Photo care of North Flatbush Avenue BID

North Flatbush Avenue Capital Project Scoping C it l P j t S i


September 28, 2010

Presentation to Community Boards 6 & 8 Transportation Committees

Project Area

Recent Area Improvements


NYCDOT with input from BID and community stakeholders

May 2009 Resurfaced Flatbush Ave between Atlantic Ave and GAP May 2009 New crosswalks and pedestrian markings at Carlton Ave April 2010 Increased left turn restrictions on Flatbush Ave; improves safety and mitigates congestion July 2010 Changed off peak hour off-peak Flatbush Ave signal timing; slows speeds and increases pedestrian crossing time August 2010 DOT selects Flatbush Ave for pedestrian countdown signals

June 2008 North Flatbush BID

Capital Project History

public planning charrette

June 2009 $200,000 streetscape


improvement earmark from Borough President added to previous earmarks

Summer 2009 W Architecture


North Flatbush Streetscape Master p Plan

January 2010 DOT commits $2


million to corridor; begins project scoping

February and June 2010


Community stakeholder meetings

Summer 2010 DOT drafts


project scope and conceptual designs
Image: NFBID Avenue Master Plan

Funding Summary
Source City Council Amount $200,000 Notes Allocation for Streetscape Improvements Allocation for Streetscape Improvements and Big Belly Solar Trash Compactors Federal Earmark Pedestrian Safety P d ti S f t Improvements

Borough President Markowitz

$447,000

Congressman Weiner City Funds Cit F d

$2,000,000 $110,000 $110 000

TOTAL: $2,757,000

Community Stakeholders
North Flatbush Avenue Borough President BID Markowitz M k it Community Board 6 Community Community Board 8 Prospect Heights Prospect Neighborhood Development Council

Council Member James Park Slope Civic Association Council Member Levin

Stakeholder Input

Sidewalk extensions at triangles and other locations to increase pedestrian safety Overall scheme is to Engage the Triangles; unique design for each

Use standard materials to control maintenance costs

Issues and Opportunities


6th Avenue Triangle g

Adjacent restaurants and retail Underutilized interior planting space Limited people space, lack of seating Inadequate sidewalks q Opportunity to expand triangle into roadway Historic clock

Photos source: NFBID Avenue Master Plan

Issues and Opportunities


7th Avenue Triangle g

Adjacent restaurants and retail Lack of seating Inadequate sidewalks Opportunity expand triangle into roadway

Photos source: NFBID Avenue Master Plan

Issues and Opportunities


Carlton Avenue Triangle g

S b t d d pedestrian ramps Substandard d t i Hi-speed turns from Flatbush Ave Opportunity to expand pedestrian space per recentlyrecently implemented markings

Issues and Opportunities


8th Avenue Triangle
Non-standard sidewalk paving treatments; inconsistent and difficult to maintain Current St. Johns Pl and Flatbush Ave intersection problematic for motorists and pedestrians Opportunities for additional greening Opportunity for expanding triangle into roadway

Photo source: NFBID Avenue Master Plan

Issues and Opportunities


Side Street Safety y

Long crossings on most side streets lengthen pedestrian exposure time Wide turning radii allow for high speed turns from Flatbush Ave to side streets Peak-hour travel lanes preclude curb extensions on Flatbush Ave; opportunities on side streets only
Photo source: NFBID Avenue Master Plan

6th Avenue Triangle


Proposed
Use standard sidewalk materials

Expand triangle

Relocate R l t clock

Add bike racks

Enhance landscaping

Create usable public space

Install additional seating

7th Avenue Triangle


Proposed
Enhance landscaping

Add bike racks

Widen and standardize sidewalks

Install seating Expand triangle

Carlton Triangle
Proposed p
Install new pedestrian ramps

Add bike racks

Expand triangle

Expand sidewalks to calm traffic and slow turning vehicles

8th Avenue Triangle


Original Proposal
Create layby for One Plaza Street drop-offs

Redirect eastbound St. Johns traffic

Dramatically expand plaza space

Plant additional Street Trees Closure of St. Johns bet een between Flatbush and 8th Avenue Eliminate problematic bl ti intersection

8th Avenue Triangle


Revised Proposal

Plant additional Street Trees

Expand plaza space

Improve problematic intersection

Add bike racks

Side Street Safety


Proposed
Installation of curb extensions

Typical curb extension

Untinted Concrete

Streetscape Elements

Steel-face Curb

Standard Bike Rack Additional Amenities (to be maintained by BID): Movable Tables and Chairs Benches Type B Poles

Photo care of ispynyc.wordpress.com

Big Belly Solar Trash Compactors Reduce trash collection by 4 times or more Eliminate overflowing bins Included in DOT Capital Plan

Next Steps
Estimated Timeline

1 - 3 months DOT: Final Scope; Transfer


to Department of Design and Construction

3 - 6 months DDC: Bidding Process

9 - 12 months DDC: Project Design th 12 - 18 months DDC: Construction


Complete

Questions and Feedback Thank You