTION (67N) WITH DIRECTIONAL COMPARISION PICKUP SCHEME AS INBUILT FUNCTION.
ZONE-1: 80% OF MAIN LINE
ZONE-2: 100% OF MAIN LINE + 50% OF SHORTEST LINE AT OTHER END
ZONE-3: 100% OF MAIN LINE + 100% OF SHORTEST LINE AT OTHER END
ZONE-4: 100% OF MAIN LINE + (100% OF SHORTEST LINE + 20% OF LONGEST LINE) AT OTHER END.
MAIN-1 PROTECTION FOR LINE
(4CT METHOD)
P2 P2 P2 CT MB
IR5 / A511 VR11 / E111
IY5 / A531 VY11 / E131
1-CT
IB5 / A551 REL 521 VB11 / E151
CORE-5 3 3 3
5S4 5S4 5S4 VN11 / E171
ACTIVE START TRIP
CTR: 2000-1000-500/1A 5S2 5S2 5S2 IN5 / A571
CLASS: PS 1-CVT
CORE – 1
DISPLAY
6 CT METHOD : 1-ACT & 2-BCT
4 CT METHOD : 1-CT & 2-BCT
200VA
3 CT METHOD : 1-CT & 2-CT
CLASS: 3P
C
E
CT MB
2-BCT
5S2
CORE-5 5S2
3 3 3 5S2
CLASS: PS
P2 P2 P2
MAIN-1 PROTECTION FOR LINE
(4CT METHOD) (NEW DEVELOPMENT)
P2 P2 P2 CT MB
IR5 / A511 IA =250.10 A VR11 / E111 1-CVT
IY5 / A531 IB =250.10 A VY11 / E131 CORE – 1
1-CT
IB5 / A551 IC =250.10 A VB11 / E151
200VA
CORE-5 3 3 3
5S4 5S4 5S4
VAB =400.0 KV VN11 / E171
CTR: 2000-1000-500/1A IN5 / A571 CLASS: 3P
5S2 5S2 5S2
VBC =400.0 KV
CLASS: PS VCA =400.0 KV
6 CT METHOD : 1-ACT & 2-BCT
4 CT METHOD : 1-CT & 2-BCT
3 CT METHOD : 1-CT & 2-CT
ESC ENT
CT MB ENABLED
TARGET
TRIP RESET
INST PH-A
2-BCT IN5 / A571 TIME PH-B
COMM PH-C
CORE-5 5S2
3 3 3 5S2 5S2 SOTF GND
CTR: 2000-1000-500/1A 5S4 5S4 5S4
IB5 / A551 ZONE1 50
ZONE2 51
CLASS: PS IY5 / A531 ZONE3 79 RESET
ZONE4 79 LOCKOUT
IR5 / A511
SEL- 421
P2 P2 P2 SEL PROTECTION
AUTOMATION
CONTROL
MAIN-1 PROTECTION FOR LINE
(5CT METHOD)
P2 P2 P2 CT MB
IR5 / A511 VR11 / E111
IY5 / A531 VY11 / E131
1-LCT
IB5 / A551 REL 521 VB11 / E151
CORE-5 3 3 3
5S4 5S4 5S4 VN11 / E171
ACTIVE START TRIP
CTR: 2000-1000-500/1A 5S2 5S2 5S2 IN5 / A571
CLASS: PS 1-CVT
CORE – 1
DISPLAY 200VA
CLASS: 3P
C
E
MAIN-2 PROTECTION FOR LINE
(4CT METHOD)
50Z
P2 P2 P2 CT MB
IR4 / C411 VR21 / E211
200VA
3 CT METHOD : 1-CT & 2-CT
CLASS: 3P
C
E
CT MB
2-BCT
CORE-4 4S2
3 3 3 4S2 4S2
CLASS: PS RAICA
LBB / BFR
P2 P2 P2 50ZT
MAIN-2 PROTECTION FOR LINE
(4CT METHOD) ( NEW DEVELOPMENT)
P2 P2 P2 CT MB
IR4 / C411 VR21 / E211 1-CVT
IY4 / C431 VY21 / E231 CORE – 2
1-CT
IB4 / C451 VB21 / E251
200VA
CORE-4 3 3 3
4S4 4S4 4S4 VN21 / E271
CTR: 2000-1000-500/1A 4S2 4S2 4S2 IN4 / C471 CLASS: 3P
CLASS: PS
6 CT METHOD : 1-ACT & 2-BCT
4 CT METHOD : 1-CT & 2-BCT
3 CT METHOD : 1-CT & 2-CT
CT MB
2-BCT
IN4 / C471
CORE-4 4S2
3 3 3 4S2 4S2
P2 P2 P2
MULTI FUNCTION NUMERICAL RELAY FOR
MULTI BREAKER, MULTI CT & CVT/PT APPLICATION
(NEW APPLICATION) (ONE & HALF BREAKER SYSTEM or RING BUS SYSTEM)
3
1-52 CB 2-52 CB 3-52 CB
3
3
BUS-1 PT BUS-2 PT
3
3
59 50 BF-1 50 BF-2
3
3 64: EARTH FAULT RELAY
50BF-1: LBB/BFR OF MAIN CB
LINE CVT 50BF-2: LBB/BFR OF TIE CB
79-1,2: AUTO RECLOSURE RELAY OF
MAIN & TIE CB
25-1,2: CHECK SYNCHRONISAM RELAY
LINE FOR MAIN & TIE CB
MAIN-2 PROTECTION FOR LINE
(5CT METHOD)
P2 P2 P2 CT MB
IR4 / C411 VR21 / E211
IY4 / C431 VY21 / E231
1-LCT
IB4 / C451 REL 316 VB21 / E251
CORE-4 3 3 3
4S4 4S4 4S4 VN21 / E271
ACTIVE START TRIP
CTR: 2000-1000-500/1A 4S2 4S2 4S2 IN4 / C471
CLASS: PS 1-CVT
CORE – 2
DISPLAY 200VA
CLASS: 3P
C
E
MULTI FUNCTION PANEL METERING & ENERGY METER
(4CT METHOD)
P2 P2 P2 CT MB
IR3 / D311
IY3 / D331
1-CT
IB3 / D351
CORE-3 3 3 3
3S4 3S4 3S4
CTR: 2000-1000-500/1A 3S2 3S2 3S2 IN3 / D371
CLASS: 0.5
6 CT METHOD : 1-ACT & 2-BCT
4 CT METHOD : 1-CT & 2-BCT
3 CT METHOD : 1-CT & 2-CT
CT MB
VR31 / E311
VY31 / E331
2-BCT VB31 / E351
VN31 / E371
CORE-3 3S2 3S2
3 3 3 3S2
P2 P2 P2 CT MB
IR3 / D311
IY3 / D331
1-LCT
IB3 / D351
CORE-3 3 3 3
3S4 3S4 3S4
CTR: 2000-1000-500/1A 3S2 3S2 3S2
CLASS: 0.5/0.2
IN3 / D371
VR31 / E311
VY31 / E331
VB31 / E351
VN31 / E371
1-CVT
CORE – 3
100VA
CLASS: 0.5/0.2
LBB & BUSBAR
PROTECTION
SCHEMES
ADOPTED IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)
BASICS OF LBB/BFR PROTECTION
LOCAL BREAKER BACKUP PROTECTION
A PROTECTION WHICH IS DESIGNED TO CLEAR A SYSTEM
FAULTY BY INITIATING TRIPPING OTHER CIRCUIT BREAKER(S) IN
THE CASE OF FAILURE TO TRIP OF THE APPROPRIATE CIRCUIT
BREAKER.
IN MODERN NETWORKS THE CRITICAL FAULT CLEARING
TIME MAY BE LESS THAN 200ms. HENCE, IF THE FAULT IS NOT
CLEARED DUE TO FAILURE OF THE PRIMARY PROTECTIVE RELAYS
OR THEIR ASSOCIATED CIRCUIT BREAKER, A FAST ACTING BACK-
UP PROTECTIVE RELAY MUST CLEAR THE FAULT.
THERE ARE TWO BASIC FORMS.
REMOTE BACK-UP.
LOCAL BACK-UP.
REMOTE BACK-UP
PROVIDES BACK-UP PROTECTION FOR THE BOTH THE
RELAYS (MAIN-1 & MAIN-2) AND BREAKERS AT REMOTE
SUBSTATION.
LOCAL BACK-UP
LOCAL BACK-UP PROTECTION CAN BE DEVIDED INTO TWO
CATAGORIES.
RELAY BACK-UP
BREAKER BACK-UP
RELAY BACK-UP
z DUPLICATE PRIMARY PROTECTION. i.e ONE IS NON SWITCHED
DISTANCE PROTECTION AND ANOTHER IS SWITCHED DISTANCE
SCHEME OR OTHER WISE BOTH SCHEMES CHARECTERSTICS ARE
DIFFERENT (QUADRALATERAL, MHO CIRCULAR, TAMOTO & OPTICAL )
OR DIFFERENT MANUFACTURERS(ABB, ALSTOM, SIEMENS, EASUN
REYROLL, SEL, GE, NXT PHASE OR BASLER) OR DIFFERENT METHODS (i.e
ELECTROMECHANICAL, STATIC, NUMERICAL{MICROPROCESSOR &DSP}).
IF MAIN-1 & MAIN-2 ARE NUMERICAL RELAYS BOTH SHOULD BE
SEPARATE CHARECTERESTICS AND SEPARATE MODELS AND ALL
FEATURES SHOULD BE AVAILABLE IN BOTH SCHEMES AND BOTH
RELAYS SHOULD BE 100% REDENDENCY IN ALL ASPECTS.
TO INCREASE THE SECURITY, THE CIRCUIT BREAKER HAS TWO
TRIP COILS, ONE IS CONNECTED TO MAIN-1 PROTECTION AND ANOTHER
IS CONNECTED TO MAIN-2 PROTECTION.
BREAKER BACK-UP
BECAUSE OF THE HIGH COST OF HIGH VOLTAGE CIRCUIT
BREAKERS, IT IS NOT FEASIBLE TO DUPLICATE THEM.
IN CASE OF A BREAKER FAILURE THE OTHER CIRCUIT BREAKERS
CONNECTED TO THE SAME BUS AS THE FAULTED BREAKER MUST THERE
FORE BE TRIPPED.
LBB/BFR FLOW CHART
MAIN TRIP
RESET
PROTECTION YES FAULT YES BREAKER
MAIN CLEARED
OPERATED BREAKER
FAILURE
SCHEME
NO
RETRIP
TRIP
YES WAIT FOR BACK-UP/
INITIATE FAULT AND
BFR Adjacent
CLEARENCE BREAKERS
BREAKER
INTURUPTING TIME MARGIN
~30ms ~60ms <12ms
SET TIME OF THE TIME MEASURING UNIT TRIPPING BACK-UP BREAKER MARGIN
RELAY INTERUPTING TIME
TIME
TIMING/OUTPUT TRIP T1
TIME STAGE T1 RELAY
STAGE
& LED
0 1
ALARM T1
TIME STAGE T2 & RELAY
SWITCHED OFF
>1 TRIP T2
TIME STAGE T2
RELAY
O&
LED
0 1 LED
CB FAILURE
INITIATE
LBB/BFR PROTECTION
LINE1 AT/F-1
86-A
86-A
REL521
MAIN-1
ABB
86-B
86-B
REL316
MAIN-2
BUSBAR-1
PROTECTION OPTD
TO 86-B TRIP RELAY
AND BUSBAR-1
OF TIE CB(2-52CB)
ISOLATED
Breaker Failure Relay of the Main Circuit Breaker Trips the Connected Bus, Tie Circuit
Breaker, and Remote End Circuit Breaker
2-52 CB LBB/BFR OPERATION
ABB ABB
86-A
REL521 RET521
MAIN-1 MAIN-1
ABB ABB
86-B
REL316 RET316
MAIN-2 MAIN-2
50ZT
DIRECT TRIP 1&2 INTER TRIP TO
VIA CARRIER LVCB & TBCCB
TO OTHER END
Breaker Failure Relay of the Tie Circuit Breaker Trips the Both Main Circuit Breakers
and Remote End Circuit Breakers ( In case of Transformer LV Circuit Breaker)
3-52 CB LBB/BFR OPERATION
ABB
86-A
86-A
RET521
MAIN-1
ABB
86-B
86-B
RET316
MAIN-2
50Z
INTER TRIP TO
LV CB & TBC CB
BUSBAR-2
PROTECTION OPTD
TO 86-B TRIP RELAY
AND BUSBAR-2
OF TIE CB(2-52CB)
ISOLATED
Breaker Failure Relay of the Main Circuit Breaker Trips the Connected Bus, Tie Circuit
Breaker, and Remote End Circuit Breaker ( In case of Transformer LV Circuit Breaker)
BASICS OF BUSBAR PROTECTION
NEED FOR BUSBAR PROTECTION
¾ IN ITS ABSENCE FAULT CLEARING TAKES PLACE IN ZONE-2 OF DISTANCE RELAY BY
REMOTE END TRIPPING.
¾ THIS MEANS SLOW AND UNSELECTIVE TRIPPING AND WIDE SPREAD BLACKOUT.
EFFECT OF DELAYED CLEARENCE
¾ GREATER DAMAGE AT FAULT POINT.
¾ INDIRECT SHOCK TO CONNECTED EQUIPMENT LIKE SHAFTS OF GENERATOR AND
WINDINGS OF TRANSFORMER.
BASIC THEORY
¾ KIRCHOFF’s CURRENT LAW STATES THAT THE SUM OF THE CURRENTS ENTERING A
GIVEN NODE MUST BE EQUAL TO THE CURRENTS LEAVING AT THAT NODE.
BUS BAR PROTECTION SYSTEMS
1. HIGH IMPEDENCE DIFFERENTIAL PROTECTION
2. MODERATE-IMPEDENCE DIFFERENTIAL PROTECTION
3. LOW-IMPEDENCE DIFFERENTIAL PROTECTION
4. NUMERICAL BUS DIFFERENTIAL PROTECTION
HIGH IMPEDENCE DIFFERENCIAL PROTECTION
THE HIGH IMPEDENCE PROTECTION SCHEME, ON THE OTHER HAND, IS A GOOD SOLUTION FOR
SINGLE BUSBAR ARRANGEMENTS , ONE & HALF BREAKER SYSTEMS OR RING BUSBARS, PROVIDING
THAT APPROPRIATE DEDICATED CT CORES ARE AVAILABLE FOR THIS USE ALONE. IT IS SENSTIVE,
STABLE & FAST PROTECTION.
HOWEVER, SPECIAL CT REQUIREMENTS, ADDITIONAL HIGH VOLTAGE DEVICE PROTECTION,
DEMANDING MAINTANENCE etc PUT RESTRICTIONS IN ITS APPLICATIONS.
A MEASURING CIRCUIT COMPRISES A HIGH-IMPEDENCE STABILIZING RESISTOR CONNECTED
ACROSS THE CIRCULATING CURRENT ARRANGEMENT OF ALL THE CTs IN PARALLEL. THE VALUE
OF THE STABILIZING RESISTOR IS CHOOSEN SUCH THAT THE VOLTAGE DROP ACROSS THE RELAY
CIRCUIT IS INSUFFICIENT TO OPERATE THE FAULTS OUTSIDE THE PROTECTED ZONE.
LIMITATIONS OF CONVENTIONAL HIGH IMPEDENCE DIFFERENTIAL RELAY
PUTS STRINGENT REQUIREMENTS ON CT’s. Class X for all CT Cores.
NEED FOR DEDICATED CT CORES. Separate CT Cores for BUSBAR and CHECK ZONE Protection.
IDENTICAL CT RATIO, MAGNETISING IMPEDENCE.
AUX CT’s RATIO CORRECTIONS UNACCEPTABLE.
IN ABILITY TO COPE WITH INCREASING FAULT CURRENT.
SLOW RESPONSE.
Advantage of Numerical Protection Technology (e.g. Fault recording, Communication etc) not available.
BASIC OPERATING TIME EXCLUDING RELAY TIME IS 15 – 20ms.
THIS RELAY REQUIRES CHECK ZONE FEATURE. THE TRIP COMMAND IS ONLY GIVEN WHEN
BOTH A DISCRIMINATING & CHECK ZONE SYSTEM OPERATES.
MEDIUM IMPEDENCE DIFFERENTIAL PROTECTION
MANY OF THE LIMITATIONS OF HIGH IMPEDENCE PROTECTION CAN BE
OVERCOME USING MODERATE MEDIUM IMPEDENCE PROTECTION (OR STABILIZED
HIGH-IMP SCHEME), WHICH IS A COMBINATION OF THE NORMAL HIGH-IMP AND
STABILIZED DIFFERENTIAL SCHEMES.
LOW IMPEDENCE DIFFERENTIAL PROTECTION
LOW IMPEDENCE PROTECTION(PERCENTAGE BIASED BUS DIFFERENTIAL RELAY) IS
MOST SUITABLE PROTECTION SCHEME FOR DOUBLE AND MULTIPLE BUSBAR SYSTEMS
(WITH OR WITHOUT TRANSFER BUS) WITH FEEDERS BEING SWITCHED BETWEEN
SECTIONS OF BUSBAR, WHICH OPERATES WITH FULL SELECTIVITY FOR ALL POSSIBLE
BUSBAR CONFIGUARATIONS.
ADVANTAGES
¾ FREE OF ANY NEED FOR MATCHED CT CHARACTERESTICS OR RATIOs, LOW
LEAKAGE REACTANCE OR RESISTANCE.
¾ OTHER PROTECTIVE RELAYS CAN BE INCLUDED IN THE SAME CIRCUIT.
¾ STABLE FOR INFINITE FAULT LEVELS. INSENSITIVE TO CT SATURATION.
¾ DETECTS FAULTS WITHIN 1 – 2ms & INITIATES TRIPPING WITHIN 5 – 7ms.
BASICS OF BUS BAR PROTECTION
BASIC THEORY
KIRCHOFF’s CURENT LAW STATES THAT THE SUM OF THE CURRENTS ENTERING A GIVEN NODE MUST BE EQUAL
TO THE CURRENTS LEAVING THAT NODE
I2 I2
I3 I3
I4 I4
I5 I5
I6 I6
IF
IF= I6= I1+I2+I3+I4+I5 IF= I1+I2+I3+I4+I5+I6
HIGH IMPEDENCE BUSBAR PROTECTION
87BBC 96 BBC : BUSBAR
UU CHECK TRIPPING RELAY
UU
UU
UU 52 CIRCUIT
BREAKER
TRIP COIL
UU
UU
UU
UU - VE
A varistor is normally applied across the
UU relay input terminals to limit the voltage
UU to a value safely below the insulation
voltage of the secondary circuits
UU
UU 96 BBM : BUSBAR
+ VE
87BBM MAIN TRIPPING RELAY
UU
UU
UU
UU
UU
UU
COIL
RESTRAINT
Id
52 CIRCUIT
BREAKER
TRIP COIL
OVER CURRENT
+VE
STARTER RELAYS
RELAY
-VE
TRIPPING
96 BUS BAR
LOW IMPEDENCE BUSBAR PROTECTION
DIFFERENCE BETWEEN BUSBAR SCHEMES
PERCENTAGE BIASED LOW IMPEDENCE
DETAILS HIGH IMPEDENCE BUSBAR PROTECTION BUS BAR PROTECTION
THE CURRENTS ENTERING AND LEAVING THE BUSBAR ARE COMPARED IT HAS DIFFERENTIAL AND BIAS SETTING. THE RESULTANT BIAS
CONTINUOSLY. IT INVOLVES CHOOSING OF IMPEDENCE HIGH ENOUGH IS PROPOTIONAL TO ARITHMATIC SUM OF ALL CURRENTS,
PRINCIPLE STABLISE THE RELAY FOR HEAVY EXTERNAL FAULTS. THIS IS WHEREAS THE OPERATING CURRENT IS VECTOR SUM OF ALL
CIRCULATING CURRENT PRINCIPLE. CIRCUIT CURRENTS.
IT REQUIRES ALL IDENTICAL CT RATIO’s & TURNS RATIO. LOW IT CAN WORK WITH CTs OF UNEQUAL RATIOS ALSO. FREE OF
RESISTANCE OF SECONDARY WINDING. Class X for all CT Cores. ANY NEED OF MATCHED CT CHARACTERESTIC OR RATIOs LOW
CTs MINIMUM KNEE POINT VOLTAGE OF 300-500V. LEAKAGE REACTANCE OR RESISTANCE. OTHER PROTECTIVE
LOW MAGNETISING CURRENT(FEW MILLIAMPS). RELAYS CAN BE INCLUDED IN THE SAME CIRCUIT.
IMPOSES COMPARATIVELY HIGH BURDEN ON CTs. AUXILIARY CTs IMPOSES LESS BURDEN ON CTs. AUXILIARY CTs HAVE NO
BURDEN REDUCE THE PERFORMANCE OF THE SCHEME EFFECT ON PERFORMANCE OF SCHEME.
OPERATION OF SCHEME EVEN WHEN CTs GET SATURATED DURING OPERATION OF SCHEME EVEN WHEN CTs GET SATURATED
CT SATURATION INTERNAL FAULTS. DURING INTERNAL FAULTS. INSENSITIVE TO CT SATURATION.
IT IS GOOD SOLUTION FOR SINGLE BUSBAR ARRANGEMENTS, ONE & MOST SUITABLE FOR DOUBLE AND MULTIPLE BUSBAR SYSTEMS
UTILISATION HALF BREAKER SYSTEMS OR RING BUSBAR SYSTEMS. ( WITH OR WITHOUT TRANSFER BUS).
BASIC OPERATING TIME EXCLUDING RELAY TIME IS 15 – 20 mS. DETECTS FAULTS WITH IN 1 –2 mS AND INITIATES TRIPPING
OPERATING TIME WITH IN 5-7 mS.
INABILITY TO COPE WITH INCREASING FAULT CURRENT. STABLE FOR INFINITE FAULT LEVEL.
STABILITY
HIGHLY SENSITIVE FOR INTERNAL FAULTS AND COMPLETELY STABLE HIGHLY SENSITIVE FOR INTERNAL FAULTS AND COMPLETELY
PERFORMANCE FOR EXTERNAL FAULTS. STABLE FOR EXTERNAL FAULTS.
THIS RELAY REQUIRES CHECK ZONE FEATURE. THE TRIP COMMAND IS THIS RELAY HAS IN BUILT CHECK ZONE FEATURE (NO SEPARATE
ADDITIONAL ONLY GIVEN WHEN BOTH A DISCRIMINATING & CHECK ZONE SYSTEM CHECKZONE FEATURE) i.e OVER CURRENT STARTING RELAY
PROTECTION OPERATES. PROVIDED.
BUS BAR MAIN & CHECHUP PROTECTION
(ANY CT METHOD)
P2 P2 P2 CT MB
BUS BAR
1-CT REB 500 PROTECTION
IN1 / B171
CORE-1 3 3 3
1S3 1S3 1S3
ACTIVE START TRIP FOR
CTR: 2000-1000/1A 1S1 1S1 1S1
IB1 / B151 BUS-1
CLASS: PS IY1 / B131
IR1 / B111 DISPLAY
E
REB 600
CT MB
IR1 / B111 ACTIVE START TRIP
IY1 / B131
3-CT
IB1 / B151
CORE-1 1S1
3 3 3 1S1 1S1
BUS-2
BUS-1
6-52 UU 5-52 UU 4-52
6-CT 4-CT
87 – BB2
87 – BB1
TO START 50 LBB
1-52 CB DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER
RED 521
TO CLOSE CKT INTERLOCK
TRIP FROM 50 LBB TRIP RELAY TO BLOCK A/R
TO TRIP COIL-1
FOR TO TRIP COIL-2
TO START 50 LBB DIRECT TRIP SEND CH-1
4-52 CB DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER
C TO START 50 LBB
13-52 CB PANEL
HIGH SPEED
13-52 CB PANEL TO CLOSE CKT INTERLOCK
TRIP RELAY TO BLOCK A/R
TO TRIP COIL-1
TRIP FROM 50 LBB FOR TO TRIP COIL-2
DIRECT TRIP SEND CH-1
13-52 CB DIRECT TRIP SEND CH-2
TO START 50 LBB TO DISTURBENCE RECORDER
TO START 50 LBB
3-52 CB DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER
REB 670
TO CLOSE CKT INTERLOCK
TRIP FROM 50 LBB TRIP RELAY TO BLOCK A/R
TO TRIP COIL-1
FOR TO TRIP COIL-2
TO START 50 LBB DIRECT TRIP SEND CH-1
6-52 CB DIRECT TRIP SEND CH-2
TO DISTURBENCE RECORDER
C TO START 50 LBB
15-52 CB PANEL
HIGH SPEED
15-52 CB PANEL TO CLOSE CKT INTERLOCK
TRIP RELAY TO BLOCK A/R
TO TRIP COIL-1
TRIP FROM 50 LBB FOR TO TRIP COIL-2
DIRECT TRIP SEND CH-1
15-52 CB DIRECT TRIP SEND CH-2
TO START 50 LBB TO DISTURBENCE RECORDER
OR OR
BUS-1
13-52
10-52
4-52
7-52
1-52
14-52
11-52
8-52
2-52
5-52
15-52
12-52
9-52
3-52
6-52
BUS-2
OR OR
LATEST DEVELOPMENT IN NUMERICAL CENTRALISED BUS BAR PROTECTION
BAY UNIT
ABB Network Partner AG REL531
1 9
2 10
LINE
3 11
4 12
5 13
6 14
7 15
8 16
PROTECTION C
E
C
21 L1 21 L2 21 L1 21 L2 21 L1 21 L2
ABB Network Partner AG REL531
ABB Network Partner AG REC 316*4
1 9
TRANSFORMER
2 10
3 11
4 12
5 13
6 14
7 15
8 16
PROTECTION C
E
C
87 T1 64 T2 87 T1 64 T2 87 T1 64 T2
1. IN THIS NO SEPARATE CORE IS REQUIRED FOR EITHER BUSBAR PROTECTION OR LBB / BFR.
2. CENTRALISED BUSBAR IS CONNECTED FROM BAY UNIT OR LBB OR BFR THROUGH FIBRE OPTIC.
3. BAY UNIT / BFR / LBB IS CONNECTED FROM MAIN-1 & MAIN-2 OF LINE PROTECTION OR MAIN & BACKUP
DESCRIPTION PROTECTION OF TRANSFORMER THROUGH FIBRE OPTIC FOR REDUNDANCY TO BAY UNIT.
4. THE CURRENT DATA IS TRANSFERED TO BAY UNIT TO BUSBAR CENTRAL UNIT FROM LINE / TRANSFORMER
PROTECTIONS FOR NUMIRICAL ALGORITHAM OF LBB & BUSBAR CENTRAL UNIT AND IT WILL OPERATE FOR
INTERNAL FAULTS AND DOES NOT OPERATE FOR THROUGH / EXTERNAL FAULTS.
MISCELENEOUS
RELAYS & PROTECTIONS
ADOPTED FOR LINE IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME
(STUB, TEED AND AUTO RECLOSURE
FUNCTIONS) PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)
STUB-1/ STUB-2 PROTECTION
BUS-1 1-52CB 2-52CB 3-52CB BUS-2
3
3
3
3
STUB-1&2 STUB-3&2
(BAY 1&2) (BAY 3&2)
1-89L DISTANCE / ATF 3-89T
LINE-1 RELAYS AT/F-1
CONVERTED
REL 521 TO STUB/BUS RET 521
OVER LOAD
RELAYS WHEN
REL 316 LINE ISOLATOR RET 316
OPENS
WHEN A LINE IS SUPPLIED VIA TWO CIRCUIT BREAKERS IN A ONE & HALF CIRCUIT
BREAKER ARRANGEMENT, THE LINE PROTECTION INCLUDES THE AREA BETWEEN THE TWO
CT’s. HOWEVER, WHEN THE LINE ISOLATOR IS OPEN THE LINE CVT‘s FOR THE DISTANCE
PROTECTION ARE CONNECTED TO THE LINE AND CANNOT PROVIDE THE CORRECT
VOLTAGE FOR THE STUB END.(i.e THE AREA BETWEEN THE LINE ISOLATOR AND CT’s)
(STUB = DEAD END)
TO PROVIDE PROTECTION FOR A FAULT IN THIS AREA, REL 521/ REL 316 IS
PROVIDED WITH A STUB PROTECTION WHICH GIVES AN BUS OVER CURRENT TRIP IF THE
LINE ISOLATOR IS OPEN AND THE CURRENT EXCEEDS THE SET VALUE IN ANY PHASE.
STUB-1 (BAY 1&2 OR BAY 3&2) IT OPERATES THE 3-PH TRIP GR-A MAIN CB (1-52CB OR 3-52CB)
OPERATES AND 3-PH TRIP GR-A TIE CB (2-52CB)
STUB-2 (BAY 1&2 OR BAY 3&2) IT OPERATES THE 3-PH TRIP GR-B MAIN CB (1-52CB OR 3-52CB)
OPERATES AND 3-PH TRIP GR-B TIE CB (2-52CB)
TEED-1/ TEED-2 PROTECTION
BUS-1 1-52CB 2-52CB 3-52CB BUS-2
3
TEED-1&2
3 3 TEED-1&2
(BAY 1&2) (BAY 2&3)
LINE-1 AT/F-1
TEED PROTECTION IS BASED ON KIRCHOFF’S CURRENT LAW. THREE SETS OF CTS
ARE CONNECTED IN STAR FASHION. SOME OF THE CURRENTS MUST BE ZERO. IF ANY
UNBALANCE CURRENTS ARE NOTICED THEN IMMEDIATELY TEED PROTECTION
OPERATES. IF TEED PROTECTION BAY 1&2 OPERATED THEN IT TRIPS 1-52CB & 2-52CB.
SIMILARLY IF TEED PROTECTION BAY 2&3 OPERATED THEN IT TRIPS 2-52CB & 3-52CB.
SUMMATION OF INDIVIDUAL PHASES OF T-SHAPED 3
CTs BEFORE REACHING TO RELAY. THIS IS
TEED-1 CIRCULATING CURRENT PRINCIPLE. THE CURRENT
FLOWING THROUGH IS ZERO DURING BALANCED
PROTECTION CONDITION.
HIGH IMPENDENCE THREE PHASE DIFFERENTIAL
RELAY IS USED AS TEED-1 PROTECTION.
T- SHAPED 3 CTs ARE CONNECTED TO RELAY. THE
RELAY HAVING OPERATING COIL & RESTAIRING COIL.
TEED-2 BASED ON THE DIFFERENTIAL CURRENT FLOWING
THROUGH THE OPERATING COIL THE RELAY
OPERATES.
PROTECTION LOW IMPEDENCE PERCENTAGE BIASED THREE
TERMINAL THREE PHASE DIFFERENTIAL RELAY IS
USED AS TEED-2 PROTECTION.
TEED-1 PROTECTION
{BAY1&2}(5CT METHOD)
P2 P2 P2
IR5
IY5
1-CT
IB5
CORE-5 3 3 3
5S4 5S4 5S4
CTR: 2000-1000-500/1A 5S2 5S2 5S2
CLASS: PS
IT WORKS ON CIRCULATING
IN5 CURRENT PRINCIPLE AND
RADHA IT IS HIGH IMPEDENCE
P1 P1 P1
ACTIVE START TRIP DIFFERENTIAL RELAY.
P2 P2 P2 IR5 TEED-1 PROTECTION FOR
IY5 BAY 2&3 IS ALSO SAME AS
2-CT
IB5 ABOVE AND THE
CORE-5
CTR: 2000-1000-500/1A
3 3 3
5S4 5S4 5S4
DISPLAY FOLLOWING CTs & CORES
5S2 5S2 5S2
LBB/BFR
P2 P2 P2
RAICA
LBB/BFR
1-CT
RAICA
CORE-4 3 3 3
4S4 4S4 4S4
RADSB
4S4 4S4
3 3 3
CTR: 2000-1000-500/1A 4S4
4S2 4S2 4S2
4S2 4S2 4S2
CLASS: PS
2-CT
CORE-4
DISPLAY CTR: 2000-1000-500/1A
P2 P2 P2 CT MB CLASS: PS
TEED-2 PROTECTION FOR
1-LCT BAY 2&3 IS ALSO SAME AS
CORE-2
C ABOVE AND THE
CTR: 2000-1000/1A
2S3
3 3 3 2S3 2S3 FOLLOWING CTs & CORES
CLASS: PS
2S2 2S2 2S2 ARE USED. 3-CT(CORE-4),
2-CT(CORE-2) & 3-TCT
(CORE-2) ARE CONNECTED
E TO TEED-2 PROTECTION.
IT WORKS ON KIRCHOFF’S
CURRENT PRINCIPLE & IT IS
PERCENTAGE BIASED LOW
IMPEDENCE DIFFERENTIAL
RELAY
TEED PROTECTION TRIP SCHEME
ABB ABB
RADHA RADHA
TEED-1 TEED-1
86-A 86-A 86-A
MTR/ OR MTR/ OR MTR/
HSTR HSTR HSTR
ABB ABB
REL521
(BAY 1&2) RET521
STUB-1 STUB-1
TRIP COIL-1 TRIP COIL-1 TRIP COIL-1
(BAY 1&2) (BAY 2&3)
1-52CB 2-52CB 3-52CB
(BAY 2&3)
(BAY 1&2)
TRIP COIL-2 TRIP COIL-2 ABB TRIP COIL-2
ABB BUS-2
BUS-1 RADSB
RADSB
TEED-2
86-B
ABB TEED-2 86-B 86-B
REL521
MTR/ OR MTR/ OR MTR/
MAIN-1
HSTR HSTR HSTR
ABB ABB
REL316 RET316
STUB-2 STUB-2
1 9
1 9 2 10
2 10 3 11
3 11 4 12
4 12 5 13
5 13 6 14
6 14
LINE-1
7 15
7 15 8 16
8 16
C C C
LINE-2 C
E
E E
E
21 MAIN-2 21 MAIN-2
21 MAIN-1 21 MAIN-1 REL 316
REL 521 REL 316 REL 521
INSTANT OF FAULT
AUTO RECLOSING TIMING CHART
OPERATES RESETS
PROTECTION
OPERATING
TRANSIENT FAULT
TIME
CIRCUIT
BREAKER
OPENING ARCING CLOSING
TIME TIME TIME
OPERATING TIME DEAD TIME
OPERATES RESETS OPERATES RESETS
PROTECTION
RECLOSE
OPERATING ON TO FAULT
PERMANENT FAULT
TIME
TRIP COIL CONTACTS ARC CONTACTS CLOSING COIL CONTACTS CONTACTS CONTACTS ARC CONTACTS
ENERGISED SEPARATE EXTINGUISHED FULLY OPEN ENERGISED MAKE FULLY CLOSED SEPARATE EXTINGUISHED FULLY OPEN
CIRCUIT
BREAKER
OPENING ARCING CLOSING
TIME TIME TIME TRIP COIL
OPERATING TIME DEAD TIME ENERGISED
SYSTEM DISTURBANCE TIME
RECLOSE INITIATED
BY PROTECTION RELAY READY TO RESPOND
TO FURTHER FAULT INCIDENTS
AUTO RECLOSE (AFTER SUCEESFUL RECLOSRE)
RELAY
DEAD TIME CLOSING PULSE TIME
RECLAIM TIME
TIME
CARRIER
INTERTRIPPING
SCHEMES
ADOPTED IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)
TYPES OF CARRIER TRIPPING SCHEMES
PERMISSIVE TRIPPING
Permissive trip commands are always monitored by a protection
relay. The circuit breaker is tripped when receipt of the command
coincides with operation of the protection relay at the receiving end
responding to a system fault. The receipt of an incorrect signal
must coincide with operation of the receiving end protection for a
trip operation to take place. Normally, the risk of a spurious trip is
lesser. The intention of these schemes is to speed up tripping for
faults occurring within the protected zone.
BLOCKING SCHEME
Blocking commands are initiated by a protection element that
detects faults external to the protected zone. Detection of an
external fault at the local end of a protected circuit results in a
blocking signal being transmitted to the remote end. At the remote
end, receipt of the blocking signal prevents the remote end
protection operating if it had detected the external fault. Loss of the
communications channel is less serious for this scheme than in
others as loss of the channel does not result in a failure to trip when
required. However, the risk of a spurious trip is higher.
TYPES OF CARRIER TRIPPING SCHEMES
Conventional time-stepped distance protection has One of the main disadvantages is that the
instantaneous Zone 1 protection at each end of the protected line cannot be set to cover the whole
of the feeder length and is usually set to about 80%. This leaves two 'end zones', each being about
20% of the protected feeder length. Faults in these zones are cleared in Zone 1 time by the
protection at one end of the feeder and in Zone 2 time (typically 0.25 to 0.5 seconds) by the
protection at the other end of the feeder. This situation cannot be tolerated in some applications,
for two main reasons:
I). Faults remaining on the feeder for Zone 2 time may cause the system to become unstable.
II). Where high-speed auto-reclosing is used, the non-simultaneous opening of the circuit.
Breakers at both ends of the faulted section results in no 'dead time' during the auto- reclose cycle
for the fault to be extinguished and for ionized gases to clear. This results in the possibility that a
transient fault will cause permanent lockout of the circuit breakers at each end of the line section.
Even where instability does not occur, the increased duration of the disturbance may give rise to
power quality problems, and may result in increased plant damage.
Unit schemes of protection that compare the conditions at the two ends of the feeder
simultaneously positively identify whether the fault is internal or external to the protected section
and provide high-speed protection for the whole feeder length. This advantage is balanced by the
fact that the unit scheme does not provide the back up protection for adjacent feeders given by a
distance scheme.
The most desirable scheme is obviously a combination of the best features of both arrangements,
that is, instantaneous tripping over the whole feeder length plus back-up protection to adjacent
feeders. This can be achieved by interconnecting the distance protection relays at each end of the
protected feeder by a communications channel.
The purpose of the communications channel is to transmit information about the system
conditions from one end of the protected line to the other, including requests to initiate or prevent
tripping of the remote circuit breaker. The former arrangement is generally known as a 'transfer
tripping scheme' while the latter is generally known as a 'blocking scheme'. However, the
terminology of the various schemes varies widely, according to local custom and practice.
TYPES OF CARRIER TRIPPING SCHEMES
1. ZONE 1 EXTENSION SCHEME (Z1X SCHEME)
2. TRANSFER TRIPPING SCHEMES
I. DIRECT UNDER REACH TRANSFER TRIP SCHEME (DUTT)
II. PERMISSIVE UNDER REACH TRANSFER TRIP SCHEME (PUTT)
III. PUTT – FWD SCHEME
IV. PERMISSIVE UNDER REACH ACCELERATED SCHEME
V. PERMISSIVE OVER REACH TRANSFER TRIP SCHEME (POTT)
VI. WEEK IN FEED CONDITIONS.
3. BLOCKING OVER REACHING SCHEMES
I. BLOCKING OVER-REACHING PROTECTION SCHEME USING ZONE 2.
OR DIRECTIONAL COMPARISION BLOCKING SCHEME
II. BLOCKING OVER-REACHING PROTECTION SCHEME USING ZONE 1.
III. WEEK IN FEED CONDITIONS.
4. DIRECTIONAL COMPARISON UNBLOCKING SCHEME
PROPERTIES OF COMMAND PROTECTION SYSTEMS
UNDER OVER PERMISSIVE
OPERATING GENERAL
REACHING REACHING CRITERIA
MODE REQUIREMENTS
SENDING SENDING RECEIVING
PERMISSIVE UNDER IMPEDENCE
UNDER VOLTAGE
UNDER SECURE &
ZONE-1 - - - OVER CURRENT
FAST
REACH DISTANE &
(PUTT) DIRECTION
PERMISSIVE
OVER SECURE &
- - - ZONE-2 FAST
REACH
(POTT)
DIRECT DISTANCE & SECURE &
ZONE-1 - - - DEPENDABLE
TRIP DIRECTION
ACCELERA
ZONE-1 - - - SECURE &
TED UNDER ZONE-2 FAST
REACH
BLOCKING
REVERSE DISTANCE & FAST &
OVER - - - LOCKING DEPENDABLE
DIRECTION
REACH
PREFFERED APPLICATIONS OF TELE/ CARRIER TRIPPING SCHEMES
PARAMETERS PUTT POTT BLOCKING UNBLOCKING
Signal Dependable and secure communication Reliable Dedicated channel
channel communication With continuous
Transmission 1. Power line carrier with frequency shift channel (only signal Transfer
System modulation. HF signal coupled to 2 phases required during 1. Power line carrier
of the protected line, or even better, to a external faults) With frequency shift
parallel circuit to avoid transmission of 1. Power line carrier keying. Continuous
the HF signal through the fault location. With amplitude Signal transmission
2. Microwave radio, especially Modulation (ON/OFF). must be permitted.
digital(PCM) The same frequency
3. Fibre -optic cables may be used on all
terminals)
Characteristic Best suited for 1. Excellent All line types – Same as POTT
longer lines - where coverage On short Preferred practice
Of line the Under-reach lines in the in the USA.
zone provides Presence of fault
sufficient resistance.
resistance 2. Suitable for the
coverage. Protection of multi-
terminal lines with
intermediate in-
feed.
COMPARISION OF TELE/ CARRIER TRIPPING SCHEMES
On normal two-terminal lines the main deciding factors in the choice of the type
of scheme, apart from the reliability of the signalling channel, operating speed
and the method of operation of the system. Table compares the important
characteristics of the various types of scheme.
ALARM-1
5 2+ 2+
250V DC
NSD 70
ACTIVE START TRIP 5- RX 5- RX
6 C C
TRIP TRIP
R R
6+ A(C) 6+ C(A)
DISPLAY
9- TX 9- TX
C C
S TRIP TRIP
S
ALARM-2
C 7 B(D) D(B)
250V DC
10+ 10+
8 13- 13-
C RX C
RX
E R TRIP R TRIP
14+ B(D) 14+ D(B)
CS
G4AC V9LC 2 CARRIER SEND
G4AA V9LB 5
ABB
PANEL-1
+VE -VE
NSD 50
G4AC V9LC 10
G4AC V9LC 13
THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP
G4AC V9LC 14 AND CONNECTED IN ANOTHER PANEL
G4AC V9LC 9
ABB
PANEL-2
MAIN-2 PROTECTION CARRIER INTER TRIPPING
G4AC V9LC 1
NSD 50
CS
G4AC V9LC 2 CARRIER SEND
G4AA V9LB 5
ABB
PANEL-2
+VE -VE
NSD 50
G4AC V9LC 10
G4AC V9LC 13
THIS IS BACKUP FOR PERMISSIVE/ PROTECTION TRIP
G4AC V9LC 14 AND CONNECTED IN ANOTHER PANEL
G4AC V9LC 9
ABB
PANEL-1
DIRECT TRIP SEND CARRIER CHANNEL-1
96 BUSBAR PROT-2 PANEL
87 BUSBAR TRIP (ZONE-2) PANEL-1
96 BUSBAR PROT-1 PANEL
ABB
87 BUSBAR TRIP (ZONE-1)
NSD 50
DC +VE
CONTROL PANEL FROM PANEL
T NC
R Y B
MAIN CB(1-52CB) TIE CB (2-52 CB)
T NC
G4AD V9LC 2
R Y B
TIE CB(2-52CB) G4AD V9LC 1
MAIN CB (1-52 CB)
50 LBB/BFR FOR MAIN CB / RAICA
CONDITIONS FOR DIRECT TRIP DC –VE FROM PANEL
59L1 / OVER VOLTAGE STAGE-1 1. TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP GIVEN.
2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN.
59L2 / OVER VOLTAGE STAGE-2 3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED.
4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED (FOR HALF DIA ONLY).
87 HZ / TEED-1 PROTECTION 5. MAIN CB 50 LBB/BFR OPERATED.
6. TIE CB 50 LBB/BFR OPERATED.
87 LZ / TEED-2 PROTECTION 7. 59L1 OVER VOLTAGE STAGE-1 OPERATED.
8. 59L2 OVER VOLTAGE STAGE-2 OPERATED.
50 LBB/BFR FOR TIE CB / RAICA
9. 87 HZ TEED-1 PROTECTION OPERATED
10. 87 LZ TEED-2 PROTECTION OPERATED.
DIRECT TRIP SEND CARRIER CHANNEL- 2
96 BUSBAR PROT-2 PANEL
87 BUSBAR TRIP (ZONE-2)
PANEL-2
R Y B
MAIN CB(1-52CB) TIE CB (2-52 CB)
T NC
G4AD V9LC 2
R Y B
TIE CB(2-52CB) G4AD V9LC 1
MAIN CB (1-52 CB)
50 LBB/BFR FOR MAIN CB / RAICA
CONDITIONS FOR DIRECT TRIP DC –VE FROM PANEL
59L1 / OVER VOLTAGE STAGE-1 1. TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP GIVEN.
2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN.
59L2 / OVER VOLTAGE STAGE-2 3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED.
4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED (FOR HALF DIA ONLY).
87 HZ / TEED-1 PROTECTION 5. MAIN CB 50 LBB/BFR OPERATED.
6. TIE CB 50 LBB/BFR OPERATED.
87 LZ / TEED-2 PROTECTION 7. 59L1 OVER VOLTAGE STAGE-1 OPERATED.
8. 59L2 OVER VOLTAGE STAGE-2 OPERATED.
50 LBB/BFR FOR TIE CB / RAICA
9. 87 HZ TEED-1 PROTECTION OPERATED
10. 87 LZ TEED-2 PROTECTION OPERATED.
DIRECT TRIP RECEIVE CHANNEL-1&2
PANEL-1
ABB TO 86-A MASTER TRIP RELAY
NSD 50 (HIGH SPEED TRIP RELAY) FOR
MAIN CB(152CB)
DC +VE TO 86-A MASTER TRIP RELAY
(HIGH SPEED TRIP RELAY) FOR
G4AD V9LC 6 TIE CB(252CB)
DIRECT TRIP-1
CARRIER RECEIVE
G4AD V9LC 5 RELAY
+VE -VE
PANEL-2
ABB TO 86-B MASTER TRIP RELAY
(HIGH SPEED TRIP RELAY) FOR
NSD 50
MAIN CB(152CB)
DC +VE TO 86-B MASTER TRIP RELAY
(HIGH SPEED TRIP RELAY) FOR
G4AD V9LC 6 TIE CB(252CB)
DIRECT TRIP-2
G4AD V9LC 5 CARRIER RECEIVE
RELAY
PLCC CARRIER PROTECTION SYSTEM
(TELEPROTECTION)
ABB Network Partner AG REL531 ABB Network Partner AG REL531
REL 521
MAIN-1
PROTECTION
C C
E E
ELECTRICAL CONNECTION
NSD 50 NSD 50
PANEL PANEL
PLCC PLCC
PANEL ELECTRICAL POWER LINE PANEL
NSD 50 NSD 50
PANEL PANEL
ELECTRICAL CONNECTION
ABB Network Partner AG REC 316*4 ABB Network Partner AG REC 316*4
1 9 1 9
REL 316
2 10 2 10
3 11 3 11
4 12 4 12
5 13 5 13
6 14 6 14
7 15 7 15
MAIN-2
8 16 8 16
C
PROTECTION C
E E
FIBRE OPTIC PROTECTION SYSTEM
(TELEPROTECTION)
ABB Network Partner AG REL531 ABB Network Partner AG REL531
REL 521
MAIN-1
PROTECTION
C C
E E
ELECTRICAL CONNECTION
NSD 70 NSD 70
PANEL PANEL
FOX-U FOX-U
GECOD/ SIFOX
GECOD/ SIFOX
TUNOS
TUNOS
FOX-515 FOX-515
NSD 70 NSD 70
PANEL PANEL
ELECTRICAL CONNECTION
ABB Network Partner AG REC 316*4 ABB Network Partner AG REC 316*4
1 9 1 9
REL 316
2 10 2 10
3 11 3 11
4 12 4 12
5 13 5 13
6 14 6 14
7 15 7 15
MAIN-2
8 16 8 16
C
PROTECTION C
E E
FIBRE OPTIC CARRIER PROTECTION SYSTEM
(TELEPROTECTION)
DIGITAL RELAY CONNECTION VIA FIBRE OPTIC
ABB Network Partner AG REL531 ABB Network Partner AG REL531
REL 521
MAIN-1
PROTECTION
C C
E E
FOX-U FOX-U
OTERM
OTERM
TUNOS
TUNOS
FOX-515 FOX-515
ABB Network Partner AG REC 316*4 ABB Network Partner AG REC 316*4
1 9 1 9
REL 316
2 10 2 10
3 11 3 11
4 12 4 12
5 13 5 13
6 14 6 14
7 15 7 15
MAIN-2
8 16 8 16
C
PROTECTION C
E E
MAIN-1 & MAIN-2
PROTECTION FOR
AUTO TRANSFORMER
ADOPTED IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)
BASICS OF TRANSFORMER PROTECTION
1. PURPOSE OF POWER TRANSFORMER PROTECTION
POWER T/F PROTECTION IS USUALLY INSTALLED TO DISCONNECT THE T/F AT:
A. INTERNAL SHORT CIRCUITS AND EARTH FAULTS IN THE T/F AND ITS CONNECTED
CIRCUITS.
B. EXTERNAL FAULTS ON OTHER CIRCUITS. (BACK-UP PROTECTION)
C. ABNORMAL SERVICE CONDITIONS SUCH AS OVERLOAD & OVER VOLTAGE.
2. PROTECTION DEVICES INBUILT OR MOUNTED ON POWER T/F
A. OIL IMMERSED POWER T/F USUALLY HAVE A GAS DETECTOR AND OIL SURGE.
DETECTOR (BUCHHOLZ ALARAM & TRIP DEVICES), WHICH ARE EXCELLENT FOR
DETECTING INTERNAL FAULTS.
B. LOAD TAPCHANGER COMPARTMENTS MAY HAVE A SIMILAR OVER PRESSURE
DEVICE.
C. TEMPARATURE MONITORS FOR OIL & WINDING PROVIDE GOOD OVER LOAD
PROTECTION.
D. PRESSURE RELIEF DEVICE IS PROVIDED TO SAFE GUARD THE T/F FROM HIGH
PRESURES.
3. TRANSFORMER DIFFERENTIAL PROTECTION
IT IS WIDELY USED AS INSTANTANEOUS PROTECTION FOR SHORT CIRCUIT FAULTS WITH
IN THE DIFFERENTIAL ZONE. THIS IS TREATED AS MAIN-1 PROT FOR T/F.
THE MOST COMMON TYPE OF PROTECTION IS THE CURRENT RESTRAINT TYPE.
SOME TYPE OF DIFFERENTIAL RELAYS REQUIRE INTERPOSING CTs FOR CT RATIO
MATCHING AND/OR PHASE SHIFT.
HIGH IMPEDENCE DIFFERENTIAL PROTECTION CAN BE USED ON AUTO T/F & REACTORS.
IT COVERS ONE GALVANICALLY INTERCONNECTED WINDING (WDG DIFF). BUT NOT A
SEPARATE TERTIARY WINDING.
IT REQUIRES A THREE PHASE SET OF CTs AT THE NEUTRAL SIDE OF WINDING.
4.RESTRICTED EARTH FAULT PROTECTION
AT/Fs are used to couple EHV Power Networks, If the Ratio of their Voltages is Moderate. An Alternative
to Differential Protection that can be applied to AT/Fs. A Circulating Current System is arranged between
Equal Ratio Current Transformers in the Two Groups of Line Connections and the Neutral End
Connections. The Line Current Transformers can be connected in Parallel to A Single Element Relay, Thus
providing a Scheme Responsive to Earth Faults Only. If Current Transformers are fitted in Each Phase at
the Neutral End of the Windings and a Three-Element Relay is used, A Differential System can be provided,
giving Full Protection against Phase and Earth Faults. This Provides High-speed Sensitive Protection. It is
Unaffected by Ratio Changes on the Transformer due to Tap-changing and is immune to the Effects of
Magnetizing In Rush Current. It does not respond to Interturn Faults. In Addition, This Scheme does not
respond to any Fault in a Tertiary Winding. Unloaded Delta-connected Tertiary Windings are often not
Protected.
5. BACK UP PROTECTION
A VARIETY OF RELAYS ARE AVAILABLE.
A. OVER CURRENT & EARTH FAULT PROTECTION. ( 50, 50N, 51, 51N, 67, 67N - ANY COMBINATION OF THESE)
B. UNDER IMPEDENCE / DISTANCE ( Z<)(21T).
C. NEUTRAL DISPLACEMENT PROTECTION (Un>).
6.OTHER TYPES OF RELAYS
A. OVER VOLTAGE RELAY (U >).
B. OVER FLUX/ EXCITATION (V/F >)( INVERSE TIME & DIFENITE TIME).
FOR 400KV/220KV & 765/400KV TRANSFORMERS BOTH SIDES( i.e HV & LV) OVER FLUX RELAYS ARE
PROVIDED BECAUSE BOTH SIDES HAVING GRID.
C. AT/F NEUTRAL CURRENT RELAY (51N).
1 7.5 & 16 66 / 11
NIL
DIFFERENTIAL RELAY
DIFFERENTIAL RELAY
DIFFERENTIAL RELAY
RELAY ( 51 )
7.5 , 16 ,
HV REF (64)
16 , 31.5
4 50 & 80 132 / 33
5 31.5, 50 220 / 33
6
31.5, 50 &
220 / 66 BUCHHOLZ
100 HV & LV OVER FLUX
PRINCIPLE: MERZ PRICE)
7
100, 200
400 / 132
REF 64 3 OL + OLTC OSR
& 250 1 DIR EL PRV/PRD
(51P +
87 TH / 64 REF
0.91 / 0.577A
AUX.CT Y/
3-CT
0.689 / 0.577A
CORE-5
RET 521/
3 3 3
5S4 5S4 5S4
3 3 3
CTR: 2000-1000-500/1A 5S1 5S1 5S1
AUX.CT Y/
5S3 5S3 5S3
RADSB
4 CT METHOD : 3-CT & 2-ACT
6 CT METHOD : 3-ACT & 2-ACT
P2 P2 P2
LV-CT
CORE-5
DISPLAY CTR: 1200-800/1A
CT MB CLASS: PS
IN CASE OF 1&1/2 CB
SYSTEM, THE DIFFERENTIAL
2-ACT C PROTECTION CTs
0.91 / 0.577A
CORE-5 5S3
3 3 3 5S3 5S3 ASSOCIATED WITH MAIN &
AUX.CT Y/
CTR: 2000-1000-500/1A
5S4 5S4 5S4 TIE CBs SHOULD BE
CONNECTED TO SEPARATE
CLASS: PS BIAS WINDINGS AND THESE
SHOULD NOT BE PARALLED
E IN ORDER TO AVOID FALSE
P2 P2 P2 OPERATION DUE TO
DISSIMILAR CT TRANSIENT
RESPONSE.
MAIN / DIFFERENTIAL PROTECTION FOR AT/F
(5 CT METHOD)
CT MB
0.689 / 0.577A
P2 P2 P2 CT MB RET 521/
3 3 3
5S1 5S1 5S1
AUX.CT Y/
RET 316
0.91 / 0.577A
5S3 5S3 5S3
AUX.CT Y/
3-TCT RADSB
CORE-5 3 3 3
5S4 5S4 5S4
ACTIVE START TRIP
CTR: 2000-1000-500/1A 5S3 5S3 5S3
P2 P2 P2
CLASS: PS
LV-CT
CORE-5
DISPLAY CTR: 1200-800/1A
CLASS: PS
C NORMALLY LOW
IMPEDENCE BIASED
DIFFERENTIAL RELAY
IS USED FOR
E TRANSFORMER
DIFFERENTIAL
PROTECTION
SELECTION OF AUX.CTs FOR DIFFERENTIAL PROTECTION
¾ NORMALLY 400KV/220KV AUTO TRANSFORMERS ARE OF CAPACITY 315MVA.
¾ FOR MERZ PRICE PROTECTION IF TRANSFORMER IS CONNECTED IN STAR/STAR
THEN CT SECONDARIES ARE TO BE CONNECTED IN DELTA/DELTA.
¾ CORRECT RATIO CTs ARE NOT AVAILABLE, THEN AUX.CTs ARE TO BE PROVIDED
FOR ACHEVING SUITABLE CURRENTS.
¾ IF AUX CTs ARE USING THEN MAIN CT SECONDARIES ARE CONNECTED IN STAR.
¾ THIS IS BROUGHT TO AUX CTs. AUX CTs PRIMARY IS CONNECTED IN STAR &
SECONDARIES ARE CONNECTED IN DELTA.
¾ NORMALLY THE RELAY RATED CURRRENT IS 1A.
¾ AUX.CT s SECONDARIES ARE CONNECTED IN DELTA. FOR ACHIEVING 1A TO
RELAY, AUX.CT SECONDARY CURRENT IS TO BE 0.577A.
¾ THE FULL LOAD PRIMARY CURRENT OF 315MVA AT/F IS 454.7A.
¾ BUT THE 400KV CTs RATIOs ARE AVAILABLE : 2000-1000-500/1A
¾ NEAREST VALUE TO FULL LOAD CURRENT IS 500/1A. HENCE IT IS ADOPTED.
¾ HENCE AT FULL LOAD HV CURRENT i.e 454.7A, THEN SECONDARY OF CT
CURRENT WILL BE 0.91A.
¾ SO HV SIDE AUX.CT RATIO IS 0.91/0.577A.
¾ THE FULL LOAD SECONDARY CURRENT OF 315MVA AT/F IS 826.7A.
¾ BUT THE 220KV CTs RATIOs ARE AVAILABLE: 1200-800/1A.
¾ NEAREST VALUE TO FULL LOAD CURRENT IS 1200/1A. HENCE IT IS ADOPTED.
¾ HENCE AT FULL LOAD LV CURRENT i.e 826.7A,THEN SECONDARY OF CT CURRENT
WILL BE 0.689A.
¾ SO LV SIDE AUX CT RATIO IS 0.689/0.577A.
¾ SPECIAL INFORMATION: LATEST NUMERICAL RELAYS NEED NOT REQUIRE AUX
CTs. IN THESE RELAYS, CT RATIOS MATCHING CAN BE PROGRAMMED.
BACKUP PROTECTION FOR AT/F HV
(4 CT METHOD)
P2 P2 P2 CT MB
IR4 / C411
IY4 / C431 VR11 / E111
3-CT RAICA IB4 / C451
VY11 / E131
CORE-4 3 3 3
4S4 4S4 4S4
LBB / BFR RAPDK
CTR: 2000-1000-500/1A 4S3 4S3 4S3
IN4 / C471 DIR O/L & E/F VB11 / E151
CLASS: PS 50Z
REL 505 VN11 / E171
4 CT METHOD : 3-CT & 2-ACT
6 CT METHOD : 3-ACT & 2-ACT
3 3 3
E172
E174 CVT
DISPLAY SELECTION
CT MB BUS-1 CVT /
BUS-2 CVT /
LINE CVT
2-ACT C CORE-1
4S3
CORE-4 4S3
3 3 3 4S3
VA : 200
CTR: 2000-1000-500/1A
4S4 4S4 4S4 IB4 / C451 CLASS: 3P
CLASS: PS IY4 / C431
IR4 / C411
E
P2 P2 P2
BACKUP PROTECTION FOR AT/F HV
(5 CT METHOD)
VR11 / E111
VY11 / E131
RAPDK
DIR O/L & E/F VB11 / E151
P2 P2 P2 CT MB
IR4 / C411 REL 505 VN11 / E171
IY4 / C431 ACTIVE START TRIP
3-TCT
3 3 3
IB4 / C451
CORE-4 3 3 3
4S4 4S4 4S4
3 3 3
CTR: 2000-1000-500/1A 4S3 4S3 4S3
IN4 / C471 E172
CLASS: PS E174 CVT
DISPLAY SELECTION
BUS-1 CVT /
BUS-2 CVT /
LINE CVT
C CORE-1
VA : 200
CLASS: 3P
E
BACKUP PROTECTION FOR AT/F LV
P1 P1 P1 CT MB
IR4 / C411
IY4 / C431 VR11 / E111
LV-CT RAICA IB4 / C451
VY11 / E131
CORE-4
RAPDK
3 3 3
4S2 4S2 4S2
LBB / BFR
CTR: 1200 – 800 /1A 4S1 4S1 4S1
IN4 / C471 VB11 / E151
CLASS: PS 50Z DIR O/L & E/F
REL 505 VN11 / E171
ACTIVE START TRIP
P2 P2 P2 3 3 3
3 3 3
E172
E174 VOLTAGE
DISPLAY
SELECTION
BUS-1 PT /
BUS-2 PT
C CORE-1
VA : 200
CLASS: 3P
E
MISCELLENEOUS
RELAYS & PROTECTIONS
ADOPTED FOR
AUTO TRANSFORMER IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME
(OVER FLUX & REF FUNCTIONS)
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)
OVER EXCITATION/FLUX RELAY
{FOR AUTO TRANSFORMER HV & LV}
VOLTAGE
SELECTION
BUS-1 PT /
RATUB
BUS-2 PT
CVT SELECTION
BUS-1 CVT / RATUB
BUS-2 CVT /
LINE CVT V/F RELAY
CORE-1 LV
VA : 200
CLASS: 3P
315MVA, 400KV/220KV/33KV AT/F
RESTRICTED EARTH FAULT RELAY
P2 P2 P2
400KV HV
RADHD
BUSHING CT S2
3 3 3 S2 S2
ACTIVE START TRIP
CORE-1 S1 S1 S1
CTR: 1000/1A
CLASS: PS
P1 P1 P1
DISPLAY
P1 P1 P1
NEUTRAL C
BUSHING CT S1
3 3 3 S1 S1
CORE-1 S2 S2 S2 E
CTR: 1000/ 1A
CLASS: PS
P2 P2 P2
P1 P1 P1
220KV LV
BUSHING CT
S1
3 3 3 S1 S1
CORE-1
CTR: 1000/1A
S2 S2 S2
CLASS: PS
P2 P2 P2
315MVA, 400KV/220KV/33KV AT/F
3-PH HIGH IMPEDENCE DIFFERENTIAL RELAY
P2 P2 P2
400KV HV
RADHA
BUSHING CT S2
3 3 3 S2 S2
ACTIVE START TRIP
CORE-1 S1 S1 S1
CTR: 1000/1A
CLASS: PS
P1 P1 P1
DISPLAY
P1 P1 P1
NEUTRAL C
BUSHING CT S1
3 3 3 S1 S1
CORE-1 S2 S2 S2 E
CTR: 1000/ 1A
CLASS: PS
P2 P2 P2
P1 P1 P1
220KV LV
BUSHING CT
S1
3 3 3 S1 S1
CORE-1
CTR: 1000/1A
S2 S2 S2
CLASS: PS
P2 P2 P2
315MVA, 400KV/220KV AT/F VOLAGE SELECTION
BUS-1 1-52CB 2-52CB 3-52CB BUS-2
LINE1
AT/F-1
FEEDER HAVING LINE CVTs &BUSES ARE HAVING BUS CVTs BUT AT/Fs ARE
NOT HAVING CVTs. FOR TRANSFORMER PANEL, PT SUPPLY IS SELECTED AS
PER SELECTION DESCRIBED BELOW FOR METERING AND PROTECTION,
WHICH IS FIRST SELECTED .
If AT/F is feeding from Bus-1 and 1-52CB & 2-52CB is closed. Then
BUS-1 Bus-1 CVT is selected and this supply is extended to Control &
CVT Relay Panels for Auto Transformer.
If AT/F is feeding from Direct Line and 2-52CB is closed & 1-52 CB
LINE & 3-52 CB is open and 389T ISO is Closed . Then line CVT is
CVT selected and this supply is extended to Control & Relay Panels for
Auto Transformer.
MAIN-1 & MAIN-2
PROTECTION FOR
SHUNT REACTOR
ADOPTED IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)
BASICS OF SHUNT REACTOR
1. TYPES OF REACTORS :
A. BASED ON REACTOR CONNECTION
i. SHUNT REACTOR.
ii. SERIES REACTOR.
B. BASED ON REACTOR LOCATION
i. BUS REACTOR
ii. LINE REACTOR
C. BASED ON CONTROL
i. 3-PH OIL IMMERSED REACTOR WITH GAPPED IRON CORE.
ii. THYRISTOR CONTROLLED REACTOR (STATIC VAR COMPENSATOR)
(APTRANSCO UTILISING SHUNT REACTORS FOR BUS & LINE IN 400KV NETWORK)
2. NEED OF SHUNT REACTOR:
A. LINE REACTOR
SHUNT REACTORS ARE USED IN ORDER TO COMPENSATE FOR THE CAPACITIVE SHUNT
REACTANCE OF TRANSMISSION LINES. THE REACTOR IS CONNECTED PARALLEL TO THE LINE. THE
LOCATION OF REACTOR IS OUT GOING SIDE OF LINE i.e AFTER CIRCUIT BREAKER. LENGTH OF LINE
IS MORE THERE MAY BE VOLTAGE IS RAISING DUE TO FARANTI EFFECT(CAPACITANCE) DURING
CHARGING. IN CASE OF ZONE-2 (OPEN JUMPER) FAULT, THE FAULT CLEARED BY REMOTE END IS
FAST, BUT THIS END IT WILL TAKE TIME DELAY DUE TO ZONE-2. DURING THIS TIME, VOLTAGE MAY
RAISING. SO, LINE REACTOR IS USED FOR CONTROLLING THE SWITCHING OVER VOLTAGES AND
SAFEGUARD THE OPERATING EQUIPMENT. NORMALLY IT IS ALWAYS IN SERVICE. NORMALLY BOTH
ENDS LINE REACTORS ARE PROVIDED. THE ELECTRICAL INTERLOCK IS PROVIDED THAT IF
REACTOR ISOLATOR CLOSSED POSITION ONLY WILL GIVE PERMIT TO CLOSE THE LINE ISOLATOR.
SIMILARLY FOR OPENING REACTOR ISOLATOR THE LINE ISOLATOR SHOULD BE IN OPEN POSITION.
NEUTRAL REACTOR CONNECTED BETWEEN THE STAR POINT OF EHV SHUNT REACTOR AND THE
GROUND, LIMITS THE SECONDARY ARC CURRENT TO A LOW VALUE OF AROUND 10 AMPS
TYPICALLY FOR 400KV SYSTEM TO ENSURE COMPLETE DE-IONISATION OF ARC PATH WHEN EHV
SYSTEM DEVELOPS A SINGLE LINE TO GROUND FAULT. ARC EXTINCTION DURING LINE SINGLE-
PHASE AUTORECLOSE DEAD TIME IS ASSISTED BY THIS NEUTRAL REACTOR.
B. BUS REACTOR
THE REACTOR IS CONNECTED PARALLEL TO THE BUS i.e LIKE A FEEDER/LINE.
DURING LIGHTLY LOADED CONDITIONS THERE MAY BE POSSIBULITY OF RAISING
BUS VOLTAGES. FOR SAFEGUARD THE OPERATING EQUIPMENT BUS REACTORS
ARE UTILISING. NORMALLY IT IS NOT IN SERVICE. WHENEVER THE VOLTAGE
RAISES TO 4%TO 5% MORE THAN THE RATED VOLTAGE THIS MAY BE KEPT IN
SERVICE AND 2% TO 3% LESS THAN THE RATED VOLTAGE THIS MAY BE KEPT OUT
OF SERVICE.
3. SELECTION OF REACTOR
A. LINE REACTOR
NORMALLY LINE REACTORS ARE PROVIDED IF THE LINE IS MORE OR EQUAL TO
250KM. IN APTRANSCO NETWORK MAXIMUM LENTH OF LINE IS 350KM. AS PER
SYSTEM STUDIES RECOMANDATIONS IF LINE LENGTH IS 250KM TO 300KM 50MVAR
REACTOR IS TO BE USED. IF MORE THAN 300KM 63MVAR REACTOR IS TO BE
USED.
B. BUS REACTOR
NORMALLY BUS REACTORS ARE PROVIDED IF THE SUBSTATION BUS VOLTAGE IS
RAISING 5% MORE THAN THE RATED VOLTAGE DURING LIGHTLY LOADED
CONDITION. BASED ON THE SYSTEM STUDIES RECOMANDATIONS BUS REACTORS
ARE TO BE PROVIDED. CALCULATIONS ARE REQUIRED FOR PROVIDING BUS
REACTOR. IN THIS THERE IS NO STANDARDISATION.
4. LOCATION OF REACTORS WITH CAPACITY IN APTRANSCO
A. LINE REACTOR
1. 400KV KALAPAKA-KHAMMAM 1 AT BOTH ENDS – 63MVAR
2. 400KV KALAPAKA-KHAMMAM 2 AT BOTH ENDS – 63MVAR
B. BUS REACTOR
1. 400KV KALAPAKA SS – 2 X 50 MVAR
2. 400KV NUNNA SS(PGCIL BAYS) – 1 x 63 MVAR
5. PURPOSE OF SHUNT REACTOR PROTECTION
THE PURPOSE OF THE PROTECTION RELAYING IS TO DISCONNECT THE REACTOR AND
LIMIT DAMAGE IN CASE OF INTERNAL SHORT CIRCUITS, EARTH FAULTS, INTERTURN
FAULTS AND OVER VOLTAGE OR OVER LOAD.THE REACTOR FORMS CERTAIN
IMPEDENCE FOR RATED FREQUENCY, AND AS IT IS SHUNT CONNECTED, AS OVER LOAD
MAY BE CAUSED BY OVER VOLTAGE OR HARMONICS IN VOLTAGE AND CURRENT.
6. PROTECTION DEVICES INBUILT OR MOUNTED ON REACTOR
A. OIL IMMERSED REACTOR USUALLY HAVE A GAS DETECTOR AND OIL SURGE.
DETECTOR (BUCHHOLZ ALARAM & TRIP DEVICES), WHICH ARE EXCELLENT FOR
DETECTING INTERNAL FAULTS.
B. TEMPARATURE MONITORS FOR OIL & WINDING PROVIDE GOOD OVER LOAD
PROTECTION.
C. PRESSURE RELIEF DEVICE IS PROVIDED TO SAFE GUARD THE REACTOR FROM HIGH
PRESURES.
7. REACTOR DIFFERENTIAL PROTECTION
IT IS WIDELY USED AS INSTANTANEOUS PROTECTION FOR SHORT CIRCUIT FAULTS WITH
IN THE DIFFERENTIAL ZONE. THIS IS TREATED AS MAIN-1 PROT FOR REACTOR.
IT CAN BE OF HIGH IMPEDENCE TYPE OR OF A SENSITIVE CURRENT STABILISED TYPE.
HIGH IMPEDENCE DIFFERENTIAL PROTECTION RELAYS REQUIRE AN EQUAL CT TURNS
RATIO ON THE PHASE AND NEUTRAL SIDE. SENSITIVITY IS 5% OF NOMINAL REACTOR CT
CURRENT.
8. BACK-UP PROTECTION
A VARIETY OF RELAYS ARE AVAILABLE.
A. OVER CURRENT & EARTH FAULT PROTECTION. ( 50, 50N, 51, 51N, 67, 67N - ANY
COMBINATION OF THESE)
B. UNDER IMPEDENCE / DISTANCE ( Z<)(21R).
C. NEUTRAL DISPLACEMENT PROTECTION (Un>).
9. RESTRICTED EARTH FAULT PROTECTION
IF, FOR SOME REASON, A SENSITIVE DIFFERENTIAL PROTECTION NOT CHOOSEN A
RESTRICTED EARTH FAULT PROTECTION CAN BE UTILISED.
SHUNT REACTOR (BUS & LINE)
(4CT METHOD)
BUS-1 BUS-2
IL 1-89 3-89
INTER LOCK FACILITY:
WHEN 1-89R CLOSES ONLY
PERMIT TO CLOSE 1-89L AND
1-89L OPENS ONLY
1-52CB 3-52CB
PERMIT TO OPEN 1-89R.
P2 P2
1-CT 3P1 3
P1
3-CT
1-89A 3-89A
2-ACT 2-BCT
1-89R
. 3
3
P2 P1
P1 3
P2 P1 P2
1-RCT IL 2-89A 2-89B
2-52CB
LINE
UUU
SHUNT 3-89R
1-89L
REACTOR
. BUS
UUUU
SHUNT
UUU
1-PH NEUTRAL
REACTOR
GROUNDING REACTOR
LINE 1
SHUNT REACTOR (BUS & LINE)
(5CT METHOD)
BUS-1 BUS-2
IL 1-89 3-89
INTER LOCK FACILITY:
WHEN 1-89R CLOSES ONLY
PERMIT TO CLOSE 1-89L AND
1-89L OPENS ONLY 1-52CB 3-52CB
PERMIT TO OPEN 1-89R.
P2 P2
1-CT 3P1 3 3-CT
P1
1-89A 3-89A
2-CT
1-89R
.
3
P2
P1 3
P1 P2
1-RCT 2-89A 2-89B
IL 2-52CB 3-89R
LINE
UUU
SHUNT P2
REACTOR
1-89L
3 3-RCT
. 3P1
P2 P1 BUS
UUUU
1-LCT SHUNT
1-PH NEUTRAL
UUU
GROUNDING REACTOR
REACTOR
LINE 1
SHUNT REACTOR PROTECTION
PROTECTIONS 3,4,6S - CT METHOD 5,6T1,6T2 - CT METHOD
LINE PROTECTION
MAIN-1 PROTECTION, IN THIS REACTOR CT CURRENT IS OPPOSES THE AS USUAL IN
MAIN&TIE CT CURRENT. VECTOR SUM OF CTs i.e.
MAIN-2 PROTECTION, MAIN, TIE & REACTOR IS LINE CURRENT. 5CT METHOD,
METERING, 3CT METHOD, 4CT METHOD, 6CT(T1) METHOD,
BUSBAR & BUSBAR
6CT(S) METHOD 6CT(T2) METHOD
CHECKUP PROTECTION
RESTRICTED EARTH FAULT HV BUSHING CT CORE-2 & 1-PH HV BUSHING CT CORE-2 & I-PH
PROTECTION (64 R ) NEUTRAL GROUNDING REACTOR NEUTRAL GROUNDING REACTOR
EARTH BUSHING CT CORE-1.2 OF EARTH BUSHING CT CORE-1.2 OF
LINE SHUNT REACTOR IS LINE SHUNT REACTOR IS
CONNECTED TO 1-PH HIGH CONNECTED TO 1-PH HIGH
IMPEDENCE DIFFERENTIAL IMPEDENCE DIFFERENTIAL
RELAY(REF). RELAY(REF).
METERING REACTOR STAR SIDE BUSHING CT REACTOR STAR SIDE BUSHING CT
CORE-1 IS CONNECTED TO REACTOR CORE-1 IS CONNECTED TO
METERING REACTOR METERING
SHUNT REACTOR PROTECTION
PROTECTIONS 4 CT METHOD 5 CT METHOD
BUS SHUNT REACTOR PROTECTION
MAIN PROTECTION (87 R) HV BUSHING CT CORE-1 & NEUTRAL HV BUSHING CT CORE-1&
(DIFFERENTIALPROTECTION) BUSHING CT CORE-3 OF BUS SHUNT NEUTRAL BUSHING CT CORE-3 OF
REACTOR IS CONNECTED TO 3-PH BUS SHUNT REACTOR IS
HIGH IMPEDENCE DIFFERENTIAL CONNECTED TO 3-PH HIGH
RELAY. IMPEDENCE DIFFERENTIAL RLY.
BACK UP PROTECTION (21R ) 3-CT CORE-5 & 2-ACT CORE-5 3-RCT CORE-5 & SELECTED CVT IS
( SINGLE STEP REACTOR SECONDARIES ARE CONNECTED CONNECTED TO SINGLE STEP
IMPEDENCE PROTECTION ) PARALLEL & SELECTED CVT IS REACTOR IMPEDENCE RELAY.
CONNECTED TO SINGLE STEP
REACTOR IMPEDENCE RELAY.
RESTRICTED EARTH FAULT HV BUSHING CT CORE-2 & EARTH HV BUSHING CT CORE-2 & EARTH
PROTECTION ( 64 R ) BUSHING CT CORE-2 OF BUS SHUNT BUSHING CT CORE-2 OF BUS
REACTOR IS CONNECTED TO 1-PH SHUNT REACTOR IS CONNECTED
HIGH IMPEDENCE DIFFERENTIAL TO 1-PH HIGH IMPEDENCE
RELAY(REF). DIFFERENTIAL RELAY(REF).
SPECIAL PROTECTION
LINE SHUNT REACTOR STUB PROTECTION TEED-1: 1-CT, 2-CT, 1-LCT & 1-RCT
TEED-2: 1-CT, 2-CT, 1-LCT & 1-RCT
BUS SHUNT REACTOR TEE DIFFERENTIAL PROTECTION : TEED-1: 3-CT, 2-CT & 3-RCT
3-CT, 2A-CT & REACTOR HV CT TEED-2: 3-CT, 2-CT & 3-RCT
CVT SELECTION LINE SHUNT REACTOR: ACCORDING BUS SHUNT REACTOR:
TO ISOLATORS & BREAKERS ACCORDING TO ISOLATORS &
POSITION BUS-1/ BUS-2/ LINE CVT BREAKERS POSITION BUS-1/
WILL BE SELECTED. BUS-2 CVT WILL BE SELECTED.
REACTOR BUSHING CT CONNECTIONS
CORES LINE SHUNT REACTOR BUS SHUNT REACTOR
4 CT METHOD 5 CT METHOD 4 CT METHOD 5 CT METHOD
HV (400KV SIDE) BUSHING CTs
CORE-1(PS) REACTOR HIGH REACTOR HIGH REACTOR HIGH REACTOR HIGH
IMPEDENCE IMPEDENCE IMPEDENCE IMPEDENCE
DIFFERENTIAL RELAY DIFFERENTIAL RELAY DIFFERENTIAL RELAY DIFFERENTIAL RELAY
NEUTRAL REACTOR (MAIN REACTOR STAR POINT SIDE) BUSHING CTs *NOTE: NORMALLY CORE-3 OF HV
BUSHING CT IS USED FOR REACTOR
CORE-1.1(PS) SPARE SPARE IMPEDENCE PROTECTION. FOR REACTOR
IMPEDENCE PROTECTION EITHER CORE-3
NEUTRAL REACTOR (EARTH POINT SIDE) BUSHING CTs OF HV BUSHING CT OR ONE OF THE
CORE-1.2 (PS) RESTRICTED EARTH RESTRICTED EARTH PROTECTION CORE OF EXTERNAL CT
FAULT PROTECTION FAULT PROTECTION MAY BE UTILISED.
LINE SHUNT REACTOR PROTECTION
(4CT METHOD) CORE-1: 2000-1000-500/1
P1
3. 1-RCT
CORE-2:
CORE-3:
CORE-4:
2000-1000-500/1
2000-1000-500/1
2000-1000-500/1
CORE-5: 2000-1000-500/1
200/ 1A CORES
3 2 1
CORES
3
5 4 3 2 1
HV BUSHING
. .1-89R
3
3
3
3
3
3
(400KV SIDE) CTs
P2 . . LINE
METERING
1-CT
LINESHUNT UUU
. MAIN-2 PROTECTION
2B-CT
.
LINE
REACTOR
P1 1-CT
200/ 1A
3
. MAIN-1 PROTECTION
2B-CT
3 2 1
CORES
LINE
NEUTRAL BUSHING
3 1-CT
.
2B-CT
(STAR PONT SIDE) 3
REACTOR DIFFERENTIAL PROTECTION
CTs
P2 . . RESTRICTED EARTHFAULT PROTECTION
REACTOR IMPEDENCE PROTECTION
P1 . SELECTED
3 BUS-1/ BUS-2/ LINE
200/ 1A CORE – 1.1
P2 . REACTOR METERING
CVT VOLTAGE
UUU
1-PH NEUTRAL
GROUNDING REACTOR
P1
3.
200/ 1A CORE – 1.2
P2 .
LINE SHUNT REACTOR PROTECTION
(5CT METHOD) CORE-1: 2000-1000-500/1
P1
3. 1-RCT
CORE-2:
CORE-3:
CORE-4:
2000-1000-500/1
2000-1000-500/1
2000-1000-500/1
200/ 1A CORES
3 2 1
CORE-5: 2000-1000-500/1
CORES
3
5 4 3 2 1
HV BUSHING
. .
1-89R
3
3
3
3
3
3
(400KV SIDE) CTs P2
.
P1
1-LCT CORE-1
LINESHUNT
P2
UUU . TEE DIFFERENTIAL PROTECTION-1
REACTOR
P1 . 1-CT CORE-5
1-CT
200/ 1A
3
2-CT CORE-5 CORE-4
3 2 1
CORES
NEUTRAL BUSHING
3
(STAR PONT SIDE)
CTs
3 . TEE DIFFERENTIAL PROTECTION-2 2-CT
CORE-4
P1
3. SELECTED
200/ 1A CORE – 1.1
.
BUS-1/ BUS-2/ LINE
P2 CVT VOLTAGE
UUU
3-52CB
3 P2
SELECTED
2
3 3-CT
5 4 3
CORES
REACTOR IMPEDENCE PROTECTION 3
. 3
REACTOR METERING
P1
2-52CB 3-89A
3
3
3
3
3
5 4 3 2 1 3-89R
P2 P1 2-89B
CORES
2A-CT .
.
. . UUU . .
3
3
3
3
3
3
P2 P1 P2 3 2 1 P1
3 2 1
CORES CORES
NEUTRAL BUSHING CTs HV BUSHING CTs
(STAR PONT SIDE) 200/ 1A BUS SHUNT REACTOR 200/ 1A (400KV SIDE)
BUS SHUNT REACTOR PROTECTION
BUS-2
1
3
2
3 3-CT
3 4 5
CORES
. 3
. 3
2-52CB P1 2-CT P1
P2 3-89A
REACTOR METERING
3
3
3
3
5 4 3 2 1 3-89R
2-89B
CORES P2
1
. 3
CORES
2 3 4
3R-CT
. 3
3
. . UUU . . 3
3
3
3
3
5
3
P2 P1 P2 3 2 1 P1 P1
3 2 1
CORES CORES
NEUTRAL BUSHING CTs HV BUSHING CTs
(STAR PONT SIDE) 200/ 1A BUS SHUNT REACTOR 200/ 1A (400KV SIDE)
CARRIER INTERTRIPPING OF LINE SHUNT REACTOR
LINE SHUNT REACTOR PROTECTION TRIPPINGS WILL BE USED AS DIRECT TRIPPINGS OF LINE IN
ADDITION TO OTHER TRIPPINGS. BUS SHUNT REACTOR NEED NOT REQUIRE CARRIER INTER
TRIPPING FACILITY.
87R REACTOR DIFFERENTIAL RELAY
LINE PROTECTION
RADHA
ABB COUPLER PANEL-1
21R REACTOR IMPEDENCE RELAY
NSD 50
DC +VE
RAKZB FROM PANEL
Y PH VOLTAGE
B PH VOLTAGE
R PH CURRENT
Y PH CURRENT
B PH CURRENT
STAR/NEUTRAL CURRENT
MAIN CB R PH OPEN
MAIN CB Y PH OPEN
MAIN CB B PH OPEN
TIE CB R PH OPEN
TIE CB Y PH OPEN
TIE CB B PH OPEN
MAIN/TIE CB LBB OPTD
DIRECT TRIP CH-1/2 OPTD
BUSBAR PROT OPTD
MAIN-1 PROT OPTD
MAIN-2 PROT OPTD
OVER VOLTAGE STAGE-1/2 OPTD
STUB PROT-1/2 OPTD
MAIN-1 PROT CARRIER RECEIVE
MAIN-2 PROT CARRIER RECEIVE
DF/DT OPTD
EVENT NO
NAME OF FEEDER
DATE & TIME
PREFERRED DISTURBANCE RECORDER
400 KV LINES 400 KV TRANSFORMER
ANALOG CHANNELS ANALOG CHANNELS DIGITAL CHANNELS
1. R-PH VOLTAGE 1. HV R-PH VOLTAGE 1. HV MAIN CB R-PH OPEN
2. Y-PH VOLTAGE 2. HV Y-PH VOLTAGE 2. HV MAIN CB Y-PH OPEN
3. B-PH VOLTAGE 3. HV B-PH VOLTAGE 3. HV MAIN CB B-PH OPEN
4. OPEN DELTA VOLTAGE 4. HV OPEN DELTA VOLTAGE 4. HV TIE CB R-PH OPEN
5. R-PH CURRENT 5. LV R-PH VOLTAGE 5. HV TIE CB Y-PH OPEN
6. Y-PH CURRENT 6. LV Y-PH VOLTAGE 6. HV TIE CB B-PH OPEN
7. B-PH CURRENT
7. LV B-PH VOLTAGE 7. LV 220 CB R-PH OPEN
8. NEUTRAL/STAR CURRENT
8. LV OPEN DELTA VOLTAGE 8. LV 220 CB Y-PH OPEN
DIGITAL CHANNELS 9. HV R-PH CURRENT 9. LV 220 CB B-PH OPEN
1. HV MAIN CB R-PH OPEN
10. HV Y-PH CURRENT 10 87 LZ DIFF RLY OPERATED
2. HV MAIN CB Y-PH OPEN
3. HV MAIN CB B-PH OPEN
11. HV B-PH CURRENT 11. HV 67 ABCN OPERATED
4. HV TIE CB R-PH OPEN 12. HV NEUTRAL/STAR CURRENT 12. LV 67 ABCN OPERATED
5. HV TIE CB Y-PH OPEN 13. LV R-PH CURRENT 13. 51 O/L RLY OPERATED
6. HV TIE CB B-PH OPEN 14. LV Y-PH CURRENT 14. 64 REF / 87 HZ RLY OPERATED
7. 21 MAIN1 REL 521 OPERATED 15. LV B-PH CURRENT 15. NDR RLY OPERATED
8. 21 MAIN2 REL 316 OPERATED 16. LV NEUTRAL/STAR CURRENT 16. HV 99T OVER FLUX OPTD
9. 87 BUSBAR RELAY OPERATED 17. LV 99T OVER FLUX OPTD
10. MAIN CB A/R OPERATED 18. HV 400 BUSBAR OPERATED
11. TIE CB A/R OPERATED 19. LV 220 BUSBAR OPERATED
12. PSB OPERATED 20. HV MAIN CB LBB OPERATED
13. SOTF OPERATED 21. HV TIE CB LBB OPERATED
14. 27 O/V STG-1/2 OPERATED 22. LV 220 CB LBB OPERATED
15. 51 STUB-1/2 OPERATED 23. HV 86 GR-A/B RELAY OPTD
16. 87HZ / LZ TEED-1/2 OPERATED
24. LV 86 GR-A/B RELAY OPTD
17. MAIN CB LBB OPERATED
18. TIE CB LBB OPERATED
25. AT/F 21T UZ RELAY OPERATED
19. DIRECT TRIP CH-1/2 TRIP 26. OIL TEMP HIGH TRIP
20. 21M1 / 21M2 CARRIER RECEIVE 27. WNDG TEMP HV/IV/LV TRIP
21. 86 GR-A/B RELAY OPERATED 28. BUCHHOLZ MAIN/OLTC TRIP
22. 67N DEF/TEF RLY OPERATED 29. PRD 1/ 2 TRIP
23. DF/DT RELAY OPERATED 30. AT/F NEUTRAL CURRENT TRIP
CONFIGUARATION
OF CONTROL &
RELAY PANELS IN
ONE AND HALF
CIRCUIT BREAKER
SCHEME PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)
CONFIGUARATION OF C & R PANEL
CONTROL PANEL CB RELAY PANEL LINE PROTECTION PANEL
1. AMMETERS IN 3Phs 1. BREAKER FAILURE RELAY 1. MAIN-1 NUM. DIST. PROT
2. VOLTMETER WITH SEL. SWITCH 2. AUTO RECLOSURE RELAY 2. MAIN-2 NUM. DIST. PROT.
3. WATTMETER 3. CHECK SYNCHRONISING RELAY 3. O/V STAGE-1 (EXT/IN BUILT)
4. VAR METER 4. CB ALARM RELAYS 4. O/V STAGE-2 (EXT/IN BUILT)
5. 20W ANNUCIATION FACIA
6. CB CONTROL (TNC) SWITCH 5. CB TRIP CKT SUPERVISION RELAYS 5. DISTURBANCE RECORDER(EXT/INBUILT)
7. ISO CONTROL (TNC) SWITCH 6. 3-PH TRIP UNITS 86-GA & 86-GB 6. DISTANCE TO FAULT (EXT/ INBUILT)
8. SEMAPHORE FOR EARTH SWITCH 7. 1-PH TRIP RELAYS M1, M2 - 1 2 Nos 7. DC SUPERVISION RELAYS
9. INDICATING LAMPS FOR CB G&R 8. DIRECT TRIP RECEIVE RELAYS 8. TEED-1 PROTECTION
10. INDICATING LAMPS FOR ISO 9. DC SUPERVISION RELAYS 9. TEED-2 PROTECTION
11. INDICATING LAMPS FOR DC 10. U/V RELAY E/S I/L 10. STUB-1/2 PROTECTION (EXT/ INBUILT)
12. INDICATING LAMPS FOR ISO I/L 11. CB MULTIPLICATION RELAY 11. AUXILIARY RELAYS
13. PUSH BUTTON FOR ANNUNCIATION 12. TEST TERMINAL BLOCK 12. MAIN-1 CARRIER SEL.SWITCH
14. SYNCHRONISING SOCKET FOR CB 13. ENERGY METER 13. MAIN-2 CARRIER SEL.SWITCH
15. SYNCHRONISING SEL.SWITCH
14. AUX RELAYS 14. CARRIER RECEIVE RELAYS
16. PROTECTION TRANSFER
17. MIMIC TO REPRESENT SLD 15. PANEL INDICATING LABEL 15. FLAG RELAYS
18. CUTOUT FOR RWTI WITH SEL .SWI. 16. TIMERS
19. PANEL INDICATING LABEL 17. PANEL INDICATING LABEL
* IN CASE OF ONE AND HALF CB
SYSTEM CONTROL PANEL FOR FULL
DIA IS TO BE AVAILABLE
CONFIGUARATION OF C & R PANEL
TRANSFORMER PROTECTION PANEL
REACTOR PROTECTION PANEL
HV PROTECTION PANEL MV PROTECTION PANEL
1. T/F DIFFERENTIAL PROTECTION 1. DIRECTIONAL O/L E/F RELAYS 1. REACTOR DIFFERENTIAL PROTECTION
2. REF PROTECTION RELAY 2. OVER FLUX PROTECTION 2. REF PROTECTION RELAY
3. DIRECTIONAL O/L E/F RELAYS 3. NEUTRAL DISPALCEMENT RELAY 3. REACTOR IMPEDENCE PROTECTION
4. OVER FLUX PROTECTION 4. VOLTAGE SELECTION RELAYS 4. CVT SELECTION RELAYS
5. OVER LOAD PROTECTION 5. FUSE FAILURE RELAY 5. FLAG RELAYS
6. VOLTAGE SELECTION RELAYS 6. AUX RELAYS FOR T/F TROBLES 6. AUX RELAYS
7. FUSE FAILURE RELAY 7. FLAG RELAYS 7. TIMERS
8. AUX RELAYS FOR T/F TROBLES 8. TIMERS 8. CIRCUIT LABEL
9. FLAG RELAYS 9. CIRCUIT LABEL
10. TIMERS
11. CIRCUIT LABEL
IN ADDITION TO THE ABOVE THE FOLLOWING PANELS WILL BE AVAILABLE
1. CONTROL PANELS FOR LINE, T/F, B/C, TBC, BUS REACTOR (AS & WHEN REQ)
2. COMMON CONTROL PANEL
3. BUS BAR PROTECTION PANELS
4. TRANSFER BUS COUPLER PROTECTION PANEL(IN CASE OF DMT/SMT SCHEME)
5. BUS COUPLER PROTECTION PANEL (IN CASE OF DMT/DB SCHEME)
I. NOMINCLATURE FOR PANELS ARE NORMALLY
MAIN CB PANEL – RLA, TIE CB PANEL – RTB, HV CB PANEL – RTRA, LV CB PANEL – RTRD
LINE PROTECTION PANEL – RLB, HV PROTECTION PANEL – RTRB, LV PROTECTION PANEL
– RTRC, LINE REACTOR PROTECTION PANEL – RLRC, BUS REACTOR PROTECTION PANEL –
RBRA, BUS BAR PANEL – RBBA, CONTROL PANEL – CP, KP, KT, KBC, KTBC,KL,CCP
400KV INTEGRATED CONTROL PANELS
400KV LINE CB RELAY & PROTN PANEL
4RLA 4RLB 4RTB
79 + 25 79 + 25
(AUTO RECLOSURE + (AUTO RECLOSURE +
CHECK SYNC RELAY) CHECK SYNC RELAY)
50 Z 50 Z
(LBB / BFR) 21 MAIN 1 (LBB / BFR)
DC-1I
86 GR -B RELAYS -6 DC-1 86 GR -B RELAYS -6
FOR 21M2 FOR 21M2
87 HIGH 87 LOW
TEED-1 TEED-2
400KV LINE + R CB RELAY & PROTN PANEL
4RLA 4RLRB 4RLC 4RTB
79 + 25 75 A 79 + 25
(AUTO RECLOSURE + 75 B (AUTO RECLOSURE +
CHECK SYNC RELAY) 75 L CHECK SYNC RELAY)
50 Z 87 MAIN 50 Z
(LBB / BFR) 21 MAIN 1 (LBB / BFR)
HIGH IMP
DC-1I
DC-1
DC-1
86 GR -B RELAYS -6 86 GR -B RELAYS -6
FOR 21M2 FOR 21M2
D/T CH-1 D/T CH-2 HIGH SPEED D/T CH-1 D/T CH-2
59 L1 59 L2
RECEIVE RECEIVE 64 REF AUX TRIP O/V STG-1 O/V STG-1i
RECEIVE RECEIVE
RELAYS RELAYS RELAYS RELAYS RELAYS
87 HIGH 87 LOW
TEED-1 TEED-2
400KV ICT HV + IV CB RELAY & PROTN PANEL
4RTRA 4RTRB 4RTRC
75 A 75 A
75 B 75 B
75 L
50 Z 87 MAIN 1 50 Z
(LBB / BFR) (LBB / BFR)
LOW IMP
DC-1I
RECEIVE RECEIVE DC-1 AUX TRIP
RELAYS RELAYS RELAYS
BREAKER BREAKER
99T 99T
MULTIPLICA MULTIPLICA
HV O/F IV O/F
TION RELAY TION RELAY
87 HIGH 87 LOW
TEED-1 TEED-2
400KV BUS REACTOR CB RELAY & PROTN PANEL
4RBRA 4RBRB 4RTB
79 + 25
75 A
(AUTO RECLOSURE +
75 B
CHECK SYNC RELAY)
50 Z 87 MAIN 50 Z
(LBB / BFR) (LBB / BFR)
HIGH IMP
1-PH TRIP
DC-1I
DC-1 86 GR -B RELAYS -6
FOR 21M2
BREAKER BREAKER
87 HIGH 87 LOW
MULTIPLICA MULTIPLICA
TEED-1 TEED-2
TION RELAY TION RELAY
400KV BUSBAR PROTECTION PANEL
4RBB1 BBM1 BAY UNITS 4RBB2 BBM1 + 96 UNITS 4RBB3 BBM2 + 96 UNITS 4RBB4 BBM2 BAY UNITS
TRIP LOGICS
OF
ONE AND HALF
CIRCUIT BREAKER
SCHEME
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)
GROUP-A & GROUP-B TRIPPINGS
FOR 400KV STATIONS THERE SHALL BE TWO SEPARATE BATTERY SYSTEMS AVAILABLE FOR
PROTECTION, CONTROL & TRIPPING/CLOSING OPERATIONS. TO OBTAIN REDUNDENCY AND TO BE
ABLE TO TAKE PROTECTION OUT FOR MAINTANENCE, WHILE EQUIPMENT IS IN SERVICE, THE
RELAYS ARE ELECTRICALLY AND PHYSICALLY SEGREGATED IN TO TWO GROUPS. GROUPING IS
DONE TO THE EXTENT POSSIBLE IN SUCH A WAY THAT EACH GROUP CAN INDEPENDENTLY
CARRYOUT PROTECTIVE FUNCTIONS WITH NEAR EQUAL REDUNDENCY. INTER CONNECTION OF
THESE TWO GROUPS SHALL NOT BE GENERALLY BE ATTEMPTED.
DISTRIBUTION OF DC SUPPLY SHALL BE DONE BAY WISE TO FEED THE FOLLOWING
1. PROTECTION
2. CB CONTROL
3. ISOLATOR / EARTH SWITCH CONTROL
4. ANNUNCIATION / INDICATION
LINE PROTECTION TRANSFORMER PROTECTION REACTOR PROTECTION
GROUP-A GROUP-A GROUP-A
MAIN-1 PROTECTION T/F DIFFERENTIAL RELAY REACTOR DIFFERENTIAL RELAY
M1 BUILT IN FUNCTIONS T/F HV BACKUP RELAY REACTOR BACKUP / 21R RELAY
TEED-1 PROTECTION T/F IMP / 21T RELAY OIL TEMP HIGH TRIP
OVER VOLTAGE STAGE-1 PROT T/F HV OVERFLUX RELAY PRESURE RELIEF TRIP
DIRECT TRIP CHANNEL-1 RECEIVED OIL TEMP HIGH TRIP GROUP-B
GROUP-B PRESURE RELIEF TRIP REACTOR REF RELAY
MAIN-2 PROTCTION TERITIARY DELTA WNDG NDR PROT BUCHHOLZ TRIP
M2 BUILT IN FUNCTIONS GROUP-B WINDING TEMP HIGH TRIP
TEED-2 PROTECTION T/F REF / HIGH Z DIFF RELAY LOW/ HIGH OIL LEVEL TRIP
OVER VOLTAGE STAGE-2 PROT BUCHHOLZ TRIP FIRE PROTECTION TRIP
LBB/BFR RELAY T/F LV BACKUP RELAY
DIRECT TRIP CHANNEL-2 RECEIVED T/F NEUTRAL CURRENT / 51 O/C RLY
T/F LV OVERFLUX RELAY
OVER LOAD PROT (ALARM ONLY)
OLTC BUCHHOLZ TRIP
WINDING TEMP HIGH TRIP
LOW/ HIGH OIL LEVEL TRIP
MAIN CB FOR LINE (1-52CB)TRIPPING LOGICS
OUTPUT
GROUP
PROTECTION
RELAY
INITIATE ALARM
MAIN-1 PROTECTION 21 M1 A 1-PH X X X X X X X
MAIN-2 PROTECTION 21 M2 B 1-PH X X X X X X X
SOTF, PSB IN BUILT FUNCTIONS OF DISTANCE SCHEME
OVER VOLTAGE
STAGE-1 & STAGE-2 59 L1 & L2 A 3-PH X X X X X X X
(BUILT – IN 21 M1)
OVER VOLTAGE
STAGE-1 & STAGE-2 59 L1 & L2 B 3-PH X X X X X X X
(BUILT – IN 21 M2)
STUB, TOC, BOC,
TEF, DEF, A 3-PH X X X X X X X
(BUILT- IN 21M1)
STUB, TOC, BOC,
TEF, DEF, B 3-PH X X X X X X X
(BUILT- IN 21M2)
TEED PROT-1 87T HZ A 3-PH X X X X X X X
SYMBOL
OUTPUT
GROUP
PROTECTION
25
79
SYMBOL
286
186
A/R
86B
86A
50 Z
50 ZT
B
A
B
B
A
A
B
&
A
B
B
GROUP
&
OUTPUT
3-PH
3-PH
3-PH
1-PH
3-PH
1-PH
3-PH
3-PH
1-PH
3-PH
3-PH
X
252 INITIATE T_CB 3PH TRIP UNIT GR-A
252 INITIATE T_CB 1PH TRIP UNIT GR-B
X
X
INITIATE ALARM
X
X
X
X
X
X
OUTPUT
GROUP
INITIATE ALARM
DIFFERENTIAL RELAY 87T(LZ) A 3-PH X X X X X X
HV BACKUP PROTECTION 67 ABCN A 3-PH X X X X X X
HV OVER FLUX PROT 99T HV A 3-PH X X X X X X
OVER LOAD RELAY 51 O/L A 3-PH X X X X X X
HV PROT TRIP UNIT GR-A & B 86 GR-A/B A/B 3-PH X X X X X X X
REF PROTECTION 64T(HZ) B 3-PH X X X X X X
TEED PROT-1 / 2 87T HZ/LZ A/B 3-PH X X X X X X X X X X X
STUB PROT 50 STUB A 3-PH X X X X X X
AT/F TROUBLE TRIP HV & LV 86 GR-A/B A/B 3-PH X X X X X X X X X
AT/F TROUBLE ALRM X X
M_CB BFR / LBB PROT 50Z B 3-PH X X X X X X
T_CB BFR / LBB PROT 50ZT B 3-PH X X X X X X
LV_CB BFR / LBB PROT 50Z B 3-PH X X X X X X X
400KV B/B PROT 87 BB 96 3-PH X X X X X
220KV B/B PROT 87 BB 96 3-PH X X X X X X
LV BACKUP PROTECTION 67 ABCN B 3-PH X X X X X X
LV OVER FLUX PROT 99T LV B 3-PH X X X X X X
TERI NEUTRAL DISP PROT 151N A 3-PH X X X X X X
LV PROT TRIP UNIT GR-A & B 86 GR-A/B A/B 3-PH X X X X X X X
PROTECTION TRIP SCHEME
86-A ABB 86-A ABB 86-A
MTR/ REL521 MTR/ RET521 MTR/
HSTR MAIN-1 HSTR MAIN-1 HSTR
86-B
ABB ABB 86-B ABB 86-B
REL521
MTR/ REL316 MTR/ RET316 MTR/
MAIN-1
HSTR MAIN-2 HSTR MAIN-2 HSTR
INITIATE MAIN CB GR-B 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE )
REL 316 INITIATE TIE CB GR-B 1-PH TRIP UNIT ( INTURN IT WILL TRIP 1-POLE )
ACTIVE START TRIP
START MAIN CB AUTO RECLOSURE
START TIE CB AUTO RECLOSURE
CARRIER SEND
DISPLAY
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATE MAIN CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
REL 316 INITIATE TIE CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP
BLOCK MAIN CB AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE
CARRIER SEND
DISPLAY
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
CARRIER SIGNAL
REL 521 INITIATE TIE CB GR-A 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
RECEIVED ACTIVE START TRIP BLOCK MAIN CB AUTO RECLOSURE
& ZONE-2 STARTER BLOCK TIE CB AUTO RECLOSURE
IS PICKUP CONDITION
TO LBB/BFR INITIATION
DISPLAY INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATE ALARM (ANNUNCIATION CAME)
C TO DISTURBANCE RECORDER
TO EVENT RECORDER ( SOE/ SCADA )
E
INITIATE MAIN CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
REL 316 INITIATE TIE CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
CARRIER SIGNAL
ACTIVE START TRIP
RECEIVED BLOCK MAIN CB AUTO RECLOSURE
& ZONE-2 STARTER
BLOCK TIE CB AUTO RECLOSURE
IS PICKUP CONDITION
CARRIER SEND ( IF PUTT OR2 SCHEME SELECTED )
DISPLAY
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATE MAIN CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
REL 316 INITIATE TIE CB GR-B 1-PH TRIP UNITS ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP
BLOCK MAIN CB AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE
TO LBB/BFR INITIATION
DISPLAY
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
DISPLAY
TO TRIP COIL-1 TO TRIP COIL-1
TO TRIP COIL-2 TO TRIP COIL-2
C
186 B 186 B
E
TO TRIP COIL-1 TO TRIP COIL-1
TO TRIP COIL-2 TO TRIP COIL-2
CO CO
286 R 286 R
TO TRIP COIL-1
DISPLAY
TO TRIP COIL-1
TO TRIP COIL-2 TO TRIP COIL-2
C
286 B 286 B
E
TO TRIP COIL-1 TO TRIP COIL-1
TO TRIP COIL-2 TO TRIP COIL-2
MAIN LBB
INITIATION
INITIATE BUSBAR PROTECTION ( INTURN IT WILL TRIP CONNECTED BUS CBs)
1-PH TRIP RELAYS OF
INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
MAIN-1 PROTECTION RAICA
BLOCK MAIN CB & TIE CB AUTO RECLOSURE
ACTIVE START TRIP
DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END
1-PH TRIP RELAYS OF
MAIN-2 PROTECTION DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END
DISPLAY CLOSE INTERLOCK OF MAIN CB & TIE CB
86-GR-A INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
MASTER TRIP RELAY
C INITIATE ALARM (ANNUNCIATION COME)
86-GR-B
TO DISTURBANCE RECORDER
MASTER TRIP RELAY
96 BB
E TO EVENT RECORDER ( SOE/ SCADA )
BUSBAR RELAY
TIE LBB
INITIATION
1-PH TRIP RELAYS OF INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT (TRIP BAY1 CB 3-POLES )
MAIN-1 PROTECTION
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( TRIP BAY3 CB 3-POLES )
OF LINE-1(BAY1) &
LINE-2 (BAY3) RAICA BLOCK MAIN CB OF BAY1 & BAY3 AUTO RECLOSURE
ACTIVE START TRIP BLOCK TIE CB AUTO RECLOSURE
1-PH TRIP RELAYS OF
MAIN-2 PROTECTION CLOSE INTERLOCK OF MAIN CB OF BAY1 & BAY 3
OF LINE-1 (BAY1) &
CLOSE INTERLOCK OF TIE CB
LINE-2 (BAY 3)
DISPLAY DIRECT TRANSFER TRIP-1 CARRIER SEND TO BAY1 & BAY3 LINES
86-GR-A DIRECT TRANSFER TRIP-2 CARRIER SEND TO BAY1 & BAY3 LINES
MASTER TRIP RELAY INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
C INITIATE ALARM (ANNUNCIATION COME)
86-GR-B
MASTER TRIP RELAY TO DISTURBANCE RECORDER (BAY1 & BAY3)
E TO EVENT RECORDER ( SOE/ SCADA )
BUS BAR PROTECTION
INITIATE ALL CBs TRIP UNITS CONNECTED TO THIS BUS AND OPERATE.
TO TRIP COIL-1 CONCERNED BAY CB
RED 521 TO TRIP COIL-2 CONCERNED BAY CB
ACTIVE START TRIP TO CLOSE CIRCUIT INTERLOCK OF CONCERN CB
DIRECT TRIP SEND CHANNEL-1 TO OTHER END
DIRECT TRIP SEND CHANNEL-2 TO OTHER END
DISPLAY TO LBB/BFR INITIATION
FROM LBB/BFR TO BUS BAR TRIPPING
INITIATE ALL CBs TRIP UNITS CONNECTED TO THIS BUS AND OPERATE.
TO TRIP COIL-1 CONCERNED BAY CB
REB 670 TO TRIP COIL-2 CONCERNED BAY CB
ACTIVE START TRIP TO CLOSE CIRCUIT INTERLOCK OF CONCERN CB
DIRECT TRIP SEND CHANNEL-1 TO OTHER END
DIRECT TRIP SEND CHANNEL-2 TO OTHER END
DISPLAY TO LBB/BFR INITIATION
FROM LBB/BFR TO BUS BAR TRIPPING
C TO DISTURBANCE RECORDER OF MAIN-1
TO DISTURBANCE RECORDER OF MAIN-2
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
REL 316 INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP
BLOCK MAIN CB AUTO RECLOSURE
LINE /AT/F BLOCK TIE CB AUTO RECLOSURE
ISOLATOR
OPENS DISPLAY CLOSE INTERLOCK OF MAIN CB
CLOSE INTERLOCK OF TIE CB
E TO DISTURBANCE RECORDER
TO EVENT RECORDER ( SOE/ SCADA )
TEED PROTECTION
INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
RADHA INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP BLOCK MAIN CB AUTO RECLOSURE
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
RADSB INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP
87 T2
BLOCK MAIN CB AUTO RECLOSURE
BLOCK TIE CB AUTO RECLOSURE
E TO DISTURBANCE RECORDER
TO EVENT RECORDER ( SOE/ SCADA )
MAIN-1/ MAIN-2
OVER VOLTAGE STAGE-1
INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
REL 521 INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
110% OF V
ACTIVE START TRIP BLOCK MAIN CB & TIE CB AUTO RECLOSURE
4 SECS FOR
FEEDER-1 DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END
5 SECS FOR
DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END
FEEDER-2
DISPLAY CLOSE INTERLOCK OF MAIN CB & TIE CB
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
C INITIATE ALARM (ANNUNCIATION COME)
TO DISTURBANCE RECORDER
E TO EVENT RECORDER ( SOE/ SCADA )
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
REL 316 INITIATE TIE CB 86-GR-a 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
110% OF V
ACTIVE START TRIP
4 SECS FOR BLOCK MAIN CB & TIE CB AUTO RECLOSURE
FEEDER-1
DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END
5 SECS FOR
FEEDER-2 DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END
DISPLAY
CLOSE INTERLOCK OF MAIN CB & TIE CB
E TO DISTURBANCE RECORDER
TO EVENT RECORDER ( SOE/ SCADA )
OVER VOLTAGE STAGE-2
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
RXEG 21 INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP BLOCK MAIN CB & TIE CB AUTO RECLOSURE
DIRECT TRANSFER TRIP-1 CARRIER SEND TO OTHER END
120% OF V
DIRECT TRANSFER TRIP-2 CARRIER SEND TO OTHER END
20m SECS
DISPLAY CLOSE INTERLOCK OF MAIN CB & TIE CB
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
C INITIATE ALARM (ANNUNCIATION COME)
TO DISTURBANCE RECORDER (MAIN-1 & MAIN-2)
E TO EVENT RECORDER ( SOE/ SCADA )
RXEG 21
ACTIVE START TRIP
C
E
CARRIER TRIPPING SCHEMES(TELEPROTECTION)
DETAILS PERMISSIVE TRIPPING DIRECT TRIPPING
CHANNEL-1 MAIN-1 PROTECTION : HERE CHANNEL-1 & CHANNEL-2 SIGNALS ARE MAIN & ALTERNATE CHANNEL
IT SENDS SIGNAL PARALLEL VIA 1. TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP GIVEN.
SEND PLCC PROTECTION COUPLER PANEL-1 AS A MAIN CHANNEL & 2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP GIVEN.
PLCC PROTECTION COUPLER PANEL-2 AS A ALTERNATE 3. TIE CB OPEN CONDITION + 87 BUSBAR-1 OPERATED.
CHANNEL.. 4. MAIN CB OPEN CONDITION + 87 BUSBAR-2 OPERATED
(FOR HALF DIA ONLY).
CHANNEL-2 MAIN-2 PROTECTION : 5. MAIN CB 50 LBB/BFR OPERATED.
IT SENDS SIGNAL PARALLEL VIA 6. TIE CB 50 LBB/BFR OPERATED.
SEND PLCC PROTECTION COUPLER PANEL-2 AS A MAIN CHANNEL & 7. 59L1 OVER VOLTAGE STAGE-1 OPERATED.
PLCC PROTECTION COUPLER PANEL-1 AS A ALTERNATE 8. 59L2 OVER VOLTAGE STAGE-2 OPERATED.
CHANNEL. 9. 87 TEED-1 PROTECTION OPERATED
10. 87 TEED-2 PROTECTION OPERATED
CHANNEL-1 MAIN-1 PROTECTION : 1. TO 86-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR MAIN CB.
IT RECEIVES SIGNAL PARALLEL VIA 2. TO 86-A MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR TIE CB.
RECEIVE PLCC PROTECTION COUPLER PANEL-1 AS A MAIN CHANNEL &
PLCC PROTECTION COUPLER PANEL-2 AS A ALTERNATE
CHANNEL.
MAIN-2 PROTECTION :
CHANNEL-2 IT RECEIVES SIGNAL PARALLEL VIA 1. TO 86-B MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR MAIN CB.
RECEIVE PLCC PROTECTION COUPLER PANEL-2 AS A MAIN CHANNEL & 2. TO 86-B MASTER TRIP RELAY (HIGH SPEED TRIP RELAY) FOR TIE CB.
PLCC PROTECTION COUPLER PANEL-1 AS A ALTERNATE
CHANNEL.
CARRIER TRIPPING SCHEMES(TELEPROTECTION)
21 M1 – REL 521 21 M1 – REL 521
ABB Network Partner AG REL531
PROTECTION PROTECTION
PANEL-1 PANEL-1
PT SEND PT SEND
C C
E
PT RECEIVE PT RECEIVE E
PT SEND PT SEND
PANEL-2 PANEL-2
1 9 1 9
2 10 2 10
3 11 3 11
4 12 4 12
5 13 5 13
6 14 6 14
7 15 7 15
PT SEND PT SEND
8 16 8 16
C
PT RECEIVE PT RECEIVE C
E E
PT SEND PT SEND
DIRECT TRIP PT RECEIVE PT RECEIVE DIRECT TRIP
SEND CH-2 SEND CH-2
DT SEND DT SEND
MAIN CB 86-B DT RECEIVE DT RECEIVE MAIN CB 86-B
PT : PERMISSIVE PROTECTION TRANSFER TRIP
TIE CB 86-B DT : DIRECT TRANSFER TRIP TIE CB 86-B
DIRECT TRANSFER TRIP
CHANNEL – 1 / 2 RECEIVED
INITIATE MAIN CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
85 LO X1 INITIATE TIE CB 86-GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP BLOCK MAIN CB AUTO RECLOSURE
DIRECT TRIP
BLOCK TIE CB AUTO RECLOSURE
CHANNEL-1
RECEIVED CLOSE INTERLOCK OF MAIN CB
DISPLAY CLOSE INTERLOCK OF TIE CB
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
C INITIATE ALARM (ANNUNCIATION COME)
TO DISTURBANCE RECORDER
E TO EVENT RECORDER ( SOE/ SCADA )
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
85 LO X2 INITIATE TIE CB 86-GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP
BLOCK MAIN CB AUTO RECLOSURE
DIRECT TRIP BLOCK TIE CB AUTO RECLOSURE
CHANNEL-2
RECEIVED. DISPLAY CLOSE INTERLOCK OF MAIN CB
CLOSE INTERLOCK OF TIE CB
E TO DISTURBANCE RECORDER
TO EVENT RECORDER ( SOE/ SCADA )
86-GA & 86 GB MASTER TRIP / HIGH SPEED
TRIP LOCKOUT RELAY OPERATION
TRIP COIL-1
TRIP COIL -1
TIE CB
MAIN CB
TRIP COIL -2
MASTER SOTF PROTECTION MASTER
( IN BUILT MAIN-2 )
TRIP /
TRIP COIL-2
TRIP /
HIGH OVER VOLTAGE STAGE-2
HIGH
SPEED DEF, TOC, BOC, STUB SPEED
( IN BUILT MAIN-2 )
TRIP TRIP
RELAY MAIN LBB OPERATED
RELAY
TIE LBB OPERATED
TEED-2 PROTECTION
MASTER TRIP RELAYS
HIGH SPEED TRIP RELAYS
LOCKOUT RELAYS
TO CLOSING INTERLOCK OF CONCERNED BAY CB
PUSH BUTTON FOR RESETTING.
86-GA TO INITIATE LBB/BFR OF CONCERNED BAY
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
RADSB INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
87 T1 DISPLAY
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATE ALARM (ANNUNCIATION COME)
(LZ) TO EVENT RECORDER ( SOE/ SCADA )
C
E
INITIATE 400KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
RADHD INITIATE 400KV TIE CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP
64 T2 INITIATE 220KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 220KV TBC CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
RAPDK INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
67 HV INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
INITIATE 400KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
RAPDK INITIATE 400KV TIE CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP
INITIATE 220KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
67 LV INITIATE 220KV TBC CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
RALK INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
99T HV INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
DISPLAY INITIATE ALARM (ANNUNCIATION COME)
TO EVENT RECORDER ( SOE/ SCADA )
C
E
INITIATE 400KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
RATUB INITIATE 400KV TIE CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP
INITIATE 220KV MAIN CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
99T LV INITIATE 220KV TBC CB GR-B 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
86-B
ABB ABB 86-B 86-B
REL521
MTR/ O/V – 1 MTR/ MTR/
MAIN-1
HSTR O/V – 2 HSTR HSTR
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
RXIG 21 INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
51 O/L INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
DISPLAY INITIATE ALARM (ANNUNCIATION COME)
TO EVENT RECORDER ( SOE/ SCADA )
C
E
INITIATE 400KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
RAEDK1 INITIATE 400KV TIE CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
ACTIVE START TRIP
INITIATE 220KV MAIN CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
NDR INITIATE 220KV TBC CB GR-A 3-PH TRIP UNIT ( INTURN IT WILL TRIP 3-POLES )
TIE LBB
INITIATION
1-PH TRIP RELAYS OF INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT (TRIP BAY1 CB 3-POLES )
MAIN-1 PROTECTION
INITIATE MAIN CB 86-GR-B 3-PH TRIP UNIT ( TRIP BAY3 CB 3-POLES )
OF LINE-1(BAY1)
RAICA BLOCK MAIN CB OF BAY1 AUTO RECLOSURE
ACTIVE START TRIP BLOCK TIE CB AUTO RECLOSURE
1-PH TRIP RELAYS OF
MAIN-2 PROTECTION CLOSE INTERLOCK OF MAIN CB OF BAY1 & BAY 3
OF LINE-1 (BAY1)
CLOSE INTERLOCK OF TIE CB
DISPLAY DIRECT TRANSFER TRIP-1 CARRIER SEND TO BAY1 & BAY3 LINES
86-GR-A DIRECT TRANSFER TRIP-2 CARRIER SEND TO BAY1 & BAY3 LINES
MASTER TRIP RELAY INITIATE FLAG RELAY (INTURN FLAG RELAY OPERATES)
C INITIATE ALARM (ANNUNCIATION COME)
86-GR-B
MASTER TRIP RELAY TO DISTURBANCE RECORDER (BAY1)
E TO EVENT RECORDER ( SOE/ SCADA )
86-GA & 86 GB MASTER TRIP / HIGH SPEED
TRIP LOCKOUT RELAY OPERATION
TRIP COIL-1
TRIP COIL -1
TIE CB
MAIN CB
TRIP COIL -2
MASTER ICT TROUBLES GR-B MASTER
PROTECTION TRIP
TRIP /
TRIP COIL-2
TRIP /
HIGH STUB RELAY 50ST
HIGH
SPEED MAIN LBB OPERATED SPEED
TRIP TIE LBB OPERATED TRIP
RELAY ICT LV OVER FLUX RELAY RELAY
INTER TRIP FROM TBC LBB
& MANUAL TRIP OF 220KV
AUTO TRANSFORMER INTER TRIP CIRCUITS
HV INTER TRIP CIRCUITS(TO LV) LV INTER TRIP CIRCUIT(TO HV)
FOR LV MASTER TRIP RELAY 86 GR-A FOR HV M-CB MASTER TRIP RELAY 86 GR-A
1. TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP 1. LV CB REMOTE HAND TRIP GIVEN.
GIVEN.
2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP
2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION)
GIVEN. OPERATED.
3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED. 3. LV CB 50 LBB/BFR OPERATED.
4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED FOR HV M-CB MASTER TRIP RELAY 86 GR-B
(FOR HALF DIA ONLY). 1. LV CB REMOTE HAND TRIP GIVEN.
5. MAIN CB 50 LBB/BFR OPERATED.
6. TIE CB 50 LBB/BFR OPERATED. 2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION)
7. 87 TEED-1 PROTECTION OPERATED OPERATED.
8. 87 TEED-2 PROTECTION OPERATED. 3. LV CB 50 LBB/BFR OPERATED.
FOR LV MASTER TRIP RELAY 86 GR-B FOR HV T-CB MASTER TRIP RELAY 86 GR-A
1. TIE CB OPEN CONDITION + MAIN CB REMOTE HAND TRIP 1. LV CB REMOTE HAND TRIP GIVEN.
GIVEN. 2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION)
2. MAIN CB OPEN CONDITION + TIE CB REMOTE HAND TRIP OPERATED.
GIVEN.
3. TIE CB OPEN CONDITION + 96 BUSBAR-1 OPERATED. 3. LV CB 50 LBB/BFR OPERATED.
4. MAIN CB OPEN CONDITION + 96 BUSBAR-2 OPERATED FOR HV T-CB MASTER TRIP RELAY 86 GR-B
(FOR HALF DIA ONLY). 1. LV CB REMOTE HAND TRIP GIVEN.
5. MAIN CB 50 LBB/BFR OPERATED.
2. LV 87 BB(96) BUSBAR-1/2 (ISO SELECTION)
6. TIE CB 50 LBB/BFR OPERATED.
7. 87 TEED-1 PROTECTION OPERATED OPERATED.
8. 87 TEED-2 PROTECTION OPERATED. 3. LV CB 50 LBB/BFR OPERATED.
TRANSFORMER TROUBLES TRIPPING
GR-A
86 AX
OL RELAY 51OL
PRD-1 TRIP
86 AY
HV O/L+E/F PROT 67
PRD-2 TRIP
86 BY
LV O/L+E/F PROT 67
WNDG TEMP-HV TRIP
86GR-A
.
.
.
86GR-B
.
.
.
96BB
TRIP COIL – 2 CIRCUITS
TRIP COIL-2
186R1 186Y1 186B1
86GR-A
.
.
.
86GR-B
.
.
.
96BB
ISOLATOR S.NO
ISOLATOR EQUIPMENT-1 EQUIPMENT-2 EQUIPMENT-3 EQUIPMENT-4
INTERLOCKS OPEN/CLOSE INTERLOCKS REQUIRED FOR CONCERNED ISOLATOR / EARTH SWITCH OPEN OR CLOSE
BAY - 1
1 1 - 89 ISO BB189 E O 189 AE O 189 E O 152 CB O
2 1 – 89 E ES 189 A O 189 O -- - -- -
3 1 – 89 A ISO 189 AE O 189 E O 152 CB O -- -
4 1 – 89 AE ES 189 A O 189 O -- - -- -
5 1 – 89 L ISO 189 LE O 152 CB O 252 CB O -- -
6 1 – 89 LE ES 189 L O UV RELAY A -- - -- -
BAY - 2
NOTE: All Earth Switches
in the Bay are towards 7 2 – 89 A ISO 289 BE O 289 AE O 252 CB O -- -
Circuit Breaker side only. 8 2 – 89 AE ES 289 B O 289 A O -- - -- -
The Line and Transformer
9 2 – 89 B ISO 289 BE O 289 AE O 252 CB O -- -
Earth Switches are towards
Line & Transformer. 10 2 – 89 BE ES 289 B O 289 A O -- - -- -
O: OPEN BAY - 3
C: CLOSE 11 3 – 89 ISO BB289 E O 389 AE O 389 E O 352 CB O
A: ACTED
12 3 – 89 E ES 389 A O 389 O -- - -- -
BB189E : BUSBAR-1 EARTH SWITCH .
13 3 – 89 A ISO 389 AE O 389 E O 352 CB O -- -
BB289E : BUSBAR-2EARTH SWITCH .
UV RELAY: UNDER VOLTAGE RELAY. 14 3 – 89 AE ES 389 A O 389 O -- - -- -
15 3 – 89 T ISO LV89 E2 O 389 TE O 252 CB O 352 CB O
16 3 – 89 TE ES 389 T O LV89 T O -- - -- -
BB189E
OPEN ISOLATOR & CB INTERLOCKS OPEN
BB289E
OPEN OPEN
1-89AE
OPEN & OPERATION 1-89 1-89E
CLOSE LOCAL
3-89
OPERATION
& OPEN
3-89AE
& 1-52CB
CLOSE
1-89E CLOSE 3-89E
OPEN 1-89AE OPEN
1-52CB 3-52CB
CLOSE LOCAL
1-52CB OPEN 2-89AE OPEN 3-52CB
& 2-52CB
CLOSE
CLOSE
1-89AE
OPEN
& OPERATION 1-89A
2-89BE
3-89A
OPERATION
&
OPEN
3-89AE
OPEN CLOSE OPEN
1-89E 3-89E
LOCAL 3-89E
& 3-52CB
CLOSE
CLOSE
3-89AE OPEN
OPEN 3-52CB
1-52CB RESET
OPEN 86GR-A OPEN
1-89LE & OPERATION 1-89L
REMOTE
OPERATION 3-89TE
OPEN 86GR-B
RESET
& 1-52CB
CLOSE 3-89T & OPEN
2-52CB
2-52CB RESET
96BB OPEN
LV89E2
OPEN
1-89 OPERATION RESET OPEN
OPEN & 1-89E 86GR-A
REMOTE
OPERATION
&
3-89
& 2-52CB
CLOSE
1-89A 3-89E OPEN
RESET 3-89A
86GR-B
OPEN
1-89 OPERATION OPEN
1-89A
OPEN & 1-89AE
86GR-A
RESET
REMOTE 3-89AE
OPERATION
& OPEN
3-89
RESET 3-89A
&
CLOSE
OPEN 86GR-B
1-89L OPERATION RESET 3-52CB OPEN
U/V RLY
ACTED & 1-89LE 96BB 3-89TE
OPERATION
& OPEN
3-89T
LV89T
OPEN
2-89A
OPEN 2-89B
OPEN & OPERATION
2-89AE
OPEN
2-52CB 2-52CB
OPEN
2-89AE & OPERATION 2-89A
OPEN 2-89AE
OPEN
& OPERATION
2-89BE
OPEN 2-89A
2-89B
OPEN & OPERATION
2-89BE 2-89BE
OPEN 2-89B
CLOSING INTERLOCK OF MAIN & TIE CB
96 BB 86 GR-A 86 GR-B
+ VE
T N C
CB REMOTE CLOSE
MAIN CB
21M1 AR
CB AUTO RECLOSE
21M2 AR
86 GR-A 86 GR-B
+ VE
T N C
CB REMOTE CLOSE
TIE CB
TIE AR
CB AUTO RECLOSE
ADVANTAGES & DISADVANTAGES OF ONE & HALF BREAKER SYSTEM
A. ADVANTAGES:
1. THREE CIRCUIT BREAKERS IN A FULL DIA ARE ALWAYS IN CLOSED POSITION.
2. IF MAIN CB PROBLEM / FOR PERIODICAL MAINTANENCE, DURING THAT PERIOD
THE FEEDER IS FEEDING FROM TIE CB & OTHER BUS . NEED NOT REQUIRE
TRANSFER THE FEEDER.
3. IF TIE CB PROBLEM / FOR PERIODICAL MAINTANENCE, DURING THAT PERIOD
THE FEEDER IS FEEDING FROM MAIN CB & CONNECTED BUS.
4. EVEN IF BOTH MAIN BREAKERS UNDER TROUBLE, DURING THAT PERIOD ONE
FEEDER WORKS AS INCOMING AND OTHER FEEDER WORKS AS OUTGOING VIA
TIE CB. (WITHOUT INTERUPTION TO FEEDERS)
5. IF BUSBAR-1 OPERATED / FOR PERIODICAL MAINTANENCE, ONLY THE MAIN
BREAKERS CONNECTED TO BUSBAR-1 WILL TRIP. DURING THAT PERIOD THE
FEEDERS CONNECTED TO BUS-1 ARE FEEDING VIA TIE CB FROM BUS-2.
6. IF BUSBAR-2 OPERATED / FOR PERIODICAL MAINTANENCE, ONLY THE MAIN
BREAKERS CONNECTED TO BUSBAR-2 WILL TRIP. DURING THAT PERIOD THE
FEEDERS CONNECTED TO BUS-2 ARE FEEDING VIA TIE CB FROM BUS-1.
7. IN THIS BUSBAR PROTECTION IS SIMPLE AND NEED NOT REQUIRE SELECTION
OF ISOLATOR.
8. IT IS MORE RELIABLE SYSTEM FOR OPERATION & MAINTANENCE POINT OF
VIEW.
B. DISADVANTAGES
1. CT CONNECTIONS & PROTECTION TRIP LOGICS ARE SOME WHAT
COMPLICATED. COMPLEX CONTROL & PROTECTION PHILOSOPHY
2. COST TOWARDS CTs, CIRCUIT BREAKERS & PANELS ARE TO BE INCREASED DUE
TO EXTRA BAY. THE COST COMPARISION TABLE SHOWN IN NEXT
PRESENTATION.
3. THE OPERATIONS FOR OPERATOR POINT OF VIEW IS LITTLE BIT COMPLICATED
WHEN COMPARED TO CONVENTIONAL SYSTEM.
4. SPACE OCUPATION FOR BAY IS MORE i.e COST OF LAND IS INCREASE.
COST COMPARISION BETWEEN CONVENTIONAL SYSTEM
& ONE AND HALF BREAKER SYSTEM FOR FEEDER
ONE & HALF BREAKER SYSTEM
CONVENTIONAL
S.No EQUIPMENT FULL DIA % INCREASE HALF DIA % INCREASE
SYSTEM
(FOR 2 FEEDERS) IN COST (FOR 1 FEEDER) IN COST
CIRCUIT
1. 1 No 3 Nos 50% 2 Nos 100%
BREAKERS
CURRENT
INCLUDES THE COST OF CT MARSHELLING BOXES.
TRANSFORMERS
3 CT METHOD 3 Sets 50% 2 Sets 100%
2. 1 Set
4 CT METHOD 4 Sets 100% 2 Sets 100%
5 CT METHOD 5 Sets 125% 3 Sets 200%
6 CT METHOD 6 Sets 200% 3 Sets 200%
I SET 3 SETS 30% 2 SETS 30%
CONTROL &
3. NORMALLY EXTRA PANEL IS TIE BAY PANEL. IT IS ARROUND 30% COST OF MAIN
RELAY PANELS PANEL. BECAUSE IT IS NOT HAVING PROTECTION RELAYS( M-1 & M-2 AND OTHER
RELAYS) . ONLY TIE CB TRIPPING RELAYS & ASSOCIATED RELAYS(A/R +LBB).
BAY
4. MARSHALLING 1 No 3 Nos 50% 2 Nos 30%
BOXES
CONTROL
5. 8 KM 30 KM 100% 20 KM 150%
CABLES
OTHER
INFORMATION
REGARDING
RELAYS AND
TESTING
EQUIPMENT
PREPARED BY
GOPALA KRISHNA PALEPU
ADE/MRT(PROTECTION)
ABB RELAYS
ABB Network Partner AG
ABB Network Partner AG REL 521 ABB Network Partner AG REL 316*4
1 9
2 10
3 11
4 12
5 13
6 14
7 15
8 16
C
C
EE
C
E
c
E
ALSTOM RELAYS
P443 P445
P437 E-PAC
P442
GE MULTILIN
RELAYS
SIEMENS
RELAYS
SEL RELAYS
ENABLED
TARGET SPT MC
IA =250.10 A TRIP RESET ENABLED ENABLED SEL- 421
IB =250.10 A INST PH - A COMM RECLOSE
PROTECTION
AUTOMATION
IC =250.10 A TIME PH - B ENABLED ENABLED CONTROL
EXIT
SEL
CANCEL SELECT
VA TECH REYROLLE RELAYS
NXT PHASE RELAYS
RELAY HARDWARE
16 / 32 BIT
PC
MODEM
IRIG-B
RE/CC
SEL
QUAD/ SEL 321 QUAD/
SEL 421 MHO MHO SEL 387 SEL 351
SEL 311C
GE D-60, QUAD/ L-60/L-90 QUAD/ T-35 / T-60 F-60
MHO MHO
MULTILIN ALPS D-30 SR 7465 SR 750/60
EASUN THR 4 PE 16
THR 4 PE 24 MHO MHO --- MIT
REYROLL THR 3 PE 18
NXT QUAD/ LENS/
L-PRO MHO L-PRO T-PRO F-PRO
PHASE TOMAT0
VA TECH QUAD/ OHMEGA QUAD/
OHMEGA 402 MHO DUOBIAS M ARGUS
REYROLL 311/308 MHO
RELAY TESTING EQUIPMENTS
1. PROGRAMA_GE (MODEL: FREEJA-300) 2. MANTA TEST SYSTEMS (MODEL: MTS 4000)
3. OMICRON (MODEL: CMC 256-6) 4. DOBLE ( MODEL: F 6150)
RELAY TESTING EQUIPMENTS
1. MEEGER_AVO (MODEL: MPRT 8430) 2. RES (MODEL: APTS 3)
3. KOCOS (MODEL: ARTES 440 II) 4. EURO SMC ( MODEL: TRES)
400KV SUBSTATIONS IN APTRANSCO
S.No 400KV SUBSTATION CAPACITY FEEDERS
1. SRISAILAM 1&2 3. KHAMMAM 1&2(PGCIL)
1. MAMIDIPALLY (HYDERABAD) 3 X 315 MVA 2. GHANAPUR (PGCIL) 4. YEDDUMAILARAM 1&2**
1. RAMAGUNDAM 2. GHANAPUR
11. MALKARAM** (SECUNDRABAD) 2 X 315 MVA
1. GAJWEL 1&2 2. MAMIDIPALLY 1&2
12. YEDDUMAILARAM** (RR, SHANKARPALLY) 3 X 315 MVA
1. VTPS 1&2 2. MALKARAM 1&2
13. SURYAPETA** (NALGONDA) 2 X 315 MVA
400KV SUBSTATIONS OF PGCIL IN AP
S.No 400KV SUBSTATION CAPACITY FEEDERS
2 X 200 MVA 1. GHANAPUR 1&2
2. GAJWEL(GHNP3)
4. TALLAPALLY 1&2
5. DICHPALLY
1. RAMAGUNDAM(NTPC) 2 X 250 MVA 3. MALKARAM(GHNP4) 6. KHAMMAM (WRNGL)
7. CHANDRAPUR 1&2
1 X 315 MVA
1. RAMAGUNDAM 1&2 4. NAGARJUNA SAGAR
2. GHANAPUR (HYDERABAD) 3 X 315 MVA 2. MAMIDIPALLY 5. KURNOOL
3. GAJWEL(RMGNDM3) 6. MALKARAM (RMGNDM4)
1. NUNNA 3. VEMAGIRI 1&2
3. GAJUWAKA (VISHAKHAPATNAM) 2 X315 MVA 2. KALAPAKA1&2 4. JAIPUR(HVDC)
1. GAJUWAKA 4. VEMAGIRI 3&4(VTPS)’
2. SRISAILAM 1&2 5. KHAMMAM
4. NUNNA (VIJAYAWADA) 2 X315 MVA (NRSPT) 6. NELLORE 1&2
3. VEMAGIRI 1&2
WARANGAL
HVDC
BTPS
JAIPUR KALAPAKA DICHPALLY
CHANDRAPUR
TALLAPALLY (MAHARASTRA)
GAJWEL
MALKARAM
IPP3 IPP4
KTPS
VEMAGIRI
IPP1 IPP2
GHANAPUR
MBNGR
YEDDUMAILARAM
NUNNA KADAPA
KURNOOL
VTPS
CHITTOR
KHAMMAM GOOTY
GUNTUR
BANGALORE
BANGALORE
NELLORE
CHENNAI
KOLAR
SRISAILAM
ALAMETHI
/ CHENNAI RAICHUR
MAMIDIPALLY
VEMAGIRI SUBSTATION DISPLAY
NUNNA – I NUNNA – II KALAPAKA – I KALAPAKA – II GAJUWAKA – I GAJUWAKA – II GOWTHAMI – I GOWTHAMI – II FUTURE – I FUTURE – II
(PGCIL) (PGCIL) (PGCIL) (PGCIL) PHES PHES
GUNTUR – I GUNTUR – II VPGCL – I VPGCL – II KOPCL – I KOPCL – II GVK EXT – I GVK EXT – II
315MVA, 315MVA,
GMR VASAVI GMR VASAVI KONASEEMA KONASEEMA
400/220KV 400/220KV
AUTO AUTO
TRANSFORMER-I TRANSFORMER-II
DISPLAY