Sample of Calculation Format

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 72

JOB No.

Doc. No.

C-210-1338-002

0-0608-05-0000

MLNG Doc No

Rev. 0A

DATE 19 - DEC - 2011

Rev.

SHEET 1 OF

PREPD

Mitra Alam

CHKD

Betanto Rachmat

APP'D

Suwarto

DESIGN CALCULATION REPORT


FOR FLARE LINE SUPPORT II

FOR REVIEW

MALAYSIA LNG SDN BHD


DETAIL ENGINEERING FOR
DRY GAS DIVERTER MANIFOLD PROJECT

PT JGC INDONESIA
REV.
0A

DATE
19-DEC-2011

PAGE
ALL

DESCRIPTION
FOR INFORMATION

PREPD

CHKD

APPD

MA

BR

SW

MLNG
SEEN

SEEN

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 2 OF 72

CONTENTS
1.

DESIGN CRITERIA ....................................................................................................................... 3


1.1. APPLICABLE DOCUMENTS................................................................................................. 3
1.2. ALLOWABLE EFFECTIVE LENGTH .................................................................................... 3
1.3. ALLOWABLE DEFLECTIONS .............................................................................................. 3

2.

LAYOUT PLAN ............................................................................................................................. 4


2.1. PIPING INFORMATION DRAWING ...................................................................................... 4
2.2. FRAMING SKETCH AND MEMBER LIST ............................................................................ 5

3.

DESIGN LOAD .............................................................................................................................. 7


3.1. DEAD LOAD ........................................................................................................................... 7
3.2. PIPING LOADS ...................................................................................................................... 7

4.

COMBINATIONS ........................................................................................................................... 8
4.1. FACTORED LOAD COMBINATION FOR STEEL STRUCTURE......................................... 8
4.2. UNFACTORED LOAD COMBINATION FOR STEEL STRUCTURE ................................. 10

5.

CALCULATION ........................................................................................................................... 12
5.1. ANALYSIS MODEL DIAGRAM ........................................................................................... 12
5.2. LOADING DATA .................................................................................................................. 13

6.

SUMMARY OF STEEL DESIGN ................................................................................................. 38

7.

STAADPRO INPUT DATA .......................................................................................................... 53

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 3 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

1. DESIGN CRITERIA
This calculation sheet is made to prove the safety of Flare Line Support II in MLNG TIGA AREA DRY GAS DIVERTER
MANIFOLD PROJECT.

1.1. APPLICABLE DOCUMENTS

a. S-000-1310-001

: General Specification for General Civil & Structure

b. International Codes and Standards


UBC 1997

: Uniform Building Code 1997

BS 5950

: Steel Structures Design

c. Reference Document
D-210-1338-004 ~007

: Pipe Rack Flare Line Support II Framing Plan and Elevation

D-000-1225-111 (2 of 4)

: Conceptual Piping Route for MLNG TIGA Area

H-210-1360-002

: Pipe Bridge, Stanchion and Sleeper Info For Offsite Area

PTS 34.00.01.30

: Minimum Requirements for Structural Design and Engineering

PTS 34.28.00.31

: Steel Structures

1.2. ALLOWABLE EFFECTIVE LENGTH


Allowable limitation of the ratio of effective length (kl) to the appropriate radius of gyration (r) is tabulated below:
For main compressive members

Kl/r 150

For bracing and other secondary members in compression

Kl/r 200

For main tension

Kl/r 250

For other member

Kl/r 300

1.3. ALLOWABLE DEFLECTIONS


Allowable Deflection shall refer to PTS 34.28.00.31 Item 2.2.5.
(a) Vertical Deflection:
- Due to total of dead load and live load

span / 400

(b) Horizontal Deflection


Total horizontal displacement of portal frames shall not exceed 1/150 of the height for equipment supporting
structures.

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

2. LAYOUT PLAN
2.1. PIPING INFORMATION DRAWING

Where :
P(N) = Load for Piping Operation Condition
P(T) = Load for Piping Hydrotest

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 4 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

2.2. FRAMING SKETCH AND MEMBER LIST

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 5 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 6 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 7 OF 72

3. DESIGN LOAD
3.1.

DEAD LOAD
Dead load including Selfweight, Piping empty and Piping operation.

LOADING DIAGRAMS
*SELFWEIGHT OF STRUCTURE*
LOAD 1 (a)
*DEAD-LOAD_ACCESSORY WEIGHT *
LOAD 2 (baccessory)
LOAD 3 (bother equip) *DEAD-LOAD_OTHER WEIGHT *
*PIPING-EMPTY WEIGHT*
LOAD 4 (dpipe)
*PIPING-OPERATION WEIGHT *
LOAD 5 (epipe)
*PIPING1-TEST LOAD *
LOAD 6 (fpipe.1)
*PIPING 2-TEST LOAD *
LOAD 7 (fpipe.2)
*PIPING 3-TEST LOAD *
LOAD 8 (fpipe.3)
*LIVE-LOAD *
LOAD 9 (g)
*LIVE-LOAD-ROOF*
LOAD 10 (groof)
*EQUIPMENT-EMPTY WEIGHT *
LOAD 11 (dequip)
*EQUIPMENT-OPERATION WEIGHT *
LOAD 12 (eequip)
*EQUIPMENT1 -TEST WEIGHT *
LOAD 13 (fequip.1)
*EQUIPMENT 2-TEST WEIGHT *
LOAD 14 (fequip.2)
*LOADS DURING ERECTION*
LOAD 15 (m)
*VOID*
LOAD 16 (VOID)
*THERMAL-ANCHOR-FORCE *
LOAD 17 (la)
*THERMAL-GUIDE-FORCE X-DIR *
LOAD 18 (lg.x)
*THERMAL-GUIDE-FORCE Z-DIR *
LOAD 19 (lg.z)
*THERMAL-GUIDE-FORCE Y-DIR *
LOAD 20 (lg.y)
*THERMAL-FRICTION-FORCE X-DIR *
LOAD 21 (lf.x)
*THERMAL-FRICTION-FORCE Z -DIR *
LOAD 22 (lf.z)
*THERMAL-SLIDING-FORCE X-DIR *
LOAD 23 (ls.x)
*THERMAL-SLIDING-FORCE Z-DIR *
LOAD 24 (ls.x)
*EARTHQUAKE-LOAD X-DIR *
LOAD 25 (nx)
*EARTHQUAKE-LOAD Z-DIR *
LOAD 26 (nx)
*EARTHQUAKE-LOAD-Y*
LOAD 27 (ny)
*WIND-LOAD-X*
LOAD 28 (hx)
*WIND-LOAD-Z*
LOAD 29 (hz)
*BUNDLE-PULLING-FORCES*
LOAD 30 (j)
*CRANE-LOADS*
LOAD 31 (c)

REMARKS
()
( )
(X)
(X)
()
()
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
()
()
(X)
(X)
()
(X)
(X)
()
()
()
()
()
(X)
(X)

Notes :
Remaks ( ) means that its load will be assigned on structure based on the latest piping info
Remaks ( X ) means that its load is not considered and not be assigned based on the latest piping info
3.2. Piping Loads
Refer to Piping info document H-210-1360-002 Info Drawing for MLNG TIGA Area.

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 8 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

4. COMBINATIONS
4.1. FACTORED LOAD COMBINATION FOR STEEL STRUCTURE

Load Description

a : Weight of structure proper


d : Empty weight
e : Operating weight
f : Test weight
g : Live loads
h : Wind loads
l : Thermal loads
n: Earthquake loads
Repeat
Load No.

Combination

101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128

LC. A
LC. A
LC. A
LC. A
LC. A
LC. A
LC. A
LC. A
LC. B
LC. B
LC. B
LC. B
LC. B
LC. B
LC. B
LC. B
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1

Operation
W/O
W/
Wind
Wind
A
B
1.4
1.2
1.4
1.2
1.6
1.2
1.2
1.4
1.2
-

Test

Erection

Oper. W/
Earthquake

C
1.2
1.2
1.2
0.6
-

D
1.2
1.2
1.2
1.2
-

E
1.0
1.0
1.4
1.4

Factored
1.4(a+e+l.af + l.gx + l.gz + l.gy + l.fx + l.fz + l.sx + l.sz) + 1.6.g
1.4(a+e+l.af - l.gx + l.gz + l.gy - l.fx + l.fz - l.sx + l.sz) + 1.6.g
1.4(a+e+l.af + l.gx - l.gz + l.gy + l.fx - l.fz + l.sx - l.sz) + 1.6.g
1.4(a+e+l.af - l.gx - l.gz + l.gy - l.fx - l.fz - l.sx - l.sz) + 1.6.g
1.4(a+e+l.af + l.gx + l.gz - l.gy + l.fx+ l.fz + l.sx + l.sz) + 1.6.g
1.4(a+e+l.af - l.gx + l.gz - l.gy - l.fx + l.fz - l.sx + l.sz) + 1.6.g
1.4(a+e+l.af + l.gx - l.gz - l.gy + l.fx - l.fz + l.sx - l.sz) + 1.6.g
1.4(a+e+l.af - l.gx - l.gz - l.gy - l.fx - l.fz - l.sx - l.sz) + 1.6.g
1.2(a+e+l.af + l.gx + l.gz + l.gy + l.fx + l.fz + l.sx + l.sz) + 1.2.hx
1.2(a+e+l.af - l.gx + l.gz + l.gy - l.fx + l.fz - l.sx + l.sz) - 1.2.hx
1.2(a+e+l.af + l.gx - l.gz + l.gy + l.fx - l.fz + l.sx - l.sz) + 1.2.hx
1.2(a+e+l.af - l.gx - l.gz + l.gy - l.fx - l.fz - l.sx - l.sz) - 1.2.hx
1.2(a+e+l.af + l.gx + l.gz - l.gy + l.fx+ l.fz + l.sx + l.sz) + 1.2.hz
1.2(a+e+l.af - l.gx + l.gz - l.gy - l.fx + l.fz - l.sx + l.sz) + 1.2.hz
1.2(a+e+l.af + l.gx - l.gz - l.gy + l.fx - l.fz + l.sx - l.sz) - 1.2.hz
1.2(a+e+l.af - l.gx - l.gz - l.gy - l.fx - l.fz - l.sx - l.sz) - 1.2.hz
1.2(a+g +fpipe.1) + 0.6.hx
1.2(a+g +fpipe.2) + 0.6.hx
1.2(a+g +fpipe.3) + 0.6.hx
1.2(a+g +fpipe.1) - 0.6.hx
1.2(a+g +fpipe.2) - 0.6.hx
1.2(a+g +fpipe.3) - 0.6.hx
1.2(a+g +fpipe.1) + 0.6.hz
1.2(a+g +fpipe.2) + 0.6.hz
1.2(a+g +fpipe.3) + 0.6.hz
1.2(a+g +fpipe.1) - 0.6.hz
1.2(a+g +fpipe.2) - 0.6.hz
1.2(a+g +fpipe.3) - 0.6.hz

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148

LC. C2
LC. C2
LC. C2
LC. C2
LC. C2
LC. C2
LC. C2
LC. C2
LC. D
LC. D
LC. D
LC. D
LC. E
LC. E
LC. E
LC. E
LC. E
LC. E
LC. E
LC. E

l.af
l.gx
l.gz
l.gy
l.fx
l.fz
l.sx
l.sz

0-0608-05-0000
C-210-1338-002
SHEET 9 OF 72

1.2(a+g +fequip.1) + 0.6.hx


1.2(a+g +fequip.2) + 0.6.hx
1.2(a+g +fequip.1) - 0.6.hx
1.2(a+g +fequip.2) - 0.6.hx
1.2(a+g +fequip.1) + 0.6.hz
1.2(a+g +fequip.2) + 0.6.hz
1.2(a+g +fequip.1) - 0.6.hz
1.2(a+g +fequip.2) - 0.6.hz
1.2(a+d+g) + 1.2.hx
1.2(a+d+g) - 1.2.hx
1.2(a+d+g) + 1.2.hz
1.2(a+d+g) - 1.2.hz
(a+e) + 1.4.( l.af + l.gx + l.gz + l.gy + l.fx + l.fz + l.sx + l.sz ) + 1.4.nx + 1.4.ny
(a+e) + 1.4.( l.af - l.gx + l.gz + l.gy - l.fx + l.fz - l.sx + l.sz ) - 1.4.nx + 1.4.ny
(a+e) + 1.4.( l.af + l.gx - l.gz + l.gy + l.fx - l.fz + l.sx - l.sz ) + 1.4.nx + 1.4.ny
(a+e) + 1.4.( l.af - l.gx - l.gz + l.gy - l.fx - l.fz - l.sx - l.sz ) - 1.4.nx + 1.4.ny
(a+e) + 1.4.( l.af + l.gx + l.gz - l.gy + l.fx+ l.fz + l.sx + l.sz ) + 1.4.nz - 1.4.ny
(a+e) + 1.4.( l.af - l.gx + l.gz - l.gy - l.fx + l.fz - l.sx + l.sz ) + 1.4.nz - 1.4.ny
(a+e) + 1.4.( l.af + l.gx - l.gz - l.gy + l.fx - l.fz + l.sx - l.sz ) - 1.4.nz - 1.4.ny
(a+e) + 1.4.( l.af - l.gx - l.gz - l.gy - l.fx - l.fz - l.sx - l.sz ) - 1.4.nz - 1.4.ny

Notes :

Job No. :
Doc. No. :

= Thermal anchor force


= Thermal guide force ( x-dir )
= Thermal guide force ( z-dir )
= Thermal guide force ( y-dir )
= Thermal friction force ( x-dir )
= Thermal friction force ( z-dir )
= Thermal sliding force ( x-dir )
= Thermal sliding force ( x-dir )

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 10 OF 72

4.2. UNFACTORED LOAD COMBINATION FOR STEEL STRUCTURE

Repeat
Load
No.
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240

Combination
LC. A
LC. A
LC. A
LC. A
LC. A
LC. A
LC. A
LC. A
LC. B
LC. B
LC. B
LC. B
LC. B
LC. B
LC. B
LC. B
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1
LC. C1
LC. C2
LC. C2
LC. C2
LC. C2
LC. C2
LC. C2
LC. C2
LC. C2
LC. D
LC. D
LC. D
LC. D

Unfactored
1.0(a+e+l.af + l.gx + l.gz + l.gy + l.fx + l.fz + l.sx + l.sz) + 1.0.g
1.0 (a+e+l.af - l.gx + l.gz + l.gy - l.fx + l.fz - l.sx + l.sz) + 1.0.g
1.0 (a+e+l.af + l.gx - l.gz + l.gy + l.fx - l.fz + l.sx - l.sz) + 1.0.g
1.0 (a+e+l.af - l.gx - l.gz + l.gy - l.fx - l.fz - l.sx - l.sz) + 1.0.g
1.0 (a+e+l.af + l.gx + l.gz - l.gy + l.fx+ l.fz + l.sx + l.sz) + 1.0.g
1.0 (a+e+l.af - l.gx + l.gz - l.gy - l.fx + l.fz - l.sx + l.sz) + 1.0.g
1.0 (a+e+l.af + l.gx - l.gz - l.gy + l.fx - l.fz + l.sx - l.sz) + 1.0.g
1.0 (a+e+l.af - l.gx - l.gz - l.gy - l.fx - l.fz - l.sx - l.sz) + 1.0.g
1.0(a+e+l.af + l.gx + l.gz + l.gy + l.fx + l.fz + l.sx + l.sz) + 1.0.hx
1.0(a+e+l.af - l.gx + l.gz + l.gy - l.fx + l.fz - l.sx + l.sz) - 1.0.hx
1.0(a+e+l.af + l.gx - l.gz + l.gy + l.fx - l.fz + l.sx - l.sz) + 1.0.hx
1.0(a+e+l.af - l.gx - l.gz + l.gy - l.fx - l.fz - l.sx - l.sz) - 1.0.hx
1.0(a+e+l.af + l.gx + l.gz - l.gy + l.fx+ l.fz + l.sx + l.sz) + 1.0.hz
1.0(a+e+l.af - l.gx + l.gz - l.gy - l.fx + l.fz - l.sx + l.sz) + 1.0.hz
1.0(a+e+l.af + l.gx - l.gz - l.gy + l.fx - l.fz + l.sx - l.sz) - 1.0.hz
1.0(a+e+l.af - l.gx - l.gz - l.gy - l.fx - l.fz - l.sx - l.sz) - 1.0.hz
1.0(a+g +fpipe.1) + 0.5.hx
1.0(a+g +fpipe.2) + 0.5.hx
1.0(a+g +fpipe.3) + 0.5.hx
1.0(a+g +fpipe.1) - 0.5.hx
1.0(a+g +fpipe.2) - 0.5.hx
1.0(a+g +fpipe.3) - 0.5.hx
1.0(a+g +fpipe.1) + 0.5.hz
1.0(a+g +fpipe.2) + 0.5.hz
1.0(a+g +fpipe.3) + 0.5.hz
1.0(a+g +fpipe.1) - 0.5.hz
1.0(a+g +fpipe.2) - 0.5.hz
1.0(a+g +fpipe.3) - 0.5.hz
1.0(a+g +fequip.1) + 0.5.hx
1.0(a+g +fequip.2) + 0.5.hx
1.0(a+g +fequip.1) - 0.5.hx
1.0(a+g +fequip.2) - 0.5.hx
1.0(a+g +fequip.1) + 0.5.hz
1.0(a+g +fequip.2) + 0.5.hz
1.0(a+g +fequip.1) - 0.5.hz
1.0(a+g +fequip.2) - 0.5.hz
1.0(a+d+g) + 1.0.hx
1.0(a+d+g) - 1.0.hx
1.0(a+d+g) + 1.0.hz
1.0(a+d+g) - 1.0.hz

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

241
242
243
244
245
246
247
248

LC. E
LC. E
LC. E
LC. E
LC. E
LC. E
LC. E
LC. E

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 11 OF 72

(a+e) + 1.0.( l.af + l.gx + l.gz + l.gy + l.fx + l.fz + l.sx + l.sz ) + 1.0.nx + 1.0.ny
(a+e) + 1.0.( l.af - l.gx + l.gz + l.gy - l.fx + l.fz - l.sx + l.sz ) - 1.0.nx + 1.0.ny
(a+e) + 1.0.( l.af + l.gx - l.gz + l.gy + l.fx - l.fz + l.sx - l.sz ) + 1.0.nx + 1.0.ny
(a+e) + 1.0.( l.af - l.gx - l.gz + l.gy - l.fx - l.fz - l.sx - l.sz ) - 1.0.nx + 1.0.ny
(a+e) + 1.0.( l.af + l.gx + l.gz - l.gy + l.fx+ l.fz + l.sx + l.sz ) + 1.0.nz - 1.0.ny
(a+e) + 1.0.( l.af - l.gx + l.gz - l.gy - l.fx + l.fz - l.sx + l.sz ) + 1.0.nz - 1.0.ny
(a+e) + 1.0.( l.af + l.gx - l.gz - l.gy + l.fx - l.fz + l.sx - l.sz ) - 1.0.nz - 1.0.ny
(a+e) + 1.0.( l.af - l.gx - l.gz - l.gy - l.fx - l.fz - l.sx - l.sz ) - 1.0.nz - 1.0.ny

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

5. CALCULATION
5.1. ANALYSIS MODEL DIAGRAM
5.1.1. JOINT NUMBER.

5.1.2. MEMBER NUMBER

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 12 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 13 OF 72

5.2. LOADING DATA


5.2.1. LOAD 1 DEAD LOAD SELFWEIGHT
Selfweight is automatically calculated by Staad Pro 2007.

5.2.2.LOAD 2 DEAD LOAD ACCESSORY WEIGHT

GRATING LOAD
BEAM
NUMBER
157 158
243
245
245
83
83
83
242
252
169
146
146
146
107 108

ELEV.

P(kN)

STAAD INPUT

Ton

kN

GD +29.770

0.1

0.981

157 158 243 UNI Y -0.981

GD +29.770
GD +29.770
GD +29.770
GD +29.770
GD +29.770
GD +29.770
GD +29.770
GD +29.770
GD +29.770
GD +29.770
GD +29.770

0.1
0.1
0.1
0.1
0.1
0.19
0.19
0.19
0.19
0.19
0.19

0.981
0.981
0.981
0.981
0.981
1.96
1.96
1.96
1.96
1.96
1.96

245 UNI Y -0.981 0.25 2.25


245 UNI Y -0.981 0 0.25
83 UNI Y -0.981 1.84 2.25
83 UNI Y -0.981 0.93 1.84
83 UNI Y -0.981 0 0.93
242 UNI Y -1.96
252 UNI Y -1.96 0 1.55
169 UNI Y -1.96 0 0.25
146 UNI Y -1.96 1.84 2.25
146 UNI Y -1.96 0.93 1.84
146 UNI Y -1.96 0 0.93

GD +14.950

0.02

0.2

107 108 UNI Y -0.2

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 14 OF 72

122 156
216

GD +22.070

0.02

0.2

122 156 216 UNI Y -0.2

234 235
237 248

GD +29.770

0.02

0.2

122 156 216 234 235 237


248 UNI Y -0.2

LEDDER LOAD
BEAM
NUMBER

ELEV.

P(kN)
Ton

kN

STAAD INPUT

90

GD +22.070

0.25

2.48

90 CON GY -2.48 0.5

90

GD +22.070

0.25

2.48

90 CON GY -2.48 0.1

149

GD +14.950

0.27

2.65

149 CON GY -2.65 0.5

149
152
152

GD +14.950
GD +29.770
GD +29.770

0.27
0.275
0.275

2.65
2.695
2.695

152 CON GY -2.695 0.5


152 CON GY -2.695 0.9

149 CON GY -2.65 0.1

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 15 OF 72

5.2.3.LOAD 5 PIPING OPERATION LOAD (at GD +12.350 , GD +13.450, GD +29.200 and GD


+29.770 )
Refer to Piping Info H-210-1360-002

BEAM
NUMBER

ELEV.

P(kN)
Ton

kN

5.886
7.848
8.829
8.829
68.67

58

GD +29.200

0.6

59

GD +29.200
GD +12.350

0.8

85
87
41

GD +12.350
GD +13.450

0.9
0.9
7.7

STAAD INPUT
58 CON GY -5.886 0.9
59 CON GY -7.848 0.9
85 UNI Y -8.829 0 1.2
87 UNI Y -8.829 0.6 1.8
41 CON GY -68.67 0.9

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 16 OF 72

LOAD FROM OTHER STRUCTURE


BEAM
NUMBER
85

ELEV.
GD +12.350
GD +12.350
GD +12.350
GD +12.350
GD+12.350
GD +12.350

P(kN)
Ton
0.021
0.0002

kN
0.207

85 CON GX -0.207 0

0.002

85 CON GX -0.002 1.2

0
0.0002
0.177
0.207

STAAD INPUT

85 CON GY 0 0

0.002

85 CON GY -0.002 1.2

1.742

85 CON GZ -1.742 0

2.035

85 CON GZ -2.035 1.2

LOAD FROM PIPING VALVE AT 29.770


BEAM
NUMBER
244
245
250
250
251
83
83
245

ELEV.

P(kN)

STAAD INPUT

Ton
0.288

kN
2.829

244 CON GY -8.829 0.24

GD +29.770

1.4

13.734

245 CON GY -13.734 2.05

GD +29.770

0.1

0.981

250 CON GY -0.981 0.93

GD +29.770

0.1

0.981

250 CON GY -0.981 1.84

GD +29.770

0.1

0.981

251 CON GY -0.981 0.5

GD +29.770

0.3

2.943

83 CON GY -2.943 0.93

GD +29.770

0.3

2.943

83 CON GY -2.943 1.84

GD +29.770

0.2

1.962

245 CON GY -1.962 0.5

GD +29.770

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 17 OF 72

5.2.4.LOAD 6 PIPING HYDROTEST LOAD (PH1) (at GD +12.350 and GD +13.450)

JOINT
NUMBER

ELEV.

41

GD +13.450

P(N)

STAAD INPUT

Ton

kN

12.8

125.568

41 CON GY -125.568 0.9

LOAD FROM OTHER STRUCTURE


BEAM
NUMBER
85

ELEV.
GD +12.350
GD +12.350
GD +12.350
GD +12.350
GD+12.350
GD +12.350

P(kN)
Ton

STAAD INPUT

0.006

kN
0.687

85 CON GX -0.687 0

0.0001

0.002

85 CON GX -0.002 1.2

0.003

85 CON GY -0.003 0

85 CON GY 0 1.2

0.0478

0.623

85 CON GZ -0.623 0

0.0083

3.313

85 CON GZ -3.313 1.2

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 18 OF 72

5.2.5.LOAD 18 THERMAL-GUIDE-FORCE X-DIR (at GD +13.450 and GD +29.200)

MEMBER
NUMBER

ELEV.

58
59
41

GD +29.200
GD +29.200
GD +13.350

P (kN)
Ton/m
0.299
0.199
1.299

kN
2.943
1.962
12.753

STAAD INPUT
58 CON GX 2.943 0.9
59 CON GX 1.962 0.9
41 CON GX 12.753 0.9

LOAD FROM OTHER STRUCTURE


BEAM
NUMBER
85

ELEV.
GD +12.350
GD +12.350
GD +12.350
GD +12.350
GD+12.350
GD +12.350

P(kN)

STAAD INPUT

Ton

kN

0.006

0.059

85 CON GX -0.059 0

0.0001

0.001

85 CON GX -0.001 1.2

85 CON GY 0 0

85 CON GY 0 1.2

0.0478

0.469

85 CON GZ -0.469 0

0.0083

0.081

85 CON GZ -0.081 1.2

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 19 OF 72

5.2.6.LOAD 19 THERMAL-GUIDE-FORCE Z-DIR (at GD +13.450 and GD +29.200)

JOINT
NUMBER

ELEV.

P(kN)

STAAD INPUT

Ton

kN

13.734
110.853

58

GD +29.200

1.399

41

GD +13.450

11.295

58 CON GZ 13.734 0.9


41 CON GZ 110.853 0.9

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 20 OF 72

5.2.7. LOAD 22 THERMAL FRICTION FORCE (GFZ) (at GD +12.350, GD +13.450)


Friction Load = 30% x Normal Operating Load

MEMBER
NUMBER
41
85
87

ELEV.
GD +13.450
GD +12.350
GD +12.350

Q (kN/m)
Ton/m

kN/m

2.309
0.269
0.269

22.661
2.648
2.648

STAAD INPUT
41 CON GZ 22.661 0.9
85 UNI Z 2.648 0 1.2
87 UNI Z -2.648 0.6 1.8

LOAD FROM OTHER STRUCTURE


BEAM
NUMBER
85

ELEV.
GD +12.350
GD +12.350
GD +12.350
GD +12.350
GD+12.350
GD +12.350

P(kN)

STAAD INPUT

Ton

kN

0.081

0.791

85 CON GX 0.791 0

0.002

0.02

85 CON GX 0.02 1.2

0.00081

0.008

85 CON GY -0.008 0

0.00091

0.009

85 CON GY -0.009 1.2

1.96

19.227

85 CON GZ 19.227 0

1.91

18.787

85 CON GZ 18.787 1.2

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 21 OF 72

5.2.8.LOAD 25 TO 27 EARTHQUAKE LOADS


Seismic forces shall be in accordance with UBC 1997 as following: parameters:
Zone

: 1, seismic factor, z = 0.075 (Table 16-I)

Importance Factor (I)

: 1 (Table 16-K)

Soil Profile

: SD

PGA (Peak Ground Acceleration)

: 0.05 g

Ca (Seismic Coefficient)

: 0.12

Cv (Seismic Coefficient)

: 0.18

R ( Overstrength & Ductility Coefficient )

: 5.6

5.2.8.1.

EARTHQUAKE LOAD (X-DIR and Y-DIR)

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 22 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

STR ID:

PR FLARE II

Vertical Distribution of Forces

CvI

V Ft Fi

RT

V max

2.5CaI

where;

Ft 0.07TV 0.25V

Ft 0 when T 0.7 sec

Vmin 0.11CaIW
Ft + Fn

where:
W = Total Seismic Dead Load
T = Elastic fundamental period of vibration

F
i

Wn

(V Ft)w ihi
w ihi

W2
F2
hn

3/4
T C t (hn )
r=

F1

W1

h2
h1

GL

EL 7.400

Cv =
Ca =
R=
I=

0.18
0.12
5.6
1.00

JOINT

3
5
7
9
11
13
15
19
21
23
25
27
29
31
33
40
42
45
47
50
52
56

Cv =
Ca =
R=
I=

0.18
0.12
5.6
1.00

JOINT

4
6
8
10
12
14
16
20
22
24
26
28
30
32
34
41
43

Ct =
hn =
T=
W=

Level

10.9
13.6
15.12
18.67
22.22
25.68
29.15
10.9
13.6
15.12
18.67
22.22
25.68
29.15
29.92
10.9
13.6
15.12
18.67
22.22
25.68
29.92

Ct =
hn =
T=
W=

Level

10.9
13.6
15.12
18.67
22.22
25.68
29.15
10.9
13.6
15.12
18.67
22.22
25.68
29.15
29.92
10.9
13.6

0.0853
22.370 m
0.877 sec
179 kN

hi
(m)
3.50
6.20
7.72
11.27
14.82
18.28
21.75
3.50
6.20
7.72
11.27
14.82
18.28
21.75
22.52
3.50
6.20
7.72
11.27
14.82
18.28
22.52

V=
Vmax =
Vmin =
V=

wi
(kN)
10.96
4.47
6.29
6.96
6.89
6.72
6.11
19.81
4.58
7.08
4.82
5.12
4.79
3.92
10.95
14.73
3.42
9.55
7.29
10.48
11.40
12.69

38.36
27.69
48.54
78.43
102.09
122.79
132.96
69.35
28.40
54.62
54.31
75.85
87.60
85.26
246.62
51.56
21.19
73.69
82.14
155.27
208.37
285.76

179

2131

3.50
6.20
7.72
11.27
14.82
18.28
21.75
3.50
6.20
7.72
11.27
14.82
18.28
21.75
22.52
3.50
6.20

V=
Vmax =
Vmin =
V=

wi
(kN)
10.96
38.72
6.29
6.96
6.89
6.72
7.09
17.60
39.35
6.50
7.19
7.10
7.21
7.49
18.31
15.30
3.35

w ihi
(kN-m)
38.36
240.05
48.54
78.43
102.09
122.75
154.29
61.61
243.97
50.19
81.04
105.25
131.74
162.99
412.43
53.53
20.75

0.037 W
0.054 W
0.013 W
0.037 W

wi.hi
.wi.hi

w i hi
(kN-m)

0.0853
22.370 m
0.877 sec
260 kN

hi
(m)

=
=
=
=

0.018
0.013
0.023
0.037
0.048
0.058
0.062
0.033
0.013
0.026
0.025
0.036
0.041
0.040
0.116
0.024
0.010
0.035
0.039
0.073
0.098
0.134

=
=
=
=

0.037 W
0.054 W
0.013 W
0.037 W

wi.hi
.wi.hi
0.013
0.083
0.017
0.027
0.035
0.043
0.054
0.021
0.085
0.017
0.028
0.037
0.046
0.057
0.143
0.019
0.007

V = 6.56 kN

Fi
(kN)

Ft
(kN)

Ft = 0.40 kN
Fv
Fi
(kN)
= Fi+ Ft
(kN)

0.11
0.08
0.14
0.23
0.29
0.35
0.38
0.20
0.08
0.16
0.16
0.22
0.25
0.25
0.71
0.15
0.06
0.21
0.24
0.45
0.60
0.83

0.11
0.08
0.14
0.23
0.29
0.35
0.38
0.20
0.08
0.16
0.16
0.22
0.25
0.25
0.71
0.15
0.06
0.21
0.24
0.45
0.60
0.83

0.66
0.27
0.38
0.42
0.41
0.40
0.37
1.19
0.27
0.42
0.29
0.31
0.29
0.24
0.66
0.88
0.21
0.57
0.44
0.63
0.68
0.76

11

Ev =

V = 9.51 kN

Fi
(kN)
0.08
0.51
0.10
0.17
0.32
0.38
0.48
0.19
0.76
0.16
0.25
0.33
0.41
0.51
1.28
0.17
0.06

Ft
(kN)

Ft = 0.58 kN
Fv
Fi
(kN)
= Fi+ Ft
(kN)
0.08
0.51
0.10
0.17
0.32
0.38
0.48
0.19
0.76
0.16
0.25
0.33
0.41
0.51
1.28
0.17
0.06

0.66
2.32
0.38
0.42
0.41
0.40
0.43
1.06
2.36
0.39
0.43
0.43
0.43
0.45
1.10
0.92
0.20

31
29.15
21.75
33
29.92
22.52
40
10.9
3.50
42
13.6
6.20
45
15.12
7.72
DETAIL ENGINEERING
FOR DRY11.27
GAS
47
18.67
50
22.22
14.82
DESIGN CALCULATION
REPORT18.28
FOR
52
25.68
29.92
22.52
SUPPORT II56

3.92
85.26
0.040
10.95
246.62
0.116
14.73
51.56
0.024
3.42
21.19
0.010
9.55
73.69
0.035
DIVERTER
MANIFOLD
7.29
82.14
0.039
10.48
155.27
0.073
FLARE
11.40 LINE
208.37
0.098
12.69
285.76
0.134
179

Cv =
Ca =
R=
I=

0.18
0.12
5.6
1.00

JOINT

4
6
8
10
12
14
16
20
22
24
26
28
30
32
34
41
43
46
48
51
53
57

Ct =
hn =
T=
W=

Level

10.9
13.6
15.12
18.67
22.22
25.68
29.15
10.9
13.6
15.12
18.67
22.22
25.68
29.15
29.92
10.9
13.6
15.12
18.67
22.22
25.68
29.92

0.0853
22.370 m
0.877 sec
260 kN

hi
(m)
3.50
6.20
7.72
11.27
14.82
18.28
21.75
3.50
6.20
7.72
11.27
14.82
18.28
21.75
22.52
3.50
6.20
7.72
11.27
14.82
18.28
22.52

2131

V=
Vmax =
Vmin =
V=

wi
(kN)

0.25
0.71
0.15
0.06
0.21
Job 0.24
No. :
Doc.0.45
No. :
0.60
0.83

w ihi
(kN-m)

10.96
38.72
6.29
6.96
6.89
6.72
7.09
17.60
39.35
6.50
7.19
7.10
7.21
7.49
18.31
15.30
3.35
6.31
6.97
6.91
12.16
14.13

38.36
240.05
48.54
78.43
102.09
122.75
154.29
61.61
243.97
50.19
81.04
105.25
131.74
162.99
412.43
53.53
20.75
48.71
78.57
102.42
222.27
318.28

260

2878

0.25
0.24
0.71
0.66
0.15
0.88
0.06
0.21
0.21
0.57
0-0608-05-0000
0.24
0.44
C-210-1338-002
0.45
0.63
SHEET
230.68
OF 72
0.60
0.83
0.76

=
=
=
=

0.037 W
0.054 W
0.013 W
0.037 W

wi.hi
.wi.hi
0.013
0.083
0.017
0.027
0.035
0.043
0.054
0.021
0.085
0.017
0.028
0.037
0.046
0.057
0.143
0.019
0.007
0.017
0.027
0.036
0.077
0.111

11

Ev =

V = 9.51 kN

Fi
(kN)

Ft
(kN)

Ft = 0.58 kN
Fv
Fi
(kN)
= Fi+ Ft
(kN)

0.08
0.51
0.10
0.17
0.32
0.38
0.48
0.19
0.76
0.16
0.25
0.33
0.41
0.51
1.28
0.17
0.06
0.15
0.24
0.32
0.69
0.99

0.08
0.51
0.10
0.17
0.32
0.38
0.48
0.19
0.76
0.16
0.25
0.33
0.41
0.51
1.28
0.17
0.06
0.15
0.24
0.32
0.69
0.99

0.66
2.32
0.38
0.42
0.41
0.40
0.43
1.06
2.36
0.39
0.43
0.43
0.43
0.45
1.10
0.92
0.20
0.38
0.42
0.41
0.73
0.85

16

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 24 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

5.2.8.2. EARTHQUAKE LOAD (Z-DIR)

Cv =
Ca =
R=
I=

0.18
0.12
5.6
1.00
JOINT

3
5
7
9
11
13
15
4
6
8
10
12
14
16

Ct =
hn =
T=
W=
Level

10.90
13.60
15.12
18.67
22.22
25.68
29.15
10.90
13.60
15.12
18.67
22.22
25.68
29.15

0.0853
21.600 m
0.855 sec
132 kN
hi
wi
(m)
(kN)
3.50
6.20
7.72
11.27
14.82
18.28
21.75
3.50
6.20
7.72
11.27
14.82
18.28
21.75

V=
Vmax =
Vmin =
V=
w i hi
(kN-m)

10.96
4.47
6.29
6.96
6.89
6.72
6.11
10.96
38.72
6.29
6.96
6.89
6.72
7.09

38.36
27.69
48.54
78.43
102.09
122.79
132.96
38.36
240.05
48.54
78.43
102.09
122.75
154.29

132.01

1335.37

=
=
=
=

0.038 W
0.054 W
0.013 W
0.038 W

wi.hi
.wi.hi
0.029
0.021
0.036
0.059
0.076
0.092
0.100
0.029
0.180
0.036
0.059
0.076
0.092
0.116

V = 4.96 kN
Fi
Ft
(kN)
(kN)

Ft = 0.30

0.13
0.10
0.17
0.27
0.36
0.43
0.46
0.13
0.84
0.17
0.27
0.36
0.43
0.54

Fi
= Fi+ Ft
(kN)
0.13
0.10
0.17
0.27
0.36
0.43
0.46
0.13
0.84
0.17
0.27
0.36
0.43
0.54

4.67

4.67

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 25 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

Cv =
Ca =
R=
I=

0.18
0.12
5.60
1.00
JOINT

19
21
23
25
27
29
31
33
20
22
24
26
28
30
32
34

Cv =
Ca =
R=
I=

0.18
0.12
5.60
1.00
JOINT

40
42
45
47
50
52
56
41
43
46
48
51
53
57

Ct =
hn =
T=
W=
Level

10.90
13.60
15.12
18.67
22.22
25.68
29.15
29.92
10.90
13.60
15.12
18.67
22.22
25.68
29.15
29.92

Ct =
hn =
T=
W=
Level

10.90
13.60
15.12
18.67
22.22
25.68
29.92
10.90
13.60
15.12
18.67
22.22
25.68
29.92

0.0853
22.370 m
0.877 sec
172 kN
hi
wi
(m)
(kN)
3.50
6.20
7.72
11.27
14.82
18.28
21.75
22.52
3.50
6.20
7.72
11.27
14.82
18.28
21.75
22.52

V=
Vmax =
Vmin =
V=
w i hi
(kN-m)

19.81
4.58
7.08
4.82
5.12
4.79
3.92
10.95
17.60
39.35
6.50
7.19
7.10
7.21
7.49
18.31

69.35
28.40
54.62
54.31
75.85
87.60
85.26
246.62
61.61
243.97
50.19
81.04
105.25
131.74
162.99
412.43

172

1951

0.0853
22.370 m
0.877 sec
135 kN
hi
wi
(m)
(kN)
3.50
6.20
7.72
11.27
14.82
18.28
22.52
3.50
6.20
7.72
11.27
14.82
18.28
22.52

V=
Vmax =
Vmin =
V=
w i hi
(kN-m)

14.73
3.42
9.55
7.29
10.48
11.40
12.69
15.30
3.35
6.31
6.97
6.91
12.16
14.13

51.56
21.19
73.69
82.14
155.27
208.37
285.76
53.53
20.75
48.71
78.57
102.42
222.27
318.28

135

1723

=
=
=
=

0.037 W
0.054 W
0.013 W
0.037 W

wi.hi
.wi.hi
0.036
0.015
0.028
0.028
0.039
0.045
0.044
0.126
0.032
0.125
0.026
0.042
0.054
0.068
0.084
0.211

=
=
=
=

0.037 W
0.054 W
0.013 W
0.037 W

wi.hi
.wi.hi
0.026
0.011
0.038
0.042
0.080
0.107
0.146
0.027
0.011
0.025
0.040
0.052
0.114
0.163

V = 6.29 kN
Fi
Ft
(kN)
(kN)

Ft = 0.39

0.21
0.09
0.17
0.16
0.23
0.27
0.26
0.75
0.19
0.74
0.15
0.25
0.32
0.40
0.49
1.25

Fi
= Fi+ Ft
(kN)
0.21
0.09
0.17
0.16
0.23
0.27
0.26
0.75
0.19
0.74
0.15
0.25
0.32
0.40
0.49
1.25

V = 4.93 kN
Fi
Ft
(kN)
(kN)

Ft = 0.30

0.16
0.06
0.22
0.25
0.47
0.63
0.87
0.16
0.06
0.15
0.24
0.31
0.67
0.96

Fi
= Fi+ Ft
(kN)
0.16
0.06
0.22
0.25
0.47
0.63
0.87
0.16
0.06
0.15
0.24
0.31
0.67
0.96

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 26 OF 72

5.2.9. LOAD 28, 29 WIND LOAD

Wind loads shall be determined in accordance with Appendix 1 of PTS 34.00.01.30-Gen.


Highest mean hourly wind speed V10 at 10m above ground level is 18 m/s.
Exposure category

:2

Gust factor

: All structures shall be designed for a 10-second gust,

Uz

: the design wind speed at height z (m), thus:


Uz = F x V10 x (z/10)

where,

1/

(m/s)

1/ = 1/11
z = height (m)

The wind force (W) shall be calculated as follows:


W = Pz x A (N)
Where
Pz = Design wind pressure per unit area acting on a structure in the direction of the wind at height z
(N/m2)
Pz = 0.637 x Uz2 x Cf x K
where,

Cf : The shape coefficient for infinitely long bodies - are presented in

Table 2 on Appendix 1 of PTS 34.00.01.30


K : The correction factor for aspect ratio - are presented in Table 3 on Appendix 1 of PTS 34.00.01.30
A : Projected area of all the elements of the wind word face (m2)

The wind can blow in any direction and the most unfavourable case shall be considered. For overhead
pipe tracks of 4 m wide or less, the wind load on the three largest pipes shall be taken into account. For
overhead pipe tracks of over 4 m wide, the wind load on the four largest pipes shall be taken into
account.

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 27 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

5.2.9.1. Wind Load Calculation ( X-Dir )

STRUCTURE ID :
PR FLARE II-ex struc.

STRUCTURE PROPERTIES
Ground level : EL.
Number of frame (n)

Length of Structure (m)


3 4 40 41
Level
EL

FRAME NAME :
A-B

For Solidity Ratio


Height (m)
Width (m)

7.250
3
5
Member

D, d, h
(m)

Frame

Column
(Post)

EL+10.750

22.37
3.80

Area HxW (m2)

Category

COLUMN NUMBER :
LINE
1-4

FRAME

FPRF(Insl.)
THK(m)

WIND LOAD SUMMARY


Fwi =
Total Wind Force :

85.01
UW
(m)

1.316
0.6

Aei
(m2)

Cfm

Uz
(m/s)

Pz
(kN)

1.80

23.19

2.28

Fwi / 3 =

0.76 kN

Uz
(m/s)
23.19

Pz
(kN)
1.87

20.440

0.681

Fwi / 3 =

0.85 kN

Factor or
Quantity

0.35

6.05

0.50

1.06

Girder
(Beam)

0.25

5.00

0.50

0.63

V.Brace

0.20

3.68

0.50

0.37

2.05

2.28 kN
Member
Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.25

48.19 kN

L/W =
K=

L
(m)

Sub Total of Effective Solid Area


Total wind force Fwi =
19 20
Level
Category
EL
EL+10.750
Frame

DIR.
X

L
(m)
6.05

Factor or
Quantity
0.50

UW
(m)

Aei
(m2)

Cfm

1.06

1.80

5.00

0.50

0.63

10.00

1.00

1.68
2.03

V.Brace

EL+10.850

Transverse
Pipe

Total wind force Fwi =

Sub Total of Effective Solid Area


Bundle
0.20

2.55 kN

0.70
0.70
0.70

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 28 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

Level
EL
EL+13.450

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.25

L
(m)
4.22

Factor or
Quantity
0.50

5.00

0.50

UW
(m)

Aei
(m2)

Cfm

0.74

1.80

Uz
(m/s)
24.23

Pz
(kN)
1.65

0.63

V.Brace

Transverse
Pipe
EL+13.550

Sub Total of Effective Solid Area


Bundle

Single

Total wind force Fwi =


42 43
Level
Category
EL
EL+13.450
Frame

0.91

1.36

7.50

0.50

0.70
0.70
0.70
0.70
0.70

3.41

2.80 kN
Member
Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.25

L
(m)
4.22

Factor or
Quantity
0.50

5.00

0.50

UW
(m)

Aei
(m2)

Cfm

0.74

1.80

20.440

1.144

Fwi / 3 =

0.93 kN

Uz
(m/s)
24.23

Pz
(kN)
1.65

Fwi / 3 =

0.55 kN

Uz
(m/s)
24.69

Pz
(kN)
2.45

Fwi / 3 =

0.82 kN

Uz
(m/s)
24.69

Pz
(kN)
3.45

20.440

0.01

Fwi / 3 =

1.15 kN

0.63

V.Brace

Sub Total of Effective Solid Area

Total wind force Fwi =


78
Level
Category
EL
EL+14.970
Frame

Accessory

Total wind force Fwi =


45 46
Level
Category
EL
EL+14.970
Frame

Accessory

EL+14.970

Total wind force Fwi =

1.36

1.65 kN
Member
Column
(Post)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

L
(m)
5.07

Factor or
Quantity
0.50

UW
(m)

Aei
(m2)

Cfm

0.89

1.80

Girder
(Beam)

0.25

5.00

0.50

0.63

V.Brace

0.20

4.34

0.50

0.43

Sub Total of Effective Solid Area


Handrail
Ladder w/o hoop front
Ladder w/o hoop side
Ladder w/ hoop front
Ladder w/ hoop side
Stair front
Stair side

1.95
0.24
0.22
0.26
0.46
0.44
0.58
1.45

2.45 kN
Member
Column
(Post)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

L
(m)
5.07

Factor or
Quantity
0.50

UW
(m)

Aei
(m2)

Cfm

0.89

1.80

Girder
(Beam)

0.25

5.00

0.50

0.63

V.Brace

0.20

12.26

0.50

1.23

Sub Total of Effective Solid Area


Handrail
Ladder w/o hoop front
Ladder w/o hoop side
Ladder w/ hoop front
Ladder w/ hoop side
Stair front
Stair side
3.46 kN

2.74

7.57

1.00

0.24
0.22
0.26
0.46
0.44
0.58
1.45

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 29 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

Level
EL
EL+14.970

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.25

L
(m)
5.07

Factor or
Quantity
0.50

5.00

0.50

UW
(m)

Aei
(m2)

Cfm

0.89

2.00

Uz
(m/s)
24.69

Pz
(kN)
2.11

Fwi / 3 =

0.70 kN

Uz
(m/s)
25.62

Pz
(kN)
3.46

Fwi / 3 =

1.15 kN

Uz
(m/s)
25.62

Pz
(kN)
2.81

Fwi / 3 =

0.94 kN

Uz
(m/s)
26.15

Pz
(kN)
3.38

Fwi / 3 =

1.13 kN

0.63

V.Brace

Accessory

Total wind force Fwi =


9 10 47 48
Level
Category
EL
EL+18.520
Frame

Sub Total of Effective Solid Area


Handrail
Ladder w/o hoop front
Ladder w/o hoop side
Ladder w/ hoop front
Ladder w/ hoop side
Stair front
Stair side

1.51
0.24
0.22
0.26
0.46
0.44
0.58
1.45

2.11 kN
Member
Column
(Post)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

L
(m)
7.10

Factor or
Quantity
0.50

UW
(m)

Cfm
2.00

Girder
(Beam)

0.25

5.00

0.50

0.63

V.Brace

0.20

4.34

0.50

0.43

Sub Total of Effective Solid Area


Total wind force Fwi =
25 26
Level
Category
EL
EL+18.520
Frame

Aei
(m2)
1.24

2.30

3.46 kN
Member
Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.25

L
(m)
7.10

Factor or
Quantity
0.50

5.00

0.50

UW
(m)

Aei
(m2)

Cfm

1.24

2.00

0.63

V.Brace

Sub Total of Effective Solid Area

10

Total wind force Fwi =


11 12
Level
Category
EL
EL+22.070
Frame

1.87

2.81 kN
Member
Column
(Post)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

L
(m)
7.01

Factor or
Quantity
0.50

UW
(m)

Cfm

1.23

2.00

Girder
(Beam)

0.20

5.00

0.50

0.50

V.Brace

0.20

4.27

0.50

0.43

Sub Total of Effective Solid Area


Total wind force Fwi =

Aei
(m2)

2.15

3.38 kN

50 51

11

Level
EL
EL+22.070

Category

Member

Frame

Column
(Post)

Accessory

EL+22.070

Total wind force Fwi =

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

L
(m)
7.01

Factor or
Quantity
0.50

UW
(m)

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

1.23

2.00

26.15

Fwi
(kN)
3.38

20.440

0.01

Fwi / 3 =

1.13 kN

Girder
(Beam)

0.20

5.00

0.50

0.50

V.Brace

0.20

4.27

0.50

0.43

Sub Total of Effective Solid Area


Handrail
Ladder w/o hoop front
Ladder w/o hoop side
Ladder w/ hoop front
Ladder w/ hoop side
Stair front
Stair side
3.39 kN

2.15

7.10

0.50

0.24
0.22
0.26
0.46
0.44
0.58
1.45

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 30 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

12

Level
EL
EL+22.070

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
7.01

Factor or
Quantity
1.00

5.00

0.50

UW
(m)

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

2.45

2.00

26.15

Fwi
(kN)
4.63

Fwi / 3 =

1.54 kN

0.50

V.Brace

Sub Total of Effective Solid Area


Total wind force Fwi =

2.95

4.63 kN

13 14 52 53

13

Level
EL
EL+25.530

Category

Member

Frame

Column
(Post)

Transverse
Pipe

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

L
(m)
6.93

Factor or
Quantity
0.50

UW
(m)

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

1.21

2.00

26.71

Fwi
(kN)
3.50

Girder
(Beam)

0.20

5.00

0.50

0.50

V.Brace

0.20

4.28

0.50

0.43

Sub Total of Effective Solid Area


Bundle

2.14
0.70
0.70
0.70
0.70
0.70

Single
Total wind force Fwi =

Fwi / 3 =

1.17 kN

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

1.21

2.00

26.71

Fwi
(kN)
2.80

Fwi / 3 =

0.93 kN

3.50 kN

29 30

14

Level
EL
EL+25.530

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
6.93

Factor or
Quantity
0.50

5.00

0.50

UW
(m)

0.50

V.Brace

Sub Total of Effective Solid Area


Total wind force Fwi =

1.71

2.80 kN

15 16 31 32

15

Level
EL
EL+29.000

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
6.93

Factor or
Quantity
0.50

5.00

0.50

UW
(m)

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

1.21

2.00

27.07

Fwi
(kN)
2.88

20.440

0.426

0.50

V.Brace

Transverse
Pipe
EL+29.100

Sub Total of Effective Solid Area


Bundle

Single

Total wind force Fwi =

0.25

1.71

10.00

0.50

L
(m)
0.77

Factor or
Quantity
0.50

5.00

0.50

1.27

0.70
0.70
0.70
0.70
0.70

Fwi / 3 =

1.10 kN

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

0.13

2.00

27.18

Fwi
(kN)
1.29

Fwi / 3 =

0.43 kN

3.30 kN

33 34

16

Level
EL
EL+29.770

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.25

UW
(m)

0.63

V.Brace

Sub Total of Effective Solid Area


Total wind force Fwi =

1.29 kN

0.76

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 31 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

17

Level
EL
EL+29.770

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.25

L
(m)
4.24

Factor or
Quantity
0.50

5.00

0.50

UW
(m)

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

0.74

2.00

27.18

Fwi
(kN)
2.32

20.440

0.01

Fwi / 3 =

0.78 kN

0.63

V.Brace

Accessory

EL+29.770

Total wind force Fwi =

Sub Total of Effective Solid Area


Handrail
Ladder w/o hoop front
Ladder w/o hoop side
Ladder w/ hoop front
Ladder w/ hoop side
Stair front
Stair side
2.33 kN

1.37

7.70

1.00

0.24
0.22
0.26
0.46
0.44
0.58
1.45

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 32 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

5.2.9.2. Wind Load Calculation ( Z-Dir )

STRUCTURE PROPERTIES
Ground level : EL.
Number of frame (n)

7.250
2

For Solidity Ratio


Height (m)
Width (m)

22.37
5.00

Length of Structure (m)

3.80

Area HxW (m2)

111.85

WIND LOAD SUMMARY


Fwi =
Total Wind Force :

L/W =
K=

34.78 kN

0.760
0.6

43
Level
EL

Category

Member

D, d, h
(m)

L
(m)

Factor or
Quantity

Aei
(m2)

Cfm

Uz
(kN/m2)

Pz
(kN)

EL+10.750

Frame

Column
(Post)

0.35

FPRF(Insl.)
THK(m)

6.05

0.50

UW
(m)

1.06

2.00

23.19

1.45

Girder
(Beam)

0.20

1.80

0.50

0.18

V.Brace

0.15

7.04

0.50

0.53

Sub Total of Effective Solid Area


Total wind force Fwi =
19 20
Level
Category
EL
EL+10.750
Frame

1.77
Fwi / 2 =

0.73 kN

Aei
(m2)

Cfm

Uz
(kN/m2)

1.06

2.00

23.19

Pz
(kN)
1.18

1.40
1.40
1.40

20.440

0.015

Fwi / 2 =

0.60 kN

1.45 kN
Member
Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

0.20

FPRF(Insl.)
THK(m)

L
(m)
6.05

Factor or
Quantity
0.50

UW
(m)

3.80

0.50

0.38

1.00

1.44
0.03

V.Brace

EL+10.850

Longitudinal
Pipe

Total wind force Fwi =

0.20

1.20 kN

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 33 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

40 41
Level
EL
EL+10.750

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
6.05

Factor or
Quantity
0.50

2.00

0.50

UW
(m)

Aei
(m2)

Cfm

Uz
(kN/m2)

1.06

2.00

23.19

Pz
(kN)
1.03

0.20

V.Brace

Transverse
Pipe

Sub Total of Effective Solid Area


Bundle

1.26
0.70
0.70
0.70
0.70
0.70

Single

Total wind force Fwi =


56
Level
Category
EL
EL+13.450
Frame

Fwi / 2 =

0.52 kN

Aei
(m2)

Cfm

Uz
(kN/m2)

0.74

2.00

24.23

Pz
(kN)
1.03

1.40
1.40
1.40

20.440

0.291

1.03 kN
Member
Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.45

L
(m)
4.22

Factor or
Quantity
0.50

UW
(m)

1.80

0.50

0.41

0.50

1.14
0.65

V.Brace

EL+13.550

Total wind force Fwi =


21 22
Level
Category
EL
EL+13.450
Frame

EL+13.550

Longitudinal
Pipe

Longitudinal
Pipe

Total wind force Fwi =


42 43
Level
Category
EL
EL+13.450
Frame

Sub Total of Effective Solid Area


0.91

Column
(Post)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

L
(m)
4.22

Factor or
Quantity
0.50

UW
(m)

0.66 kN

Cfm

Uz
(kN/m2)

0.74

2.00

24.23

Pz
(kN)
1.42

1.40
1.40
1.40

20.440

0.291

Fwi / 2 =

0.86 kN

Girder
(Beam)

0.45
0.20

1.80
2.00

0.50
0.50

0.41
0.20

V.Brace

0.15

3.24

0.50

0.24

0.50

1.59
0.65

Sub Total of Effective Solid Area


0.91

1.72 kN
Member
Column
(Post)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

L
(m)
4.22

Factor or
Quantity
0.50

UW
(m)

Aei
(m2)

Cfm

Uz
(kN/m2)

0.74

2.00

24.23

Pz
(kN)
1.38

Fwi / 2 =

0.69 kN

Girder
(Beam)

0.20

2.00

0.50

0.20

V.Brace

0.15

3.98

1.00

0.60

Sub Total of Effective Solid Area


Total wind force Fwi =

Fwi / 2 =
Aei
(m2)

1.32 kN
Member

1.38 kN

1.54

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 34 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

78
Level
EL
EL+14.970

Category

Member

Frame

Column
(Post)

Accessory

Total wind force Fwi =


23 24
Level
Category
EL
EL+14.970
Frame

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

L
(m)
5.07

Factor or
Quantity
0.50

UW
(m)

Cfm

Uz
(kN/m2)

2.00

24.69

Pz
(kN)
1.75

Fwi / 2 =

0.88 kN

Girder
(Beam)

0.20

2.00

1.00

0.40

V.Brace

0.15

7.88

0.50

0.59

Sub Total of Effective Solid Area


Handrail
Ladder w/o hoop front
Ladder w/o hoop side
Ladder w/ hoop front
Ladder w/ hoop side
Stair front
Stair side

1.88
0.24
0.22
0.26
0.46
0.44
0.58
1.45

1.75 kN
Member
Column
(Post)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

L
(m)
5.07

Factor or
Quantity
0.50

UW
(m)

Aei
(m2)

Cfm

Uz
(kN/m2)

0.89

2.00

24.69

Pz
(kN)
1.46

Girder
(Beam)

0.20

3.80

0.50

0.38

V.Brace

0.15

3.98

0.50

0.30

Sub Total of Effective Solid Area


Total wind force Fwi =
46
Level
Category
EL
EL+14.970
Frame

Aei
(m2)
0.89

1.57
Fwi / 2 =

0.73 kN

Aei
(m2)

Cfm

Uz
(kN/m2)

0.89

2.00

24.69

Pz
(kN)
1.01

Fwi / 2 =

0.51 kN

1.46 kN
Member
Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
5.07

Factor or
Quantity
0.50

2.00

0.50

UW
(m)

0.20

V.Brace

Sub Total of Effective Solid Area

10

Total wind force Fwi =


45
Level
Category
EL
EL+14.970
Frame

1.09

1.01 kN
Member
Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
5.07

Factor or
Quantity
0.50

2.00

0.50

UW
(m)

Aei
(m2)

Cfm

Uz
(kN/m2)

0.89

2.00

24.69

Pz
(kN)
1.01

20.440

0.01

Fwi / 2 =

0.51 kN

0.20

V.Brace

Accessory

EL+14.970

Total wind force Fwi =

Sub Total of Effective Solid Area


Handrail
Ladder w/o hoop front
Ladder w/o hoop side
Ladder w/ hoop front
Ladder w/ hoop side
Stair front
Stair side

1.09

7.70

0.24
0.22
0.26
0.46
0.44
0.58
1.45

1.00

1.02 kN

9 10

11

Level
EL
EL+18.520

Category

Member

Frame

Column
(Post)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

Factor or
Quantity
0.50

UW
(m)

Aei
(m2)

Cfm

Uz
(kN/m2)

1.24

2.00

25.62

Pz
(kN)
2.03

Fwi / 2 =

1.01 kN

Girder
(Beam)

0.20

1.80

0.50

0.18

V.Brace

0.15

7.96

0.50

0.60

Sub Total of Effective Solid Area


Total wind force Fwi =

L
(m)
7.10

2.03 kN

2.02

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 35 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

12

Level
EL
EL+18.520

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
7.10

Factor or
Quantity
0.50

3.80

0.50

UW
(m)

Aei
(m2)

Cfm

Uz
(kN/m2)

1.24

2.00

25.62

Pz
(kN)
1.63

Fwi / 2 =

0.81 kN

0.38

V.Brace

Sub Total of Effective Solid Area


Total wind force Fwi =

1.62

1.63 kN

47 48

13

Level
EL
EL+18.520

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
7.10

Factor or
Quantity
0.50

2.00

0.50

UW
(m)

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

1.24

2.00

25.62

Fwi
(kN)
1.45

Fwi / 2 =

0.72 kN

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

1.23

2.00

26.15

Fwi
(kN)
1.47

Fwi / 2 =

0.74 kN

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

1.23

2.00

26.15

Fwi
(kN)
2.30

Fwi / 2 =

1.15 kN

0.20

V.Brace

Sub Total of Effective Solid Area


Total wind force Fwi =

1.44

1.45 kN

11 12

14

Level
EL
EL+22.070

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
7.01

Factor or
Quantity
0.50

1.80

0.50

UW
(m)

0.18

V.Brace

Sub Total of Effective Solid Area


Total wind force Fwi =

1.41

1.47 kN

27 28

15

Level
EL
EL+22.070

Category

Member

Frame

Column
(Post)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

L
(m)
7.01

Factor or
Quantity
0.50

UW
(m)

Girder
(Beam)

0.20

3.80

0.50

0.38

V.Brace

0.15

7.88

0.50

0.59

Sub Total of Effective Solid Area

2.20

Longitudinal
Pipe
Total wind force Fwi =

1.40
1.40
1.40
2.30 kN

51

16

Level
EL
EL+22.070

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
7.01

Factor or
Quantity
0.50

2.00

0.50

UW
(m)

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

1.23

2.00

26.15

Fwi
(kN)
1.49

Fwi / 2 =

0.75 kN

0.20

V.Brace

Sub Total of Effective Solid Area


Longitudinal
Pipe
Total wind force Fwi =

1.43
1.40
1.40
1.40

1.49 kN

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 36 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

12

Level
EL
EL+18.520

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
7.10

Factor or
Quantity
0.50

3.80

0.50

UW
(m)

Aei
(m2)

Cfm

Uz
(kN/m2)

1.24

2.00

25.62

Pz
(kN)
1.63

Fwi / 2 =

0.81 kN

0.38

V.Brace

Sub Total of Effective Solid Area


Total wind force Fwi =

1.62

1.63 kN

47 48

13

Level
EL
EL+18.520

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
7.10

Factor or
Quantity
0.50

2.00

0.50

UW
(m)

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

1.24

2.00

25.62

Fwi
(kN)
1.45

Fwi / 2 =

0.72 kN

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

1.23

2.00

26.15

Fwi
(kN)
1.47

Fwi / 2 =

0.74 kN

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

1.23

2.00

26.15

Fwi
(kN)
2.30

Fwi / 2 =

1.15 kN

0.20

V.Brace

Sub Total of Effective Solid Area


Total wind force Fwi =

1.44

1.45 kN

11 12

14

Level
EL
EL+22.070

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
7.01

Factor or
Quantity
0.50

1.80

0.50

UW
(m)

0.18

V.Brace

Sub Total of Effective Solid Area


Total wind force Fwi =

1.41

1.47 kN

27 28

15

Level
EL
EL+22.070

Category

Member

Frame

Column
(Post)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

L
(m)
7.01

Factor or
Quantity
0.50

UW
(m)

Girder
(Beam)

0.20

3.80

0.50

0.38

V.Brace

0.15

7.88

0.50

0.59

Sub Total of Effective Solid Area

2.20

Longitudinal
Pipe
Total wind force Fwi =

1.40
1.40
1.40
2.30 kN

51

16

Level
EL
EL+22.070

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
7.01

Factor or
Quantity
0.50

2.00

0.50

UW
(m)

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

1.23

2.00

26.15

Fwi
(kN)
1.49

Fwi / 2 =

0.75 kN

0.20

V.Brace

Sub Total of Effective Solid Area


Longitudinal
Pipe
Total wind force Fwi =

1.43
1.40
1.40
1.40

1.49 kN

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 37 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

23

Level
EL
EL+29.770

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
0.77

Factor or
Quantity
0.50

2.00

0.50

UW
(m)

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

0.13

2.00

27.18

Fwi
(kN)
0.38

Fwi / 2 =

0.19 kN

0.20

V.Brace

Sub Total of Effective Solid Area


Total wind force Fwi =

0.33

0.38 kN

56 57

24

Level
EL
EL+29.770

Category

Member

Frame

Column
(Post)

Girder
(Beam)

D, d, h
(m)
0.35

FPRF(Insl.)
THK(m)

0.20

L
(m)
4.24

Factor or
Quantity
0.50

2.00

0.50

UW
(m)

Aei
(m2)

Cq

Ce*qs*Iw
(kN/m2)

0.74

2.00

27.18

Fwi
(kN)
1.06

20.440

0.01

Fwi / 2 =

0.54 kN

0.20

V.Brace

Accessory

EL+29.770

Total wind force Fwi =

Sub Total of Effective Solid Area


Handrail
Ladder w/o hoop front
Ladder w/o hoop side
Ladder w/ hoop front
Ladder w/ hoop side
Stair front
Stair side
1.07 kN

0.94

7.70

1.00

0.24
0.22
0.26
0.46
0.44
0.58
1.45

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

6. SUMMARY OF STEEL DESIGN

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 38 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 39 OF 72

STAAD.Pro CODE CHECKING - (BSI )


***********************
PROGRAM CODE REVISION V2.11_5950-1_2000
"PIPE RACK FLARE LINE SUPPORT II"
ALL UNITS ARE - KN
MEMBER

-- PAGE NO.

METE (UNLESS OTHERWISE NOTED)

TABLE

RESULT/
CRITICAL COND/
RATIO/
LOADING/
FX
MY
MZ
LOCATION
=======================================================================
1 ST

WH350

2 ST

WH350

3 ST

SH250

4 ST

WH350

7 ST

WH350

8 ST

SH250

9 ST

WH350

12 ST

WH350

13 ST

SH250

14 ST

WH350

17 ST

WH350

18 ST

SH250

19 ST

WH350

22 ST

WH350

23 ST

SH250

24 ST

WH350

27 ST

WH350

28 ST

SH250

29 ST

WH350

32 ST

WH350

33 ST

SH250

36 ST

SH350

37 ST

SH350

40 ST

SH500

41 ST

SH500

42 ST

SH200

43 ST

SH200

PASS
168.60 T
PASS
131.03 T
PASS
48.75 C
PASS
89.17 T
PASS
211.26 C
PASS
18.94 C
PASS
40.02 T
PASS
50.28 C
PASS
2.86 C
PASS
38.96 T
PASS
29.09 T
PASS
12.08 C
PASS
15.85 T
PASS
9.90 T
PASS
6.08 C
PASS
32.36 C
PASS
28.76 C
PASS
6.37 C
PASS
9.68 C
PASS
9.65 C
PASS
10.25 C
PASS
1.97 C
PASS
0.00 T
PASS
0.00 T
PASS
0.00 T
PASS
4.21 C
PASS
9.27 C

BS-4.8.2.2
1.19
BS-4.8.2.2
0.63
BS-4.7
(C)
0.00
BS-4.8.2.2
-5.38
ANNEX I.1
0.73
BS-4.7
(C)
0.00
BS-4.8.2.2
5.38
ANNEX I.1
3.21
ANNEX I.1
0.00
BS-4.8.2.2
-6.03
BS-4.8.2.2
3.28
BS-4.7
(C)
0.00
BS-4.8.2.2
1.38
BS-4.8.2.2
-0.71
BS-4.7
(C)
0.00
ANNEX I.1
0.26
ANNEX I.1
0.09
BS-4.7
(C)
0.00
ANNEX I.1
0.10
ANNEX I.1
0.06
BS-4.7
(C)
0.00
ANNEX I.1
5.69
BS-4.9
0.68
BS-4.9
1.43
BS-4.9
78.78
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00

0.090
35.08
0.092
42.61
0.243
-0.23
0.064
19.66
0.054
35.24
0.094
-0.29
0.068
29.23
0.057
32.12
0.039
1.28
0.045
12.15
0.030
9.06
0.060
-0.26
0.029
14.94
0.021
11.54
0.030
-0.28
0.023
14.90
0.021
14.17
0.032
-0.19
0.015
10.03
0.015
9.84
0.051
-0.20
0.289
38.41
0.215
46.10
0.101
48.93
0.978
49.41
0.009
-0.10
0.019
-0.10

109
3.35
111
3.35
145
2.50
109
2.70
110
113
2.50
109
0.00
112
103
109
0.00
111
0.00
113
2.50
109
0.00
111
0.00
113
2.50
110
112
145
2.50
109
141
146
2.50
112
112
1.80
110
1.80
144
1.80
110
0.90
120
0.90

398

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II
46 ST

SH300

47 ST

SH300

50 ST

SH200

51 ST

SH200

54 ST

SH300

55 ST

SH300

58 ST

SH200

59 ST

SH200

60 ST

WH350

61 ST

WH350

62 ST

SH250

63 ST

WH350

64 ST

WH350

65 ST

SH250

66 ST

WH350

67 ST

WH350

68 ST

SH250

69 ST

WH350

70 ST

WH350

71 ST

SH250

72 ST

WH350

73 ST

WH350

74 ST

SH250

75 ST

WH350

76 ST

WH350

77 ST

SH250

78 ST

WH350

79 ST

WH350

80 ST

SH250

81 ST

WH350

82 ST

WH350

83 ST

SH250

85 ST

SH350

86 ST

SH200

PASS
0.17 C
PASS
0.17 C
PASS
0.44 T
PASS
0.60 T
PASS
1.28 C
PASS
1.86 C
PASS
2.18 C
PASS
1.95 T
PASS
25.49 T
PASS
12.41 C
PASS
112.88 C
PASS
42.62 C
PASS
127.81 C
PASS
15.39 C
PASS
71.72 C
PASS
40.87 C
PASS
4.14 C
PASS
62.85 C
PASS
43.21 C
PASS
8.09 C
PASS
50.66 C
PASS
55.12 C
PASS
4.71 C
PASS
29.47 C
PASS
36.12 C
PASS
5.36 C
PASS
19.51 C
PASS
33.60 C
PASS
10.84 C
PASS
17.63 C
PASS
17.44 C
PASS
0.04 T
PASS
0.00 T
PASS

ANNEX I.1
0.84
ANNEX I.1
0.83
BS-4.3.6
0.00
BS-4.8.2.2
0.00
ANNEX I.1
0.85
ANNEX I.1
0.88
ANNEX I.1
8.65
BS-4.3.6
0.00
BS-4.8.2.2
3.18
ANNEX I.1
0.54
BS-4.7
(C)
0.14
ANNEX I.1
4.09
ANNEX I.1
3.58
BS-4.7
(C)
0.47
ANNEX I.1
4.59
ANNEX I.1
3.58
ANNEX I.1
0.00
ANNEX I.1
4.93
ANNEX I.1
1.35
BS-4.7
(C)
-0.07
ANNEX I.1
1.25
ANNEX I.1
0.41
BS-4.7
(C)
0.01
ANNEX I.1
0.59
ANNEX I.1
0.14
BS-4.7
(C)
-0.03
BS-4.2.3-(Y)
-0.17
ANNEX I.1
0.44
BS-4.7
(C)
0.00
ANNEX I.1
1.03
ANNEX I.1
1.62
BS-4.3.6
-0.21
BS-4.9
16.42
BS-4.8.2.2

0.201
23.96
0.181
21.21
0.003
0.12
0.003
-0.12
0.189
22.25
0.157
17.63
0.872
3.83
0.125
5.06
0.085
-47.81
0.087
58.34
0.563
-0.67
0.055
28.84
0.074
42.73
0.077
-0.76
0.054
27.36
0.064
36.06
0.039
1.28
0.044
19.65
0.033
19.36
0.040
-0.28
0.042
25.91
0.033
21.84
0.023
-0.40
0.036
23.70
0.030
20.37
0.027
-0.27
0.008
2.65
0.027
17.53
0.054
-0.27
0.006
1.89
0.008
1.79
0.312
22.01
0.514
36.57
0.030

0-0608-05-0000
C-210-1338-002
SHEET 40 OF 72

111
110
101
0.90
101
0.90
111
111
101
101
0.90
110
3.35
112
114
2.50
112
111
114
2.50
111
111
103
112
112
114
2.50
111
109
113
2.50
110
112
146
2.50
111
0.23
111
145
2.50
102
148
101
2.25
112
0.00
146

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

87 ST

SH350

88 ST

SH300

89 ST

SH300

90 ST

SH200

91 ST

SH200

94 ST

SH300

95 ST

SH300

98 ST

SH200

101 ST

SH300

102 ST

SH300

106 ST

SH200

107 ST

SH200

108 ST

SH200

110 ST

WH350

111 ST

WH350

112 ST

SH250

113 ST

WH350

116 ST

WH350

117 ST

SH250

118 ST

WH350

121 ST

WH350

122 ST

SH200

123 ST

SH250

124 ST

WH350

127 ST

WH350

128 ST

SH250

129 ST

WH350

132 ST

WH350

133 ST

SH200

134 ST

SH250

135 ST

WH350

138 ST

WH350

139 ST

SH250

1.05 T
PASS
6.97 C
PASS
2.03 C
PASS
6.68 C
PASS
0.37 T
PASS
7.12 C
PASS
0.00 T
PASS
0.00 T
PASS
0.61 T
PASS
1.82 C
PASS
2.93 C
PASS
3.11 T
PASS
0.00 T
PASS
6.43 C
PASS
5.56 T
PASS
33.48 T
PASS
24.69 C
PASS
150.88 C
PASS
132.19 C
PASS
10.14 C
PASS
126.64 C
PASS
107.91 C
PASS
0.39 T
PASS
0.92 T
PASS
113.20 C
PASS
100.80 C
PASS
5.84 C
PASS
78.18 C
PASS
67.42 C
PASS
0.00 T
PASS
2.87 C
PASS
62.42 C
PASS
58.72 C
PASS
6.48 T

-0.21
ANNEX I.1
1.45
ANNEX I.1
1.35
ANNEX I.1
9.41
BS-4.3.6
0.00
BS-4.7
(C)
0.00
BS-4.9
0.98
BS-4.9
0.79
BS-4.3.6
0.00
ANNEX I.1
0.95
ANNEX I.1
1.01
BS-4.8.2.2
0.00
BS-4.9
0.14
BS-4.7
(C)
0.00
BS-4.8.2.2
-1.24
BS-4.8.2.2
-0.60
BS-4.7
(C)
0.00
BS-4.7
(C)
-1.47
BS-4.7
(C)
0.95
BS-4.7
(C)
0.00
BS-4.7
(C)
0.96
BS-4.7
(C)
-0.62
BS-4.8.2.2
0.01
BS-4.3.6
0.00
BS-4.7
(C)
0.91
BS-4.7
(C)
-0.07
BS-4.7
(C)
0.00
ANNEX I.1
0.51
ANNEX I.1
0.07
BS-4.9
0.08
BS-4.7
(C)
0.00
ANNEX I.1
0.25
ANNEX I.1
0.09
BS-4.8.2.2
0.00

-0.56
0.244
48.42
0.187
18.98
0.455
15.81
0.044
1.67
0.016
-0.13
0.234
27.21
0.215
25.52
0.004
0.15
0.222
25.69
0.205
23.15
0.011
0.36
0.019
0.34
0.015
-0.25
0.061
-38.19
0.073
-44.06
0.123
-0.44
0.034
5.74
0.030
13.60
0.051
-0.49
0.026
13.00
0.023
-8.56
0.002
0.07
0.039
1.28
0.027
10.83
0.024
11.03
0.029
-0.38
0.027
17.11
0.021
14.49
0.009
0.09
0.014
-0.29
0.024
15.61
0.022
14.58
0.010
-0.36

0-0608-05-0000
C-210-1338-002
SHEET 41 OF 72

0.00
111
111
141
101
0.50
110
1.00
111
0.00
109
0.00
101
1.00
111
109
102
0.50
111
0.75
112
1.00
112
3.35
112
3.35
114
2.50
111
0.00
109
0.00
114
2.50
111
1.00
109
0.00
110
0.00
101
2.50
111
0.00
109
3.55
114
2.50
111
109
111
0.17
146
2.50
111
109
115
2.50

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II
140 ST

WH350

141 ST

WH350

144 ST

WH350

145 ST

WH350

146 ST

SH250

147 ST

SH200

148 ST

SH200

149 ST

SH200

150 ST

L75

151 ST

L75

152 ST

SH250

153 ST

L75

155 ST

SH250

156 ST

SH200

157 ST

SH250

158 ST

SH250

162 ST

SH250

163 ST

SH250

164 ST

SH250

165 ST

SH250

166 ST

SH250

167 ST

SH250

168 ST

SH250

169 ST

SH250

170 ST

ST200

171 ST

ST200

172 ST

ST200

173 ST

ST200

174 ST

SH250

175 ST

SH250

176 ST

ST200

177 ST

ST200

178 ST

ST200

179 ST

ST200

PASS
24.78 C
PASS
26.79 C
PASS
16.16 C
PASS
10.88 C
PASS
0.78 C
PASS
0.00 T
PASS
0.59 T
PASS
0.00
PASS
8.17 C
PASS
13.88 C
PASS
6.22 T
PASS
1.06 C
PASS
9.74 T
PASS
0.00 T
PASS
0.60 T
PASS
0.04 C
PASS
54.98 C
PASS
6.14 C
PASS
10.74 C
PASS
5.82 C
PASS
6.34 C
PASS
6.38 T
PASS
0.78 C
PASS
0.78 C
PASS
89.82 C
PASS
90.22 C
PASS
35.45 C
PASS
30.13 C
PASS
95.67 C
PASS
7.30 C
PASS
84.63 C
PASS
84.41 C
PASS
13.58 C
PASS

ANNEX I.1
0.28
ANNEX I.1
0.11
ANNEX I.1
1.21
ANNEX I.1
0.02
ANNEX I.1
0.64
BS-4.9
0.01
BS-4.8.2.2
-0.01
BS-4.3.6
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.8.2.2
0.60
BS-4.7
(C)
0.00
BS-4.8.2.2
0.04
BS-4.9
0.01
BS-4.8.2.2
-0.49
ANNEX I.1
0.49
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.8.2.2
0.00
BS-4.7
(C)
0.00
ANNEX I.1
0.12
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)

0.016
10.09
0.017
11.23
0.015
7.50
0.016
11.23
0.051
1.48
0.001
0.05
0.004
-0.13
0.044
2.37
0.072
0.00
0.122
0.00
0.064
-2.65
0.009
0.00
0.045
-3.22
0.002
0.08
0.077
4.96
0.123
9.45
0.274
0.52
0.031
0.61
0.054
0.38
0.029
0.46
0.032
0.30
0.010
0.36
0.004
0.19
0.031
2.44
0.156
0.00
0.156
0.00
0.061
0.00
0.052
0.00
0.477
0.43
0.036
0.32
0.127
0.00
0.127
0.00
0.020
0.00
0.020

0-0608-05-0000
C-210-1338-002
SHEET 42 OF 72

111
101
103
101
102
101
0.58
138
0.00
101
0.00
104
1.41
104
1.41
102
1.00
142
0.00
102
1.00
101
0.50
102
1.00
102
148
0.00
115
0.00
116
0.00
115
0.00
116
0.00
113
0.00
147
0.00
102
148
4.18
145
4.18
115
4.18
114
4.18
148
0.00
140
0.00
148
3.68
145
3.68
115
3.68
114

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

180 ST

ST150

181 ST

ST150

182 ST

ST150

183 ST

ST150

184 ST

SH250

185 ST

ST150

186 ST

ST150

187 ST

ST150

188 ST

ST150

189 ST

SH250

190 ST

ST150

191 ST

ST150

192 ST

ST150

193 ST

ST150

194 ST

ST150

195 ST

ST150

196 ST

ST150

197 ST

ST150

198 ST

SH250

199 ST

SH250

200 ST

SH250

201 ST

SH250

202 ST

SH250

203 ST

SH250

204 ST

ST200

205 ST

ST200

206 ST

ST200

207 ST

ST200

208 ST

ST150

209 ST

ST150

210 ST

ST150

211 ST

ST150

212 ST

ST150

13.45 C
PASS
22.79 C
PASS
22.71 C
PASS
12.92 C
PASS
12.95 C
PASS
2.71 C
PASS
13.67 C
PASS
13.73 C
PASS
7.79 C
PASS
7.62 C
PASS
6.19 C
PASS
13.12 C
PASS
13.16 C
PASS
6.84 C
PASS
6.76 C
PASS
10.78 C
PASS
10.78 C
PASS
10.00 C
PASS
9.52 C
PASS
61.00 C
PASS
6.88 C
PASS
5.39 C
PASS
3.37 C
PASS
104.81 C
PASS
5.06 C
PASS
156.45 C
PASS
144.78 C
PASS
82.25 C
PASS
88.41 C
PASS
16.38 C
PASS
13.65 C
PASS
6.86 C
PASS
11.11 C
PASS
11.26 C

0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
0.00
BS-4.7
(C)
-0.07
BS-4.7
(C)
0.16
BS-4.7
(C)
0.01
BS-4.7
(C)
0.01
BS-4.7
(C)
0.07
BS-4.7
(C)
-0.01
BS-4.8.3.3.1
0.19
BS-4.8.3.3.1
0.17
BS-4.8.3.3.1
2.32
BS-4.8.3.3.1
0.78
BS-4.8.3.3.1
0.40
BS-4.8.3.3.1
0.67
BS-4.8.3.3.1
0.39
BS-4.8.3.3.1
0.29
BS-4.8.3.3.1
0.08

0.00
0.115
0.00
0.115
0.00
0.065
0.00
0.066
0.00
0.013
0.34
0.069
0.00
0.070
0.00
0.039
0.00
0.039
0.00
0.031
0.24
0.065
0.00
0.065
0.00
0.034
0.00
0.033
0.00
0.053
0.00
0.053
0.00
0.062
0.00
0.059
0.00
0.304
0.66
0.034
0.36
0.027
0.32
0.017
0.28
0.522
-0.21
0.025
0.28
0.321
1.03
0.282
0.59
0.391
0.72
0.223
0.77
0.196
0.48
0.257
0.27
0.145
0.19
0.139
0.18
0.081
0.18

0-0608-05-0000
C-210-1338-002
SHEET 43 OF 72

3.68
116
4.34
113
4.34
115
4.34
114
4.34
147
0.00
116
4.34
113
4.34
115
4.34
114
4.34
148
0.00
116
4.27
113
4.27
147
4.27
146
4.27
147
4.28
146
4.28
114
4.92
115
4.92
147
0.00
115
0.00
148
0.00
148
0.00
148
1.25
148
0.00
115
114
116
145
115
146
143
146
147
-

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II
213 ST

ST150

214 ST

ST150

215 ST

ST150

216 ST

SH200

217 ST

L75

218 ST

L75

219 ST

WH350

221 ST

L75

222 ST

L75

224 ST

L75

225 ST

L75

230 ST

WH350

231 ST

WH350

232 ST

WH350

233 ST

SH200

234 ST

SH200

235 ST

SH200

236 ST

SH200

237 ST

SH200

238 ST

L75

239 ST

L75

240 ST

L75

241 ST

L75

242 ST

SH250

243 ST

SH250

244 ST

SH250

245 ST

SH250

246 ST

SH200

247 ST

SH200

248 ST

SH200

249 ST

SH200

250 ST

SH200

251 ST

SH200

252 ST

SH250

PASS
11.14 C
PASS
8.93 C
PASS
8.50 C
PASS
0.05 C
PASS
0.41 T
PASS
0.44 T
PASS
72.57 C
PASS
1.39 C
PASS
1.73 C
PASS
0.79 C
PASS
0.86 C
PASS
72.77 C
PASS
128.49 C
PASS
25.23 C
PASS
0.00 T
PASS
0.00 T
PASS
2.93 T
PASS
0.00 T
PASS
1.20 C
PASS
1.23 C
PASS
0.75 T
PASS
0.93 C
PASS
0.68 C
PASS
0.07 T
PASS
0.04 C
PASS
0.14 T
PASS
0.00 T
PASS
0.24 T
PASS
3.11 T
PASS
2.93 T
PASS
0.24 T
PASS
0.00 T
PASS
0.00 T
PASS

BS-4.8.3.3.1
0.11
BS-4.8.3.3.1
0.46
BS-4.8.3.3.1
0.41
ANNEX I.1
0.07
BS-4.8.2.2
0.00
BS-4.8.2.2
-0.10
BS-4.7
(C)
-0.48
BS-4.8.3.3.1
0.21
BS-4.8.3.3.1
0.28
BS-4.8.3.3.1
0.00
BS-4.8.3.3.1
0.00
ANNEX I.1
4.26
BS-4.7
(C)
1.47
ANNEX I.1
0.81
BS-4.9
0.10
BS-4.9
0.09
BS-4.8.2.2
0.00
BS-4.9
0.93
ANNEX I.1
0.30
BS-4.8.3.3.1
0.42
BS-4.8.2.2
-0.01
BS-4.8.3.3.1
0.28
BS-4.8.3.3.1
0.27
BS-4.8.2.2
0.13
ANNEX I.1
0.03
BS-4.2.3-(Y)
0.00
BS-4.9
0.30
BS-4.8.2.2
0.00
BS-4.8.2.2
0.00
BS-4.8.2.2
0.00
BS-4.8.2.2
0.00
BS-4.8.2.2
0.00
BS-4.8.2.2
0.00
BS-4.8.2.2

0.086
0.18
0.173
0.17
0.157
0.17
0.011
0.29
0.052
0.09
0.074
0.09
0.015
4.12
0.126
0.01
0.168
0.01
0.016
0.01
0.017
0.01
0.063
34.39
0.027
13.24
0.031
19.83
0.011
0.09
0.014
0.33
0.017
0.74
0.101
0.19
0.033
0.22
0.240
0.02
0.053
0.08
0.162
0.01
0.151
0.01
0.034
-2.58
0.089
8.47
0.039
-2.26
0.248
22.52
0.027
1.45
0.011
-0.36
0.017
-0.74
0.026
-1.44
0.021
-1.16
0.013
-0.73
0.034

0-0608-05-0000
C-210-1338-002
SHEET 44 OF 72

146
143
142
111
111
0.00
110
0.00
111
0.00
111
110
103
101
111
111
0.52
109
111
0.00
111
0.75
104
0.50
142
0.00
143
142
110
0.00
111
111
102
0.00
102
101
0.25
102
0.46
102
0.50
102
0.00
104
0.00
102
0.00
103
0.94
103
0.69
102

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 45 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

253 ST

L75

254 ST

L75

0.07 T
PASS
0.72 T
PASS
0.97 C

-0.13
BS-4.8.2.2
0.00
BS-4.8.3.3.1
0.00

2.59
0.012
0.02
0.024
0.02

STEEL TAKE-OFF
-------------PROFILE
ST
ST
ST
ST
ST
ST
ST
ST
ST

WH350
SH250
SH350
SH500
SH200
SH300
L75
ST200
ST150

LENGTH(METE)
132.68
118.00
7.60
3.60
42.80
19.20
21.53
47.16
104.67

WEIGHT(KN

177.662
34.409
3.725
3.166
9.086
7.027
1.432
15.273
19.104
---------------TOTAL =
270.884

1.80
102
0.00
101
-

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 46 OF 72

DEFLECTION CHECK
Vertical deflection checked by L/400
JOINT
LENGTH
LOAD
NO
(mm)
COMBINATION
100
5000
211

DEFFLECTION (mm )
ALLOWABLE ACTUAL
12.5
5.650

Horizontal displacement checked by L/150


JOINT
HEIGHT
LOAD
NO
(mm)
COMBINATION
62
22370
209

DEFFLECTION (mm )
ALLOWABLE ACTUAL
149.13
20.421

STATUS
PASS

STATUS
PASS

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

BENDING MOMENT MAXIMUM

Moment Maximum (MZ) at Beam 41 (Load Combination 126)

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 47 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 48 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

DESIGN OF BASE PLATE AND ANCHOR BOLT


DESIGN OF COLUMN BASE ( BPF-1)
1. Column Location :
Joint :

Member Designation

WH350

stiffness

W/ STIFF

A. Bolt Arrangement

INSIDE

SUMMARY

Design Load
Nmax =

332.30 (KN)

Base Plate Wide

750 mm
750 mm

d=

350 (mm)

Tmax =

-169.84 (KN)

Base Plate Length

bf =

350 (mm)

VX =

-42.26 (KN)

NOS of A. Bolt

tw =

12 (mm)

VZ =

-12.09 (KN)

Anchor Bolt Dia.

VR =

43.95 (KN)

8 pcs
31.8 mm

Control

tf =

19 (mm)

ts =

19 (mm)

Compression Check =

ok --->>

Hs =

200 (mm)

Stiffener Plate Check =

ok --->>

Shear Capacity (Va) =

ok --->>

Tension Capacity (Ta) =

ok --->>

2. Base Plate and Anchor Bolt Data


Yield Strength os Steel

Fy =

Allowable bearing Stress

Fb =

250 N/mm2

Allowable Shear Strenght of Fillet Weld

Fw =

Allowable Shear Strenght of A Bolt

Vb =

Compressive Strength of Conc

F'c =

Allowable Bearing Strenght of Concrete

Fp =

0.35 * F'c =

Base Plate Wide

B=

750 (mm)

0.75 * Fy =

187.5 N/mm2
144 N/mm3
63.00 (KN)
40 N/mm2
14 N/mm2

Base Plate Length

N=

750 (mm)

Base Plate Thickness

tb =

28 (mm)

A. Bolt nos

n=

8 pcs

Anchor Bolt Pitch

G=

180 (mm)

Anchor Bolt Dia.

db =

Tension Strenght of Anc. Bolt

T1 =

63.00 (KN)

Ts =

63.00 (KN)

A. Bolt

31.8 (mm)

Tb =

63.00 (KN)

Ae =

794.23 (mm2)

3. Compression Capacity
A=

tb / (3*Fp/Fb)1/2 =
2*L*(d+bf-2*L) =

A=

2*L*(d+2*bf-4*L-30) =

Na =

Fp * A /1000 =

L=

A use =

59.16 (mm)
92688.03 (mm2) with stiffener
68825.12 (mm2) without stiffener
92688.03 (mm2)
1297.63 (KN)

ok --->>

Nmax =

332.30 (KN)

ok --->>

ts provided =

ok --->>

V req' =

43.95 (KN)

Ta req' =

169.84 (KN)

3.1 Stiffener Plate Check


ts, req'd =

Fp*((bf/2-15)*2*L-L2) =
Nstiff/((Hs-R)*Fv)/1000 =

Ss, req'd =

Nstiff/2/21/2*Fw*(Hs-R)/1000 =

Va provided =

n*Vb =

Nstiff =

216.04 (KN)
12.35 (mm)

19 (mm)

6.06 (mm)

4. Shear Capacity (Va)


504.00 (KN)

5. Tension Capacity (Ta)


g=

(G+-tw)/2 =

g=

(G-(d-tf))/2 =
g use =

Be1 use =

2*g+db =

Be2 =

min((d/2,G/2+g+db/2) =

Be2 =

min(2*g+db,(g+db/2+50) =

Be2 use =

Sc =

min(Be1,Be2)*tb2/6 =

Sc =

Be2*tb2/6 =
Sc use =

84.00 for inside a bolt arr.


only for outside a. bolt arr.
84.00 (mm)
199.80 (mm) for inside a bolt arr.
175.00 for inside a bolt arr.
only for for outside a. bolt arr.
175.00 (mm)
22866.67 for inside a bolt arr.
only for for outside a. bolt arr.
22866.67 (mm3)
5.49 (kN)

V=

VR/n =

Ta =

min(Ts, Tb, T1-1.8*V) =

53.11 (kN)

Tall 1 =

n*Ta =

424.89 (KN)

Tall 2 =

n*Sc*Fb/g/1000 =

408.33 (KN)

Tall =

min (Tall 1,Tall 2) =

424.89 (KN)

ok --->>

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 49 OF 72

CONNECTION CHECKING
SINGLE SHEAR CONNECTION
MEMBER
No.
3
3
8
8
13
13
18
18
23
23
28
28
33
33
36
36
37
37
42
42
43
43
46
46
47
47
50
50
51
51
54
54
55
55
58
58
59
59
62
65
68
68
71
74
77
80
83
83
85
85
86
87
87
88
88
89
89
90
90
91
91
94
94
95
95
98
98
101
101
102
102
105
105
106
106
107
108
112
112
117
117
122
122
123
123
128
128
133
133
134
134
139
139
146
146
147
147
148
148
149
152
152

JOINT
No.
3
66
5
74
7
8
9
68
11
70
13
77
15
72
19
3
20
4
23
7
24
8
25
9
26
10
27
11
28
12
29
13
30
14
31
15
32
16
19
21
23
24
25
27
29
31
33
34
19
40
35
41
20
42
21
43
22
45
23
46
24
47
25
48
26
51
28
52
29
53
30
56
33
57
34
35
50
40
67
42
75
45
44
45
46
47
69
50
49
50
76
52
71
56
73
44
58
45
59
50
61
56

LEVEL
EL+

MEMBER
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH200
SH250
SH250
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH250
SH250
SH250
SH250
SH200
SH200
SH250
SH250
SH250
SH250
SH200
SH200
SH250
SH250
SH250
SH250
SH250
SH250
SH200
SH200
SH200
SH200
SH200
SH250
SH250

BEAM SIZE
CONN'D MEMB
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
SH200
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL

CONNECTION DETAILS
TYPE alpha
CAPA.(KN)
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.526
42.100
SS
0.588
77.600
SS
0.588
77.600
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.331
26.500
SS
0.526
42.100
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.526
42.100
SS
0.526
42.100
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.526
42.100
SS
0.526
42.100
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.588
77.600
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.526
42.100
SS
0.588
77.600
SS
0.588
77.600

CRITICAL
LOAD CASE
216
216
216
216
210
210
216
216
216
216
216
216
215
213
211
211
212
212
209
209
212
212
211
211
209
212
211
211
237
237
209
209
211
211
210
241
212
215
247
215
246
246
215
216
215
214
212
212
211
209
212
209
209
211
211
209
209
209
209
209
209
211
210
209
209
210
210
211
211
209
209
237
237
216
216
210
210
215
215
215
214
210
211
209
209
215
215
211
211
215
215
247
247
247
247
209
210
211
211
201
209
209

MEMB.FORCE
T (KN)
V (KN)
-42.09
0.14
42.09
0.59
-14.88
0.17
14.88
0.56
-3.56
0.73
3.56
0.73
-11.03
0.23
11.03
0.50
-6.12
0.26
6.12
0.47
-6.27
0.27
6.27
0.46
-7.18
0.43
-7.26
0.46
5.62
0.19
-5.62
0.19
-10.33
0.19
10.33
0.19
-13.10
0.19
13.10
0.19
16.54
0.19
-16.54
0.19
-1.13
19.23
1.13
-18.85
-1.14
17.41
-1.30
17.26
-0.42
0.19
0.42
0.19
-0.34
0.19
0.34
0.19
0.56
19.55
-0.56
-19.17
0.24
16.12
-0.24
-15.74
-2.97
3.13
1.54
3.13
-2.51
4.12
0.85
4.12
-88.09
0.19
-19.50
0.27
-4.12
0.73
4.12
0.73
-13.59
0.11
-7.90
0.29
-7.16
0.26
7.36
0.27
-0.43
3.18
0.43
3.18
13.71
12.99
-21.21
7.82
0.78
0.03
19.87
4.53
-19.87
6.65
12.28
13.92
-12.28
-13.50
16.62
15.14
-16.62
-14.72
-26.84
2.44
26.84
0.61
-28.14
0.21
28.14
0.21
-0.96
19.96
-1.18
19.43
-1.18
19.05
1.18
-18.63
-1.03
0.21
1.03
0.21
1.50
20.28
-1.50
-19.85
1.32
18.13
-1.32
-17.71
-1.65
2.47
1.65
0.61
-1.10
0.21
1.10
0.21
0.63
1.00
-1.33
0.21
-39.65
0.19
39.65
0.54
-7.96
0.30
-7.89
0.54
-0.35
0.25
0.53
0.51
-1.36
0.73
1.36
0.73
-5.70
0.22
5.70
0.51
-0.76
0.05
0.76
0.16
-3.92
0.24
3.92
0.49
-4.25
0.26
4.25
0.47
-1.63
2.17
1.63
3.46
0.00
0.27
0.01
-0.05
-1.32
-1.28
1.32
1.50
0.00
2.67
-3.98
-0.30
3.98
0.59

|V|+alpha*|T|
(KN)
24.89
25.34
8.92
9.31
2.82
2.82
6.72
6.99
3.86
4.07
3.96
4.15
4.65
4.73
3.15
3.15
5.62
5.62
7.08
7.08
8.89
8.89
19.82
19.44
18.01
17.94
0.41
0.41
0.37
0.37
19.84
19.46
16.25
15.87
4.69
3.94
5.44
4.57
51.99
11.74
3.15
3.15
8.10
4.94
4.47
4.60
3.43
3.43
21.05
20.29
0.44
16.21
18.33
20.38
19.96
23.88
23.46
16.56
14.73
15.01
15.01
20.46
20.05
19.67
19.25
0.75
0.75
21.07
20.64
18.82
18.40
3.34
1.48
0.79
0.79
1.21
0.91
23.50
23.85
4.98
5.18
0.43
0.79
1.53
1.53
3.57
3.86
0.45
0.56
2.54
2.79
2.76
2.97
3.13
4.42
0.27
0.06
1.97
2.19
2.67
2.64
2.93

CHECK
PASS ( |V|+alpha*|T| < CAPA. )
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS

ANOTHER
JOINT No.
66
3
74
5
8
7
68
9
70
11
77
13
72
15
3
19
4
20
7
23
8
24
9
25
10
26
11
27
12
28
13
29
14
30
15
31
16
32
78
82
24
23
79
80
83
81
34
33
40
19
27
20
41
21
42
22
43
23
45
24
46
25
47
26
48
28
51
29
52
30
53
33
56
34
57
84
27
67
40
75
42
44
45
46
45
69
47
49
50
76
50
71
52
73
56
58
44
59
45
60
56
61

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 50 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

155
155
156
156
157
157
158
158
159
159
162
162
163
163
164
164
165
165
166
166
167
167
168
168
169
169
174
174
175
175
184
184
189
189
199
199
200
201
201
202
203
216
216
226
226
227
227
228
228

64
57
59
58
61
62
62
63
63
64
66
4
67
41
68
10
69
48
70
12
71
53
72
16
73
57
74
6
75
43
76
51
77
14
79
26
28
81
32
22
30
84
49
88
87
88
61
87
56

SH250
SH250
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH200
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH250
SH200
SH200
SH250
SH250
SH200
SH200
SH200
SH200

COL
COL
COL
COL
SH250
SH250
COL
COL
SH250
SH250
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
COL
SH200
SH200
COL
COL
COL
COL
COL
COL

SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS

0.588
0.588
0.526
0.526
0.295
0.295
0.526
0.526
0.295
0.295
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.588
0.331
0.331
0.588
0.588
0.526
0.526
0.526
0.526

77.600
77.600
42.100
42.100
23.700
23.700
42.100
42.100
23.700
23.700
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
77.600
26.500
26.500
77.600
77.600
42.100
42.100
42.100
42.100

211
211
210
210
210
210
210
210
214
214
213
213
214
214
213
213
214
214
213
213
214
246
247
240
245
245
216
213
215
215
214
214
213
213
214
214
214
248
248
214
214
211
211
211
211
210
210
215
215

-3.20
3.20
-0.01
0.01
-0.80
0.80
-0.39
0.39
0.10
-0.10
-44.89
44.89
-7.88
7.88
-9.81
9.81
-5.75
5.75
-6.38
6.38
-4.30
4.30
0.51
-0.49
-0.62
0.62
73.98
74.08
6.44
-6.44
-3.46
3.46
-6.12
6.12
-12.44
12.44
8.23
1.53
-1.53
78.78
6.78
0.27
-0.27
0.69
-0.69
-0.67
0.67
-1.21
1.21

-0.24
0.53
0.36
0.05
3.03
-1.84
1.79
1.79
-1.84
3.03
0.46
0.27
0.52
0.21
0.46
0.27
0.48
0.25
0.46
0.27
0.47
0.27
0.42
0.36
3.46
2.17
0.56
0.29
0.43
0.30
0.48
0.25
0.45
0.28
0.59
0.14
0.28
0.46
0.27
0.27
0.27
-0.71
0.93
-0.58
0.79
0.59
0.61
0.47
0.72

2.12
2.41
0.37
0.06
3.27
2.08
2.00
2.00
1.87
3.06
26.86
26.67
5.15
4.84
6.23
6.04
3.86
3.63
4.21
4.02
3.00
2.80
0.72
0.65
3.82
2.53
44.06
43.85
4.22
4.09
2.51
2.28
4.05
3.88
7.90
7.45
5.12
1.36
1.17
46.59
4.26
0.80
1.02
0.99
1.20
0.94
0.96
1.11
1.36

PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS

57
64
58
59
62
61
63
62
64
63
4
66
41
67
10
68
48
69
12
70
53
71
16
72
57
73
6
74
43
75
51
76
14
77
26
79
80
32
81
82
83
49
84
87
88
61
88
56
87

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 51 OF 72

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

EM CONNECTION
MEMBER
No.
36
36
37
37
40
40
41
41
46
46
47
47
54
54
55
55
85
85
88
88
89
89
94
94
95
95
101
101
102
102

JOINT
No.
19
3
20
4
21
5
22
6
25
9
26
10
29
13
30
14
19
40
42
21
43
22
47
25
48
26
52
29
53
30

MEMBEE SIZE
COLUMN
BEAM
WH350
SH350
WH350
SH350
WH350
SH350
WH350
SH350
WH350
SH500
WH350
SH500
WH350
SH500
WH350
SH500
WH350
SH300
WH350
SH300
WH350
SH300
WH350
SH300
WH350
SH300
WH350
SH300
WH350
SH300
WH350
SH300
WH350
SH350
WH350
SH350
WH350
SH300
WH350
SH300
WH350
SH300
WH350
SH300
WH350
SH300
WH350
SH300
WH350
SH300
WH350
SH300
WH350
SH300
WH350
SH300
WH350
SH300
WH350
SH300

TYPE
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM
EM

EM CONNECTION DETAILS
alpha M.CAPA.(tonf*m) V.CAPA.(tonf)
0.169
92.00
215.80
0.169
92.00
215.80
0.169
92.00
215.80
0.169
92.00
215.80
0.242
209.50
439.92
0.242
209.50
439.92
0.242
209.50
439.92
0.242
209.50
439.92
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30
0.169
92.00
215.80
0.169
92.00
215.80
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30
0.145
33.50
172.30

CRITICAL
LOAD CASE
209
212
211
210
209
212
211
212
211
211
212
212
211
211
209
209
210
209
211
211
209
209
211
211
209
209
211
211
209
209

MEMBER END FORCES


T (tonf) V (tonf) M (tonf*m)
-1.42
40.18
33.46
-1.90
40.56
-39.04
-2.20
45.35
37.87
2.42
45.74
-44.28
4.70
56.27
48.56
4.63
56.41
-51.63
11.56
91.58
59.67
2.54
93.06
-63.88
-0.05
26.90
22.62
0.05
-26.24
25.21
0.33
-21.81
-18.73
-0.33
22.47
-21.13
0.67
24.40
20.41
-0.67
-23.74
22.93
1.09
17.45
14.37
-1.09
-16.79
16.46
-4.15
46.37
37.42
-8.21
39.98
-39.65
2.15
18.07
19.31
-2.15
-17.34
16.10
5.63
18.98
20.58
-5.63
-18.25
16.65
0.03
27.20
28.01
-0.03
-26.47
25.66
0.14
24.26
24.85
-0.14
-23.53
22.94
1.62
25.03
25.71
-1.62
-24.30
23.62
2.77
21.00
21.26
-2.77
-20.27
20.00

|M|+alpha*|T|
(tonf*m)
33.70
39.36
38.24
44.69
49.70
52.75
62.47
64.49
22.63
25.22
18.78
21.18
20.51
23.03
14.53
16.62
38.12
41.04
19.62
16.41
21.40
17.47
28.01
25.66
24.87
22.96
25.94
23.85
21.66
20.40

CHECK
PASS ( |M|+alpha*|T| < M.CAPA )
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS

EM CONNECTION DETAILS
V.CAPA.(tonf)
215.80
215.80
215.80
215.80
439.92
439.92
439.92
439.92
172.30
172.30
172.30
172.30
172.30
172.30
172.30
172.30
215.80
215.80
172.30
172.30
172.30
172.30
172.30
172.30
172.30
172.30
172.30
172.30
172.30
172.30

CRITICAL
LOAD CASE
209
212
211
210
209
212
211
210
211
210
212
212
211
211
209
209
210
211
211
210
209
209
211
210
209
209
211
211
209
209

MEMBER END FORCES


T (tonf) V (tonf) M (tonf*m)
-1.42
40.18
33.46
-1.90
40.56
-39.04
-2.20
45.35
37.87
2.42
45.74
-44.28
4.70
56.27
48.56
4.63
56.41
-51.63
11.56
91.58
59.67
2.17
93.16
-63.83
-0.05
26.90
22.62
-0.15
26.25
-24.79
0.33
-21.81
-18.73
-0.33
22.47
-21.13
0.67
24.40
20.41
-0.67
-23.74
22.93
1.09
17.45
14.37
-1.09
-16.79
16.46
-4.15
46.37
37.42
-7.31
40.17
-39.79
2.15
18.07
19.31
0.73
17.85
-16.16
5.63
18.98
20.58
-5.63
-18.25
16.65
0.03
27.20
28.01
-0.10
26.79
-25.47
0.14
24.26
24.85
-0.14
-23.53
22.94
1.62
25.03
25.71
-1.62
-24.30
23.62
2.77
21.00
21.26
-2.77
-20.27
20.00

V
(tonf)
40.18
40.56
45.35
45.74
56.27
56.41
91.58
93.16
26.90
26.25
-21.81
22.47
24.40
-23.74
17.45
-16.79
46.37
40.17
18.07
17.85
18.98
-18.25
27.20
26.79
24.26
-23.53
25.03
-24.30
21.00
-20.27

CHECK
PASS ( |V| < V.CAPA )
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

0-0608-05-0000
C-210-1338-002
SHEET 52 OF 72

BRACE CONNECTION
MEMBER
No.
150
150
151
151
153
153
154
154
170
170
171
171
172
172
173
173
176
176
177
177
178
178
179
179
180
180
181
181
182
182
183
183
185
185
186
186
187
187
188
188
190
191
192
193
194
195
196
197
204
204
205
205
206
206
207
207
208
209
210
211
212
213
214
215
217
217
218
218
221
221
222
222
224
224
225
225
238
238
239
239
240
240
241
241

JOINT
No.
61
54
64
55
56
62
63
57
66
1
66
2
67
38
67
39
74
3
74
4
75
40
75
41
68
7
68
8
69
45
69
46
70
9
70
10
76
47
76
48
77
77
71
71
72
72
73
73
78
17
78
18
82
19
82
20
79
79
80
80
83
83
81
81
45
84
23
84
49
94
35
92
44
85
59
85
56
97
33
97
96
54
95
98

BRACE
MEMBER
ST125
ST125
ST125
ST125
L75
L75
L75
L75
ST200
ST200
ST200
ST200
ST200
ST200
ST200
ST200
ST200
ST200
ST200
ST200
ST200
ST200
ST200
ST200
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST200
ST200
ST200
ST200
ST200
ST200
ST200
ST200
ST150
ST150
ST150
ST150
ST150
ST150
ST150
ST150
L75
L75
L75
L75
ST125
ST125
ST125
ST125
ST125
ST125
ST125
ST125
L75
L75
L75
L75
ST125
ST125
ST125
ST125

CONNECTION DETAILS
TYPE
CAPA.(kN)
GPL
146.200
GPL
146.200
GPL
146.200
GPL
146.200
GPL
88.000
GPL
88.000
GPL
88.000
GPL
88.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
264.000
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
164.200
GPL
88.000
GPL
88.000
GPL
88.000
GPL
88.000
GPL
146.200
GPL
146.200
GPL
146.200
GPL
146.200
GPL
146.200
GPL
146.200
GPL
146.200
GPL
146.200
GPL
88.000
GPL
88.000
GPL
88.000
GPL
88.000
GPL
146.200
GPL
146.200
GPL
146.200
GPL
146.200

CRITICAL
LOAD
212
212
242
210
214
214
214
214
216
216
213
213
215
215
215
215
216
216
213
213
215
215
214
214
216
216
213
213
215
215
214
214
216
216
213
213
215
215
214
214
216
213
215
214
248
245
214
215
247
247
247
247
215
215
213
213
216
213
216
213
216
213
216
213
211
211
210
210
211
211
214
214
211
211
238
238
214
214
214
214
211
211
210
210

MEMB.FORCE
T (KN)
4.57
-4.72
3.91
-4.05
1.13
-1.13
-1.13
1.13
72.28
-73.37
72.15
-73.24
39.33
-40.42
-37.39
36.30
66.86
-67.74
66.60
-67.47
11.89
-12.77
11.88
-12.75
17.35
-18.00
17.24
-17.89
9.40
-10.05
9.43
-10.08
10.37
-11.02
10.37
-11.01
5.65
-6.30
5.52
-6.17
9.96
9.94
4.64
4.67
7.15
7.20
6.45
6.44
110.24
-111.32
-108.27
107.18
74.25
-75.13
73.65
-74.53
23.41
23.01
14.20
14.10
12.06
11.93
9.69
9.45
-0.81
0.81
-0.73
0.73
1.73
-1.88
2.24
-2.39
0.79
-0.94
0.92
-1.06
1.32
-1.32
-1.29
1.29
1.23
-1.23
1.16
-1.16

CHECK
PASS ( |T| < CAPA. )
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS

ANOTHER
JOINT No.
54
61
55
64
62
56
57
63
1
66
2
66
38
67
39
67
3
74
4
74
40
75
41
75
7
68
8
68
45
69
46
69
9
70
10
70
47
76
48
76
11
12
50
51
13
14
53
52
17
78
18
78
19
82
20
82
23
24
25
26
27
28
29
30
84
45
84
23
94
49
92
35
85
44
85
59
97
56
97
33
54
96
98
95

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

7. STAADPRO INPUT DATA


STAAD SPACE "PIPE RACK FLARE LINE SUPPORT II"
START JOB INFORMATION
JOB NAME DRY GAS DIVERTER MANIFOLD PROJECT
JOB CLIENT PETRONAS CALIGARI
JOB NO 0-0608-05-0000
ENGINEER NAME INAY
CHECKER NAME HIDAYAT
APPROVED NAME MITRA
ENGINEER DATE 23-NOV-11
END JOB INFORMATION
INPUT WIDTH 79
OUTPUT WIDTH 72
SET NL 500
* ------------------- JOINT COORDINATES -----------------****************
SET ECHO OFF
UNIT MMS KN
JOINT COORDINATES
1 0 150 25900; 2 0 150 30900; 3 0 3500 25900; 4 0 3500 30900; 5 0 6200 25900;
6 0 6200 30900; 7 0 7720 25900; 8 0 7720 30900; 9 0 11270 25900;
10 0 11270 30900; 11 0 14820 25900; 12 0 14820 30900; 13 0 18280 25900;
14 0 18280 30900; 15 0 21750 25900; 16 0 21750 30900; 17 1800 150 25900;
18 1800 150 30900; 19 1800 3500 25900; 20 1800 3500 30900; 21 1800 6200 25900;
22 1800 6200 30900; 23 1800 7720 25900; 24 1800 7720 30900;
25 1800 11270 25900; 26 1800 11270 30900; 27 1800 14820 25900;
28 1800 14820 30900; 29 1800 18280 25900; 30 1800 18280 30900;
31 1800 21750 25900; 32 1800 21750 30900; 33 1800 22520 25900;
34 1800 22520 30900; 35 1800 7720 24900; 38 3800 150 25900; 39 3800 150 30900;
40 3800 3500 25900; 41 3800 3500 30900; 42 3800 6200 25900; 43 3800 6200 30900;
44 3800 14820 24900; 45 3800 7720 25900; 46 3800 7720 30900;
47 3800 11270 25900; 48 3800 11270 30900; 49 3800 7720 24900;
50 3800 14820 25900; 51 3800 14820 30900; 52 3800 18280 25900;
53 3800 18280 30900; 54 3800 21520 25900; 55 3800 21520 30900;
56 3800 22520 25900; 57 3800 22520 30900; 58 4800 14820 24900;
59 4800 14820 25900; 60 4800 7720 25900; 61 4800 22520 25900;
62 4800 22520 26900; 63 4800 22520 30200; 64 4800 22520 30900; 66 0 3500 28400;
67 3800 3500 28400; 68 0 11270 28400; 69 3800 11270 28400; 70 0 14820 28400;
71 3800 18280 28400; 72 0 21750 28400; 73 3800 22520 28150; 74 0 6200 28400;
75 3800 6200 28400; 76 3800 14820 28400; 77 0 18280 28400; 78 1800 3500 28400;
79 1800 11270 28400; 80 1800 14820 28400; 81 1800 21750 28400;
82 1800 6200 28400; 83 1800 18280 28400; 84 2800 7720 24900;
85 3800 13820 25900; 92 1800 6720 25900; 94 3800 6720 25900;
95 1800 22520 24900; 96 3800 22520 24900; 97 2800 22520 24900;
98 1800 21520 25900; 99 3800 22520 30200; 100 1800 22520 28150;
101 3300 22520 30900; 102 3300 22520 25900; 103 3300 22520 28150;
104 3800 22520 28400;
MEMBER INCIDENCES
1 1 3; 2 2 4; 3 3 66; 4 3 5; 7 4 6; 8 5 74; 9 5 7; 12 6 8; 13 7 8; 14 7 9;
17 8 10; 18 9 68; 19 9 11; 22 10 12; 23 11 70; 24 13 11; 27 14 12; 28 13 77;
29 15 13; 32 16 14; 33 15 72; 36 19 3; 37 20 4; 40 21 5; 41 22 6; 42 23 7;
43 24 8; 46 25 9; 47 26 10; 50 27 11; 51 28 12; 54 29 13; 55 30 14; 58 31 15;
59 32 16; 60 17 19; 61 18 20; 62 19 78; 63 21 19; 64 22 20; 65 21 82; 66 23 92;
67 24 22; 68 23 24; 69 23 25; 70 24 26; 71 25 79; 72 25 27; 73 26 28; 74 27 80;
75 29 27; 76 30 28; 77 29 83; 78 31 98; 79 32 30; 80 31 81; 81 31 33; 82 32 34;
83 33 100; 85 19 40; 86 23 35; 87 41 20; 88 42 21; 89 43 22; 90 50 27;
91 46 24; 94 47 25; 95 48 26; 98 51 28; 101 52 29; 102 53 30; 106 57 101;
107 35 84; 108 45 23; 110 38 40; 111 39 41; 112 40 67; 113 42 40; 116 43 41;
117 42 75; 118 45 94; 121 46 43; 122 50 44; 123 45 46; 124 45 47; 127 46 48;
128 47 69; 129 47 85; 132 48 51; 133 45 49; 134 50 76; 135 52 50; 138 53 51;
139 52 71; 140 54 52; 141 55 53; 144 56 54; 145 57 55; 146 56 73; 147 44 58;
148 50 59; 149 45 60; 150 61 54; 151 64 55; 152 61 56; 153 56 62; 155 64 57;
156 59 58; 157 61 62; 158 62 63; 162 66 4; 163 67 41; 164 68 10; 165 69 48;
166 70 12; 167 71 53; 168 72 16; 169 73 104; 170 66 1; 171 66 2; 172 67 38;
173 67 39; 174 74 6; 175 75 43; 176 74 3; 177 74 4; 178 75 40; 179 75 41;
180 68 7; 181 68 8; 182 69 45; 183 69 46; 184 76 51; 185 70 9; 186 70 10;
187 76 47; 188 76 48; 189 77 14; 190 77 11; 191 77 12; 192 71 50; 193 71 51;
194 72 13; 195 72 14; 196 104 53; 197 104 52; 198 78 20; 199 79 26; 200 80 28;
201 81 32; 202 82 22; 203 83 30; 204 78 17; 205 78 18; 206 82 19; 207 82 20;
208 79 23; 209 79 24; 210 80 25; 211 80 26; 212 83 27; 213 83 28; 214 81 29;
215 81 30; 216 84 49; 217 45 84; 218 23 84; 219 85 50; 221 49 94; 222 35 92;
224 44 85; 225 59 85; 230 92 21; 231 94 42; 232 98 29; 233 33 95; 234 95 97;

0-0608-05-0000
C-210-1338-002
SHEET 53 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

235 56 102; 236 56 96; 237 97 96; 238 56 97; 239 33 97; 240 96 54; 241 95 98;
242 99 57; 243 63 64; 244 63 99; 245 100 34; 246 73 103; 247 101 34;
248 102 33; 249 103 100; 250 102 103; 251 103 101; 252 104 99; 253 50 58;
254 58 85;
**++++++++++++++++++++++++++++ START USER TABLE ++++++++++++++++++++++++++++**
*THE USER TABLE OF STEEL MEMBER IS OMITTED TO PRINT.
SET ECHO OFF
**--------------------------------------------------------------------------**
START USER TABLE
**--------------------------------------------------------------------------**
TABLE 1
**--------------------------------------------------------------------------**
UNIT CM KN
**--------------------------------------------------------------------------**
**--------------------------------------------------------------------------**
** AX : D : TW : WF : TF : IZ : IY : IX : AY : AZ
**
**--------------------------------------------------------------------------**
WIDE FLANGE
WH100
21.9 10 0.6 10 0.8 383 134 4 6 16
WH125
30.31 12.5 0.65 12.5 0.9 847 294 7.1 8.13 22.5
WH150
40.55 15 0.7 15 1 1660 564 11.5 10.5 30
WH175
51.43 17.5 0.75 17.5 1.1 2900 984 17.7 13.13 38.5
WH200
64.28 20 0.8 20 1.2 4770 1600 26 16 48
WH250
92.18 25 0.9 25 1.4 10800 3650 51.1 22.5 70
WH300
120.4 30 1 30 1.5 20500 6760 76.5 30 90
WH350
173.9 35 1.2 35 1.9 40300 13600 178 42 133
WH400
219.5 40 1.3 40 2.1 66900 22400 273.2 52 168
WH408
251.5 40 2.1 40.8 2.1 71100 23800 362.4 84 171.36
**--------------------------------------------------------------------------**
MH148
27.25 14.8 0.6 10 0.9 1040 151 5.8 8.88 18
MH194
39.76 19.4 0.6 15 0.9 2740 508 8.6 11.64 27
MH244
56.24 24.4 0.7 17.5 1.1 6120 985 18.1 17.08 38.5
MH294
73.03 29.4 0.8 20 1.2 11400 1600 27.6 23.52 48
MH340
101.5 34 0.9 25 1.4 21700 3650 53.3 30.6 70
MH390
136.7 39 1 30 1.6 38900 7210 93.9 39 96
MH488
164.4 48.8 1.1 30 1.8 71400 8120 136.7 53.68 108
MH588
192.5 58.8 1.2 30 2 118000 9020 191.6 70.56 120
MH700
235.5 70 1.3 30 2.4 201000 10800 324.2 91 144
MH800
267.4 80 1.4 30 2.6 292000 11700 419.9 112 156
**--------------------------------------------------------------------------**
SH200
27.57 20 0.55 10 0.8 1880 134 4.4 11 16
SH250
37.87 25 0.6 12.5 0.9 4080 294 7.7 15 22.5
SH300
47.53 30 0.65 15 0.9 7350 508 9.9 19.5 27
SH350
63.66 35 0.7 17.5 1.1 13700 985 19.3 24.5 38.5
SH400
84.12 40 0.8 20 1.3 23700 1740 35.7 32 52
SH450
97.41 45 0.9 20 1.4 33700 1870 46.8 40.5 56
SH500
114.2 50 1 20 1.6 47800 2140 70.2 50 64

0-0608-05-0000
C-210-1338-002
SHEET 54 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

SH600
135.2 60 1.1 20 1.7 78200 2280 90.6 66 68
**--------------------------------------------------------------------------**
TABLE 2
**--------------------------------------------------------------------------**
UNIT CM KN
**--------------------------------------------------------------------------**
**--------------------------------------------------------------------------**
** AX: D : WF : TF : TW : IZ : IY : IX : CY : AY : AZ **
**--------------------------------------------------------------------------**
TEE
ST125
18.94 12.5 12.5 0.9 0.6 249 147 3.87 2.78 7.5 11.25
ST150
23.76 15 15 0.9 0.65 465 254 4.94 3.38 9.75 13.5
ST175
31.83 17.5 17.5 1.1 0.7 816 492 9.64 3.74 12.25 19.25
ST200
42.06 20 20 1.3 0.8 1400 868 17.84 4.23 16 26
ST250
57.12 25 20 1.6 1 3210 1070 35.11 5.96 25 32
ST300
67.6 30 20 1.7 1.1 5822 1140 45.31 7.81 33 34
**--------------------------------------------------------------------------**
TABLE 3
**--------------------------------------------------------------------------**
UNIT CM KN
**--------------------------------------------------------------------------**
**--------------------------------------------------------------------------**
** D : WF : TF : SP : IZ : IY : IX : CY : AY : AZ : RVV **
**--------------------------------------------------------------------------**
DOUBLE ANGLE
2L70
7 7 0.6 1 75.54 171.91 1.93 1.94 8.4 8.4 0
2L75
7.5 7.5 0.6 1 93.82 210.07 2.07 2.06 9 9 0
2L90
9 9 0.7 1 189.66 406.65 3.96 2.47 12.6 12.6 0
2L100
10 10 0.8 1.2 296.48 648.72 6.55 2.76 16 16 0
**--------------------------------------------------------------------------**
TABLE 4
**--------------------------------------------------------------------------**
UNIT CM KN
**--------------------------------------------------------------------------**
**--------------------------------------------------------------------------**
** D : WF : TF : R : AY : AZ
**
**--------------------------------------------------------------------------**
ANGLE
L50
5 5 0.6 0.98 3 3
L63
6.3 6.3 0.6 1.24 3.78 3.78
L70
7 7 0.6 1.38 4.2 4.2
L75
7.5 7.5 0.6 1.49 4.5 4.5
L75X8
7.5 7.5 0.8 1.47 6 6
L90
9 9 0.7 1.78 6.3 6.3
L90X10
9 9 1 1.76 9 9
L100
10 10 0.8 1.98 8 8
L100X10
10 10 1 1.96 10 10
**--------------------------------------------------------------------------**
L75X50
7.5 5 0.6 1.08 4.5 3
L90X56
9 5.6 0.6 1.21 5.4 3.36
L100X80
10 8 0.8 1.71 8 6.4

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 55 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

L125X80
12.5 8 0.8 1.75 10 6.4
L125X80X10
12.5 8 1 1.74 12.5 8
L140X90
14 9 1 1.96 14 9
**--------------------------------------------------------------------------**
TABLE 5
**--------------------------------------------------------------------------**
UNIT CM KN
**--------------------------------------------------------------------------**
**--------------------------------------------------------------------------**
** AX : D : TW : WF : TF : IZ : IY : IX : CZ : AY : AZ **
**--------------------------------------------------------------------------**
CHANNEL
C100
12.74 10 0.53 4.8 0.85 198.3 25.6 2.31 1.52 5.3 8.16
C120
15.36 12 0.55 5.3 0.9 346 37.4 3.06 1.62 6.6 9.54
C160
21.95 16 0.65 6.3 1 866.2 73.4 5.36 1.8 10.4 12.6
C180
25.69 18 0.7 6.8 1.05 1272.7 98.6 6.91 1.89 12.6 14.28
C200
32.83 20 0.9 7.5 1.1 1913.7 143.6 10.85 1.95 18 16.5
C250
34.91 25 0.7 7.8 1.2 3359.1 175.9 11.3 2.07 17.5 18.72
**--------------------------------------------------------------------------**
TABLE 6
**--------------------------------------------------------------------------**
UNIT CM KN
**--------------------------------------------------------------------------**
**--------------------------------------------------------------------------**
** OD : ID : AY : AZ
**
**--------------------------------------------------------------------------**
PIPE
P114
11.4 10.2 20.36 20.36
P168
16.8 15.4 35.41 35.41
P219
21.9 20.5 46.6 46.6
P273
27.3 25.7 66.6 66.6
P325
32.5 30.9 82.88 82.88
P351
35.1 33.5 86.16 86.16
**--------------------------------------------------------------------------**
END
SET ECHO OFF
**--------------------------------------------------------------------------**
*SET ECHO ON
*START GROUP DEFINITION
*MEMBER
*END GROUP DEFINITION
*
*********************************************************
* CONCRETE MEMBER
*===========================
*
* COLUMN : ICR = 0.70IG (ACI-318-99, 10.11.1)
*
* BEAM : ICR = 0.35IG (ACI-318-99, 10.11.1)
* XX TO YY PRIS IY IZ YD ZD
*
*********************************************************
*
*
*********************************************************
* STEEL MEMBER
*===========================
*********************************************************
*MEMBER TRUSS

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 56 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

*_BRACING
*
*********************************************************
*
UNIT METER KN
DEFINE MATERIAL START
ISOTROPIC MATERIAL1
E 2e+008
POISSON 0.3
DENSITY 77
ALPHA 1.17e-005
*
*ISOTROPIC MATERIAL2
*E 2E+008
*POISSON 0.3
*DENSITY 0
*ALPHA 1.17E-005
*
*ISOTROPIC STEEL
*E 2.05E+008
*POISSON 0.3
*DENSITY 76.8195
*ALPHA 1.2E-005
*DAMP 0.03
*
ISOTROPIC STEEL
E 2.05e+008
POISSON 0.3
DENSITY 76.8195
ALPHA 1.2e-005
DAMP 0.03
END DEFINE MATERIAL
*
MEMBER PROPERTY JAPANESE
42 43 50 51 58 59 86 90 91 98 106 TO 108 122 133 147 TO 149 156 216 233 TO 237 246 TO 251 UPTABLE 1 SH200
MEMBER PROPERTY JAPANESE
150 151 153 217 218 221 222 224 225 238 TO 241 253 254 UPTABLE 4 L75
MEMBER PROPERTY JAPANESE
152 155 157 158 243 244 UPTABLE 1 SH250
MEMBER PROPERTY JAPANESE
170 TO 173 176 TO 179 204 TO 207 UPTABLE 2 ST200
1 2 4 7 9 12 14 17 19 22 24 27 29 32 60 61 63 64 66 67 69 70 72 73 75 76 78 79 81 82 110 111 113 116 118 121 124 127 129 132 135 138 140 141 144 145 219 230 TO 232 UPTABLE 1 WH350
MEMBER PROPERTY JAPANESE
180 TO 183 185 TO 188 190 TO 197 208 TO 215 UPTABLE 2 ST150
MEMBER PROPERTY JAPANESE
3 8 13 18 23 28 33 62 65 68 71 74 77 80 83 112 117 123 128 134 139 146 162 163 TO 169 174 175 184 189 198 TO 203 242 245 252 UPTABLE 1 SH250
MEMBER PROPERTY JAPANESE
46 47 54 55 88 89 94 95 101 102 UPTABLE 1 SH300
MEMBER PROPERTY
40 41 UPTABLE 1 SH500
36 37 85 87 UPTABLE 1 SH350
CONSTANTS
MATERIAL MATERIAL1 MEMB 1 TO 4 7 TO 9 12 TO 14 17 TO 19 22 TO 24 27 TO 29 32 33 36 37 40 TO 43 46 47 50 51 54 55 58 TO 83 85 TO 91 94 95 98 101 102 106 TO 108 110 TO 113 116 TO 118 121 TO 124 127 TO 129 132 TO 135 138 TO 141 144 TO 153 155 TO 158 162 TO 179 184 189 198 TO 207 216 TO 219 221 222 224 225 230 TO 254
MATERIAL STEEL MEMB 180 TO 183 185 TO 188 190 TO 197 208 TO 215
**
SUPPORTS
* FOR COMMON CALCULATION *
1 2 17 18 38 39 PINNED
** FOR SEISMIC CALCULATION *
*3 TO 16 19 TO 34 40 TO 43 45 TO 48 50 TO 53 56 57 PINNED
*
MEMBER RELEASE
3 8 13 18 23 28 33 42 43 50 51 58 59 62 65 68 71 74 77 80 83 90 91 98 106 108 112 117 123 128 134 139 157 235 244 246 250 251 START MY MZ
13 42 43 50 51 58 59 68 90 91 98 108 123 162 TO 168 174 175 184 189 198 TO 203 242 TO 245 247 TO 251 END MY MZ

0-0608-05-0000
C-210-1338-002
SHEET 57 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

*
MEMBER TRUSS
150 151 153 170 TO 173 176 TO 183 185 TO 188 190 TO 197
*
********************************************************
*LOADING DATA*
********************************************************
LOAD 1 (a) *DEAD-LOAD_STRUCTUTRE-SELFWEIGHT*-----------------LOAD-01
SELFWEIGHT Y -1 ALL
**LOAD FROM PIPE RACK FLARE TYPE A**
MEMBER LOAD
85 CON GX -0.495 0
85 CON GX -0.002 1.2
**
85 CON GY -0.818 0
85 CON GY -0.816 1.2
**
85 CON GZ -1.403 0
85 CON GZ -3.198 1.2
**--------------------------------------------------------------------------**
LOAD 2 (b.accessory) *DEAD-LOAD_ACCESSORY*--------------------LOAD-02
MEMBER LOAD
*GRATING* 40 kg/m
157 158 243 UNI Y -0.981
245 UNI Y -0.981 0.25 2.25
245 UNI Y -0.981 0 0.25
83 UNI Y -0.981 1.84 2.25
83 UNI Y -0.981 0.93 1.84
83 UNI Y -0.981 0 0.93
242 UNI Y -1.96
252 UNI Y -1.96 0 1.55
169 UNI Y -1.96 0 0.25
146 UNI Y -1.96 1.84 2.25
146 UNI Y -1.96 0.93 1.84
146 UNI Y -1.96 0 0.93
107 108 122 156 216 234 235 237 248 UNI Y -0.2
**
*LEDDERS* 0.343~0.35 kN/m = 35 kg/m
90 CON GY -2.48 0.5
90 CON GY -2.48 0.1
149 CON GY -2.65 0.5
149 CON GY -2.65 0.1
152 CON GY -2.695 0.5
152 CON GY -2.695 0.9
**
**--------------------------------------------------------------------------**
LOAD 3 (b.other equip) *DEAD-LOAD_OTHER*----------------------LOAD-03
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 4 (d.pipe) *PIPING-EMPTY*-------------------------------LOAD-04
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 5 (e.pipe) *PIPING-OPERATION*---------------------------LOAD-05
MEMBER LOAD
58 CON GY -5.886 0.9
59 CON GY -7.848 0.9
85 UNI Y -8.829 0 1.2
87 UNI Y -8.829 0.6 1.8
41 CON GY -68.67 0.9
**
**PIPE VALVE AT GD +.29.770**
MEMBER LOAD
244 CON GY -8.829 0.24
245 CON GY -13.734 2.05
250 CON GY -0.981 0.93
250 CON GY -0.981 1.84
251 CON GY -0.981 0.5
83 CON GY -2.943 0.93
83 CON GY -2.943 1.84
245 CON GY -1.962 0.5
**
**

0-0608-05-0000
C-210-1338-002
SHEET 58 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

**LOAD FROM PIPE RACK FLARE TYPE A**


MEMBER LOAD
85 CON GX -0.207 0
85 CON GX -0.002 1.2
**
85 CON GY 0 0
85 CON GY -0.002 1.2
**
85 CON GZ -1.742 0
85 CON GZ -2.035 1.2
**--------------------------------------------------------------------------**
LOAD 6 (f.pipe.1) *PIPING-TEST-1*-----------------------------LOAD-06
MEMBER LOAD
41 CON GY -125.568 0.9
**LOAD FROM PIPE RACK FLARE TYPE A**
MEMBER LOAD
85 CON GX -0.687 0
85 CON GX -0.002 1.2
**
85 CON GY -0.003 0
85 CON GY 0 1.2
**
85 CON GZ -0.623 0
85 CON GZ -3.313 1.2
**--------------------------------------------------------------------------**
LOAD 7 (f.pipe.2) *PIPING-TEST-2*-----------------------------LOAD-07
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 8 (f.pipe.3) *PIPING-TEST-3*-----------------------------LOAD-08
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 9 (g) *LIVE-LOAD-PEOPLE*-------------------------------LOAD-09
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 10 (g.roof) *LIVE-LOAD-ROOF*-----------------------------LOAD-10
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 11 (d.equip) *EQUIPMENT-EMPTY*----------------------------LOAD-11
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 12 (e.equip) *EQUIPMENT-OPERATION*-----------------------LOAD-12
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 13 (f.equip.1) *EQUIPMENT-TEST-1*------------------------LOAD-13
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 14 (f.equip.2) *EQUIPMENT-TEST-2*------------------------LOAD-14
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 15 (m) *ERECTION-LOAD*-----------------------------------LOAD-15
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 16 (VOID) *VOID*-------------------------------------------------LOAD-16
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 17 (l.af) *THERMAL-ANCHOR-FORCE*---------------------------LOAD-17
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 18 (l.g.x ) *THERMAL-GUIDE-FORCE X*------------------------LOAD-18
MEMBER LOAD
58 CON GX 2.943 0.9
59 CON GX 1.962 0.9
41 CON GX 12.753 0.9

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 59 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

**LOAD FROM PIPE RACK FLARE TYPE A**


MEMBER LOAD
85 CON GX -0.059 0
85 CON GX -0.001 1.2
**
85 CON GY 0 0
85 CON GY 0 1.2
**
85 CON GZ -0.469 0
85 CON GZ -0.081 1.2
**--------------------------------------------------------------------------**
LOAD 19 (l.g.z) *THERMAL-GUIDE-FORCE Z*-------------------------LOAD-19
*STOPPER
MEMBER LOAD
58 CON GZ 13.734 0.9
41 CON GZ 110.853 0.9
**--------------------------------------------------------------------------**
LOAD 20 (lg.y) *THERMAL-GUIDE-FORCE Y*-------------------------LOAD-20
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 21 (l.f.x) *THERMAL-FRICTION-FORCE X*----------------------LOAD-21
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 22 (l.f.z) *THERMAL-FRICTION-FORCE Z*----------------------LOAD-22
MEMBER LOAD
41 CON GZ 22.661 0.9
85 UNI Z 2.648 0 1.2
87 UNI Z -2.648 0.6 1.8
**LOAD FROM PIPE RACK FLARE TYPE A**
MEMBER LOAD
85 CON GX 0.791 0
85 CON GX 0.02 1.2
**
85 CON GY -0.008 0
85 CON GY -0.009 1.2
**
85 CON GZ 19.227 0
85 CON GZ 18.787 1.2
**--------------------------------------------------------------------------**
LOAD 23 (l.s.x) *THERMAL-SLIDING-FORCE X*------------------------LOAD-23
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 24 (l.s.z) *THERMAL-SLIDING-FORCE Z*------------------------LOAD-24
MEMBER LOAD
1 CON GY 0 0
**--------------------------------------------------------------------------**
LOAD 25 (n.x) *EARTHQUAKE-LOAD-X* -------------------------------LOAD-25
JOINT LOAD
1 17 FX 0
**
3 FX 0.12
5 FX 0.08
7 FX 0.15
9 FX 0.23
11 FX 0.3
13 FX 0.36
15 FX 0.39
19 FX 0.21
21 FX 0.09
23 FX 0.16
25 FX 0.16
27 FX 0.22
29 FX 0.26
31 FX 0.25
33 FX 0.72
40 FX 0.15
42 FX 0.07
45 FX 0.22
47 FX 0.24
50 FX 0.45
52 FX 0.61

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 60 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

56 FX 0.83
**
4 FX 0.09
6 FX 0.52
8 FX 0.11
10 FX 0.17
12 FX 0.32
14 FX 0.39
16 FX 0.48
20 FX 0.2
22 FX 0.76
24 FX 0.16
26 FX 0.26
28 FX 0.33
30 FX 0.41
32 FX 0.51
34 FX 1.28
41 FX 0.17
43 FX 0.07
46 FX 0.16
48 FX 0.25
51 FX 0.32
53 FX 0.69
57 FX 0.99
**
**LOAD FROM PIPE RACK FLARE TYPE A**
MEMBER LOAD
85 CON GX 1.664 0
85 CON GX -0.003 1.2
**
85 CON GY 0.001 0
85 CON GY -0.004 1.2
**
85 CON GZ -5.479 0
85 CON GZ 3.542 1.2
**--------------------------------------------------------------------------**
LOAD 26 (n.z) *EARTHQUAKE-LOAD-Z* -------------------------------LOAD-26
JOINT LOAD
3 FZ 0.14
5 FZ 0.1
7 FZ 0.17
9 FZ 0.28
11 FZ 0.36
13 FZ 0.43
15 FZ 0.47
4 FZ 0.14
6 FZ 0.84
8 FZ 0.17
10 FZ 0.28
12 FZ 0.36
14 FZ 0.43
16 FZ 0.54
**
19 FZ 0.21
21 FZ 0.09
23 FZ 0.17
25 FZ 0.17
27 FZ 0.23
29 FZ 0.27
31 FZ 0.26
33 FZ 0.75
20 FZ 0.19
22 FZ 0.74
24 FZ 0.16
26 FZ 0.25
28 FZ 0.32
30 FZ 0.4
32 FZ 0.5
34 FZ 1.25
**
40 FZ 0.16
42 FZ 0.07
45 FZ 0.23
47 FZ 0.25

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 61 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

50 FZ 0.48
52 FZ 0.64
56 FZ 0.87
41 FZ 0.17
43 FZ 0.07
46 FZ 0.15
48 FZ 0.24
51 FZ 0.32
53 FZ 0.68
57 FZ 0.97
**LOAD FROM PIPE RACK FLARE TYPE A**
MEMBER LOAD
85 CON GX 0.197 0
85 CON GX 0.007 1.2
**
85 CON GY -0.004 0
85 CON GY -0.003 1.2
**
85 CON GZ 6.707 0
85 CON GZ 6.162 1.2
**--------------------------------------------------------------------------**
LOAD 27 (n.y) *EARTHQUAKE-LOAD-Y* -------------------------------LOAD-27
JOINT LOAD
3 FY -0.66
5 FY -0.27
7 FY -0.38
9 FY -0.42
11 FY -0.42
13 FY -0.41
15 FY -0.37
19 FY -1.19
21 FY -0.28
23 FY -0.43
25 FY -0.29
27 FY -0.31
29 FY -0.29
31 FY -0.24
33 FY -0.66
40 FY -0.89
42 FY -0.21
45 FY -0.58
47 FY -0.44
50 FY -0.63
52 FY -0.69
56 FY -0.77
**
4 FY -0.66
6 FY -2.33
8 FY -0.38
10 FY -0.42
12 FY -0.42
14 FY -0.41
16 FY -0.43
20 FY -1.06
22 FY -2.37
24 FY -0.4
26 FY -0.44
28 FY -0.43
30 FY -0.44
32 FY -0.45
34 FY -1.1
41 FY -0.92
43 FY -0.21
46 FY -0.38
48 FY -0.42
51 FY -0.42
53 FY -0.73
57 FY -0.85
**
**LOAD FROM PIPE RACK FLARE TYPE A**
MEMBER LOAD
85 CON GX -0.58 0
85 CON GX 0 1.2
**

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 62 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

85 CON GY -0.001 0
85 CON GY 0 1.2
**
85 CON GZ -0.201 0
85 CON GZ -0.415 1.2
***--------------------------------------------------------------------------**
LOAD 28 (h.x) *WIND-LOAD-X* -------------------------------------LOAD-28
JOINT LOAD
*
**
3 4 40 41 FX 0.759
19 20 FX 0.85
5 6 21 22 FX 0.933
42 43 FX 0.551
7 8 FX 0.817
45 46 56 FX 1.152
23 24 FX 0.705
9 10 47 48 FX 1.155
25 26 FX 0.938
11 12 FX 1.126
50 51 FX 1.129
27 28 FX 1.544
13 14 52 53 FX 1.168
29 30 FX 0.935
15 16 31 32 FX 1.102
33 34 FX 0.43
56 57 FX 0.776
**LOAD FROM PIPE RACK FLARE TYPE A**
MEMBER LOAD
85 CON GX 4.292 0
85 CON GX -0.007 1.2
**
85 CON GY 0.002 0
85 CON GY 0.01 1.2
**
85 CON GZ -13.914 0
85 CON GZ 9.136 1.2
***--------------------------------------------------------------------------**
LOAD 29 (hz) *WIND-LOAD-Z* -------------------------------------LOAD-29
JOINT LOAD
*
**
3 4 FZ 0.727
19 20 FZ 0.599
40 41 FZ 0.518
5 6 FZ 0.659
21 22 FZ 0.858
42 43 FZ 0.69
7 8 FZ 0.876
23 24 FZ 0.73
46 FZ 0.507
45 56 FZ 0.512
9 10 FZ 1.014
25 26 FZ 0.815
47 48 FZ 0.724
11 12 FZ 0.736
27 28 FZ 1.149
51 FZ 0.746
50 FZ 0.751
13 14 FZ 1.153
29 30 FZ 0.943
52 53 FZ 0.845
15 16 FZ 0.442
31 32 FZ 0.682
33 34 FZ 0.19
56 57 FZ 0.537
**
**LOAD FROM PIPE RACK FLARE TYPE A**
MEMBER LOAD
85 CON GX 0.645 0
85 CON GX 0.019 1.2
**
85 CON GY -0.01 0
85 CON GY -0.009 1.2

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 63 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

**
85 CON GZ 18.926 0
85 CON GZ 17.815 1.2
***--------------------------------------------------------------------------**
LOAD 30 (j) *BUNDLE-PULLING-LOAD *-------------------------------LOAD-28
JOINT LOAD
1 17 FX 0
***--------------------------------------------------------------------------**
LOAD 31 (c) *CRANE-LOAD*-----------------------------------------LOAD-29
JOINT LOAD
1 17 FX 0
***--------------------------------------------------------------------------**
*******************************************************************************
*
LOAD COMBINATIONS FOR FOUNDATION FOR STEEL STRUCTURE - PTS LOAD COMB *
*******************************************************************************
*******************************************************
*( LC A
) -- > W/O WIND -- 1.4(a+e+l) + 1.6.g
*******************************************************
LOAD 101
REPEAT LOAD
1 1.4 2 1.4 3 1.4 4 1.4 5 1.4 9 1.6 10 1.6 11 1.4 12 1.4 17 1.4 18 1.4 19 1.4 20 1.4 21 1.4 22 1.4 23 1.4 24 1.4
LOAD 102
REPEAT LOAD
1 1.4 2 1.4 3 1.4 4 1.4 5 1.4 9 1.6 10 1.6 11 1.4 12 1.4 17 1.4 18 -1.4 19 1.4 20 1.4 21 -1.4 22 1.4 23 -1.4 24 1.4
*
LOAD 103
REPEAT LOAD
1 1.4 2 1.4 3 1.4 4 1.4 5 1.4 9 1.6 10 1.6 11 1.4 12 1.4 17 1.4 18 1.4 19 -1.4 20 1.4 21 1.4 22 -1.4 23 1.4 24 -1.4
*
LOAD 104
REPEAT LOAD
1 1.4 2 1.4 3 1.4 4 1.4 5 1.4 9 1.6 10 1.6 11 1.4 12 1.4 17 1.4 18 -1.4 19 -1.4 20 1.4 21 -1.4 22 -1.4 23 -1.4 24 -1.4
*
LOAD 105
REPEAT LOAD
1 1.4 2 1.4 3 1.4 4 1.4 5 1.4 9 1.6 10 1.6 11 1.4 12 1.4 17 1.4 18 1.4 19 1.4 20 -1.4 21 1.4 22 1.4 23 1.4 24 1.4
*
LOAD 106
REPEAT LOAD
1 1.4 2 1.4 3 1.4 4 1.4 5 1.4 9 1.6 10 1.6 11 1.4 12 1.4 17 1.4 18 -1.4 19 1.4 20 -1.4 21 -1.4 22 1.4 23 -1.4 24 1.4
*
LOAD 107
REPEAT LOAD
1 1.4 2 1.4 3 1.4 4 1.4 5 1.4 9 1.6 10 1.6 11 1.4 12 1.4 17 1.4 18 1.4 19 -1.4 20 -1.4 21 1.4 22 -1.4 23 1.4 24 -1.4
*
LOAD 108
REPEAT LOAD
1 1.4 2 1.4 3 1.4 4 1.4 5 1.4 9 1.6 10 1.6 11 1.4 12 1.4 17 1.4 18 -1.4 19 -1.4 20 -1.4 21 -1.4 22 -1.4 23 -1.4 24 -1.4
********************************************************
*( LC B ) OP WITH WIND ---> 1.2(a+e+l) + 1.2.h
********************************************************
LOAD 109
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 5 1.2 9 1.2 10 1.2 11 1.2 12 1.2 17 1.2 18 1.2 19 1.2 20 1.2 21 1.2 22 1.2 23 1.2 24 1.2 28 1.2
*
LOAD 110
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 5 1.2 9 1.2 10 1.2 11 1.2 12 1.2 17 1.2 18 -1.2 19 1.2 20 1.2 21 -1.2 22 1.2 23 -1.2 24 1.2 28 -1.2
*
LOAD 111
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 5 1.2 9 1.2 10 1.2 11 1.2 12 1.2 17 1.2 18 1.2 19 -1.2 20 1.2 21 1.2 22 -1.2 23 1.2 24 -1.2 28 1.2
*

0-0608-05-0000
C-210-1338-002
SHEET 64 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

LOAD 112
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 5 1.2 9 1.2 10 1.2 11 1.2 12 1.2 17 1.2 18 -1.2 19 -1.2 20 1.2 21 -1.2 22 -1.2 23 -1.2 24 -1.2 28 -1.2
*
LOAD 113
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 5 1.2 9 1.2 10 1.2 11 1.2 12 1.2 17 1.2 18 1.2 19 1.2 20 -1.2 21 1.2 22 1.2 23 1.2 24 1.2 29 1.2
*
LOAD 114
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 5 1.2 9 1.2 10 1.2 11 1.2 12 1.2 17 1.2 18 -1.2 19 1.2 20 -1.2 21 -1.2 22 1.2 23 -1.2 24 1.2 29 1.2
*
LOAD 115
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 5 1.2 9 1.2 10 1.2 11 1.2 12 1.2 17 1.2 18 1.2 19 -1.2 20 -1.2 21 1.2 22 -1.2 23 1.2 24 -1.2 29 -1.2
*
LOAD 116
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 5 1.2 9 1.2 10 1.2 11 1.2 12 1.2 17 1.2 18 -1.2 19 -1.2 20 -1.2 21 -1.2 22 -1.2 23 -1.2 24 -1.2 29 -1.2
*****************************************************************
* ( LC C ) ---- PIPING TEST ---> 1.2(a+g +fpipe) + 0.6.h
*****************************************************************
LOAD 117
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 6 1.2 9 1.2 10 1.2 11 1.2 28 0.6
*
LOAD 118
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 7 1.2 9 1.2 10 1.2 11 1.2 28 0.6
*
LOAD 119
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 8 1.2 9 1.2 10 1.2 11 1.2 28 0.6
*
LOAD 120
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 6 1.2 9 1.2 10 1.2 11 1.2 28 -0.6
*
LOAD 121
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 7 1.2 9 1.2 10 1.2 11 1.2 28 -0.6
*
LOAD 122
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 8 1.2 9 1.2 10 1.2 11 1.2 28 -0.6
*
LOAD 123
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 6 1.2 9 1.2 10 1.2 11 1.2 29 0.6
*
LOAD 124
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 7 1.2 9 1.2 10 1.2 11 1.2 29 0.6
LOAD 125
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 8 1.2 9 1.2 10 1.2 11 1.2 29 0.6
*
LOAD 126
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 6 1.2 9 1.2 10 1.2 11 1.2 29 -0.6
*
LOAD 127
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 7 1.2 9 1.2 10 1.2 11 1.2 29 -0.6
*
LOAD 128
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 8 1.2 9 1.2 10 1.2 11 1.2 29 -0.6
*

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 65 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

*****************************************************************
* ( LC C ) ---- EQUIPMENT TEST ---> 1.2(a+g +fequip) + 0.6.h
*****************************************************************
LOAD 129
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 9 1.2 10 1.2 11 1.2 13 1.2 28 0.6
*
LOAD 130
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 9 1.2 10 1.2 11 1.2 14 1.2 28 0.6
*
LOAD 131
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 9 1.2 10 1.2 11 1.2 13 1.2 28 -0.6
*
LOAD 132
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 9 1.2 10 1.2 11 1.2 14 1.2 28 -0.6
LOAD 133
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 9 1.2 10 1.2 11 1.2 13 1.2 29 0.6
*
LOAD 134
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 9 1.2 10 1.2 11 1.2 14 1.2 29 0.6
*
LOAD 135
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 9 1.2 10 1.2 11 1.2 13 1.2 29 -0.6
*
LOAD 136
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 9 1.2 10 1.2 11 1.2 14 1.2 29 -0.6
*
*****************************************************************
* ( LC D ) ---- ERECTION ---> 1.2(a+d+g) + 1.2.h
*****************************************************************
LOAD 137
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 9 1.2 10 1.2 11 1.2 15 1.2 28 1.2
*
LOAD 138
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 9 1.2 10 1.2 11 1.2 15 1.2 28 -1.2
*
LOAD 139
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 9 1.2 10 1.2 11 1.2 15 1.2 29 1.2
*
LOAD 140
REPEAT LOAD
1 1.2 2 1.2 3 1.2 4 1.2 9 1.2 10 1.2 11 1.2 15 1.2 29 -1.2
*****************************************************************
* ( LC E ) ---- OPERATION W/ EARTHQUAKE ---> (a+e) + 1.4 l + 1.4.n
*****************************************************************
LOAD 141
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.4 18 1.4 19 1.4 20 1.4 21 1.4 22 1.4 23 1.4 24 1.4 25 1.4 27 1.4
LOAD 142
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.4 18 -1.4 19 1.4 20 1.4 21 -1.4 22 1.4 23 -1.4 24 1.4 25 -1.4 27 1.4
LOAD 143
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.4 18 1.4 19 -1.4 20 1.4 21 1.4 22 -1.4 23 1.4 24 -1.4 25 1.4 27 1.4
LOAD 144
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.4 18 -1.4 19 -1.4 20 1.4 21 -1.4 22 -1.4 23 -1.4 24 -1.4 25 -1.4 27 1.4
LOAD 145
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.4 18 1.4 19 1.4 20 1.4 -

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 66 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

21 1.4 22 1.4 23 1.4 24 1.4 26 1.4 27 -1.4


*
LOAD 146
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.4 18 -1.4 19 1.4 20 1.4 21 -1.4 22 1.4 23 -1.4 24 1.4 26 1.4 27 -1.4
*
LOAD 147
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.4 18 1.4 19 -1.4 20 1.4 21 1.4 22 -1.4 23 1.4 24 -1.4 26 -1.4 27 -1.4
*
LOAD 148
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.4 18 -1.4 19 -1.4 20 1.4 21 -1.4 22 -1.4 23 -1.4 24 -1.4 26 -1.4 27 -1.4
*
*******************************************************************************
*******************************************************************************
*
LOAD COMBINATIONS FOR STEEL AND FOUNDATION STABILITY CHECK
*
ALLOWABLE STRESS DESIGN
*
*******************************************************************************
************OPERATING CONDITION**************
*******************************************************
*( LC A1
) -- > W/O WIND -- a + e + l + g
*******************************************************
LOAD 201
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 1.0 19 1.0 20 1.0 21 1.0 22 1.0 23 1.0 24 1.0
*
LOAD 202
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 -1.0 19 1.0 20 1.0 21 -1.0 22 1.0 23 -1.0 24 1.0
*
LOAD 203
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 1.0 19 -1.0 20 1.0 21 1.0 22 -1.0 23 1.0 24 -1.0
*
LOAD 204
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 -1.0 19 -1.0 20 1.0 21 -1.0 22 -1.0 23 -1.0 24 -1.0
*
LOAD 205
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 1.0 19 1.0 20 -1.0 21 1.0 22 1.0 23 1.0 24 1.0
*
LOAD 206
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 -1.0 19 1.0 20 -1.0 21 -1.0 22 1.0 23 -1.0 24 1.0
*
LOAD 207
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 1.0 19 -1.0 20 -1.0 21 1.0 22 -1.0 23 1.0 24 -1.0
*
LOAD 208
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 -1.0 19 -1.0 20 -1.0 21 -1.0 22 -1.0 23 -1.0 24 -1.0
********************************************************
*( LC B1 ) OP W/ WIND + LIVE ---> a + e + l + h
********************************************************
LOAD 209
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 1.0 19 1.0 20 1.0 21 1.0 22 1.0 23 1.0 24 1.0 28 1.0
*
LOAD 210

0-0608-05-0000
C-210-1338-002
SHEET 67 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 -1.0 19 1.0 20 1.0 21 -1.0 22 1.0 23 -1.0 24 1.0 28 -1.0
*
LOAD 211
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 1.0 19 -1.0 20 1.0 21 1.0 22 -1.0 23 1.0 24 -1.0 28 1.0
*
LOAD 212
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 -1.0 19 -1.0 20 1.0 21 -1.0 22 -1.0 23 -1.0 24 -1.0 28 -1.0
*
LOAD 213
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 1.0 19 1.0 20 -1.0 21 1.0 22 1.0 23 1.0 24 1.0 29 1.0
*
LOAD 214
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 -1.0 19 1.0 20 -1.0 21 -1.0 22 1.0 23 -1.0 24 1.0 29 1.0
*
LOAD 215
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 1.0 19 -1.0 20 -1.0 21 1.0 22 -1.0 23 1.0 24 -1.0 29 -1.0
*
LOAD 216
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 10 1.0 11 1.0 12 1.0 17 1.0 18 -1.0 19 -1.0 20 -1.0 21 -1.0 22 -1.0 23 -1.0 24 -1.0 29 -1.0
*****************************************************************
* ( LC C1 ) ---- PIPING TEST ---> a + g + fpipe + 0.5.h
*****************************************************************
LOAD 217
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 9 1.0 10 1.0 11 1.0 28 0.5
*
LOAD 218
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 9 1.0 10 1.0 11 1.0 28 0.5
*
LOAD 219
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 8 1.0 9 1.0 10 1.0 11 1.0 28 0.5
*
LOAD 220
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 9 1.0 10 1.0 11 1.0 28 -0.5
*
LOAD 221
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 9 1.0 10 1.0 11 1.0 28 -0.5
*
LOAD 222
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 8 1.0 9 1.0 10 1.0 11 1.0 28 -0.5
*
LOAD 223
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 9 1.0 10 1.0 11 1.0 29 0.5
*
LOAD 224
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 9 1.0 10 1.0 11 1.0 29 0.5
*
LOAD 225
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 8 1.0 9 1.0 10 1.0 11 1.0 29 0.5
*
LOAD 226
REPEAT LOAD

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 68 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

1 1.0 2 1.0 3 1.0 4 1.0 6 1.0 9 1.0 10 1.0 11 1.0 29 -0.5


*
LOAD 227
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 7 1.0 9 1.0 10 1.0 11 1.0 29 -0.5
*
LOAD 228
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 8 1.0 9 1.0 10 1.0 11 1.0 29 -0.5
*
*****************************************************************
* ( LC C2 ) ---- EQUIPMENT TEST ---> a + g + fequip + 0.5 h
*****************************************************************
LOAD 229
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 13 1.0 28 0.5
*
LOAD 230
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 14 1.0 28 0.5
*
LOAD 231
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 13 1.0 28 -0.5
*
LOAD 232
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 14 1.0 28 -0.5
*
LOAD 233
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 13 1.0 28 0.5
*
LOAD 234
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 14 1.0 28 0.5
*
LOAD 235
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 13 1.0 29 -0.5
*
LOAD 236
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 14 1.0 29 -0.5
*
*****************************************************************
* ( LC D ) ---- ERECTION ---> a + d + g + h
*****************************************************************
LOAD 237
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 15 1.0 28 1.0
*
LOAD 238
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 15 1.0 28 -1.0
*
LOAD 239
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 15 1.0 29 1.0
*
LOAD 240
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 9 1.0 10 1.0 11 1.0 15 1.0 29 -1.0
*****************************************************************
* ( LC E1 ) ---- OPERATING + EARTHQUAKE ---> a + e + l + n
*****************************************************************
LOAD 241
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.0 18 1.0 19 1.0 20 1.0 21 1.0 22 1.0 23 1.0 24 1.0 25 1.0 27 1.0
*
LOAD 242
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.0 18 -1.0 19 1.0 20 1.0 -

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 69 OF 72

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 70 OF 72

21 -1.0 22 1.0 23 -1.0 24 1.0 25 -1.0 27 1.0


*
LOAD 243
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.0 18 1.0 19 -1.0 20 1.0 21 1.0 22 -1.0 23 1.0 24 -1.0 25 1.0 27 1.0
*
LOAD 244
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.0 18 -1.0 19 -1.0 20 1.0 21 -1.0 22 -1.0 23 -1.0 24 -1.0 25 -1.0 27 1.0
*
LOAD 245
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.0 18 1.0 19 1.0 20 -1.0 21 1.0 22 1.0 23 1.0 24 1.0 26 1.0 27 -1.0
*
LOAD 246
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.0 18 -1.0 19 1.0 20 -1.0 21 -1.0 22 1.0 23 -1.0 24 1.0 26 1.0 27 -1.0
*
LOAD 247
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.0 18 1.0 19 -1.0 20 -1.0 21 1.0 22 -1.0 23 1.0 24 -1.0 26 -1.0 27 -1.0
*
LOAD 248
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 11 1.0 12 1.0 17 1.0 18 -1.0 19 -1.0 20 -1.0 21 -1.0 22 -1.0 23 -1.0 24 -1.0 26 -1.0 27 -1.0
*
*****************************************************************
**********************SEISMIIC*******************************
*****************************************************************
* ( LC 1000 ) ---- OPERATION
*****************************************************************
LOAD 1000
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0 9 1.0 11 1.0 12 1.0
*
LOAD 1001
REPEAT LOAD
1 1.0 2 1.0 3 1.0 4 1.0 11 1.0
*
PERFORM ANALYSIS
CHANGE
*
******************************************************************************
****************************** PRINTING CONTROL ******************************
******************************************************************************
**CASE-1 : FOR ALL CONNECTION CHECKS
**CASE-2 : FOR CALCULATION SHEET
**CASE-3 : FOR FOUNDATION LOADING DATA
**--------------------------------------------------------------------------**
**
/ ACTIVATION **
**
PRINTING CONTENT
/
CASE **
**
/ 1 2 3 **
**--------------------------------------------------------------------------**
**MEMBER FORCE FOR STEEL CONNECTION CHECK
/ o x x **
**MEMBER FORCE FOR CONCRETE BEAM CONNECTION CHECK
/ o x x **
**MEMBER FORCE FOR CONCRETE BEAM WEAK AXIS MOMENT CHECK
/ o x x **
**MEMBER FORCE FOR PS CONNECTION CHECK
/ o x x **
**MEMBER FORCE FOR COLUMN BASE DESIGN (BPC)
/ o x x **
**SUPPORT REACTION FOR BP CONNECTION CHECK AND SOCKET DESIGN / o x x **
**JOINT DISPLACEMENT FOR DRIFT CHECK
/ x o x **
**--------------------------------------------------------------------------**
**++++++++++++++++ MEMBER FORCE FOR STEEL CONNECTION CHECK +++++++++++++++++**
**++++++++++++++++
EXCEPT PS/BP/BPC CONNECTIONS
+++++++++++++++++**
LOAD LIST 201 TO 248
PRINT MEMBER FORCES ALL
*PRINT MEMBER FORCES LIST 175
**++++++++++++ MEMBER FORCE FOR CONCRETE BEAM CONNECTION CHECK +++++++++++++**

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD


DESIGN CALCULATION REPORT FOR FLARE LINE
SUPPORT II

Job No. :
Doc. No. :

0-0608-05-0000
C-210-1338-002
SHEET 71 OF 72

*LOAD LIST 101 TO 144 161 TO 163 170 TO 177


*PRINT MEMBER FORCES LIST _RC-BEAM
**+++++++++ MEMBER FORCE FOR CONCRETE BEAM WEAK AXIS MOMENT CHECK ++++++++++**
*LOAD LIST 101 TO 144 161 TO 163 170 TO 177
*PRINT MAXFORCE ENVELOPE LIST _RC-BEAM
**++++++++++++++++++ MEMBER FORCE FOR PS CONNECTION CHECK ++++++++++++++++++**
*LOAD LIST 101 TO 144 161 TO 163
*PRINT MEMBER FORCES LIST _POST
*PRINT MEMBER FORCES LIST _SUPPORT-ON-PC
**+++++++ SUPPORT REACTION FOR BP CONNECTION CHECK AND SOCKET DESIGN +++++++**
*LOAD LIST 101 TO 144
*PRINT SUPPORT REACTIONS LIST _SUPPORT-ON-FDN
**+++++++++++++++++++ JOINT DISPLACEMENT FOR DRIFT CHECK +++++++++++++++++++**
**--------------------------------------------------------------------------**
*LOAD LIST 166 TO 169
*PRINT JOINT DISPLACEMENT LIST ???
******************************************************************************
******************************** STEEL DESIGN ********************************
******************************************************************************
**+++++++++++++++++++++++++++++++ FOR MAIN FRAME DESIGN ++++++++++++++++++++++++++++++++**
LOAD LIST 101 TO 148
PARAMETER 1
CODE BS5950
PY 275000 ALL
RATIO 1 ALL
TRACK 0 ALL
BEAM 1 ALL
SGR 0 ALL
MAIN 1 MEMB 1 TO 4 7 TO 9 12 TO 14 17 TO 19 22 TO 24 27 TO 29 32 33 36 37 40 TO 43 46 47 50 51 54 55 58 TO 83 85 TO 91 94 95 98 101 102 106 TO 108 110 TO 113 116 TO 118 121 TO 124 127 TO 129 132 TO 135 138 TO 141 144 TO 153 155 TO 158 162 TO 219 221 222 224 225 230 TO 253
**
MAIN 2 MEMB 86 107 122 133 147 TO 149 152 155 TO 158 216 233 234 236 237 243 244
**
MAIN 3 MEMB 150 151 153 170 TO 173 176 TO 183 185 TO 188 190 TO 197 204 TO 215 217 218 221 222 224 225 238 TO 241
**--------------------------------------------------------------------------**
**--------------------------------------------------------------------------**
**++++++++++++++++++++++++++++ UNSUPPORTED LENGTH ++++++++++++++++++++++++++**
*COLUMN*
*BEAM*
LY 5 MEMB 3 8 18 23 28 33 62 65 71 74 77 80 112 117 128 134 139 157 158 162 163 TO 168 174 175 184 189 198 TO 203 243
**
LZ 5 MEMB 83 146 169 242 245 250 TO 252
**
LZ 2 MEMB 107 216 234 237
**
**
*LZ #.# MEMBER ???
*UNT #.# MEMBER ???
*UNB #.# MEMBER ???
**
*
**
DFF 400 ALL
CHECK CODE ALL
******************************** MEMBER CHECK ********************************
*
**++++++++++++++++++++++++++++ LOCAL BEAM CHECK ++++++++++++++++++++++++++++**
**------------- PIPE SUPPORT BEAM Z-DIRECTION (TFX = 10% x DO) -------------**
*LOAD LIST 145 146 153 154
*PARAMETER
*CHECK CODE MEMBER ???
**------------- PIPE SUPPORT BEAM X-DIRECTION (TFZ = 10% x DO) -------------**
*LOAD LIST 147 148 155 156
*PARAMETER
*CHECK CODE MEMBER ???
**------------- PIPE SUPPORT BEAM Z-DIRECTION (TFX = 0.4 x DO) -------------**
*LOAD LIST 149 150 157 158
*PARAMETER
*CHECK CODE MEMBER ???

DETAIL ENGINEERING FOR DRY GAS DIVERTER MANIFOLD

Job No. :
Doc. No. :

DESIGN CALCULATION REPORT FOR FLARE LINE


SUPPORT II

**------------- PIPE SUPPORT BEAM X-DIRECTION (TFZ = 0.4 x DO) -------------**


*LOAD LIST 151 152 159 160
*PARAMETER
*CHECK CODE MEMBER ???
**------------------------ PIPING HYDROTEST PERIOD -------------------------**
*LOAD LIST 161 162
*PARAMETER
*CHECK CODE MEMBER ???
*--------------------------- MAINTENANCE PERIOD ----------------------------**
*LOAD LIST 163
*PARAMETER
*CHECK CODE MEMBER ???
****************************** DEFLECTION CHECK ******************************
*
*UNT 5.1 MEMB 46 56 67 68
*UNB 5.1 MEMB 46 56 67 68
*LY 2.5 MEMB 1
*
*COLUMN
*
*KY 0.5 MEMB 5 7 9 TO 13 15
*KZ 0.5 MEMB 5 7 9 TO 13 15
*KY 0.8 MEMB 1 3 65 66
*KZ 0.8 MEMB 1 3 65 66
*
*BEAM Z
*
*BEAM X
*
* DEFLECTION
*DJ1 46 MEMB 51 412 418 434 450 466 482 498 514 530 546 562 578 594 610 626 *642 658 674 690 706 722 738
*
*DFF 250 ALL
*STEEL TAKE OFF ALL
*PRINT MEMBER FORCES ALL
*CHECK CODE ALL
*
PRINT SUPPORT REACTION ALL
STEEL TAKE OFF ALL
FINISH

0-0608-05-0000