Events Report

Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/24/2011 05:06:28:804 PM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 POSITION

Closed

8/24/2011 05:06:28:804 PM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Closed

8/24/2011 05:06:28:804 PM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 Y PHASE

Closed

8/24/2011 05:06:28:804 PM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 B PHASE

Closed

8/25/2011 08:46:49:626 AM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

FIRE PROT TRIP

HEALTHY

8/25/2011 10:41:59:175 AM

NTPC/KORBA/400KV/RAIPUR LINE-3/DS 23-89B

23-89B POS.

Closed

8/25/2011 10:42:55:559 AM

NTPC/KORBA/400KV/RAIPUR LINE-3/DS 23-89A

23-89A POS.

Open

8/25/2011 10:50:59:262 AM

NTPC/KORBA/400KV/RAIPUR LINE-4/DS 24-89B

24-89B POS.

Closed

8/25/2011 10:52:34:010 AM

NTPC/KORBA/400KV/RAIPUR LINE-4/ DS 24-89A

24-89A POS.

Open

8/25/2011 11:02:33:586 AM

NTPC/Scs/Ethernet network/P343_G1

Device link

Disconnected

8/25/2011 11:02:33:586 AM

NTPC/Scs/Ethernet network/P345_G2

Device link

Disconnected

8/25/2011 11:02:33:586 AM

NTPC/Scs/Ethernet network/P437_426-DAMOH#1

DEVICE LINK

FAILURE

8/25/2011 11:02:33:586 AM

NTPC/Scs/Ethernet network/P437_427-DAMOH#2

DEVICE LINK

FAILURE

8/25/2011 11:02:33:586 AM

NTPC/Scs/Ethernet network/P437_423-RAIPUR1

DEVICE LINK

FAILURE

8/25/2011 11:02:33:586 AM

NTPC/Scs/Ethernet network/P437_424-RAIPUR2

DEVICE LINK

FAILURE

8/25/2011 11:02:33:586 AM

NTPC/Scs/Ethernet network/P632_426R_DAMOH1

Device link

Disconnected

8/25/2011 11:02:33:586 AM

NTPC/Scs/Ethernet network/P632_427R_DAMOH2

Device link

Disconnected

8/25/2011 11:02:33:586 AM

NTPC/Scs/Ethernet network/P632_87_GT

Device link

Disconnected

8/25/2011 11:02:33:586 AM

NTPC/Scs/Ethernet network/P632_410-TIETRF4

Device link

Disconnected

8/25/2011 11:02:33:586 AM

NTPC/Scs/Ethernet network/P632_87_UT1

Device link

Disconnected

8/25/2011 11:02:33:586 AM

NTPC/Scs/Ethernet network/P632_87_HV

Device link

Disconnected

8/25/2011 11:02:33:586 AM

NTPC/Scs/Ethernet network/P632_87_UT2

Device link

Disconnected

Page 1 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 11:02:33:586 AM

NTPC/Scs/Ethernet network/P634_OD

Device link

Disconnected

8/25/2011 11:03:00:211 AM

NTPC/Scs/Ethernet network/P437_423-RAIPUR1

DEVICE LINK

OK

8/25/2011 11:03:00:211 AM

NTPC/Scs/Ethernet network/P632_410-TIETRF4

Device link

Connected

8/25/2011 11:03:00:211 AM

NTPC/Scs/Ethernet network/P632_87_HV

Device link

Connected

8/25/2011 11:03:00:211 AM

NTPC/Scs/Ethernet network/P437_424-RAIPUR2

DEVICE LINK

OK

8/25/2011 11:03:00:211 AM

NTPC/Scs/Ethernet network/P632_87_UT1

Device link

Connected

8/25/2011 11:03:00:211 AM

NTPC/Scs/Ethernet network/P632_87_GT

Device link

Connected

8/25/2011 11:03:00:539 AM

NTPC/Scs/Ethernet network/P345_G2

Device link

Connected

8/25/2011 11:03:04:372 AM

PublicOdyssey Log-in

8/25/2011 11:04:25:664 AM

PublicOdyssey Log-off

8/25/2011 11:04:25:669 AM

AdmOdyssey Log-in

8/25/2011 11:08:52:703 AM

NTPC/Scs/Ethernet network/P343_G1

Device link

Disconnected

8/25/2011 11:08:52:703 AM

NTPC/Scs/Ethernet network/P345_G2

Device link

Disconnected

8/25/2011 11:08:52:703 AM

NTPC/Scs/Ethernet network/P437_426-DAMOH#1

DEVICE LINK

FAILURE

8/25/2011 11:08:52:703 AM

NTPC/Scs/Ethernet network/P437_427-DAMOH#2

DEVICE LINK

FAILURE

8/25/2011 11:08:52:703 AM

NTPC/Scs/Ethernet network/P437_423-RAIPUR1

DEVICE LINK

FAILURE

8/25/2011 11:08:52:703 AM

NTPC/Scs/Ethernet network/P437_424-RAIPUR2

DEVICE LINK

FAILURE

8/25/2011 11:08:52:703 AM

NTPC/Scs/Ethernet network/P632_426R_DAMOH1

Device link

Disconnected

8/25/2011 11:08:52:703 AM

NTPC/Scs/Ethernet network/P632_427R_DAMOH2

Device link

Disconnected

8/25/2011 11:08:52:703 AM

NTPC/Scs/Ethernet network/P632_87_GT

Device link

Disconnected

8/25/2011 11:08:52:703 AM

NTPC/Scs/Ethernet network/P632_410-TIETRF4

Device link

Disconnected

8/25/2011 11:08:52:703 AM

NTPC/Scs/Ethernet network/P632_87_UT1

Device link

Disconnected

Page 2 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 11:08:52:703 AM

NTPC/Scs/Ethernet network/P632_87_HV

Device link

Disconnected

8/25/2011 11:08:52:703 AM

NTPC/Scs/Ethernet network/P632_87_UT2

Device link

Disconnected

8/25/2011 11:08:52:703 AM

NTPC/Scs/Ethernet network/P634_OD

Device link

Disconnected

8/25/2011 11:09:05:781 AM

NTPC/Scs/Ethernet network/P632_87_GT

Device link

Connected

8/25/2011 11:09:05:781 AM

NTPC/Scs/Ethernet network/P632_87_HV

Device link

Connected

8/25/2011 11:09:05:781 AM

NTPC/Scs/Ethernet network/P437_423-RAIPUR1

DEVICE LINK

OK

8/25/2011 11:09:05:781 AM

NTPC/Scs/Ethernet network/P632_410-TIETRF4

Device link

Connected

8/25/2011 11:09:05:781 AM

NTPC/Scs/Ethernet network/P437_424-RAIPUR2

DEVICE LINK

OK

8/25/2011 11:09:05:781 AM

NTPC/Scs/Ethernet network/P632_87_UT1

Device link

Connected

8/25/2011 11:09:05:890 AM

NTPC/Scs/Ethernet network/P345_G2

Device link

Connected

8/25/2011 11:09:35:223 AM

PublicOdyssey Log-in

8/25/2011 11:10:02:658 AM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

TRIP CKT-2

FAULTY

8/25/2011 11:10:35:343 AM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

TRIP CKT-1

FAULTY

8/25/2011 11:10:36:027 AM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

A/R RELAY

FAULTY

8/25/2011 11:10:36:436 AM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 11:10:36:551 AM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

LOSS OF SF6 ALM

RESET

8/25/2011 11:10:36:552 AM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

SF6 LOCKOUT

RESET

8/25/2011 11:10:36:552 AM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

2652 CB AC SPLY

HEALTHY

8/25/2011 11:10:36:552 AM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

2652 SPRING CHARGE

NOT-CHARGED

8/25/2011 11:21:42:218 AM

NTPC/Scs/Ethernet network/P343_G1

Device link

Disconnected

8/25/2011 11:21:42:218 AM

NTPC/Scs/Ethernet network/P345_G2

Device link

Disconnected

8/25/2011 11:21:42:218 AM

NTPC/Scs/Ethernet network/P437_426-DAMOH#1

DEVICE LINK

FAILURE

Page 3 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 11:21:42:218 AM

NTPC/Scs/Ethernet network/P437_427-DAMOH#2

DEVICE LINK

FAILURE

8/25/2011 11:21:42:218 AM

NTPC/Scs/Ethernet network/P437_423-RAIPUR1

DEVICE LINK

FAILURE

8/25/2011 11:21:42:218 AM

NTPC/Scs/Ethernet network/P437_424-RAIPUR2

DEVICE LINK

FAILURE

8/25/2011 11:21:42:218 AM

NTPC/Scs/Ethernet network/P632_426R_DAMOH1

Device link

Disconnected

8/25/2011 11:21:42:218 AM

NTPC/Scs/Ethernet network/P632_427R_DAMOH2

Device link

Disconnected

8/25/2011 11:21:42:218 AM

NTPC/Scs/Ethernet network/P632_87_GT

Device link

Disconnected

8/25/2011 11:21:42:218 AM

NTPC/Scs/Ethernet network/P632_410-TIETRF4

Device link

Disconnected

8/25/2011 11:21:42:218 AM

NTPC/Scs/Ethernet network/P632_87_UT1

Device link

Disconnected

8/25/2011 11:21:42:218 AM

NTPC/Scs/Ethernet network/P632_87_HV

Device link

Disconnected

8/25/2011 11:21:42:218 AM

NTPC/Scs/Ethernet network/P632_87_UT2

Device link

Disconnected

8/25/2011 11:21:42:218 AM

NTPC/Scs/Ethernet network/P634_OD

Device link

Disconnected

8/25/2011 11:22:00:812 AM

NTPC/Scs/Ethernet network/P437_424-RAIPUR2

DEVICE LINK

OK

8/25/2011 11:22:00:812 AM

NTPC/Scs/Ethernet network/P632_87_GT

Device link

Connected

8/25/2011 11:22:00:828 AM

NTPC/Scs/Ethernet network/P632_410-TIETRF4

Device link

Connected

8/25/2011 11:22:00:828 AM

NTPC/Scs/Ethernet network/P632_87_UT1

Device link

Connected

8/25/2011 11:22:00:828 AM

NTPC/Scs/Ethernet network/P437_423-RAIPUR1

DEVICE LINK

OK

8/25/2011 11:22:00:828 AM

NTPC/Scs/Ethernet network/P632_87_HV

Device link

Connected

8/25/2011 11:22:00:937 AM

NTPC/Scs/Ethernet network/P345_G2

Device link

Connected

8/25/2011 11:23:38:723 AM

PublicOdyssey Log-in

8/25/2011 11:24:43:187 AM

PublicOdyssey Log-off

8/25/2011 11:24:43:192 AM

AdmOdyssey Log-in

8/25/2011 11:26:51:692 AM

PublicOdyssey Log-in

Page 4 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 11:27:23:187 AM

PublicOdyssey Log-off

8/25/2011 11:27:23:192 AM

__VBA__ Log-in

8/25/2011 11:28:09:926 AM

PublicOdyssey Log-in

8/25/2011 11:30:17:187 AM

PublicOdyssey Log-off

8/25/2011 11:30:17:192 AM

AdmOdyssey Log-in

8/25/2011 11:30:47:505 AM

PublicOdyssey Log-in

8/25/2011 11:31:35:187 AM

PublicOdyssey Log-off

8/25/2011 11:31:35:192 AM

AdmOdyssey Log-in

8/25/2011 11:38:06:287 AM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SPRING CHARGE

CHARGED

8/25/2011 11:38:06:290 AM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SPRING CHARGE

NOT-CHARGED

8/25/2011 11:42:09:675 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Closed

8/25/2011 11:42:09:675 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 POSITION

Closed

8/25/2011 11:42:10:783 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Closed

8/25/2011 11:42:10:783 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 POSITION

Closed

8/25/2011 11:42:11:662 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Closed

8/25/2011 11:42:12:314 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Closed

8/25/2011 11:42:12:314 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 POSITION

Closed

8/25/2011 11:42:14:519 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Closed

8/25/2011 11:42:17:473 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Closed

8/25/2011 11:42:17:473 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 POSITION

Closed

8/25/2011 11:42:17:921 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Closed

8/25/2011 11:42:17:921 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 POSITION

Closed

Page 5 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 11:42:18:926 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Closed

8/25/2011 11:42:18:926 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 POSITION

Closed

8/25/2011 11:42:21:014 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Closed

8/25/2011 11:42:21:014 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 POSITION

Closed

8/25/2011 11:42:40:185 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Open

8/25/2011 11:42:40:185 AM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

OPERATED

8/25/2011 11:42:40:189 AM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

RESET

8/25/2011 11:42:55:522 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Closed

8/25/2011 11:42:55:522 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 POSITION

Closed

8/25/2011 11:43:00:723 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Closed

8/25/2011 11:43:00:723 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 POSITION

Closed

8/25/2011 11:46:59:097 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Open

8/25/2011 11:46:59:098 AM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

OPERATED

8/25/2011 11:46:59:102 AM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

RESET

8/25/2011 11:47:22:786 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Closed

8/25/2011 11:47:22:786 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 POSITION

Closed

8/25/2011 11:48:47:621 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 Y PHASE

Open

8/25/2011 11:48:51:095 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 Y PHASE

Open

8/25/2011 11:49:01:841 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 Y PHASE

Closed

8/25/2011 11:49:01:841 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 POSITION

Closed

8/25/2011 11:51:35:911 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 B PHASE

Open

8/25/2011 11:51:47:602 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 B PHASE

Closed

Page 6 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 11:51:47:602 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 POSITION

Closed

8/25/2011 11:52:05:158 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 Y PHASE

Open

8/25/2011 11:52:12:646 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 Y PHASE

Closed

8/25/2011 11:52:12:646 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 POSITION

Closed

8/25/2011 11:52:27:247 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Open

8/25/2011 11:52:27:247 AM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

OPERATED

8/25/2011 11:52:27:251 AM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

RESET

8/25/2011 11:52:37:689 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 R PHASE

Closed

8/25/2011 11:52:37:689 AM

NTPC/KORBA/400KV/TIE TRAFO-4/CB 10-52

1052 POSITION

Closed

8/25/2011 11:58:31:519 AM

NTPC/KORBA/400KV/TIE TRAFO-4/ES_STATUS

ES 10-89TE2 POS.

CLOSE

8/25/2011 11:58:36:223 AM

NTPC/KORBA/400KV/TIE TRAFO-4/ES_STATUS

ES 10-89TE2 POS.

OPEN

8/25/2011 11:59:01:240 AM

NTPC/KORBA/400KV/TIE TRAFO-4/ES_STATUS

ES 10-89AE POS.

CLOSE

8/25/2011 11:59:04:230 AM

NTPC/KORBA/400KV/TIE TRAFO-4/ES_STATUS

ES 10-89AE POS.

OPEN

8/25/2011 11:59:42:678 AM

NTPC/KORBA/400KV/TIE TRAFO-4/DS 10-89A

10-89A POS

CLOSE

8/25/2011 11:59:46:222 AM

NTPC/KORBA/400KV/TIE TRAFO-4/DS 10-89A

10-89A POS

OPEN

8/25/2011 12:01:51:248 PM

NTPC/KORBA/400KV/TIE TRAFO-4/DS 10-89B

10-89B POS

CLOSE

8/25/2011 12:01:53:461 PM

NTPC/KORBA/400KV/TIE TRAFO-4/DS 10-89B

10-89B POS

OPEN

8/25/2011 12:02:06:948 PM

NTPC/KORBA/400KV/TIE TRAFO-4/DS 10-89C

10-89C POS

CLOSE

8/25/2011 12:02:12:768 PM

NTPC/KORBA/400KV/TIE TRAFO-4/DS 10-89C

10-89C POS

OPEN

8/25/2011 12:02:42:529 PM

NTPC/KORBA/400KV/TIE TRAFO-4/DS 10-89T

10-89T POS

CLOSE

8/25/2011 12:02:46:025 PM

NTPC/KORBA/400KV/TIE TRAFO-4/DS 10-89T

10-89T POS

OPEN

8/25/2011 12:03:42:185 PM

NTPC/KORBA/400KV/TIE TRAFO-4/ES_STATUS

ES 10-89TE2 POS.

CLOSE

Page 7 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 12:03:47:910 PM

NTPC/KORBA/400KV/TIE TRAFO-4/ES_STATUS

ES 10-89TE2 POS.

OPEN

8/25/2011 12:04:56:864 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SPRING CHARGE

CHARGED

8/25/2011 12:05:00:386 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SPRING CHARGE

NOT-CHARGED

8/25/2011 12:07:20:454 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

CB AC1 SPLY FAIL

HEALTHY

8/25/2011 12:07:27:272 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

CB AC1 SPLY FAIL

FAIL

8/25/2011 12:08:23:422 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LOSS OF SF6 ALM

SET

8/25/2011 12:08:23:422 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

OPERATED

8/25/2011 12:08:23:426 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

RESET

8/25/2011 12:08:25:456 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LOSS OF SF6 ALM

RESET

8/25/2011 12:08:48:372 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LOSS OF SF6 ALM

SET

8/25/2011 12:08:48:419 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LOSS OF SF6 ALM

RESET

8/25/2011 12:08:48:582 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LOSS OF SF6 ALM

SET

8/25/2011 12:08:48:950 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LOSS OF SF6 ALM

RESET

8/25/2011 12:08:48:980 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LOSS OF SF6 ALM

SET

8/25/2011 12:08:52:052 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LOSS OF SF6 ALM

RESET

8/25/2011 12:09:37:096 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LOSS OF SF6 ALM

SET

8/25/2011 12:09:37:096 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

OPERATED

8/25/2011 12:09:37:101 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LOSS OF SF6 ALM

RESET

8/25/2011 12:09:38:315 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

RESET

8/25/2011 12:09:57:189 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LOSS OF SF6 ALM

SET

8/25/2011 12:09:57:189 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

OPERATED

8/25/2011 12:09:57:192 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LOSS OF SF6 ALM

RESET

Page 8 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 12:09:58:384 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

RESET

8/25/2011 12:10:12:405 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

OPERATED

8/25/2011 12:10:13:659 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

RESET

8/25/2011 12:10:13:791 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

OPERATED

8/25/2011 12:10:13:928 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

RESET

8/25/2011 12:10:32:106 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

OPERATED

8/25/2011 12:10:32:717 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

RESET

8/25/2011 12:10:32:779 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

OPERATED

8/25/2011 12:10:33:286 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

SF6 LOCKOUT

RESET

8/25/2011 12:15:54:571 PM

NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS

ES 27-89LE2 POS.

CLOSE

8/25/2011 12:18:48:130 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

BUCHOLZ TRP

TRIPPED

8/25/2011 12:18:49:616 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

BUCHOLZ TRP

HEALTHY

8/25/2011 12:18:50:018 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

BUCHOLZ TRP

TRIPPED

8/25/2011 12:18:50:640 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

BUCHOLZ TRP

HEALTHY

8/25/2011 12:19:10:293 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

HV WDG TEMP TRP

TRIPPED

8/25/2011 12:19:17:378 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

HV WDG TEMP TRP

HEALTHY

8/25/2011 12:19:48:919 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LV WDG TEMP TRIP

TRIPPED

8/25/2011 12:19:54:230 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LV WDG TEMP TRIP

HEALTHY

8/25/2011 12:20:02:342 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

PRD TRIP

TRIPPED

8/25/2011 12:20:09:452 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

PRD TRIP

HEALTHY

8/25/2011 12:20:18:203 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

FIRE PROT TRIP

TRIPPED

8/25/2011 12:20:19:762 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

FIRE PROT TRIP

HEALTHY

Page 9 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 12:20:27:632 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

BUCHOLZ ALARM

SET

8/25/2011 12:20:28:018 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

BUCHOLZ ALARM

RESET

8/25/2011 12:20:38:710 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

OIL LVL LOW ALARM

OPERATED

8/25/2011 12:20:38:770 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

OIL LVL LOW ALARM

RESET

8/25/2011 12:20:38:896 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

OIL LVL LOW ALARM

OPERATED

8/25/2011 12:20:39:354 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

OIL LVL LOW ALARM

RESET

8/25/2011 12:20:51:622 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

HV WDG TEMP ALARM

OPERATED

8/25/2011 12:20:52:100 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

HV WDG TEMP ALARM

RESET

8/25/2011 12:20:59:868 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LV WDG TEMP ALARM

OPERATED

8/25/2011 12:21:00:264 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LV WDG TEMP ALARM

RESET

8/25/2011 12:21:08:406 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

OIL TEMP ALARM

SET

8/25/2011 12:21:08:899 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

OIL TEMP ALARM

RESET

8/25/2011 12:21:28:052 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

COOLER TRB ALARM

SET

8/25/2011 12:21:28:586 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

COOLER TRB ALARM

RESET

8/25/2011 12:21:40:958 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LBB-1

OPERATED

8/25/2011 12:21:41:775 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LBB-1

RESET

8/25/2011 12:21:55:071 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LBB-2

OPERATED

8/25/2011 12:21:55:675 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

LBB-2

RESET

8/25/2011 12:22:03:098 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

TRIP CKT-1

FAULTY

8/25/2011 12:22:03:886 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

TRIP CKT-1

HEALTHY

8/25/2011 12:22:13:362 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

TRIP CKT-2

FAULTY

8/25/2011 12:22:14:205 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

TRIP CKT-2

HEALTHY

Page 10 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 12:23:05:184 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

86-A

OPERATED

8/25/2011 12:23:05:870 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

86-A

RESET

8/25/2011 12:23:12:714 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

86-B

OPERATED

8/25/2011 12:23:13:222 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

86-B

RESET

8/25/2011 12:23:23:058 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

INTERTRIP FRM LV

OPERATED

8/25/2011 12:23:23:322 PM

NTPC/KORBA/400KV/TIE TRAFO-4/PROTECTION

INTERTRIP FRM LV

RESET

8/25/2011 12:29:10:062 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

TRIP CKT-1

HEALTHY

8/25/2011 12:29:10:357 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

A/R RELAY

HEALTHY

8/25/2011 12:29:11:913 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

SPRING CHARGE

CHARGED

8/25/2011 12:29:11:914 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

SF6 LOCKOUT

OPERATED

8/25/2011 12:29:17:248 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 12:29:26:185 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

TRIP CKT-2

HEALTHY

8/25/2011 12:29:26:188 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

SF6 LOCKOUT

RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION

DAMOH-2 MAIN-1 ZONE-1 PSB RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION

DAMOH-2 MAIN-1 ZONE-1 PR

RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION

DAMOH-2 MAIN-1 ZONE-2 PR

RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION

DAMOH-2 MAIN-1 ZONE-3 PR

RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION

DAMOH-2 MAIN-1 ZONE-4 PR

RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION

DAMOH-2 MAIN-1 IN>1 E/F PR

RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION

DAMOH-2 MAIN-1 I>1 O/C PR

RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION

DAMOH-2 MAIN-1 I>3 O/C PR

RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION

DAMOH-2 MAIN-1 SOTF PRO

RESET

Page 11 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION

DAMOH-2 MAIN-1 V>1 O/V PR RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/PROTECTION

DAMOH-2 MAIN-1 V>2 O/V PR RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

2752

OPEN

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

1652

OPEN

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

DAMOH-2 86A RELAY OPTD

RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

2752 CB AUTO RECLOSE

RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

DAMOH-2 86AX RELAY

RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

DAMOH-2 86A RELAY

UNHEALTHY

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

DAMOH-2 86AX RELAY

UNHEALTHY

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

DAMOH-2 CH-1 CARRIER

HEALTHY

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

DAMOH-2 A/R LOCKOUT REL

RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

DAMOH-2 MAIN LBB-1/2

RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

DAMOH-2 TBC LBB-1/2

RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

DAMOH-2 A/R LOCKOUT REL

UNHEALTHY

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

DAMOH-2 MAIN-1 RLY OPTD T RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

DAMOH-2 MAIN-1 RELAY

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

DAMOH-2 MAIN-1 RLY OPTD T RESET

8/25/2011 12:29:27:919 PM

NTPC/KORBA/400KV/P442_427-DAMOH#2/SYSTEM

DAMOH-2 MAIN-1 VT FUSE FA RESET

8/25/2011 12:29:58:015 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-2 RELAY

HEALTHY

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

DIST_ZONE1_START

RESET

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

DIST_ZONE1_TRIP

RESET

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

DIST_ZONE2_START

RESET

Page 12 of 43

State

RESET

Events Report
Print Date/Time:

25-August-2011

18:01

S Date

Origin

Name

State

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

DIST_ZONE2_TRIP

RESET

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

DIST_ZONE3_START

RESET

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

DIST_ZONE3_TRIP

RESET

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

IN>_Trip

RESET

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

IN>> Trip Signal

Normal

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

IN>>> Trip Signal

Normal

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

I>_Trip

Normal

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

I>>_Trip

Normal

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

I>>>_Trip

Normal

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

GEN START

RESET

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

GEN TRIP

RESET

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

DEF CARRIER SEND

RESET

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

DISTANCE CARRIER SEND

RESET

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

PSIG Receive

Normal

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

PSIG Trip

Normal

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

POWER SWING BLOCKING

DISABLED

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

SWITCH ON TO FAULT

RESET

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

V>_Start

Normal

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

V>_Trip

Normal

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

V>>_Start

Normal

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/Protection

V>>_Trip

Normal

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM

MAIN BLOCKED FAULTY

HEALTHY

Page 13 of 43

Events Report
Print Date/Time:

25-August-2011

18:01

S Date

Origin

Name

State

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM

CARRIER HEALTHY (CHANNEL NO

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM

VT FUSE FAIL

RESET

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM

86B SUPERV

BLOCKED

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM

86BX_SUPERV

BLOCKED

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM

86B OPTD

DISABLED

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM

86BX OPTD

RESET

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM

MAIN-1 C-Ph A/R INITIATION

RESET

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM

MAIN-1 B-Ph A/R INITIATION

RESET

8/25/2011 12:30:05:890 PM

NTPC/KORBA/400KV/P437_427-DAMOH#2/SYSTEM

MAIN-1 A-Ph A/R INITIATION

RESET

8/25/2011 12:30:10:215 PM

NTPC/KORBA/400KV/P141_5051-DMH2RE/PROTECTION

IN2>_OP_GEN_DERIVED

RESET

8/25/2011 12:30:10:215 PM

NTPC/KORBA/400KV/P141_5051-DMH2RE/PROTECTION

PTRC_TRIP

RESET

8/25/2011 12:30:10:215 PM

NTPC/KORBA/400KV/P141_5051-DMH2RE/PROTECTION

IN1>_OP_GEN_MEASURED

RESET

8/25/2011 12:30:12:051 PM

NTPC/KORBA/400KV/P141_64R-DMH2REA/PROTECTION

PTRC_TRIP

RESET

8/25/2011 12:30:12:051 PM

NTPC/KORBA/400KV/P141_64R-DMH2REA/PROTECTION

IREF>_OP_GEN

RESET

8/25/2011 12:30:13:000 PM

NTPC/Scs/Ethernet network/P437_427-DAMOH#2

DEVICE LINK

OK

8/25/2011 12:45:34:442 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 R PHASE

Closed

8/25/2011 12:45:34:442 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 POSITION

Closed

8/25/2011 12:46:37:389 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 R PHASE

Closed

8/25/2011 12:46:37:389 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 POSITION

Closed

8/25/2011 12:48:02:458 PM

PublicOdyssey Log-in

8/25/2011 12:48:17:187 PM

PublicOdyssey Log-off

8/25/2011 12:48:17:192 PM

AdmOdyssey Log-in

Page 14 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 12:49:07:050 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 R PHASE

Closed

8/25/2011 12:49:07:050 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 POSITION

Closed

8/25/2011 12:49:57:680 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 R PHASE

Open

8/25/2011 12:51:13:606 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 R PHASE

Closed

8/25/2011 12:51:13:606 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 POSITION

Closed

8/25/2011 12:51:35:560 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 R PHASE

Open

8/25/2011 12:51:41:953 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 R PHASE

Open

8/25/2011 12:51:58:937 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 R PHASE

Closed

8/25/2011 12:51:58:937 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 POSITION

Closed

8/25/2011 12:52:53:726 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 Y PHASE

Open

8/25/2011 12:52:57:840 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 Y PHASE

Closed

8/25/2011 12:52:57:840 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 POSITION

Closed

8/25/2011 12:53:24:866 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 B PHASE

Open

8/25/2011 12:53:28:150 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 B PHASE

Closed

8/25/2011 12:53:28:150 PM

NTPC/KORBA/400KV/GEN TRAFO-7/CB 25-52

2552 POSITION

Closed

8/25/2011 12:53:47:284 PM

NTPC/KORBA/400KV/GEN TRAFO-7/DS 25-89A

25-89A POS.

Closed

8/25/2011 12:55:01:940 PM

NTPC/KORBA/400KV/GEN TRAFO-7/DS 25-89A

25-89A POS.

Open

8/25/2011 12:55:51:251 PM

NTPC/KORBA/400KV/GEN TRAFO-7/DS 25-89A

25-89A POS.

Closed

8/25/2011 12:55:57:050 PM

NTPC/KORBA/400KV/GEN TRAFO-7/DS 25-89A

25-89A POS.

Open

8/25/2011 12:56:32:271 PM

NTPC/KORBA/400KV/GEN TRAFO-7/DS 25-89B

25-89B POS.

Open

8/25/2011 12:56:41:411 PM

NTPC/KORBA/400KV/GEN TRAFO-7/DS 25-89B

25-89B POS.

Closed

8/25/2011 12:57:06:871 PM

NTPC/KORBA/400KV/GEN TRAFO-7/DS 25-89C

25-89C POS.

Closed

Page 15 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 12:57:26:104 PM

NTPC/KORBA/400KV/GEN TRAFO-7/DS 25-89C

25-89C POS.

Open

8/25/2011 12:57:45:463 PM

NTPC/KORBA/400KV/GEN TRAFO-7/DS 25-89G

25-89G POS.

Open

8/25/2011 12:57:50:836 PM

NTPC/KORBA/400KV/GEN TRAFO-7/DS 25-89G

25-89G POS.

Closed

8/25/2011 12:58:52:115 PM

NTPC/KORBA/400KV/GEN TRAFO-7/ES_STATUS

ES 25-89BE POS.

CLOSE

8/25/2011 12:58:53:329 PM

NTPC/KORBA/400KV/GEN TRAFO-7/ES_STATUS

ES 25-89BE POS.

OPEN

8/25/2011 12:59:33:637 PM

NTPC/KORBA/400KV/GEN TRAFO-7/ES_STATUS

ES 25-89GE1 POS.

CLOSE

8/25/2011 12:59:38:397 PM

NTPC/KORBA/400KV/GEN TRAFO-7/ES_STATUS

ES 25-89GE1 POS.

OPEN

8/25/2011 12:59:50:911 PM

NTPC/KORBA/400KV/GEN TRAFO-7/ES_STATUS

ES 25-89GE2 POS.

CLOSE

8/25/2011 12:59:53:022 PM

NTPC/KORBA/400KV/GEN TRAFO-7/ES_STATUS

ES 25-89GE2 POS.

OPEN

8/25/2011 01:00:16:790 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

2552 SPRING CHARGE

NOT-CHARGED

8/25/2011 01:00:21:083 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

2552 SPRING CHARGE

CHARGED

8/25/2011 01:00:32:408 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 LBB RE TRIP RELAY

FAULTY

8/25/2011 01:00:33:244 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 LBB RE TRIP RELAY

HEALTHY

8/25/2011 01:01:00:492 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

2552 POLE DISC ALM

SET

8/25/2011 01:01:03:833 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

2552 POLE DISC ALM

RESET

8/25/2011 01:01:14:638 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

2552 AC SPLY

FAIL

8/25/2011 01:01:15:645 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

2552 AC SPLY

HEALTHY

8/25/2011 01:01:29:028 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

2552 LOSS OF SF6 ALM

SET

8/25/2011 01:01:30:736 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

2552 LOSS OF SF6 ALM

RESET

8/25/2011 01:01:41:450 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

2552 SF6 LOCKOUT

OPERATED

8/25/2011 01:01:42:594 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

2552 SF6 LOCKOUT

RESET

8/25/2011 01:02:19:281 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 LBB-1

OPERATED

Page 16 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 01:02:20:342 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 LBB-1

RESET

8/25/2011 01:02:20:382 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 LBB-1

OPERATED

8/25/2011 01:02:20:384 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 LBB-1

RESET

8/25/2011 01:02:20:400 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 LBB-1

OPERATED

8/25/2011 01:02:21:724 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 LBB-1

RESET

8/25/2011 01:02:27:659 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 LBB-2

OPERATED

8/25/2011 01:02:28:174 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 LBB-2

RESET

8/25/2011 01:02:39:676 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 TRIP CKT-1

FAULTY

8/25/2011 01:02:40:185 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 TRIP CKT-1

HEALTHY

8/25/2011 01:02:46:336 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 TRIP CKT-2

FAULTY

8/25/2011 01:02:47:131 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 TRIP CKT-2

HEALTHY

8/25/2011 01:03:00:472 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 MAIN1 DC FAIL

FAIL

8/25/2011 01:03:01:172 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 MAIN1 DC FAIL

HEALTHY

8/25/2011 01:03:09:229 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 MAIN2 DC FAIL

FAIL

8/25/2011 01:03:10:231 PM

NTPC/KORBA/400KV/GEN TRAFO-7/PROTECTION

GT-7 MAIN2 DC FAIL

HEALTHY

8/25/2011 01:03:32:138 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2396 BB PROT

OPERATED

8/25/2011 01:03:33:220 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2396 BB PROT

RESET

8/25/2011 01:03:48:852 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2496 BB PROT

OPERATED

8/25/2011 01:03:50:121 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2496 BB PROT

RESET

8/25/2011 01:03:50:322 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2496 BB PROT

OPERATED

8/25/2011 01:03:51:436 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2496 BB PROT

RESET

8/25/2011 01:03:58:887 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2596 BB PROT

OPERATED

Page 17 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 01:04:00:554 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2596 BB PROT

RESET

8/25/2011 01:04:05:866 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2696 BB PROT

OPERATED

8/25/2011 01:04:07:332 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2696 BB PROT

RESET

8/25/2011 01:04:13:205 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

OPERATED

8/25/2011 01:04:13:253 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

RESET

8/25/2011 01:04:13:259 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

OPERATED

8/25/2011 01:04:13:290 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

RESET

8/25/2011 01:04:13:328 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

OPERATED

8/25/2011 01:04:13:479 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

RESET

8/25/2011 01:04:13:488 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

OPERATED

8/25/2011 01:04:13:490 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

RESET

8/25/2011 01:04:13:494 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

OPERATED

8/25/2011 01:04:13:662 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

RESET

8/25/2011 01:04:13:721 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

OPERATED

8/25/2011 01:04:13:811 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

RESET

8/25/2011 01:04:13:951 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

OPERATED

8/25/2011 01:04:14:141 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

RESET

8/25/2011 01:04:14:143 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

OPERATED

8/25/2011 01:04:14:145 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

RESET

8/25/2011 01:04:14:157 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

OPERATED

8/25/2011 01:04:14:169 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

RESET

8/25/2011 01:04:14:175 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

OPERATED

Page 18 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 01:04:14:187 PM

NTPC/KORBA/400KV/BB PROTECTION/BUSBAR OPTD

2796 BB PROT

RESET

8/25/2011 04:22:41:301 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/DS 23-89L

23-89L POS.

Closed

8/25/2011 04:23:05:878 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/DS 23-89L

23-89L POS.

Closed

8/25/2011 04:27:35:163 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/CB 23-52

2352 R PHASE

Open

8/25/2011 04:27:38:483 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/CB 23-52

2352 R PHASE

Closed

8/25/2011 04:27:38:488 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/CB 23-52

2352 POSITION

Closed

8/25/2011 04:27:39:097 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/CB 23-52

2352 R PHASE

Closed

8/25/2011 04:27:39:097 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/CB 23-52

2352 POSITION

Closed

8/25/2011 04:28:10:970 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/CB 23-52

2352 Y PHASE

Open

8/25/2011 04:28:15:330 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/CB 23-52

2352 Y PHASE

Closed

8/25/2011 04:28:15:330 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/CB 23-52

2352 POSITION

Closed

8/25/2011 04:28:33:000 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/CB 23-52

2352 B PHASE

Open

8/25/2011 04:28:36:527 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/CB 23-52

2352 B PHASE

Closed

8/25/2011 04:28:36:527 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/CB 23-52

2352 POSITION

Closed

8/25/2011 04:29:06:419 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/DS 23-89A

23-89A POS.

Closed

8/25/2011 04:29:16:972 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/DS 23-89A

23-89A POS.

Open

8/25/2011 04:29:37:024 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/DS 23-89B

23-89B POS.

Open

8/25/2011 04:29:42:081 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/DS 23-89B

23-89B POS.

Closed

8/25/2011 04:30:27:215 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/DS 23-89C

23-89C POS.

Closed

8/25/2011 04:30:35:873 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/DS 23-89C

23-89C POS.

Open

8/25/2011 04:31:20:340 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/DS 23-89L

23-89L POS.

Open

8/25/2011 04:31:25:775 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/DS 23-89L

23-89L POS.

Closed

Page 19 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 04:32:03:367 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/ES_STATUS

ES 23-89BE POS.

CLOSE

8/25/2011 04:32:04:804 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/ES_STATUS

ES 23-89BE POS.

OPEN

8/25/2011 04:32:24:966 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/ES_STATUS

ES 23-89LE1 POS.

CLOSE

8/25/2011 04:32:26:240 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/ES_STATUS

ES 23-89LE1 POS.

OPEN

8/25/2011 04:32:46:116 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/ES_STATUS

ES 23-89LE2 POS

CLOSE

8/25/2011 04:32:49:142 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/ES_STATUS

ES 23-89LE2 POS

OPEN

8/25/2011 04:33:03:928 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 SPRING

NOT-CHARGED

8/25/2011 04:33:07:940 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 SPRING

CHARGED

8/25/2011 04:33:19:639 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 POLE DISCREPANCY ALAR SET

8/25/2011 04:33:21:110 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 POLE DISCREPANCY ALAR RESET

8/25/2011 04:33:30:969 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 AC SUPPLY

FAIL

8/25/2011 04:33:31:413 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 AC SUPPLY

HEALTHY

8/25/2011 04:35:23:705 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 LOSS OF SF6 ALM

SET

8/25/2011 04:35:24:199 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 LOSS OF SF6 ALM

RESET

8/25/2011 04:35:31:403 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 SF6 LOCKOUT

OPERATED

8/25/2011 04:35:31:983 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 SF6 LOCKOUT

RESET

8/25/2011 04:35:49:185 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 CLOSE COMMAND

RESET

8/25/2011 04:35:56:435 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 CLOSE COMMAND

OPERATED

8/25/2011 04:36:22:901 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 TTS IN TRANSFER

SET

8/25/2011 04:36:24:081 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 TTS IN TRANSFER

RESET

8/25/2011 04:36:45:533 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 DC SUPPLY FAIL

8/25/2011 04:36:46:133 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 DC SUPPLY HEALTHY

Page 20 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

8/25/2011 04:36:52:574 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-2 DC SUPPLY FAIL

8/25/2011 04:36:52:782 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-2 DC SUPPLY HEALTHY

8/25/2011 04:36:52:815 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-2 DC SUPPLY FAIL

8/25/2011 04:36:53:069 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-2 DC SUPPLY HEALTHY

8/25/2011 04:37:04:561 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 VT FUSE FA OPERATED

8/25/2011 04:37:05:176 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 VT FUSE FA RESET

8/25/2011 04:37:25:288 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY

FAULTY

8/25/2011 04:37:30:736 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY

HEALTHY

8/25/2011 04:37:30:739 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY

FAULTY

8/25/2011 04:37:30:745 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY

HEALTHY

8/25/2011 04:37:45:850 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-2 VT FUSE FA OPERATED

8/25/2011 04:37:46:936 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-2 VT FUSE FA RESET

8/25/2011 04:37:58:588 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-2 RELAY

FAULTY

8/25/2011 04:38:12:091 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-2 RELAY

HEALTHY

8/25/2011 04:38:39:662 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 LBB-1 RELAY

OPERATED

8/25/2011 04:38:39:665 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 LBB-1 RELAY

RESET

8/25/2011 04:38:39:668 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 LBB-1 RELAY

OPERATED

8/25/2011 04:38:39:680 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 LBB-1 RELAY

RESET

8/25/2011 04:38:41:904 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 LBB-1 RELAY

RESET

8/25/2011 04:38:52:017 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 LBB-1 RELAY

OPERATED

8/25/2011 04:38:52:367 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 LBB-1 RELAY

RESET

8/25/2011 04:39:05:865 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 LBB-1 RELAY

OPERATED

Page 21 of 43

State

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 04:39:06:769 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 LBB-1 RELAY

RESET

8/25/2011 04:39:18:802 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 LBB-1 RELAY

OPERATED

8/25/2011 04:39:19:286 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 LBB-1 RELAY

RESET

8/25/2011 04:39:42:145 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 TRIP CIRCUIT-1

FAULTY

8/25/2011 04:39:42:886 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 TRIP CIRCUIT-1

HEALTHY

8/25/2011 04:40:01:003 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 TRIP CIRCUIT-2

FAULTY

8/25/2011 04:40:02:044 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

2352 TRIP CIRCUIT-2

HEALTHY

8/25/2011 04:40:09:129 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 A/R LOCKOUT

OPERATED

8/25/2011 04:40:09:647 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 A/R LOCKOUT

RESET

8/25/2011 04:40:09:665 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 A/R LOCKOUT

OPERATED

8/25/2011 04:40:09:911 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 A/R LOCKOUT

RESET

8/25/2011 04:40:14:933 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 AUTO RECLOSE

OPERATED

8/25/2011 04:40:15:541 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 AUTO RECLOSE

RESET

8/25/2011 04:40:34:958 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 A/R RELAY

FAULTY

8/25/2011 04:40:37:719 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 A/R RELAY

HEALTHY

8/25/2011 04:40:37:758 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 A/R RELAY

FAULTY

8/25/2011 04:40:38:047 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 A/R RELAY

HEALTHY

8/25/2011 04:40:51:973 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 A/R

OUT OF SERVICE

8/25/2011 04:40:52:103 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 A/R

INSERVICE

8/25/2011 04:40:52:107 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 A/R

OUT OF SERVICE

8/25/2011 04:40:52:111 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 A/R

INSERVICE

8/25/2011 04:40:54:908 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 A/R

INSERVICE

Page 22 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 04:40:54:987 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 A/R

OUT OF SERVICE

8/25/2011 04:40:57:025 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 A/R

INSERVICE

8/25/2011 04:41:51:955 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY RPH OPERATED

8/25/2011 04:41:53:088 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY RPH RESET

8/25/2011 04:41:59:420 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY YPH OPERATED

8/25/2011 04:41:59:787 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY YPH RESET

8/25/2011 04:41:59:817 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY YPH OPERATED

8/25/2011 04:42:00:057 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY YPH RESET

8/25/2011 04:42:05:084 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY BPH OPERATED

8/25/2011 04:42:05:372 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY BPH RESET

8/25/2011 04:42:05:377 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY BPH OPERATED

8/25/2011 04:42:06:005 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY BPH RESET

8/25/2011 04:42:09:592 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-2 RELAY RPH OPERATED

8/25/2011 04:42:10:063 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-2 RELAY RPH RESET

8/25/2011 04:42:16:791 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-2 RELAY YPH OPERATED

8/25/2011 04:42:17:397 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-2 RELAY YPH RESET

8/25/2011 04:42:23:640 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-2 RELAY BPH OPERATED

8/25/2011 04:42:24:116 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-2 RELAY BPH RESET

8/25/2011 04:43:25:566 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 CH-1 DT RECEIVED

SET

8/25/2011 04:43:26:085 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 CH-1 DT RECEIVED

RESET

8/25/2011 04:43:27:392 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 CH-1 DT RECEIVED

SET

8/25/2011 04:43:28:013 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 CH-1 DT RECEIVED

RESET

Page 23 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 04:43:29:023 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 CH-2 DT RECEIVED

SET

8/25/2011 04:43:29:747 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 CH-2 DT RECEIVED

RESET

8/25/2011 04:43:37:767 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 CH-1 DT RECEIVED

SET

8/25/2011 04:43:38:700 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 CH-1 DT RECEIVED

RESET

8/25/2011 04:43:46:484 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 CH-2 DT RECEIVED

SET

8/25/2011 04:43:47:264 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 CH-2 DT RECEIVED

RESET

8/25/2011 04:44:22:175 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/CB 24-52

2452 R PHASE

Open

8/25/2011 04:44:26:850 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/CB 24-52

2452 R PHASE

Closed

8/25/2011 04:44:26:850 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/CB 24-52

2452 POSITION

Closed

8/25/2011 04:44:44:080 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/CB 24-52

2452 Y PHASE

Open

8/25/2011 04:45:08:655 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/CB 24-52

2452 Y PHASE

Closed

8/25/2011 04:45:08:655 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/CB 24-52

2452 POSITION

Closed

8/25/2011 04:45:25:543 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/CB 24-52

2452 B PHASE

Open

8/25/2011 04:45:28:215 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/CB 24-52

2452 B PHASE

Closed

8/25/2011 04:45:28:215 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/CB 24-52

2452 POSITION

Closed

8/25/2011 04:46:12:789 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/ DS 24-89A

24-89A POS.

Open

8/25/2011 04:46:31:228 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/ DS 24-89A

24-89A POS.

Closed

8/25/2011 04:46:38:359 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/ DS 24-89A

24-89A POS.

Open

8/25/2011 04:46:48:774 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/DS 24-89B

24-89B POS.

Open

8/25/2011 04:46:58:953 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/DS 24-89B

24-89B POS.

Closed

8/25/2011 04:47:24:328 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/DS 24-89C

24-89C POS.

Closed

8/25/2011 04:47:29:461 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/DS 24-89C

24-89C POS.

Open

Page 24 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 04:48:00:907 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/DS 24-89L

24-89L POS.

Open

8/25/2011 04:48:07:983 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/DS 24-89L

24-89L POS.

Closed

8/25/2011 04:48:31:047 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/ES_STATUS

ES 24-89BE POS.

CLOSE

8/25/2011 04:48:32:603 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/ES_STATUS

ES 24-89BE POS.

OPEN

8/25/2011 04:48:41:311 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/ES_STATUS

ES 24-89AE POS.

CLOSE

8/25/2011 04:48:42:361 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/ES_STATUS

ES 24-89AE POS.

OPEN

8/25/2011 04:49:08:667 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/ES_STATUS

ES 24-89LE2 POS

CLOSE

8/25/2011 04:49:10:164 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/ES_STATUS

ES 24-89LE2 POS

OPEN

8/25/2011 04:49:23:586 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

SPRING CHARGE

NOT-CHARGED

8/25/2011 04:49:26:414 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

SPRING CHARGE

CHARGED

8/25/2011 04:49:38:490 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

CB POLE DISC ALM

SET

8/25/2011 04:49:40:069 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

CB POLE DISC ALM

RESET

8/25/2011 04:49:44:666 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

CB AC SPLY

FAIL

8/25/2011 04:49:45:751 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

CB AC SPLY

HEALTHY

8/25/2011 04:49:45:776 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

CB AC SPLY

FAIL

8/25/2011 04:49:45:794 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

CB AC SPLY

HEALTHY

8/25/2011 04:49:50:247 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

AR SWITCH

SET

8/25/2011 04:49:51:412 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

AR SWITCH

RESET

8/25/2011 04:50:05:768 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

LOSS OF SF6 ALM

SET

8/25/2011 04:50:07:366 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

LOSS OF SF6 ALM

RESET

8/25/2011 04:50:13:800 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

SF6 LOCKOUT

OPERATED

8/25/2011 04:50:15:011 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

SF6 LOCKOUT

RESET

Page 25 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 04:50:32:523 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

CB CLOSE COMMAND

RESET

8/25/2011 04:50:36:204 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

CB CLOSE COMMAND

OPERATED

8/25/2011 04:50:46:978 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

TRANSFER

SET

8/25/2011 04:50:48:750 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

TRANSFER

RESET

8/25/2011 04:51:01:994 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 DC SUPPLY

FAIL

8/25/2011 04:51:02:039 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 DC SUPPLY

HEALTHY

8/25/2011 04:51:02:094 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 DC SUPPLY

FAIL

8/25/2011 04:51:02:180 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 DC SUPPLY

HEALTHY

8/25/2011 04:51:04:925 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 DC SUPPLY

HEALTHY

8/25/2011 04:51:07:910 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-2 DC SUPPLY

FAIL

8/25/2011 04:51:07:913 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-2 DC SUPPLY

HEALTHY

8/25/2011 04:51:12:616 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 VT FUSE

FAIL

8/25/2011 04:51:12:632 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 VT FUSE

HEALTHY

8/25/2011 04:51:12:646 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 VT FUSE

FAIL

8/25/2011 04:51:12:721 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 VT FUSE

HEALTHY

8/25/2011 04:51:41:509 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 04:51:43:439 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 04:57:45:803 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 04:57:54:293 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 04:58:12:143 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 04:58:19:737 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 04:59:00:920 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY

FAULTY

Page 26 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 04:59:07:099 PM

NTPC/KORBA/400KV/RAIPUR LINE-3/PROTECTION

RAIPUR-3 MAIN-1 RELAY

HEALTHY

8/25/2011 05:00:08:185 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-2 VT FUSE

FAIL

8/25/2011 05:00:09:156 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-2 VT FUSE

HEALTHY

8/25/2011 05:00:34:778 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-2 RELAY

FAULTY

8/25/2011 05:00:40:366 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-2 RELAY

HEALTHY

8/25/2011 05:04:43:412 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:04:51:545 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:05:03:397 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:05:07:902 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:07:23:416 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:07:25:320 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:07:26:766 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:07:26:768 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:07:27:669 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:07:41:907 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:07:42:005 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:07:42:275 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:07:42:281 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:07:42:290 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:07:43:954 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:07:44:128 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:07:45:963 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

Page 27 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 05:07:45:966 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:07:48:147 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:07:48:149 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:07:54:195 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:07:54:199 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:07:56:430 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:07:56:432 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:07:56:482 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:07:56:492 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:07:57:954 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:08:12:694 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:08:12:912 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:08:12:914 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:08:12:916 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:08:13:554 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:08:13:661 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:08:13:741 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:08:13:778 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:08:14:955 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:11:759 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:10:11:783 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:12:113 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

Page 28 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 05:10:12:147 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:13:595 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:10:13:606 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:13:608 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:10:13:787 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:17:958 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:20:766 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:10:20:799 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:21:435 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:10:21:442 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:22:377 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:10:22:384 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:28:018 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:10:28:324 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:28:340 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:10:28:431 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:29:187 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:10:29:225 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:30:634 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:10:30:642 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:32:177 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:10:32:232 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

Page 29 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 05:10:34:390 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:10:34:434 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:34:447 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:10:34:458 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:35:959 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:10:37:032 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:10:37:584 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:10:37:599 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:11:38:677 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:11:38:680 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:11:38:683 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:11:39:011 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:11:41:061 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:11:41:471 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:11:42:210 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:11:42:890 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:11:42:902 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:11:42:998 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:11:43:001 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:11:43:009 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:11:44:130 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:11:44:175 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

Page 30 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 05:11:44:264 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:11:44:529 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:11:45:961 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:15:44:920 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

LBB-1

OPERATED

8/25/2011 05:15:46:087 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

LBB-1

RESET

8/25/2011 05:16:06:251 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

LBB-2

OPERATED

8/25/2011 05:16:07:005 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

LBB-2

RESET

8/25/2011 05:16:14:473 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

TRIP CKT-1

FAULTY

8/25/2011 05:16:14:989 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

TRIP CKT-1

HEALTHY

8/25/2011 05:16:20:917 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

TRIP CKT-2

FAULTY

8/25/2011 05:16:22:058 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

TRIP CKT-2

HEALTHY

8/25/2011 05:16:28:293 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

A/R LOCKOUT

OPERATED

8/25/2011 05:16:28:442 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

A/R LOCKOUT

RESET

8/25/2011 05:16:28:444 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

A/R LOCKOUT

OPERATED

8/25/2011 05:16:29:056 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

A/R LOCKOUT

RESET

8/25/2011 05:16:44:559 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

A/R

OPERATED

8/25/2011 05:16:46:058 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

A/R

RESET

8/25/2011 05:17:05:247 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

A/R RELAY

FAULTY

8/25/2011 05:17:08:672 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

A/R RELAY

HEALTHY

8/25/2011 05:17:21:967 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

A/R STATUS

OUT OF SERVICE

8/25/2011 05:17:28:463 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

A/R STATUS

INSERVICE

8/25/2011 05:18:06:729 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 R PH OPTD

SET

Page 31 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 05:18:08:376 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 R PH OPTD

RESET

8/25/2011 05:18:11:089 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 Y PH OPTD

SET

8/25/2011 05:18:11:151 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 Y PH OPTD

RESET

8/25/2011 05:18:11:155 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 Y PH OPTD

SET

8/25/2011 05:18:12:563 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 Y PH OPTD

RESET

8/25/2011 05:18:15:787 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 B PH OPTD

SET

8/25/2011 05:18:17:768 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-1 B PH OPTD

RESET

8/25/2011 05:18:18:617 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-2 R PH OPTD

SET

8/25/2011 05:18:20:160 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-2 R PH OPTD

RESET

8/25/2011 05:18:23:591 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-2 Y PH OPTD

SET

8/25/2011 05:18:24:845 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-2 Y PH OPTD

RESET

8/25/2011 05:18:29:031 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-2 B PH OPTD

SET

8/25/2011 05:18:30:065 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-2 B PH OPTD

RESET

8/25/2011 05:18:34:471 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-2 B PH OPTD

SET

8/25/2011 05:18:36:484 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

MAIN-2 B PH OPTD

RESET

8/25/2011 05:19:06:743 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

DIRECT TRIP RECEIVED CH2

SET

8/25/2011 05:19:09:177 PM

NTPC/KORBA/400KV/RAIPUR LINE-4/PROTECTION

DIRECT TRIP RECEIVED CH2

RESET

8/25/2011 05:20:38:007 PM

NTPC/KORBA/400KV/DAMOH LINE-1/CB 26-52

2652 R PHASE

Closed

8/25/2011 05:20:45:396 PM

NTPC/KORBA/400KV/DAMOH LINE-1/CB 26-52

2652 R PHASE

Open

8/25/2011 05:20:45:396 PM

NTPC/KORBA/400KV/DAMOH LINE-1/CB 26-52

2652 POSITION

Open

8/25/2011 05:20:57:051 PM

NTPC/KORBA/400KV/DAMOH LINE-1/CB 26-52

2652 Y PHASE

Closed

8/25/2011 05:21:00:500 PM

NTPC/KORBA/400KV/DAMOH LINE-1/CB 26-52

2652 Y PHASE

Open

Page 32 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 05:21:00:500 PM

NTPC/KORBA/400KV/DAMOH LINE-1/CB 26-52

2652 POSITION

Open

8/25/2011 05:21:11:053 PM

NTPC/KORBA/400KV/DAMOH LINE-1/CB 26-52

2652 B PHASE

Closed

8/25/2011 05:21:15:408 PM

NTPC/KORBA/400KV/DAMOH LINE-1/CB 26-52

2652 B PHASE

Closed

8/25/2011 05:21:18:604 PM

NTPC/KORBA/400KV/DAMOH LINE-1/CB 26-52

2652 B PHASE

Open

8/25/2011 05:21:18:604 PM

NTPC/KORBA/400KV/DAMOH LINE-1/CB 26-52

2652 POSITION

Open

8/25/2011 05:22:18:498 PM

NTPC/KORBA/400KV/DAMOH LINE-1/DS 26-89A

26-89A POS.

Open

8/25/2011 05:22:32:452 PM

NTPC/KORBA/400KV/DAMOH LINE-1/DS 26-89A

26-89A POS.

Open

8/25/2011 05:22:59:599 PM

NTPC/KORBA/400KV/DAMOH LINE-1/CB 26-52

2652 B PHASE

Open

8/25/2011 05:22:59:599 PM

NTPC/KORBA/400KV/DAMOH LINE-1/CB 26-52

2652 POSITION

Open

8/25/2011 05:23:16:912 PM

NTPC/KORBA/400KV/DAMOH LINE-1/DS 26-89A

26-89A POS.

Open

8/25/2011 05:23:26:128 PM

NTPC/KORBA/400KV/DAMOH LINE-1/DS 26-89A

26-89A POS.

Open

8/25/2011 05:23:57:051 PM

NTPC/KORBA/400KV/DAMOH LINE-1/DS 26-89A

26-89A POS.

Open

8/25/2011 05:25:03:953 PM

NTPC/KORBA/400KV/DAMOH LINE-1/DS 26-89B

26-89B POS.

Open

8/25/2011 05:26:44:571 PM

NTPC/KORBA/400KV/DAMOH LINE-1/DS 26-89B

26-89B POS.

Closed

8/25/2011 05:26:56:591 PM

NTPC/KORBA/400KV/DAMOH LINE-1/DS 26-89B

26-89B POS.

Open

8/25/2011 05:27:18:242 PM

NTPC/KORBA/400KV/DAMOH LINE-1/DS 26-89C

26-89C POS.

Closed

8/25/2011 05:27:24:961 PM

NTPC/KORBA/400KV/DAMOH LINE-1/DS 26-89C

26-89C POS.

Open

8/25/2011 05:27:44:881 PM

NTPC/KORBA/400KV/DAMOH LINE-1/DS 26-89L

26-89L POS.

Closed

8/25/2011 05:27:53:029 PM

NTPC/KORBA/400KV/DAMOH LINE-1/DS 26-89L

26-89L POS.

Open

8/25/2011 05:28:41:865 PM

NTPC/KORBA/400KV/DAMOH LINE-1/DS 26-89A

26-89A POS.

Closed

8/25/2011 05:28:56:436 PM

NTPC/KORBA/400KV/DAMOH LINE-1/DS 26-89A

26-89A POS.

Open

8/25/2011 05:30:03:064 PM

NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS

ES 26-89BE POS.

CLOSE

Page 33 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 05:30:04:837 PM

NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS

ES 26-89BE POS.

OPEN

8/25/2011 05:30:14:274 PM

NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS

ES 26-89LE1 POS.

CLOSE

8/25/2011 05:30:21:191 PM

NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS

ES 26-89LE1 POS.

OPEN

8/25/2011 05:30:50:984 PM

NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS

ES 26-89LE2 POS.

OPEN

8/25/2011 05:30:59:786 PM

NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS

ES 26-89LE2 POS.

CLOSE

8/25/2011 05:31:40:871 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

2652 SPRING CHARGE

CHARGED

8/25/2011 05:31:42:777 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

2652 SPRING CHARGE

NOT-CHARGED

8/25/2011 05:31:54:117 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

2652 CB POLE DISC ALM

SET

8/25/2011 05:31:55:491 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

2652 CB POLE DISC ALM

RESET

8/25/2011 05:31:59:435 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

2652 CB AC SPLY

FAIL

8/25/2011 05:32:00:288 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

2652 CB AC SPLY

HEALTHY

8/25/2011 05:32:15:114 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

DAMOH-1 AR SWITCH

SET

8/25/2011 05:32:17:273 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

DAMOH-1 AR SWITCH

RESET

8/25/2011 05:32:23:043 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

LOSS OF SF6 ALM

SET

8/25/2011 05:32:25:388 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

LOSS OF SF6 ALM

RESET

8/25/2011 05:32:27:225 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

SF6 LOCKOUT

OPERATED

8/25/2011 05:32:28:202 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

SF6 LOCKOUT

RESET

8/25/2011 05:32:48:018 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

CB CLOSE COMMAND

RESET

8/25/2011 05:32:54:251 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

CB CLOSE COMMAND

OPERATED

8/25/2011 05:33:06:220 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

TRANSFER

SET

8/25/2011 05:33:08:485 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

TRANSFER

RESET

8/25/2011 05:33:26:599 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 DC SUPPLY

FAIL

Page 34 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 05:33:28:090 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 DC SUPPLY

HEALTHY

8/25/2011 05:33:29:565 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 DC SUPPLY

FAIL

8/25/2011 05:33:31:145 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 DC SUPPLY

HEALTHY

8/25/2011 05:33:31:231 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 DC SUPPLY

FAIL

8/25/2011 05:33:31:284 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 DC SUPPLY

HEALTHY

8/25/2011 05:33:31:342 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 DC SUPPLY

FAIL

8/25/2011 05:33:32:773 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 DC SUPPLY

HEALTHY

8/25/2011 05:33:37:699 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 VT FUSE

FAIL

8/25/2011 05:33:38:608 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 VT FUSE

HEALTHY

8/25/2011 05:33:42:784 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:33:43:679 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:34:08:504 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:34:10:051 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:34:37:640 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:34:41:281 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:34:54:871 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 VT FUSE

FAIL

8/25/2011 05:34:56:110 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 VT FUSE

HEALTHY

8/25/2011 05:34:59:485 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 RELAY

HEALTHY

8/25/2011 05:35:01:431 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 RELAY

FAULTY

8/25/2011 05:35:04:756 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

LBB-1

OPERATED

8/25/2011 05:35:05:051 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

LBB-1

RESET

8/25/2011 05:35:05:059 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

LBB-1

OPERATED

Page 35 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 05:35:06:212 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

LBB-1

RESET

8/25/2011 05:35:09:289 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

LBB-2

OPERATED

8/25/2011 05:35:09:498 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

LBB-2

RESET

8/25/2011 05:35:09:559 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

LBB-2

OPERATED

8/25/2011 05:35:11:446 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

LBB-2

RESET

8/25/2011 05:35:30:694 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

TRIP CKT-1

HEALTHY

8/25/2011 05:35:33:811 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

TRIP CKT-1

FAULTY

8/25/2011 05:35:50:428 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

TRIP CKT-2

HEALTHY

8/25/2011 05:35:57:837 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

TRIP CKT-2

FAULTY

8/25/2011 05:35:57:839 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

TRIP CKT-2

HEALTHY

8/25/2011 05:35:57:843 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

TRIP CKT-2

FAULTY

8/25/2011 05:36:08:951 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

A/R LOCKOUT

OPERATED

8/25/2011 05:36:10:153 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

A/R LOCKOUT

RESET

8/25/2011 05:36:15:731 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

A/R

OPERATED

8/25/2011 05:36:15:843 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

A/R

RESET

8/25/2011 05:36:15:851 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

A/R

OPERATED

8/25/2011 05:36:17:121 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

A/R

RESET

8/25/2011 05:36:34:215 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

A/R RELAY

HEALTHY

8/25/2011 05:36:38:522 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

A/R RELAY

FAULTY

8/25/2011 05:36:45:337 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

A/R STATUS

OUT OF SERVICE

8/25/2011 05:36:53:856 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

A/R STATUS

INSERVICE

8/25/2011 05:37:17:481 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 R PH OPTD

SET

Page 36 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 05:37:18:042 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 R PH OPTD

RESET

8/25/2011 05:37:18:074 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 R PH OPTD

SET

8/25/2011 05:37:21:130 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 R PH OPTD

RESET

8/25/2011 05:37:23:929 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 Y PH OPTD

SET

8/25/2011 05:37:25:075 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 Y PH OPTD

RESET

8/25/2011 05:37:31:769 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 B PH OPTD

SET

8/25/2011 05:37:31:786 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 B PH OPTD

RESET

8/25/2011 05:37:31:796 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 B PH OPTD

SET

8/25/2011 05:37:33:881 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-1 B PH OPTD

RESET

8/25/2011 05:37:37:025 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 R PH OPTD

SET

8/25/2011 05:37:38:230 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 R PH OPTD

RESET

8/25/2011 05:37:42:122 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 Y PH OPTD

SET

8/25/2011 05:37:43:501 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 Y PH OPTD

RESET

8/25/2011 05:37:45:246 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 B PH OPTD

SET

8/25/2011 05:37:45:448 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 B PH OPTD

RESET

8/25/2011 05:37:45:498 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 B PH OPTD

SET

8/25/2011 05:37:47:327 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

MAIN-2 B PH OPTD

RESET

8/25/2011 05:38:06:641 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

DIRECT TRIP RECEIVED CH1

SET

8/25/2011 05:38:08:887 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

DIRECT TRIP RECEIVED CH1

RESET

8/25/2011 05:38:13:329 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

DIRECT TRIP RECEIVED CH2

SET

8/25/2011 05:38:15:811 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

DIRECT TRIP RECEIVED CH2

RESET

8/25/2011 05:38:17:411 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

REACTOR TROUBLE ALARM

SET

Page 37 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 05:38:20:310 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

REACTOR TROUBLE ALARM

RESET

8/25/2011 05:38:23:082 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

REACTOR TROUBLE TRIP

SET

8/25/2011 05:38:23:250 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

REACTOR TROUBLE TRIP

RESET

8/25/2011 05:38:23:290 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

REACTOR TROUBLE TRIP

SET

8/25/2011 05:38:26:674 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

REACTOR TROUBLE TRIP

RESET

8/25/2011 05:40:08:910 PM

NTPC/KORBA/400KV/DAMOH LINE-2/CB 27-52

2752 R PHASE

Closed

8/25/2011 05:40:12:907 PM

NTPC/KORBA/400KV/DAMOH LINE-2/CB 27-52

2752 R PHASE

Open

8/25/2011 05:40:12:907 PM

NTPC/KORBA/400KV/DAMOH LINE-2/CB 27-52

2752 POSITION

Open

8/25/2011 05:40:26:047 PM

NTPC/KORBA/400KV/DAMOH LINE-2/CB 27-52

2752 Y PHASE

Closed

8/25/2011 05:40:31:117 PM

NTPC/KORBA/400KV/DAMOH LINE-2/CB 27-52

2752 Y PHASE

Open

8/25/2011 05:40:31:117 PM

NTPC/KORBA/400KV/DAMOH LINE-2/CB 27-52

2752 POSITION

Open

8/25/2011 05:40:44:924 PM

NTPC/KORBA/400KV/DAMOH LINE-2/CB 27-52

2752 B PHASE

Closed

8/25/2011 05:40:49:139 PM

NTPC/KORBA/400KV/DAMOH LINE-2/CB 27-52

2752 B PHASE

Open

8/25/2011 05:40:49:139 PM

NTPC/KORBA/400KV/DAMOH LINE-2/CB 27-52

2752 POSITION

Open

8/25/2011 05:40:59:833 PM

NTPC/KORBA/400KV/DAMOH LINE-2/DS 27-89A

27-89A POS.

Closed

8/25/2011 05:41:05:837 PM

NTPC/KORBA/400KV/DAMOH LINE-2/DS 27-89A

27-89A POS.

Open

8/25/2011 05:41:21:798 PM

NTPC/KORBA/400KV/DAMOH LINE-2/DS 27-89B

27-89B POS.

Closed

8/25/2011 05:41:25:962 PM

NTPC/KORBA/400KV/DAMOH LINE-2/DS 27-89B

27-89B POS.

Open

8/25/2011 05:41:31:496 PM

NTPC/KORBA/400KV/DAMOH LINE-2/DS 27-89C

27-89C POS.

Closed

8/25/2011 05:41:37:858 PM

NTPC/KORBA/400KV/DAMOH LINE-2/DS 27-89C

27-89C POS.

Open

8/25/2011 05:41:51:369 PM

NTPC/KORBA/400KV/DAMOH LINE-2/DS 27-89L

27-89L POS.

Closed

8/25/2011 05:41:55:954 PM

NTPC/KORBA/400KV/DAMOH LINE-2/DS 27-89L

27-89L POS.

Open

Page 38 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 05:42:05:523 PM

NTPC/KORBA/400KV/DAMOH LINE-2/DS 27-89R

26-89R POS.

Closed

8/25/2011 05:42:09:925 PM

NTPC/KORBA/400KV/DAMOH LINE-2/DS 27-89R

26-89R POS.

Open

8/25/2011 05:42:28:357 PM

NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS

ES 27-89BE POS.

CLOSE

8/25/2011 05:42:31:601 PM

NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS

ES 27-89BE POS.

OPEN

8/25/2011 05:42:37:875 PM

NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS

ES 27-89LE1 POS.

CLOSE

8/25/2011 05:42:42:112 PM

NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS

ES 27-89LE1 POS.

OPEN

8/25/2011 05:43:00:334 PM

NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS

ES 27-89LE2 POS.

OPEN

8/25/2011 05:43:11:275 PM

NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS

ES 27-89LE2 POS.

CLOSE

8/25/2011 05:43:36:911 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

SPRING CHARGE

NOT-CHARGED

8/25/2011 05:43:43:710 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

SPRING CHARGE

CHARGED

8/25/2011 05:44:15:488 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

CB POLE DISC ALM

SET

8/25/2011 05:44:18:505 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

CB POLE DISC ALM

RESET

8/25/2011 05:44:19:991 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

CB AC SPLY

FAIL

8/25/2011 05:44:22:371 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

CB AC SPLY

HEALTHY

8/25/2011 05:44:27:857 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

AR SWITCH

SET

8/25/2011 05:44:31:932 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

AR SWITCH

RESET

8/25/2011 05:44:34:023 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

LOSS OF SF6 ALM

SET

8/25/2011 05:44:38:492 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

LOSS OF SF6 ALM

RESET

8/25/2011 05:44:39:795 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

SF6 LOCKOUT

OPERATED

8/25/2011 05:44:42:602 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

SF6 LOCKOUT

RESET

8/25/2011 05:45:06:996 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

CB CLOSE COMMAND

RESET

8/25/2011 05:45:18:067 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

CB CLOSE COMMAND

OPERATED

Page 39 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 05:45:24:770 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

CB CLOSE COMMAND

RESET

8/25/2011 05:45:32:461 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

CB CLOSE COMMAND

OPERATED

8/25/2011 05:45:32:839 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

CB CLOSE COMMAND

RESET

8/25/2011 05:45:33:161 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

CB CLOSE COMMAND

OPERATED

8/25/2011 05:46:43:661 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

TRANSFER

SET

8/25/2011 05:46:46:364 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

TRANSFER

RESET

8/25/2011 05:47:18:692 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 DC SUPPLY

FAIL

8/25/2011 05:47:20:315 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 DC SUPPLY

HEALTHY

8/25/2011 05:47:29:926 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-2 DC SUPPLY

FAIL

8/25/2011 05:47:31:120 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-2 DC SUPPLY

HEALTHY

8/25/2011 05:47:37:616 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 VT FUSE

FAIL

8/25/2011 05:47:38:389 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 VT FUSE

HEALTHY

8/25/2011 05:47:38:394 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 VT FUSE

FAIL

8/25/2011 05:47:38:399 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 VT FUSE

HEALTHY

8/25/2011 05:47:38:452 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 VT FUSE

FAIL

8/25/2011 05:47:39:090 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 VT FUSE

HEALTHY

8/25/2011 05:48:37:545 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 VT FUSE

FAIL

8/25/2011 05:48:38:139 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 VT FUSE

HEALTHY

8/25/2011 05:48:51:385 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:49:01:547 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 RELAY

HEALTHY

8/25/2011 05:49:01:583 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 RELAY

FAULTY

8/25/2011 05:49:02:357 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 RELAY

HEALTHY

Page 40 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 05:50:14:951 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-2 VT FUSE

FAIL

8/25/2011 05:50:16:296 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-2 VT FUSE

HEALTHY

8/25/2011 05:50:32:155 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-2 RELAY

FAULTY

8/25/2011 05:50:36:689 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-2 RELAY

HEALTHY

8/25/2011 05:50:44:845 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

TRIP CKT-1

FAULTY

8/25/2011 05:50:46:181 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

TRIP CKT-1

HEALTHY

8/25/2011 05:50:55:365 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

LBB-1

OPERATED

8/25/2011 05:50:56:208 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

LBB-1

RESET

8/25/2011 05:51:01:526 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

LBB-2

OPERATED

8/25/2011 05:51:02:086 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

LBB-2

RESET

8/25/2011 05:51:09:168 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

TRIP CKT-2

FAULTY

8/25/2011 05:51:10:339 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

TRIP CKT-2

HEALTHY

8/25/2011 05:51:13:668 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

A/R LOCKOUT

OPERATED

8/25/2011 05:51:14:178 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

A/R LOCKOUT

RESET

8/25/2011 05:51:16:200 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

A/R

OPERATED

8/25/2011 05:51:17:003 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

A/R

RESET

8/25/2011 05:51:25:054 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

A/R RELAY

FAULTY

8/25/2011 05:51:28:356 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

A/R RELAY

HEALTHY

8/25/2011 05:51:33:300 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

A/R STATUS

OUT OF SERVICE

8/25/2011 05:51:35:629 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

A/R STATUS

INSERVICE

8/25/2011 05:52:15:561 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

A/R STATUS

OUT OF SERVICE

8/25/2011 05:52:15:857 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

A/R STATUS

INSERVICE

Page 41 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

State

8/25/2011 05:52:15:872 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

A/R STATUS

OUT OF SERVICE

8/25/2011 05:52:18:056 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

A/R STATUS

INSERVICE

8/25/2011 05:52:54:686 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 Y PH OPTD

SET

8/25/2011 05:52:57:153 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 Y PH OPTD

RESET

8/25/2011 05:52:57:869 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 Y PH OPTD

SET

8/25/2011 05:52:59:053 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 Y PH OPTD

RESET

8/25/2011 05:52:59:687 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 R PH OPTD

SET

8/25/2011 05:53:02:886 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 R PH OPTD

RESET

8/25/2011 05:53:05:612 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 B PH OPTD

SET

8/25/2011 05:53:08:478 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-1 B PH OPTD

RESET

8/25/2011 05:53:09:234 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-2 R PH OPTD

SET

8/25/2011 05:53:12:758 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-2 R PH OPTD

RESET

8/25/2011 05:53:13:540 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-2 Y PH OPTD

SET

8/25/2011 05:53:16:095 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-2 Y PH OPTD

RESET

8/25/2011 05:53:16:555 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-2 B PH OPTD

SET

8/25/2011 05:53:16:781 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-2 B PH OPTD

RESET

8/25/2011 05:53:16:790 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-2 B PH OPTD

SET

8/25/2011 05:53:19:598 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

MAIN-2 B PH OPTD

RESET

8/25/2011 05:53:33:483 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

DIRECT TRIP RECEIVED CH1

SET

8/25/2011 05:53:38:621 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

DIRECT TRIP RECEIVED CH1

RESET

8/25/2011 05:53:39:518 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

DIRECT TRIP RECEIVED CH2

SET

8/25/2011 05:53:43:830 PM

NTPC/KORBA/400KV/DAMOH LINE-1/PROTECTION

DIRECT TRIP RECEIVED CH2

RESET

Page 42 of 43

Events Report
Print Date/Time:

25-August-2011

S Date

18:01
Origin

Name

8/25/2011 05:53:44:861 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

REACTOR TROUBLE ALARAM SET

8/25/2011 05:53:50:688 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

REACTOR TROUBLE ALARAM RESET

8/25/2011 05:53:50:694 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

REACTOR TROUBLE ALARAM SET

8/25/2011 05:53:50:702 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

REACTOR TROUBLE ALARAM RESET

8/25/2011 05:53:51:991 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

REACTOR TRIP

SET

8/25/2011 05:53:57:412 PM

NTPC/KORBA/400KV/DAMOH LINE-2/PROTECTION

REACTOR TRIP

RESET

8/25/2011 05:54:14:496 PM

NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS

ES 26-89RE POS.

CLOSE

8/25/2011 05:54:18:459 PM

NTPC/KORBA/400KV/DAMOH LINE-1/ES_STATUS

ES 26-89RE POS.

OPEN

8/25/2011 05:55:13:697 PM

NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS

ES 27-89RE POS.

CLOSE

8/25/2011 05:55:15:537 PM

NTPC/KORBA/400KV/DAMOH LINE-2/ES_STATUS

ES 27-89RE POS.

OPEN

Page 43 of 43