COMPANY OVERVIEW

Founded on Dec 13 1994


Installed Capacity 37,786.73MW
Annual Generation 179.7 billion kWh
Total Assets 211.3 billion RMB
Revenue 60.749 billion RMB
20,000 Employees
Financial Times Top 500 Listed Company
Platts Top 250 Global Energy Company

DATANG INTERNATIONAL POWER GENERATION CO.,LTD.


STATUS
Trend of Clean Energy in Datang International
2010
2009 4,878MW
4,587MW
2008
3,666MW

2007
833MW
2005
20MW 2006
335MW

Clean energy installed capacity gradually


increased 4,858MW in five years.
DATANG INTERNATIONAL POWER GENERATION CO.,LTD.
STATUS
Installed Capacity Comparison Between 2005 and 2010

Thermal
99.85%
87.09%

12.92%
0.15%
2005 2010

Thermal capacity decreased by 12.76%.


Clean energy capacity increased by 12.76%.
Renewable energy helps reduce CO2.
DATANG INTERNATIONAL POWER GENERATION CO.,LTD.
STATUS
Percentages of Thermal Generator Set Types

600MW 200MW
And
18.38% 14.80% Sub-Critical 24.67% Below
32.69% 9.46%

600MW 200MW
Sub-Critical 26.20% and Below
51% 22.85%

The percentage of high-capacity, high-


efficiency, low-consumption sets increased.
DATANG INTERNATIONAL POWER GENERATION CO.,LTD.
STATUS
Percentage of Heat-Supplying 300MW and Below Thermal Sets
Non Heat-Supplying
43.76%

Heat-Supplying
56.24%

The percentage of heat-supplying sets among


300MW and below thermal sets increased.
DATANG INTERNATIONAL POWER GENERATION CO.,LTD.
STATUS
Trend of Net Coal Consumption Rate (g/kWh)
2005
350.62 2006
342.77
2007
336.35
2008
329.9 2009
326.51 2010
323.59

The net coal consumption rate was effectively


lowered by means of flow passage reconstruction
and installation of frequency changer on motors.
DATANG INTERNATIONAL POWER GENERATION CO.,LTD.
STATUS
List of CDM Registered Projects
No Project Type Capacity Reduction
1 福建六鳌 I Wind-New 30.6 51,757
2 内蒙古卓资 II Wind-New 40 35,163
3 福建六鳌 II Wind-Expanded 45 86,286
4 山西左云 I Wind-New 49.5 104,378
5 福建六鳌 III Wind-Expanded 26 47,720
6 辽宁法库十间房 Wind-New 49.5 116,091
7 河北骆驼沟 I Wind-New 48 113,208
8 山西左云 II Wind-Expanded 49.5 104,581
9 内蒙古红牧 I Wind-New 48 126,414
10 内蒙古卓资 II Wind-Expanded 48 133,254
11 内蒙古卓资 III Wind-Expanded 48 132,955
12 重庆四眼坪 Wind-New 46.75 103,853
Total: 12 Projects 528.85 1,155,660

By the end of 2010, 12 projects have finished EB


registration, which have a total capacity of 528.85MW,
and an annual carbon reduction of 1,155,660 tons.
DATANG INTERNATIONAL POWER GENERATION CO.,LTD.
PROSPECTS
Energy Structure Adjustment
Clean Energy
20.5%

Thermal
79.5%

To further increase the installed capacity of


clean energy, thus reducing emission.
DATANG INTERNATIONAL POWER GENERATION CO.,LTD.
PROSPECTS

+185% 323.59g/kWh
Net Coal
61000MW Consumption

315g/kWh
Total
installed
capacity

37786.73MW
2010 2015

To lower net coal consumption to 315g/kWh and below,


and CO2 emission intensity to 800g/kWh and below.
DATANG INTERNATIONAL POWER GENERATION CO.,LTD.
PROSPECTS

Graphs of CO2 emission


distribution and
Ⅰ emission intensity of
each power plant

R
es Analysis of
approaches and
ea Ⅱ technologies of
rc CO2 reduction
h

Research on
Ⅲ CO2 capture
technology

Research on
CO2 Utilization
and Geo-Storage
DATANG INTERNATIONAL POWER GENERATION CO.,LTD.
PROSPECTS

CCS on Gas-Fired Plants

Using “Gaojing Thermal Plant Expansion Project” as a base, to develop


researches on capture, storage, and unitization of CO2.

Step I Step II Step III Step IV

To obtain To construct To study curing To research the


perimeters CCS pilot archive and geo- techno-economic
through project storage of CO2 indicators of the
laboratorial pilot project
experiments

DATANG INTERNATIONAL POWER GENERATION CO.,LTD.

You might also like