Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
22 views

TOC

This document outlines the technical specifications for the design, construction, and commissioning of a new bridge and associated works at kilometer 34.456 near the Nibong Tebal Railway Station. It includes 27 sections that specify requirements for various aspects of the project such as earthworks, drainage, roadworks, steel reinforcement, concrete work, piling, metal works, waterproofing, railings, bridge bearings, expansion joints, and landscaping.

Uploaded by

Michael Tan
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views

TOC

This document outlines the technical specifications for the design, construction, and commissioning of a new bridge and associated works at kilometer 34.456 near the Nibong Tebal Railway Station. It includes 27 sections that specify requirements for various aspects of the project such as earthworks, drainage, roadworks, steel reinforcement, concrete work, piling, metal works, waterproofing, railings, bridge bearings, expansion joints, and landscaping.

Uploaded by

Michael Tan
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

DESIGN, CONSTRUCTION AND COMMISIONING OF A NEW

BRIDGE NO. 67 AND ASSOCIATED WORKS AT KM. 34.456


NEAR NIBONG TEBAL RAILWAY STATION
TENDER NO : KTMB /TC 38/2005
TECHNICAL SPECIFICATION

Section 1 Not Applicable


Section 2 Site Clearance
Section 3 Earthworks
Section 4 Drainage
Section 5 Roadworks
Section 6 Formwork and Surface Finish for Structures
Section 7 Carpenter, Joiner and Glazier
Section 8 Steel Reinforcement
Section 9 Concrete for Structure
Section 10 Prestressing for Structures
Section 11 Piling Works
Section 12 Metal Works
Section 13 Protection of Steelwork Against Corrosion
Section 14 Waterproofing for Structures
Section 15 Railings
Section 16 Bridge Bearing
Section 17 Bridge Expansion Joints
Section 18 Brickwork for Structures
Section 19 Plastering
Section 20 Painting
Section 21 Aluminium Work
Section 22 Road Furniture
Section 23 Materials
Section 24 - Not used –
Section 25 Fencing
Section 26 Soil Stabilisation
Section 27 Landscaping Work

You might also like