North Flatbush Streetscape Slides Sept. 28, 2010
North Flatbush Streetscape Slides Sept. 28, 2010
North Flatbush Streetscape Slides Sept. 28, 2010
Project Area
May 2009 Resurfaced Flatbush Ave between Atlantic Ave and GAP May 2009 New crosswalks and pedestrian markings at Carlton Ave April 2010 Increased left turn restrictions on Flatbush Ave; improves safety and mitigates congestion July 2010 Changed off peak hour off-peak Flatbush Ave signal timing; slows speeds and increases pedestrian crossing time August 2010 DOT selects Flatbush Ave for pedestrian countdown signals
Funding Summary
Source City Council Amount $200,000 Notes Allocation for Streetscape Improvements Allocation for Streetscape Improvements and Big Belly Solar Trash Compactors Federal Earmark Pedestrian Safety P d ti S f t Improvements
$447,000
TOTAL: $2,757,000
Community Stakeholders
North Flatbush Avenue Borough President BID Markowitz M k it Community Board 6 Community Community Board 8 Prospect Heights Prospect Neighborhood Development Council
Council Member James Park Slope Civic Association Council Member Levin
Stakeholder Input
Sidewalk extensions at triangles and other locations to increase pedestrian safety Overall scheme is to Engage the Triangles; unique design for each
Adjacent restaurants and retail Underutilized interior planting space Limited people space, lack of seating Inadequate sidewalks q Opportunity to expand triangle into roadway Historic clock
Adjacent restaurants and retail Lack of seating Inadequate sidewalks Opportunity expand triangle into roadway
S b t d d pedestrian ramps Substandard d t i Hi-speed turns from Flatbush Ave Opportunity to expand pedestrian space per recentlyrecently implemented markings
Long crossings on most side streets lengthen pedestrian exposure time Wide turning radii allow for high speed turns from Flatbush Ave to side streets Peak-hour travel lanes preclude curb extensions on Flatbush Ave; opportunities on side streets only
Photo source: NFBID Avenue Master Plan
Expand triangle
Relocate R l t clock
Enhance landscaping
Carlton Triangle
Proposed p
Install new pedestrian ramps
Expand triangle
Plant additional Street Trees Closure of St. Johns bet een between Flatbush and 8th Avenue Eliminate problematic bl ti intersection
Untinted Concrete
Streetscape Elements
Steel-face Curb
Standard Bike Rack Additional Amenities (to be maintained by BID): Movable Tables and Chairs Benches Type B Poles
Big Belly Solar Trash Compactors Reduce trash collection by 4 times or more Eliminate overflowing bins Included in DOT Capital Plan
Next Steps
Estimated Timeline