Analysis of Rate For Construction of Retaining Wall For Earth Work Earth Pressure Around Road

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

ANALYSIS OF RATE FOR CONSTRUCTION OF RETAINING WALL(3-3) FOR EARTH WORK

EARTH PRESSURE AROUND ROAD & PARKING OF SAILA KHURD MANDI (R.K.V.Y.) M.C.
GARHSHANKAR,DISTT. HOSHIARPUR
UNIT 10 Rft
S.NO

NAME OF ITEM

1.

Earth work work in exca


-vation in foundation

2.

3.

C.Conc. 1:8:16 in fd.


With 40 mm stone
ballast
Ist Class brick work in
fd. & plinth with 1:6
C.M.
1st step
2nd step
3rd step
4th step
5th step

QUANTITY

10-0 x 3-1/2 x 5-6 =171.88


cft or 4.87 cum
10-0 x 3-1/2 x 0-9 =23.44
cft or 0.66 cum

C.S.R.

RATE

6.6

686 + 900%
per % cum

334.08

218+6=
224 + 495%
per cum

879.65

10.5b

AMOUNT

10-0 x 2-7-1/2 x 0-6=13.12


10-0 x 2-3
x 0-6=11.25
10-0 x 1-10-1/2 x 1-3=23.44
10-0 x 1-6
x 1-0=15.00
10-0 x 1-1-1/2 x 1-9=19.68
82.49
cft or 2.33 cum

4.

40 mm Th. D.P.C. c.coc.


1:2:4 topping

11.3

28 + 495%
per sqm

174.93

15.10

11 + 450%
per sqm

182.71

N.S.

302.35 per
cum

323.51

12.50 mm C.Plaster with


1:5 C.M.

10 x 3-3 = 32.50 sft or 3.02 sqm

6.

Extra carriage of sand &


bajri

C.C. 1:8:16 = 0.66 cum @ 1.00 =0.66 @.50 = 0.33


C.C. 1:2:4 =0.04 cum@ 0.90 =0.04 @.48 = 0.04
0.70
0.37
= 1.07 cum with 68-5=63 k.m lead from Bharatgarh

Extra for cement

5823.49

10-0 x 1-1/2 =11.25 sft or 1.05 10.26


sqm

5.

7.

362-4.95
=357.05 +
600%

C.C. 1:8:16 = 0.66 cum @ 1.80 bag =


C.C.1:2:4 = 0.04 cum @ 6.50 bag =
B.W 1:6
= 2.33 cum @1.20 bag =
C.P. 1:5
= 3.02 sqm @0.094 bag=

1.19
0.26
2.80
0.28
4.53 bag

4.53 bag @ 255/- = 1155.15


10% Cont.Profit =
115.51
Ad
d rate difference
4.53 bag @ 25.50 =

115.51
231.02

231.02

7949.39
per 10 rft
or 794/94
per rft