Event Logger Check Point
Event Logger Check Point
Event Logger Check Point
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/24/2011 05:06:28:804 PM
1052 POSITION
Closed
8/24/2011 05:06:28:804 PM
1052 R PHASE
Closed
8/24/2011 05:06:28:804 PM
1052 Y PHASE
Closed
8/24/2011 05:06:28:804 PM
1052 B PHASE
Closed
8/25/2011 08:46:49:626 AM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
HEALTHY
8/25/2011 10:41:59:175 AM
23-89B POS.
Closed
8/25/2011 10:42:55:559 AM
23-89A POS.
Open
8/25/2011 10:50:59:262 AM
24-89B POS.
Closed
8/25/2011 10:52:34:010 AM
24-89A POS.
Open
8/25/2011 11:02:33:586 AM
NTPC/Scs/Ethernet network/P343_G1
Device link
Disconnected
8/25/2011 11:02:33:586 AM
NTPC/Scs/Ethernet network/P345_G2
Device link
Disconnected
8/25/2011 11:02:33:586 AM
NTPC/Scs/Ethernet network/P437_426-DAMOH#1
DEVICE LINK
FAILURE
8/25/2011 11:02:33:586 AM
NTPC/Scs/Ethernet network/P437_427-DAMOH#2
DEVICE LINK
FAILURE
8/25/2011 11:02:33:586 AM
NTPC/Scs/Ethernet network/P437_423-RAIPUR1
DEVICE LINK
FAILURE
8/25/2011 11:02:33:586 AM
NTPC/Scs/Ethernet network/P437_424-RAIPUR2
DEVICE LINK
FAILURE
8/25/2011 11:02:33:586 AM
NTPC/Scs/Ethernet network/P632_426R_DAMOH1
Device link
Disconnected
8/25/2011 11:02:33:586 AM
NTPC/Scs/Ethernet network/P632_427R_DAMOH2
Device link
Disconnected
8/25/2011 11:02:33:586 AM
NTPC/Scs/Ethernet network/P632_87_GT
Device link
Disconnected
8/25/2011 11:02:33:586 AM
NTPC/Scs/Ethernet network/P632_410-TIETRF4
Device link
Disconnected
8/25/2011 11:02:33:586 AM
NTPC/Scs/Ethernet network/P632_87_UT1
Device link
Disconnected
8/25/2011 11:02:33:586 AM
NTPC/Scs/Ethernet network/P632_87_HV
Device link
Disconnected
8/25/2011 11:02:33:586 AM
NTPC/Scs/Ethernet network/P632_87_UT2
Device link
Disconnected
Page 1 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 11:02:33:586 AM
NTPC/Scs/Ethernet network/P634_OD
Device link
Disconnected
8/25/2011 11:03:00:211 AM
NTPC/Scs/Ethernet network/P437_423-RAIPUR1
DEVICE LINK
OK
8/25/2011 11:03:00:211 AM
NTPC/Scs/Ethernet network/P632_410-TIETRF4
Device link
Connected
8/25/2011 11:03:00:211 AM
NTPC/Scs/Ethernet network/P632_87_HV
Device link
Connected
8/25/2011 11:03:00:211 AM
NTPC/Scs/Ethernet network/P437_424-RAIPUR2
DEVICE LINK
OK
8/25/2011 11:03:00:211 AM
NTPC/Scs/Ethernet network/P632_87_UT1
Device link
Connected
8/25/2011 11:03:00:211 AM
NTPC/Scs/Ethernet network/P632_87_GT
Device link
Connected
8/25/2011 11:03:00:539 AM
NTPC/Scs/Ethernet network/P345_G2
Device link
Connected
8/25/2011 11:03:04:372 AM
PublicOdyssey Log-in
8/25/2011 11:04:25:664 AM
PublicOdyssey Log-off
8/25/2011 11:04:25:669 AM
AdmOdyssey Log-in
8/25/2011 11:08:52:703 AM
NTPC/Scs/Ethernet network/P343_G1
Device link
Disconnected
8/25/2011 11:08:52:703 AM
NTPC/Scs/Ethernet network/P345_G2
Device link
Disconnected
8/25/2011 11:08:52:703 AM
NTPC/Scs/Ethernet network/P437_426-DAMOH#1
DEVICE LINK
FAILURE
8/25/2011 11:08:52:703 AM
NTPC/Scs/Ethernet network/P437_427-DAMOH#2
DEVICE LINK
FAILURE
8/25/2011 11:08:52:703 AM
NTPC/Scs/Ethernet network/P437_423-RAIPUR1
DEVICE LINK
FAILURE
8/25/2011 11:08:52:703 AM
NTPC/Scs/Ethernet network/P437_424-RAIPUR2
DEVICE LINK
FAILURE
8/25/2011 11:08:52:703 AM
NTPC/Scs/Ethernet network/P632_426R_DAMOH1
Device link
Disconnected
8/25/2011 11:08:52:703 AM
NTPC/Scs/Ethernet network/P632_427R_DAMOH2
Device link
Disconnected
8/25/2011 11:08:52:703 AM
NTPC/Scs/Ethernet network/P632_87_GT
Device link
Disconnected
8/25/2011 11:08:52:703 AM
NTPC/Scs/Ethernet network/P632_410-TIETRF4
Device link
Disconnected
8/25/2011 11:08:52:703 AM
NTPC/Scs/Ethernet network/P632_87_UT1
Device link
Disconnected
Page 2 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 11:08:52:703 AM
NTPC/Scs/Ethernet network/P632_87_HV
Device link
Disconnected
8/25/2011 11:08:52:703 AM
NTPC/Scs/Ethernet network/P632_87_UT2
Device link
Disconnected
8/25/2011 11:08:52:703 AM
NTPC/Scs/Ethernet network/P634_OD
Device link
Disconnected
8/25/2011 11:09:05:781 AM
NTPC/Scs/Ethernet network/P632_87_GT
Device link
Connected
8/25/2011 11:09:05:781 AM
NTPC/Scs/Ethernet network/P632_87_HV
Device link
Connected
8/25/2011 11:09:05:781 AM
NTPC/Scs/Ethernet network/P437_423-RAIPUR1
DEVICE LINK
OK
8/25/2011 11:09:05:781 AM
NTPC/Scs/Ethernet network/P632_410-TIETRF4
Device link
Connected
8/25/2011 11:09:05:781 AM
NTPC/Scs/Ethernet network/P437_424-RAIPUR2
DEVICE LINK
OK
8/25/2011 11:09:05:781 AM
NTPC/Scs/Ethernet network/P632_87_UT1
Device link
Connected
8/25/2011 11:09:05:890 AM
NTPC/Scs/Ethernet network/P345_G2
Device link
Connected
8/25/2011 11:09:35:223 AM
PublicOdyssey Log-in
8/25/2011 11:10:02:658 AM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
TRIP CKT-2
FAULTY
8/25/2011 11:10:35:343 AM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
TRIP CKT-1
FAULTY
8/25/2011 11:10:36:027 AM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
A/R RELAY
FAULTY
8/25/2011 11:10:36:436 AM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 11:10:36:551 AM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
RESET
8/25/2011 11:10:36:552 AM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
SF6 LOCKOUT
RESET
8/25/2011 11:10:36:552 AM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
2652 CB AC SPLY
HEALTHY
8/25/2011 11:10:36:552 AM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
NOT-CHARGED
8/25/2011 11:21:42:218 AM
NTPC/Scs/Ethernet network/P343_G1
Device link
Disconnected
8/25/2011 11:21:42:218 AM
NTPC/Scs/Ethernet network/P345_G2
Device link
Disconnected
8/25/2011 11:21:42:218 AM
NTPC/Scs/Ethernet network/P437_426-DAMOH#1
DEVICE LINK
FAILURE
Page 3 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 11:21:42:218 AM
NTPC/Scs/Ethernet network/P437_427-DAMOH#2
DEVICE LINK
FAILURE
8/25/2011 11:21:42:218 AM
NTPC/Scs/Ethernet network/P437_423-RAIPUR1
DEVICE LINK
FAILURE
8/25/2011 11:21:42:218 AM
NTPC/Scs/Ethernet network/P437_424-RAIPUR2
DEVICE LINK
FAILURE
8/25/2011 11:21:42:218 AM
NTPC/Scs/Ethernet network/P632_426R_DAMOH1
Device link
Disconnected
8/25/2011 11:21:42:218 AM
NTPC/Scs/Ethernet network/P632_427R_DAMOH2
Device link
Disconnected
8/25/2011 11:21:42:218 AM
NTPC/Scs/Ethernet network/P632_87_GT
Device link
Disconnected
8/25/2011 11:21:42:218 AM
NTPC/Scs/Ethernet network/P632_410-TIETRF4
Device link
Disconnected
8/25/2011 11:21:42:218 AM
NTPC/Scs/Ethernet network/P632_87_UT1
Device link
Disconnected
8/25/2011 11:21:42:218 AM
NTPC/Scs/Ethernet network/P632_87_HV
Device link
Disconnected
8/25/2011 11:21:42:218 AM
NTPC/Scs/Ethernet network/P632_87_UT2
Device link
Disconnected
8/25/2011 11:21:42:218 AM
NTPC/Scs/Ethernet network/P634_OD
Device link
Disconnected
8/25/2011 11:22:00:812 AM
NTPC/Scs/Ethernet network/P437_424-RAIPUR2
DEVICE LINK
OK
8/25/2011 11:22:00:812 AM
NTPC/Scs/Ethernet network/P632_87_GT
Device link
Connected
8/25/2011 11:22:00:828 AM
NTPC/Scs/Ethernet network/P632_410-TIETRF4
Device link
Connected
8/25/2011 11:22:00:828 AM
NTPC/Scs/Ethernet network/P632_87_UT1
Device link
Connected
8/25/2011 11:22:00:828 AM
NTPC/Scs/Ethernet network/P437_423-RAIPUR1
DEVICE LINK
OK
8/25/2011 11:22:00:828 AM
NTPC/Scs/Ethernet network/P632_87_HV
Device link
Connected
8/25/2011 11:22:00:937 AM
NTPC/Scs/Ethernet network/P345_G2
Device link
Connected
8/25/2011 11:23:38:723 AM
PublicOdyssey Log-in
8/25/2011 11:24:43:187 AM
PublicOdyssey Log-off
8/25/2011 11:24:43:192 AM
AdmOdyssey Log-in
8/25/2011 11:26:51:692 AM
PublicOdyssey Log-in
Page 4 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 11:27:23:187 AM
PublicOdyssey Log-off
8/25/2011 11:27:23:192 AM
__VBA__ Log-in
8/25/2011 11:28:09:926 AM
PublicOdyssey Log-in
8/25/2011 11:30:17:187 AM
PublicOdyssey Log-off
8/25/2011 11:30:17:192 AM
AdmOdyssey Log-in
8/25/2011 11:30:47:505 AM
PublicOdyssey Log-in
8/25/2011 11:31:35:187 AM
PublicOdyssey Log-off
8/25/2011 11:31:35:192 AM
AdmOdyssey Log-in
8/25/2011 11:38:06:287 AM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SPRING CHARGE
CHARGED
8/25/2011 11:38:06:290 AM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SPRING CHARGE
NOT-CHARGED
8/25/2011 11:42:09:675 AM
1052 R PHASE
Closed
8/25/2011 11:42:09:675 AM
1052 POSITION
Closed
8/25/2011 11:42:10:783 AM
1052 R PHASE
Closed
8/25/2011 11:42:10:783 AM
1052 POSITION
Closed
8/25/2011 11:42:11:662 AM
1052 R PHASE
Closed
8/25/2011 11:42:12:314 AM
1052 R PHASE
Closed
8/25/2011 11:42:12:314 AM
1052 POSITION
Closed
8/25/2011 11:42:14:519 AM
1052 R PHASE
Closed
8/25/2011 11:42:17:473 AM
1052 R PHASE
Closed
8/25/2011 11:42:17:473 AM
1052 POSITION
Closed
8/25/2011 11:42:17:921 AM
1052 R PHASE
Closed
8/25/2011 11:42:17:921 AM
1052 POSITION
Closed
Page 5 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 11:42:18:926 AM
1052 R PHASE
Closed
8/25/2011 11:42:18:926 AM
1052 POSITION
Closed
8/25/2011 11:42:21:014 AM
1052 R PHASE
Closed
8/25/2011 11:42:21:014 AM
1052 POSITION
Closed
8/25/2011 11:42:40:185 AM
1052 R PHASE
Open
8/25/2011 11:42:40:185 AM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
OPERATED
8/25/2011 11:42:40:189 AM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
RESET
8/25/2011 11:42:55:522 AM
1052 R PHASE
Closed
8/25/2011 11:42:55:522 AM
1052 POSITION
Closed
8/25/2011 11:43:00:723 AM
1052 R PHASE
Closed
8/25/2011 11:43:00:723 AM
1052 POSITION
Closed
8/25/2011 11:46:59:097 AM
1052 R PHASE
Open
8/25/2011 11:46:59:098 AM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
OPERATED
8/25/2011 11:46:59:102 AM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
RESET
8/25/2011 11:47:22:786 AM
1052 R PHASE
Closed
8/25/2011 11:47:22:786 AM
1052 POSITION
Closed
8/25/2011 11:48:47:621 AM
1052 Y PHASE
Open
8/25/2011 11:48:51:095 AM
1052 Y PHASE
Open
8/25/2011 11:49:01:841 AM
1052 Y PHASE
Closed
8/25/2011 11:49:01:841 AM
1052 POSITION
Closed
8/25/2011 11:51:35:911 AM
1052 B PHASE
Open
8/25/2011 11:51:47:602 AM
1052 B PHASE
Closed
Page 6 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 11:51:47:602 AM
1052 POSITION
Closed
8/25/2011 11:52:05:158 AM
1052 Y PHASE
Open
8/25/2011 11:52:12:646 AM
1052 Y PHASE
Closed
8/25/2011 11:52:12:646 AM
1052 POSITION
Closed
8/25/2011 11:52:27:247 AM
1052 R PHASE
Open
8/25/2011 11:52:27:247 AM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
OPERATED
8/25/2011 11:52:27:251 AM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
RESET
8/25/2011 11:52:37:689 AM
1052 R PHASE
Closed
8/25/2011 11:52:37:689 AM
1052 POSITION
Closed
8/25/2011 11:58:31:519 AM
NTPC/KORBA/400KV/TIE TRAFO-4/ES_STATUS
ES 10-89TE2 POS.
CLOSE
8/25/2011 11:58:36:223 AM
NTPC/KORBA/400KV/TIE TRAFO-4/ES_STATUS
ES 10-89TE2 POS.
OPEN
8/25/2011 11:59:01:240 AM
NTPC/KORBA/400KV/TIE TRAFO-4/ES_STATUS
ES 10-89AE POS.
CLOSE
8/25/2011 11:59:04:230 AM
NTPC/KORBA/400KV/TIE TRAFO-4/ES_STATUS
ES 10-89AE POS.
OPEN
8/25/2011 11:59:42:678 AM
10-89A POS
CLOSE
8/25/2011 11:59:46:222 AM
10-89A POS
OPEN
8/25/2011 12:01:51:248 PM
10-89B POS
CLOSE
8/25/2011 12:01:53:461 PM
10-89B POS
OPEN
8/25/2011 12:02:06:948 PM
10-89C POS
CLOSE
8/25/2011 12:02:12:768 PM
10-89C POS
OPEN
8/25/2011 12:02:42:529 PM
10-89T POS
CLOSE
8/25/2011 12:02:46:025 PM
10-89T POS
OPEN
8/25/2011 12:03:42:185 PM
NTPC/KORBA/400KV/TIE TRAFO-4/ES_STATUS
ES 10-89TE2 POS.
CLOSE
Page 7 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 12:03:47:910 PM
NTPC/KORBA/400KV/TIE TRAFO-4/ES_STATUS
ES 10-89TE2 POS.
OPEN
8/25/2011 12:04:56:864 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SPRING CHARGE
CHARGED
8/25/2011 12:05:00:386 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SPRING CHARGE
NOT-CHARGED
8/25/2011 12:07:20:454 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
HEALTHY
8/25/2011 12:07:27:272 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
FAIL
8/25/2011 12:08:23:422 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SET
8/25/2011 12:08:23:422 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
OPERATED
8/25/2011 12:08:23:426 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
RESET
8/25/2011 12:08:25:456 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
RESET
8/25/2011 12:08:48:372 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SET
8/25/2011 12:08:48:419 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
RESET
8/25/2011 12:08:48:582 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SET
8/25/2011 12:08:48:950 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
RESET
8/25/2011 12:08:48:980 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SET
8/25/2011 12:08:52:052 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
RESET
8/25/2011 12:09:37:096 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SET
8/25/2011 12:09:37:096 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
OPERATED
8/25/2011 12:09:37:101 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
RESET
8/25/2011 12:09:38:315 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
RESET
8/25/2011 12:09:57:189 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SET
8/25/2011 12:09:57:189 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
OPERATED
8/25/2011 12:09:57:192 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
RESET
Page 8 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 12:09:58:384 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
RESET
8/25/2011 12:10:12:405 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
OPERATED
8/25/2011 12:10:13:659 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
RESET
8/25/2011 12:10:13:791 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
OPERATED
8/25/2011 12:10:13:928 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
RESET
8/25/2011 12:10:32:106 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
OPERATED
8/25/2011 12:10:32:717 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
RESET
8/25/2011 12:10:32:779 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
OPERATED
8/25/2011 12:10:33:286 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SF6 LOCKOUT
RESET
8/25/2011 12:15:54:571 PM
NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS
ES 27-89LE2 POS.
CLOSE
8/25/2011 12:18:48:130 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
BUCHOLZ TRP
TRIPPED
8/25/2011 12:18:49:616 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
BUCHOLZ TRP
HEALTHY
8/25/2011 12:18:50:018 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
BUCHOLZ TRP
TRIPPED
8/25/2011 12:18:50:640 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
BUCHOLZ TRP
HEALTHY
8/25/2011 12:19:10:293 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
TRIPPED
8/25/2011 12:19:17:378 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
HEALTHY
8/25/2011 12:19:48:919 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
TRIPPED
8/25/2011 12:19:54:230 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
HEALTHY
8/25/2011 12:20:02:342 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
PRD TRIP
TRIPPED
8/25/2011 12:20:09:452 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
PRD TRIP
HEALTHY
8/25/2011 12:20:18:203 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
TRIPPED
8/25/2011 12:20:19:762 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
HEALTHY
Page 9 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 12:20:27:632 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
BUCHOLZ ALARM
SET
8/25/2011 12:20:28:018 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
BUCHOLZ ALARM
RESET
8/25/2011 12:20:38:710 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
OPERATED
8/25/2011 12:20:38:770 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
RESET
8/25/2011 12:20:38:896 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
OPERATED
8/25/2011 12:20:39:354 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
RESET
8/25/2011 12:20:51:622 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
OPERATED
8/25/2011 12:20:52:100 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
RESET
8/25/2011 12:20:59:868 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
OPERATED
8/25/2011 12:21:00:264 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
RESET
8/25/2011 12:21:08:406 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SET
8/25/2011 12:21:08:899 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
RESET
8/25/2011 12:21:28:052 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
SET
8/25/2011 12:21:28:586 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
RESET
8/25/2011 12:21:40:958 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
LBB-1
OPERATED
8/25/2011 12:21:41:775 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
LBB-1
RESET
8/25/2011 12:21:55:071 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
LBB-2
OPERATED
8/25/2011 12:21:55:675 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
LBB-2
RESET
8/25/2011 12:22:03:098 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
TRIP CKT-1
FAULTY
8/25/2011 12:22:03:886 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
TRIP CKT-1
HEALTHY
8/25/2011 12:22:13:362 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
TRIP CKT-2
FAULTY
8/25/2011 12:22:14:205 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
TRIP CKT-2
HEALTHY
Page 10 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 12:23:05:184 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
86-A
OPERATED
8/25/2011 12:23:05:870 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
86-A
RESET
8/25/2011 12:23:12:714 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
86-B
OPERATED
8/25/2011 12:23:13:222 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
86-B
RESET
8/25/2011 12:23:23:058 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
INTERTRIP FRM LV
OPERATED
8/25/2011 12:23:23:322 PM
NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION
INTERTRIP FRM LV
RESET
8/25/2011 12:29:10:062 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
TRIP CKT-1
HEALTHY
8/25/2011 12:29:10:357 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
A/R RELAY
HEALTHY
8/25/2011 12:29:11:913 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
SPRING CHARGE
CHARGED
8/25/2011 12:29:11:914 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
SF6 LOCKOUT
OPERATED
8/25/2011 12:29:17:248 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 12:29:26:185 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
TRIP CKT-2
HEALTHY
8/25/2011 12:29:26:188 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
SF6 LOCKOUT
RESET
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION
RESET
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION
RESET
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION
RESET
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION
RESET
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION
RESET
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION
RESET
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION
RESET
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION
RESET
Page 11 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
2752
OPEN
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
1652
OPEN
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
RESET
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
RESET
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
RESET
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
UNHEALTHY
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
UNHEALTHY
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
HEALTHY
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
RESET
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
RESET
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
RESET
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
UNHEALTHY
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
8/25/2011 12:29:27:919 PM
NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM
8/25/2011 12:29:58:015 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-2 RELAY
HEALTHY
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
DIST_ZONE1_START
RESET
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
DIST_ZONE1_TRIP
RESET
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
DIST_ZONE2_START
RESET
Page 12 of 43
State
RESET
Events Report
Print Date/Time:
25-August-2011
18:01
S Date
Origin
Name
State
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
DIST_ZONE2_TRIP
RESET
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
DIST_ZONE3_START
RESET
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
DIST_ZONE3_TRIP
RESET
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
IN>_Trip
RESET
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
Normal
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
Normal
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
I>_Trip
Normal
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
I>>_Trip
Normal
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
I>>>_Trip
Normal
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
GEN START
RESET
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
GEN TRIP
RESET
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
RESET
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
RESET
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
PSIG Receive
Normal
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
PSIG Trip
Normal
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
DISABLED
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
SWITCH ON TO FAULT
RESET
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
V>_Start
Normal
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
V>_Trip
Normal
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
V>>_Start
Normal
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection
V>>_Trip
Normal
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM
HEALTHY
Page 13 of 43
Events Report
Print Date/Time:
25-August-2011
18:01
S Date
Origin
Name
State
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM
VT FUSE FAIL
RESET
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM
86B SUPERV
BLOCKED
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM
86BX_SUPERV
BLOCKED
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM
86B OPTD
DISABLED
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM
86BX OPTD
RESET
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM
RESET
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM
RESET
8/25/2011 12:30:05:890 PM
NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM
RESET
8/25/2011 12:30:10:215 PM
NTPC/KORBA/400KV/P141_5051-DMH2RE/PROTECTION
IN2>_OP_GEN_DERIVED
RESET
8/25/2011 12:30:10:215 PM
NTPC/KORBA/400KV/P141_5051-DMH2RE/PROTECTION
PTRC_TRIP
RESET
8/25/2011 12:30:10:215 PM
NTPC/KORBA/400KV/P141_5051-DMH2RE/PROTECTION
IN1>_OP_GEN_MEASURED
RESET
8/25/2011 12:30:12:051 PM
NTPC/KORBA/400KV/P141_64R-DMH2REA/PROTECTION
PTRC_TRIP
RESET
8/25/2011 12:30:12:051 PM
NTPC/KORBA/400KV/P141_64R-DMH2REA/PROTECTION
IREF>_OP_GEN
RESET
8/25/2011 12:30:13:000 PM
NTPC/Scs/Ethernet network/P437_427-DAMOH#2
DEVICE LINK
OK
8/25/2011 12:45:34:442 PM
2552 R PHASE
Closed
8/25/2011 12:45:34:442 PM
2552 POSITION
Closed
8/25/2011 12:46:37:389 PM
2552 R PHASE
Closed
8/25/2011 12:46:37:389 PM
2552 POSITION
Closed
8/25/2011 12:48:02:458 PM
PublicOdyssey Log-in
8/25/2011 12:48:17:187 PM
PublicOdyssey Log-off
8/25/2011 12:48:17:192 PM
AdmOdyssey Log-in
Page 14 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 12:49:07:050 PM
2552 R PHASE
Closed
8/25/2011 12:49:07:050 PM
2552 POSITION
Closed
8/25/2011 12:49:57:680 PM
2552 R PHASE
Open
8/25/2011 12:51:13:606 PM
2552 R PHASE
Closed
8/25/2011 12:51:13:606 PM
2552 POSITION
Closed
8/25/2011 12:51:35:560 PM
2552 R PHASE
Open
8/25/2011 12:51:41:953 PM
2552 R PHASE
Open
8/25/2011 12:51:58:937 PM
2552 R PHASE
Closed
8/25/2011 12:51:58:937 PM
2552 POSITION
Closed
8/25/2011 12:52:53:726 PM
2552 Y PHASE
Open
8/25/2011 12:52:57:840 PM
2552 Y PHASE
Closed
8/25/2011 12:52:57:840 PM
2552 POSITION
Closed
8/25/2011 12:53:24:866 PM
2552 B PHASE
Open
8/25/2011 12:53:28:150 PM
2552 B PHASE
Closed
8/25/2011 12:53:28:150 PM
2552 POSITION
Closed
8/25/2011 12:53:47:284 PM
25-89A POS.
Closed
8/25/2011 12:55:01:940 PM
25-89A POS.
Open
8/25/2011 12:55:51:251 PM
25-89A POS.
Closed
8/25/2011 12:55:57:050 PM
25-89A POS.
Open
8/25/2011 12:56:32:271 PM
25-89B POS.
Open
8/25/2011 12:56:41:411 PM
25-89B POS.
Closed
8/25/2011 12:57:06:871 PM
25-89C POS.
Closed
Page 15 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 12:57:26:104 PM
25-89C POS.
Open
8/25/2011 12:57:45:463 PM
25-89G POS.
Open
8/25/2011 12:57:50:836 PM
25-89G POS.
Closed
8/25/2011 12:58:52:115 PM
NTPC/KORBA/400KV/GEN TRAFO-7/ES_STATUS
ES 25-89BE POS.
CLOSE
8/25/2011 12:58:53:329 PM
NTPC/KORBA/400KV/GEN TRAFO-7/ES_STATUS
ES 25-89BE POS.
OPEN
8/25/2011 12:59:33:637 PM
NTPC/KORBA/400KV/GEN TRAFO-7/ES_STATUS
ES 25-89GE1 POS.
CLOSE
8/25/2011 12:59:38:397 PM
NTPC/KORBA/400KV/GEN TRAFO-7/ES_STATUS
ES 25-89GE1 POS.
OPEN
8/25/2011 12:59:50:911 PM
NTPC/KORBA/400KV/GEN TRAFO-7/ES_STATUS
ES 25-89GE2 POS.
CLOSE
8/25/2011 12:59:53:022 PM
NTPC/KORBA/400KV/GEN TRAFO-7/ES_STATUS
ES 25-89GE2 POS.
OPEN
8/25/2011 01:00:16:790 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
NOT-CHARGED
8/25/2011 01:00:21:083 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
CHARGED
8/25/2011 01:00:32:408 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
FAULTY
8/25/2011 01:00:33:244 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
HEALTHY
8/25/2011 01:01:00:492 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
SET
8/25/2011 01:01:03:833 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
RESET
8/25/2011 01:01:14:638 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
2552 AC SPLY
FAIL
8/25/2011 01:01:15:645 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
2552 AC SPLY
HEALTHY
8/25/2011 01:01:29:028 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
SET
8/25/2011 01:01:30:736 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
RESET
8/25/2011 01:01:41:450 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
OPERATED
8/25/2011 01:01:42:594 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
RESET
8/25/2011 01:02:19:281 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
GT-7 LBB-1
OPERATED
Page 16 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 01:02:20:342 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
GT-7 LBB-1
RESET
8/25/2011 01:02:20:382 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
GT-7 LBB-1
OPERATED
8/25/2011 01:02:20:384 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
GT-7 LBB-1
RESET
8/25/2011 01:02:20:400 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
GT-7 LBB-1
OPERATED
8/25/2011 01:02:21:724 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
GT-7 LBB-1
RESET
8/25/2011 01:02:27:659 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
GT-7 LBB-2
OPERATED
8/25/2011 01:02:28:174 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
GT-7 LBB-2
RESET
8/25/2011 01:02:39:676 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
FAULTY
8/25/2011 01:02:40:185 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
HEALTHY
8/25/2011 01:02:46:336 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
FAULTY
8/25/2011 01:02:47:131 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
HEALTHY
8/25/2011 01:03:00:472 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
FAIL
8/25/2011 01:03:01:172 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
HEALTHY
8/25/2011 01:03:09:229 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
FAIL
8/25/2011 01:03:10:231 PM
NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION
HEALTHY
8/25/2011 01:03:32:138 PM
2396 BB PROT
OPERATED
8/25/2011 01:03:33:220 PM
2396 BB PROT
RESET
8/25/2011 01:03:48:852 PM
2496 BB PROT
OPERATED
8/25/2011 01:03:50:121 PM
2496 BB PROT
RESET
8/25/2011 01:03:50:322 PM
2496 BB PROT
OPERATED
8/25/2011 01:03:51:436 PM
2496 BB PROT
RESET
8/25/2011 01:03:58:887 PM
2596 BB PROT
OPERATED
Page 17 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 01:04:00:554 PM
2596 BB PROT
RESET
8/25/2011 01:04:05:866 PM
2696 BB PROT
OPERATED
8/25/2011 01:04:07:332 PM
2696 BB PROT
RESET
8/25/2011 01:04:13:205 PM
2796 BB PROT
OPERATED
8/25/2011 01:04:13:253 PM
2796 BB PROT
RESET
8/25/2011 01:04:13:259 PM
2796 BB PROT
OPERATED
8/25/2011 01:04:13:290 PM
2796 BB PROT
RESET
8/25/2011 01:04:13:328 PM
2796 BB PROT
OPERATED
8/25/2011 01:04:13:479 PM
2796 BB PROT
RESET
8/25/2011 01:04:13:488 PM
2796 BB PROT
OPERATED
8/25/2011 01:04:13:490 PM
2796 BB PROT
RESET
8/25/2011 01:04:13:494 PM
2796 BB PROT
OPERATED
8/25/2011 01:04:13:662 PM
2796 BB PROT
RESET
8/25/2011 01:04:13:721 PM
2796 BB PROT
OPERATED
8/25/2011 01:04:13:811 PM
2796 BB PROT
RESET
8/25/2011 01:04:13:951 PM
2796 BB PROT
OPERATED
8/25/2011 01:04:14:141 PM
2796 BB PROT
RESET
8/25/2011 01:04:14:143 PM
2796 BB PROT
OPERATED
8/25/2011 01:04:14:145 PM
2796 BB PROT
RESET
8/25/2011 01:04:14:157 PM
2796 BB PROT
OPERATED
8/25/2011 01:04:14:169 PM
2796 BB PROT
RESET
8/25/2011 01:04:14:175 PM
2796 BB PROT
OPERATED
Page 18 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 01:04:14:187 PM
2796 BB PROT
RESET
8/25/2011 04:22:41:301 PM
23-89L POS.
Closed
8/25/2011 04:23:05:878 PM
23-89L POS.
Closed
8/25/2011 04:27:35:163 PM
2352 R PHASE
Open
8/25/2011 04:27:38:483 PM
2352 R PHASE
Closed
8/25/2011 04:27:38:488 PM
2352 POSITION
Closed
8/25/2011 04:27:39:097 PM
2352 R PHASE
Closed
8/25/2011 04:27:39:097 PM
2352 POSITION
Closed
8/25/2011 04:28:10:970 PM
2352 Y PHASE
Open
8/25/2011 04:28:15:330 PM
2352 Y PHASE
Closed
8/25/2011 04:28:15:330 PM
2352 POSITION
Closed
8/25/2011 04:28:33:000 PM
2352 B PHASE
Open
8/25/2011 04:28:36:527 PM
2352 B PHASE
Closed
8/25/2011 04:28:36:527 PM
2352 POSITION
Closed
8/25/2011 04:29:06:419 PM
23-89A POS.
Closed
8/25/2011 04:29:16:972 PM
23-89A POS.
Open
8/25/2011 04:29:37:024 PM
23-89B POS.
Open
8/25/2011 04:29:42:081 PM
23-89B POS.
Closed
8/25/2011 04:30:27:215 PM
23-89C POS.
Closed
8/25/2011 04:30:35:873 PM
23-89C POS.
Open
8/25/2011 04:31:20:340 PM
23-89L POS.
Open
8/25/2011 04:31:25:775 PM
23-89L POS.
Closed
Page 19 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 04:32:03:367 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/ES_STATUS
ES 23-89BE POS.
CLOSE
8/25/2011 04:32:04:804 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/ES_STATUS
ES 23-89BE POS.
OPEN
8/25/2011 04:32:24:966 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/ES_STATUS
ES 23-89LE1 POS.
CLOSE
8/25/2011 04:32:26:240 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/ES_STATUS
ES 23-89LE1 POS.
OPEN
8/25/2011 04:32:46:116 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/ES_STATUS
ES 23-89LE2 POS
CLOSE
8/25/2011 04:32:49:142 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/ES_STATUS
ES 23-89LE2 POS
OPEN
8/25/2011 04:33:03:928 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
2352 SPRING
NOT-CHARGED
8/25/2011 04:33:07:940 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
2352 SPRING
CHARGED
8/25/2011 04:33:19:639 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:33:21:110 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:33:30:969 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
2352 AC SUPPLY
FAIL
8/25/2011 04:33:31:413 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
2352 AC SUPPLY
HEALTHY
8/25/2011 04:35:23:705 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
SET
8/25/2011 04:35:24:199 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:35:31:403 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
OPERATED
8/25/2011 04:35:31:983 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:35:49:185 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:35:56:435 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
OPERATED
8/25/2011 04:36:22:901 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
SET
8/25/2011 04:36:24:081 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:36:45:533 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:36:46:133 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
Page 20 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
8/25/2011 04:36:52:574 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:36:52:782 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:36:52:815 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:36:53:069 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:37:04:561 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:37:05:176 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:37:25:288 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
FAULTY
8/25/2011 04:37:30:736 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
HEALTHY
8/25/2011 04:37:30:739 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
FAULTY
8/25/2011 04:37:30:745 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
HEALTHY
8/25/2011 04:37:45:850 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:37:46:936 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:37:58:588 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
FAULTY
8/25/2011 04:38:12:091 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
HEALTHY
8/25/2011 04:38:39:662 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
OPERATED
8/25/2011 04:38:39:665 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:38:39:668 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
OPERATED
8/25/2011 04:38:39:680 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:38:41:904 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:38:52:017 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
OPERATED
8/25/2011 04:38:52:367 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:39:05:865 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
OPERATED
Page 21 of 43
State
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 04:39:06:769 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:39:18:802 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
OPERATED
8/25/2011 04:39:19:286 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:39:42:145 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
FAULTY
8/25/2011 04:39:42:886 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
HEALTHY
8/25/2011 04:40:01:003 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
FAULTY
8/25/2011 04:40:02:044 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
HEALTHY
8/25/2011 04:40:09:129 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
OPERATED
8/25/2011 04:40:09:647 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:40:09:665 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
OPERATED
8/25/2011 04:40:09:911 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:40:14:933 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
OPERATED
8/25/2011 04:40:15:541 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:40:34:958 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
FAULTY
8/25/2011 04:40:37:719 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
HEALTHY
8/25/2011 04:40:37:758 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
FAULTY
8/25/2011 04:40:38:047 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
HEALTHY
8/25/2011 04:40:51:973 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RAIPUR-3 A/R
OUT OF SERVICE
8/25/2011 04:40:52:103 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RAIPUR-3 A/R
INSERVICE
8/25/2011 04:40:52:107 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RAIPUR-3 A/R
OUT OF SERVICE
8/25/2011 04:40:52:111 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RAIPUR-3 A/R
INSERVICE
8/25/2011 04:40:54:908 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RAIPUR-3 A/R
INSERVICE
Page 22 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 04:40:54:987 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RAIPUR-3 A/R
OUT OF SERVICE
8/25/2011 04:40:57:025 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RAIPUR-3 A/R
INSERVICE
8/25/2011 04:41:51:955 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:41:53:088 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:41:59:420 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:41:59:787 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:41:59:817 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:42:00:057 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:42:05:084 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:42:05:372 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:42:05:377 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:42:06:005 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:42:09:592 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:42:10:063 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:42:16:791 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:42:17:397 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:42:23:640 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:42:24:116 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
8/25/2011 04:43:25:566 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
SET
8/25/2011 04:43:26:085 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:43:27:392 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
SET
8/25/2011 04:43:28:013 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
Page 23 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 04:43:29:023 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
SET
8/25/2011 04:43:29:747 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:43:37:767 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
SET
8/25/2011 04:43:38:700 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:43:46:484 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
SET
8/25/2011 04:43:47:264 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
RESET
8/25/2011 04:44:22:175 PM
2452 R PHASE
Open
8/25/2011 04:44:26:850 PM
2452 R PHASE
Closed
8/25/2011 04:44:26:850 PM
2452 POSITION
Closed
8/25/2011 04:44:44:080 PM
2452 Y PHASE
Open
8/25/2011 04:45:08:655 PM
2452 Y PHASE
Closed
8/25/2011 04:45:08:655 PM
2452 POSITION
Closed
8/25/2011 04:45:25:543 PM
2452 B PHASE
Open
8/25/2011 04:45:28:215 PM
2452 B PHASE
Closed
8/25/2011 04:45:28:215 PM
2452 POSITION
Closed
8/25/2011 04:46:12:789 PM
24-89A POS.
Open
8/25/2011 04:46:31:228 PM
24-89A POS.
Closed
8/25/2011 04:46:38:359 PM
24-89A POS.
Open
8/25/2011 04:46:48:774 PM
24-89B POS.
Open
8/25/2011 04:46:58:953 PM
24-89B POS.
Closed
8/25/2011 04:47:24:328 PM
24-89C POS.
Closed
8/25/2011 04:47:29:461 PM
24-89C POS.
Open
Page 24 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 04:48:00:907 PM
24-89L POS.
Open
8/25/2011 04:48:07:983 PM
24-89L POS.
Closed
8/25/2011 04:48:31:047 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/ES_STATUS
ES 24-89BE POS.
CLOSE
8/25/2011 04:48:32:603 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/ES_STATUS
ES 24-89BE POS.
OPEN
8/25/2011 04:48:41:311 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/ES_STATUS
ES 24-89AE POS.
CLOSE
8/25/2011 04:48:42:361 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/ES_STATUS
ES 24-89AE POS.
OPEN
8/25/2011 04:49:08:667 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/ES_STATUS
ES 24-89LE2 POS
CLOSE
8/25/2011 04:49:10:164 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/ES_STATUS
ES 24-89LE2 POS
OPEN
8/25/2011 04:49:23:586 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
SPRING CHARGE
NOT-CHARGED
8/25/2011 04:49:26:414 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
SPRING CHARGE
CHARGED
8/25/2011 04:49:38:490 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
SET
8/25/2011 04:49:40:069 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
RESET
8/25/2011 04:49:44:666 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
CB AC SPLY
FAIL
8/25/2011 04:49:45:751 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
CB AC SPLY
HEALTHY
8/25/2011 04:49:45:776 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
CB AC SPLY
FAIL
8/25/2011 04:49:45:794 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
CB AC SPLY
HEALTHY
8/25/2011 04:49:50:247 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
AR SWITCH
SET
8/25/2011 04:49:51:412 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
AR SWITCH
RESET
8/25/2011 04:50:05:768 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
SET
8/25/2011 04:50:07:366 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
RESET
8/25/2011 04:50:13:800 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
SF6 LOCKOUT
OPERATED
8/25/2011 04:50:15:011 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
SF6 LOCKOUT
RESET
Page 25 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 04:50:32:523 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
CB CLOSE COMMAND
RESET
8/25/2011 04:50:36:204 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
CB CLOSE COMMAND
OPERATED
8/25/2011 04:50:46:978 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
TRANSFER
SET
8/25/2011 04:50:48:750 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
TRANSFER
RESET
8/25/2011 04:51:01:994 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 DC SUPPLY
FAIL
8/25/2011 04:51:02:039 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 DC SUPPLY
HEALTHY
8/25/2011 04:51:02:094 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 DC SUPPLY
FAIL
8/25/2011 04:51:02:180 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 DC SUPPLY
HEALTHY
8/25/2011 04:51:04:925 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 DC SUPPLY
HEALTHY
8/25/2011 04:51:07:910 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-2 DC SUPPLY
FAIL
8/25/2011 04:51:07:913 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-2 DC SUPPLY
HEALTHY
8/25/2011 04:51:12:616 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 VT FUSE
FAIL
8/25/2011 04:51:12:632 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 VT FUSE
HEALTHY
8/25/2011 04:51:12:646 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 VT FUSE
FAIL
8/25/2011 04:51:12:721 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 VT FUSE
HEALTHY
8/25/2011 04:51:41:509 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 04:51:43:439 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 04:57:45:803 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 04:57:54:293 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 04:58:12:143 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 04:58:19:737 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 04:59:00:920 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
FAULTY
Page 26 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 04:59:07:099 PM
NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION
HEALTHY
8/25/2011 05:00:08:185 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-2 VT FUSE
FAIL
8/25/2011 05:00:09:156 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-2 VT FUSE
HEALTHY
8/25/2011 05:00:34:778 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-2 RELAY
FAULTY
8/25/2011 05:00:40:366 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-2 RELAY
HEALTHY
8/25/2011 05:04:43:412 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:04:51:545 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:05:03:397 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:05:07:902 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:07:23:416 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:07:25:320 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:07:26:766 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:07:26:768 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:07:27:669 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:07:41:907 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:07:42:005 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:07:42:275 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:07:42:281 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:07:42:290 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:07:43:954 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:07:44:128 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:07:45:963 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
Page 27 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 05:07:45:966 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:07:48:147 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:07:48:149 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:07:54:195 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:07:54:199 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:07:56:430 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:07:56:432 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:07:56:482 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:07:56:492 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:07:57:954 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:08:12:694 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:08:12:912 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:08:12:914 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:08:12:916 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:08:13:554 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:08:13:661 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:08:13:741 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:08:13:778 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:08:14:955 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:11:759 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:10:11:783 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:12:113 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
Page 28 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 05:10:12:147 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:13:595 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:10:13:606 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:13:608 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:10:13:787 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:17:958 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:20:766 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:10:20:799 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:21:435 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:10:21:442 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:22:377 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:10:22:384 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:28:018 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:10:28:324 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:28:340 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:10:28:431 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:29:187 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:10:29:225 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:30:634 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:10:30:642 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:32:177 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:10:32:232 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
Page 29 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 05:10:34:390 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:10:34:434 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:34:447 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:10:34:458 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:35:959 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:10:37:032 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:10:37:584 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:10:37:599 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:11:38:677 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:11:38:680 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:11:38:683 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:11:39:011 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:11:41:061 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:11:41:471 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:11:42:210 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:11:42:890 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:11:42:902 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:11:42:998 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:11:43:001 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:11:43:009 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:11:44:130 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:11:44:175 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
Page 30 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 05:11:44:264 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:11:44:529 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:11:45:961 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:15:44:920 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
LBB-1
OPERATED
8/25/2011 05:15:46:087 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
LBB-1
RESET
8/25/2011 05:16:06:251 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
LBB-2
OPERATED
8/25/2011 05:16:07:005 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
LBB-2
RESET
8/25/2011 05:16:14:473 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
TRIP CKT-1
FAULTY
8/25/2011 05:16:14:989 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
TRIP CKT-1
HEALTHY
8/25/2011 05:16:20:917 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
TRIP CKT-2
FAULTY
8/25/2011 05:16:22:058 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
TRIP CKT-2
HEALTHY
8/25/2011 05:16:28:293 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
A/R LOCKOUT
OPERATED
8/25/2011 05:16:28:442 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
A/R LOCKOUT
RESET
8/25/2011 05:16:28:444 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
A/R LOCKOUT
OPERATED
8/25/2011 05:16:29:056 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
A/R LOCKOUT
RESET
8/25/2011 05:16:44:559 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
A/R
OPERATED
8/25/2011 05:16:46:058 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
A/R
RESET
8/25/2011 05:17:05:247 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
A/R RELAY
FAULTY
8/25/2011 05:17:08:672 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
A/R RELAY
HEALTHY
8/25/2011 05:17:21:967 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
A/R STATUS
OUT OF SERVICE
8/25/2011 05:17:28:463 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
A/R STATUS
INSERVICE
8/25/2011 05:18:06:729 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 R PH OPTD
SET
Page 31 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 05:18:08:376 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 R PH OPTD
RESET
8/25/2011 05:18:11:089 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 Y PH OPTD
SET
8/25/2011 05:18:11:151 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 Y PH OPTD
RESET
8/25/2011 05:18:11:155 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 Y PH OPTD
SET
8/25/2011 05:18:12:563 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 Y PH OPTD
RESET
8/25/2011 05:18:15:787 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 B PH OPTD
SET
8/25/2011 05:18:17:768 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-1 B PH OPTD
RESET
8/25/2011 05:18:18:617 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-2 R PH OPTD
SET
8/25/2011 05:18:20:160 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-2 R PH OPTD
RESET
8/25/2011 05:18:23:591 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-2 Y PH OPTD
SET
8/25/2011 05:18:24:845 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-2 Y PH OPTD
RESET
8/25/2011 05:18:29:031 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-2 B PH OPTD
SET
8/25/2011 05:18:30:065 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-2 B PH OPTD
RESET
8/25/2011 05:18:34:471 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-2 B PH OPTD
SET
8/25/2011 05:18:36:484 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
MAIN-2 B PH OPTD
RESET
8/25/2011 05:19:06:743 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
SET
8/25/2011 05:19:09:177 PM
NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION
RESET
8/25/2011 05:20:38:007 PM
2652 R PHASE
Closed
8/25/2011 05:20:45:396 PM
2652 R PHASE
Open
8/25/2011 05:20:45:396 PM
2652 POSITION
Open
8/25/2011 05:20:57:051 PM
2652 Y PHASE
Closed
8/25/2011 05:21:00:500 PM
2652 Y PHASE
Open
Page 32 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 05:21:00:500 PM
2652 POSITION
Open
8/25/2011 05:21:11:053 PM
2652 B PHASE
Closed
8/25/2011 05:21:15:408 PM
2652 B PHASE
Closed
8/25/2011 05:21:18:604 PM
2652 B PHASE
Open
8/25/2011 05:21:18:604 PM
2652 POSITION
Open
8/25/2011 05:22:18:498 PM
26-89A POS.
Open
8/25/2011 05:22:32:452 PM
26-89A POS.
Open
8/25/2011 05:22:59:599 PM
2652 B PHASE
Open
8/25/2011 05:22:59:599 PM
2652 POSITION
Open
8/25/2011 05:23:16:912 PM
26-89A POS.
Open
8/25/2011 05:23:26:128 PM
26-89A POS.
Open
8/25/2011 05:23:57:051 PM
26-89A POS.
Open
8/25/2011 05:25:03:953 PM
26-89B POS.
Open
8/25/2011 05:26:44:571 PM
26-89B POS.
Closed
8/25/2011 05:26:56:591 PM
26-89B POS.
Open
8/25/2011 05:27:18:242 PM
26-89C POS.
Closed
8/25/2011 05:27:24:961 PM
26-89C POS.
Open
8/25/2011 05:27:44:881 PM
26-89L POS.
Closed
8/25/2011 05:27:53:029 PM
26-89L POS.
Open
8/25/2011 05:28:41:865 PM
26-89A POS.
Closed
8/25/2011 05:28:56:436 PM
26-89A POS.
Open
8/25/2011 05:30:03:064 PM
NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS
ES 26-89BE POS.
CLOSE
Page 33 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 05:30:04:837 PM
NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS
ES 26-89BE POS.
OPEN
8/25/2011 05:30:14:274 PM
NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS
ES 26-89LE1 POS.
CLOSE
8/25/2011 05:30:21:191 PM
NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS
ES 26-89LE1 POS.
OPEN
8/25/2011 05:30:50:984 PM
NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS
ES 26-89LE2 POS.
OPEN
8/25/2011 05:30:59:786 PM
NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS
ES 26-89LE2 POS.
CLOSE
8/25/2011 05:31:40:871 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
CHARGED
8/25/2011 05:31:42:777 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
NOT-CHARGED
8/25/2011 05:31:54:117 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
SET
8/25/2011 05:31:55:491 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
RESET
8/25/2011 05:31:59:435 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
2652 CB AC SPLY
FAIL
8/25/2011 05:32:00:288 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
2652 CB AC SPLY
HEALTHY
8/25/2011 05:32:15:114 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
DAMOH-1 AR SWITCH
SET
8/25/2011 05:32:17:273 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
DAMOH-1 AR SWITCH
RESET
8/25/2011 05:32:23:043 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
SET
8/25/2011 05:32:25:388 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
RESET
8/25/2011 05:32:27:225 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
SF6 LOCKOUT
OPERATED
8/25/2011 05:32:28:202 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
SF6 LOCKOUT
RESET
8/25/2011 05:32:48:018 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
CB CLOSE COMMAND
RESET
8/25/2011 05:32:54:251 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
CB CLOSE COMMAND
OPERATED
8/25/2011 05:33:06:220 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
TRANSFER
SET
8/25/2011 05:33:08:485 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
TRANSFER
RESET
8/25/2011 05:33:26:599 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 DC SUPPLY
FAIL
Page 34 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 05:33:28:090 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 DC SUPPLY
HEALTHY
8/25/2011 05:33:29:565 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 DC SUPPLY
FAIL
8/25/2011 05:33:31:145 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 DC SUPPLY
HEALTHY
8/25/2011 05:33:31:231 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 DC SUPPLY
FAIL
8/25/2011 05:33:31:284 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 DC SUPPLY
HEALTHY
8/25/2011 05:33:31:342 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 DC SUPPLY
FAIL
8/25/2011 05:33:32:773 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 DC SUPPLY
HEALTHY
8/25/2011 05:33:37:699 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 VT FUSE
FAIL
8/25/2011 05:33:38:608 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 VT FUSE
HEALTHY
8/25/2011 05:33:42:784 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:33:43:679 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:34:08:504 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:34:10:051 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:34:37:640 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:34:41:281 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:34:54:871 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 VT FUSE
FAIL
8/25/2011 05:34:56:110 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 VT FUSE
HEALTHY
8/25/2011 05:34:59:485 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 RELAY
HEALTHY
8/25/2011 05:35:01:431 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 RELAY
FAULTY
8/25/2011 05:35:04:756 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
LBB-1
OPERATED
8/25/2011 05:35:05:051 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
LBB-1
RESET
8/25/2011 05:35:05:059 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
LBB-1
OPERATED
Page 35 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 05:35:06:212 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
LBB-1
RESET
8/25/2011 05:35:09:289 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
LBB-2
OPERATED
8/25/2011 05:35:09:498 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
LBB-2
RESET
8/25/2011 05:35:09:559 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
LBB-2
OPERATED
8/25/2011 05:35:11:446 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
LBB-2
RESET
8/25/2011 05:35:30:694 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
TRIP CKT-1
HEALTHY
8/25/2011 05:35:33:811 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
TRIP CKT-1
FAULTY
8/25/2011 05:35:50:428 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
TRIP CKT-2
HEALTHY
8/25/2011 05:35:57:837 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
TRIP CKT-2
FAULTY
8/25/2011 05:35:57:839 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
TRIP CKT-2
HEALTHY
8/25/2011 05:35:57:843 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
TRIP CKT-2
FAULTY
8/25/2011 05:36:08:951 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
A/R LOCKOUT
OPERATED
8/25/2011 05:36:10:153 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
A/R LOCKOUT
RESET
8/25/2011 05:36:15:731 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
A/R
OPERATED
8/25/2011 05:36:15:843 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
A/R
RESET
8/25/2011 05:36:15:851 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
A/R
OPERATED
8/25/2011 05:36:17:121 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
A/R
RESET
8/25/2011 05:36:34:215 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
A/R RELAY
HEALTHY
8/25/2011 05:36:38:522 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
A/R RELAY
FAULTY
8/25/2011 05:36:45:337 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
A/R STATUS
OUT OF SERVICE
8/25/2011 05:36:53:856 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
A/R STATUS
INSERVICE
8/25/2011 05:37:17:481 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 R PH OPTD
SET
Page 36 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 05:37:18:042 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 R PH OPTD
RESET
8/25/2011 05:37:18:074 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 R PH OPTD
SET
8/25/2011 05:37:21:130 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 R PH OPTD
RESET
8/25/2011 05:37:23:929 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 Y PH OPTD
SET
8/25/2011 05:37:25:075 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 Y PH OPTD
RESET
8/25/2011 05:37:31:769 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 B PH OPTD
SET
8/25/2011 05:37:31:786 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 B PH OPTD
RESET
8/25/2011 05:37:31:796 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 B PH OPTD
SET
8/25/2011 05:37:33:881 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-1 B PH OPTD
RESET
8/25/2011 05:37:37:025 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 R PH OPTD
SET
8/25/2011 05:37:38:230 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 R PH OPTD
RESET
8/25/2011 05:37:42:122 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 Y PH OPTD
SET
8/25/2011 05:37:43:501 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 Y PH OPTD
RESET
8/25/2011 05:37:45:246 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 B PH OPTD
SET
8/25/2011 05:37:45:448 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 B PH OPTD
RESET
8/25/2011 05:37:45:498 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 B PH OPTD
SET
8/25/2011 05:37:47:327 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
MAIN-2 B PH OPTD
RESET
8/25/2011 05:38:06:641 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
SET
8/25/2011 05:38:08:887 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
RESET
8/25/2011 05:38:13:329 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
SET
8/25/2011 05:38:15:811 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
RESET
8/25/2011 05:38:17:411 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
SET
Page 37 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 05:38:20:310 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
RESET
8/25/2011 05:38:23:082 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
SET
8/25/2011 05:38:23:250 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
RESET
8/25/2011 05:38:23:290 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
SET
8/25/2011 05:38:26:674 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
RESET
8/25/2011 05:40:08:910 PM
2752 R PHASE
Closed
8/25/2011 05:40:12:907 PM
2752 R PHASE
Open
8/25/2011 05:40:12:907 PM
2752 POSITION
Open
8/25/2011 05:40:26:047 PM
2752 Y PHASE
Closed
8/25/2011 05:40:31:117 PM
2752 Y PHASE
Open
8/25/2011 05:40:31:117 PM
2752 POSITION
Open
8/25/2011 05:40:44:924 PM
2752 B PHASE
Closed
8/25/2011 05:40:49:139 PM
2752 B PHASE
Open
8/25/2011 05:40:49:139 PM
2752 POSITION
Open
8/25/2011 05:40:59:833 PM
27-89A POS.
Closed
8/25/2011 05:41:05:837 PM
27-89A POS.
Open
8/25/2011 05:41:21:798 PM
27-89B POS.
Closed
8/25/2011 05:41:25:962 PM
27-89B POS.
Open
8/25/2011 05:41:31:496 PM
27-89C POS.
Closed
8/25/2011 05:41:37:858 PM
27-89C POS.
Open
8/25/2011 05:41:51:369 PM
27-89L POS.
Closed
8/25/2011 05:41:55:954 PM
27-89L POS.
Open
Page 38 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 05:42:05:523 PM
26-89R POS.
Closed
8/25/2011 05:42:09:925 PM
26-89R POS.
Open
8/25/2011 05:42:28:357 PM
NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS
ES 27-89BE POS.
CLOSE
8/25/2011 05:42:31:601 PM
NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS
ES 27-89BE POS.
OPEN
8/25/2011 05:42:37:875 PM
NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS
ES 27-89LE1 POS.
CLOSE
8/25/2011 05:42:42:112 PM
NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS
ES 27-89LE1 POS.
OPEN
8/25/2011 05:43:00:334 PM
NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS
ES 27-89LE2 POS.
OPEN
8/25/2011 05:43:11:275 PM
NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS
ES 27-89LE2 POS.
CLOSE
8/25/2011 05:43:36:911 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
SPRING CHARGE
NOT-CHARGED
8/25/2011 05:43:43:710 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
SPRING CHARGE
CHARGED
8/25/2011 05:44:15:488 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
SET
8/25/2011 05:44:18:505 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
RESET
8/25/2011 05:44:19:991 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
CB AC SPLY
FAIL
8/25/2011 05:44:22:371 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
CB AC SPLY
HEALTHY
8/25/2011 05:44:27:857 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
AR SWITCH
SET
8/25/2011 05:44:31:932 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
AR SWITCH
RESET
8/25/2011 05:44:34:023 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
SET
8/25/2011 05:44:38:492 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
RESET
8/25/2011 05:44:39:795 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
SF6 LOCKOUT
OPERATED
8/25/2011 05:44:42:602 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
SF6 LOCKOUT
RESET
8/25/2011 05:45:06:996 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
CB CLOSE COMMAND
RESET
8/25/2011 05:45:18:067 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
CB CLOSE COMMAND
OPERATED
Page 39 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 05:45:24:770 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
CB CLOSE COMMAND
RESET
8/25/2011 05:45:32:461 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
CB CLOSE COMMAND
OPERATED
8/25/2011 05:45:32:839 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
CB CLOSE COMMAND
RESET
8/25/2011 05:45:33:161 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
CB CLOSE COMMAND
OPERATED
8/25/2011 05:46:43:661 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
TRANSFER
SET
8/25/2011 05:46:46:364 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
TRANSFER
RESET
8/25/2011 05:47:18:692 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 DC SUPPLY
FAIL
8/25/2011 05:47:20:315 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 DC SUPPLY
HEALTHY
8/25/2011 05:47:29:926 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-2 DC SUPPLY
FAIL
8/25/2011 05:47:31:120 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-2 DC SUPPLY
HEALTHY
8/25/2011 05:47:37:616 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 VT FUSE
FAIL
8/25/2011 05:47:38:389 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 VT FUSE
HEALTHY
8/25/2011 05:47:38:394 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 VT FUSE
FAIL
8/25/2011 05:47:38:399 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 VT FUSE
HEALTHY
8/25/2011 05:47:38:452 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 VT FUSE
FAIL
8/25/2011 05:47:39:090 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 VT FUSE
HEALTHY
8/25/2011 05:48:37:545 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 VT FUSE
FAIL
8/25/2011 05:48:38:139 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 VT FUSE
HEALTHY
8/25/2011 05:48:51:385 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:49:01:547 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 RELAY
HEALTHY
8/25/2011 05:49:01:583 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 RELAY
FAULTY
8/25/2011 05:49:02:357 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 RELAY
HEALTHY
Page 40 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 05:50:14:951 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-2 VT FUSE
FAIL
8/25/2011 05:50:16:296 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-2 VT FUSE
HEALTHY
8/25/2011 05:50:32:155 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-2 RELAY
FAULTY
8/25/2011 05:50:36:689 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-2 RELAY
HEALTHY
8/25/2011 05:50:44:845 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
TRIP CKT-1
FAULTY
8/25/2011 05:50:46:181 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
TRIP CKT-1
HEALTHY
8/25/2011 05:50:55:365 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
LBB-1
OPERATED
8/25/2011 05:50:56:208 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
LBB-1
RESET
8/25/2011 05:51:01:526 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
LBB-2
OPERATED
8/25/2011 05:51:02:086 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
LBB-2
RESET
8/25/2011 05:51:09:168 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
TRIP CKT-2
FAULTY
8/25/2011 05:51:10:339 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
TRIP CKT-2
HEALTHY
8/25/2011 05:51:13:668 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
A/R LOCKOUT
OPERATED
8/25/2011 05:51:14:178 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
A/R LOCKOUT
RESET
8/25/2011 05:51:16:200 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
A/R
OPERATED
8/25/2011 05:51:17:003 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
A/R
RESET
8/25/2011 05:51:25:054 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
A/R RELAY
FAULTY
8/25/2011 05:51:28:356 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
A/R RELAY
HEALTHY
8/25/2011 05:51:33:300 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
A/R STATUS
OUT OF SERVICE
8/25/2011 05:51:35:629 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
A/R STATUS
INSERVICE
8/25/2011 05:52:15:561 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
A/R STATUS
OUT OF SERVICE
8/25/2011 05:52:15:857 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
A/R STATUS
INSERVICE
Page 41 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
State
8/25/2011 05:52:15:872 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
A/R STATUS
OUT OF SERVICE
8/25/2011 05:52:18:056 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
A/R STATUS
INSERVICE
8/25/2011 05:52:54:686 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 Y PH OPTD
SET
8/25/2011 05:52:57:153 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 Y PH OPTD
RESET
8/25/2011 05:52:57:869 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 Y PH OPTD
SET
8/25/2011 05:52:59:053 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 Y PH OPTD
RESET
8/25/2011 05:52:59:687 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 R PH OPTD
SET
8/25/2011 05:53:02:886 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 R PH OPTD
RESET
8/25/2011 05:53:05:612 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 B PH OPTD
SET
8/25/2011 05:53:08:478 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-1 B PH OPTD
RESET
8/25/2011 05:53:09:234 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-2 R PH OPTD
SET
8/25/2011 05:53:12:758 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-2 R PH OPTD
RESET
8/25/2011 05:53:13:540 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-2 Y PH OPTD
SET
8/25/2011 05:53:16:095 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-2 Y PH OPTD
RESET
8/25/2011 05:53:16:555 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-2 B PH OPTD
SET
8/25/2011 05:53:16:781 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-2 B PH OPTD
RESET
8/25/2011 05:53:16:790 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-2 B PH OPTD
SET
8/25/2011 05:53:19:598 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
MAIN-2 B PH OPTD
RESET
8/25/2011 05:53:33:483 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
SET
8/25/2011 05:53:38:621 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
RESET
8/25/2011 05:53:39:518 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
SET
8/25/2011 05:53:43:830 PM
NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION
RESET
Page 42 of 43
Events Report
Print Date/Time:
25-August-2011
S Date
18:01
Origin
Name
8/25/2011 05:53:44:861 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
8/25/2011 05:53:50:688 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
8/25/2011 05:53:50:694 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
8/25/2011 05:53:50:702 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
8/25/2011 05:53:51:991 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
REACTOR TRIP
SET
8/25/2011 05:53:57:412 PM
NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION
REACTOR TRIP
RESET
8/25/2011 05:54:14:496 PM
NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS
ES 26-89RE POS.
CLOSE
8/25/2011 05:54:18:459 PM
NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS
ES 26-89RE POS.
OPEN
8/25/2011 05:55:13:697 PM
NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS
ES 27-89RE POS.
CLOSE
8/25/2011 05:55:15:537 PM
NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS
ES 27-89RE POS.
OPEN
Page 43 of 43
State