Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Volume5 Section26 Newham

Download as pdf or txt
Download as pdf or txt
You are on page 1of 11

N

A1 3

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing Keyplan:

Al fe r d s

ay

R i v e r R o a d

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

B ak ri n gC re ek

Key:
Local authority boundary

A1 3

Order limits

Tunnel

Shaft

London Borough of Barking & Dagenham

Lee Tunnel (built by others)

London Borough of Newham

3WD d0.5

Beckton Sewage Treatment Works

Siphon tunnel outlet shaft 100m 0 100m

AV

Valve Chamber Siphon tunnel inlet shaft


O R T L CONNE A P
L L

Scale 1:2500 at A1 1:5000 if reproduced at A3

NG I NCH E B

O R T N L CO NE A P

ON

O R T L NE PA

O R T N CO NEL A P

ON

O R T L NE PA

TR ON EL N PA

FOR INFORMATION
Siphon tunnel
A 1 0 2 0

Location

Beckton Sewage Treatment Works London Borough of Newham


Inlet works upgrade Document Information

R D l a y o s k c o R d a o
0 02 A1

Section 48 publicity Location plan


Mean low water

Book of plans - section 26


S48-PP-27X-BESTW-000335

h c a e r sR ak o in gp l al pn i G p o h s
Tunnel pump-out discharge chamber

River Thames

July 2012

c Thames Water Utilities Ltd 2008

y d B d r a

Track 5.0m

Me a n W H ih a g t e r ( 1 9 9 0 )

L o n gM ak r

Bol

r af Wh

El Sub Sta

B a ri k n gC r e e k R i v e r R L o o dn n gM ig a
r k

& t s n Co o r o B

B L

y d B
W L CC

N
Bol Chy
g n i p l So

m s ao ny r

Mud
Bol

El Sub Sta
g n m o i Sl p

n i a r D

Bowling Alley

M a H en i g Wa h t (9 e 19 r 0 )
h g W n a Hi Me

WB

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Works
27
B C T

NS E J NKI ANE L

y r s n a o

a h e c o gR L n

g dn v r Rie Ro i e k r ig Ba kn Cr e

RO VER RI

Football Pitches

Bol

tr ae

AD

Pavilion

2.1m

Pond
9
3

Bol

CCL W

Bo o r Co n t s &L B Bd y

y d B d r a

RO AD

Tank

UL AR

Pond

RT H CI RC

n ri Da

Refuse Transfer Station

NO

Ac/Ap
n ai Dr
NO

El Sub Sta

Depot
1 3 a

n i a r D

Bol

Pond

W E N

M A H

Y A

Bol

2 1 o t 4 1

Works
E NT RY

Pond
&
AS PS R E S OD H L

Bol

2.1m

Bol

Bol
El

WB 3.0m

Dr an i

U n d ep ra s s

WB

Drain

D r a i n

Wh r af

n o t k c e B
AD

e g a w e S

8 1

m t a e r T

W t n e

s k r o
Depot
Mud
E T L

Mud

0 2

CK S RO

Bo l r l d a s

YA L DO

2.4m

n ri Da
I RC E

E N A EL K LR C A

Works
Beckton Sewage

RO

Treatment Works
Da ri n
FB FB

Depot

4 o 2 t

8 2

n i a r D
WB

Tank

Piggeries

C I ER

E K R A L C

E N A L

Dr i an

1.7m

El Sub Sta

n i a r D

L Twr

El Sub Sta

Piggeries

C I R E

E K R A L C

E N A L

Beckton Meadows

n ri Da

Pond

El Sub Sta

D r a i n

1.5m

Tanks

Da ri n

L Twr Tank Bol

Da ri n

2.8m

Beckton Sewage Treatment Works


ng i op l S

Wharf

Tanks

2 TCB
o r Bo

TCB

FS

4.4m

Shoulder of Mutton
2.0m

n i a r D

Creek

Sludge Lagoon
Tanks

Bol

Beckton Sewage Treatment Works

4.3m

Gateway

Retail Park

2.0m
D W . 5 3 d0
NG E B NCHI

Sludge Lagoon

Beckton Sewage Treatment Works


FB 4.6m

CO NTRO L

PANEL

2.0m
CO NTRO L PANEL

CO NTROL

PANEL

CONTROL

PANEL

Water Tower

CONTROL

CONTRO L

PANEL

PANEL

Navigation Lights
(fixed white)

Outfall

Refuse Tip

4.4m

T EL

MLW

4.0m

EL T

Nr ot hr en O t ua fl l e Sw e r

W ap o r o l Re s a h c

7.4m

Depot
EL T
7.3m
1.9m

ETL

5.0m

T E L
7.4m

Conveyor

7.3m

Car Park

Nr ot hr en O t ua fl l e Sw e r

Northern Outfall Sewer


7.0m 5.5m

Bc ek t S o n e wg ae Te ra te m n t Wok r s

E L T

El Sub Sta

Refuse Tip
Beckton Sewage Treatment Works
El Sub Sta

El Sub Sta Chy


6.4m

5.8m

4.9m
7.1m
2.3m El Sub Sta 6.6m

6.9m 3.9m
Tanks

7.4m
EL T

S M

E L T
Tank 6.9m 5.5m

El Sub Sta

L T E

ESS

Chimneys El Sub Sta


4.7m

Factory
ESS

El Sub Sta

Pond
Superstore Tks

FS

KS R OAD

Da ri n
ESS

2
ESS

7.1m

ROY AL DOC

Tks

6a

Beckton Sewage Treatment Works


EL T
8
6.7m

5 . 6 m

Sl p n o ig m a o r s ny

7.1m
Tks

13

Tank
18

15

Gallions Reach Shopping Park


Tank

Beckton Sewage Treatment Works

6.8m
4.2m Shelters

Gallions Reach
ed l l i F l lr a de Wl ou B

GVC

Shopping Park
2 4
ESS

Cupola Chy

E T L

Restaurant ESS

El Sub Sta

r e t l e Sh
1

El Sub Sta

ESS

Restaurant

Y R A A A M D WA
Filling Station

ET

W AY

14

6.4m
y r sn ao gm n i p l So

RN

HO

s k n a T
Beckton Gas Works
o t
16
4

Monument

5.6m

E T L

El Sub Sta

15

o t

r e t h i Wa Hg en M a

So i m s ny l n p g ao r
17

ny p g ao r l n So i m s

Y R A A A M D WA

2.1m

Gas Holder

A R MA D AWA Y

4.4m

Mud

Gemini Business Park

18

2.3m

Gas Holder

A D

K S

El Sub Sta
27

Y A L

El Sub Sta

4.6m

2.7m

Posts

El Sub Sta
6 2

SM

Tank

4.6m

r e t Wa g ih H n a e M

El Sub Sta

Tn ak
Tank

ARM ADA

W AY

3.7m

3 2

S M

Mud

w o L n a e M

r e t a

Jetty
Crane

T EL

a 5

e r et C n n d g ai l l r e T rmw Co

1
b Su l E
a t S

E T L
tr h g W ae a M e n Hi

a te s t g n E ai rd a l l T ae Kt

Elizabethan House

This drawing Keyplan:

LB

1.5m

i an Dr

4 2

&

AS PS R E S OD H L

i an Dr

k ac r T

1.8m

Sub Sta

9 2 1 3

3 3

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
1.8m

k ac r T

Key:
Limits of land to be acquired or used (LLAU)

30

29

28

10 0

9 4

90

Ap
Works

Access to permanent works

Ac
E T L

Access to construction works

Notes:
Steel Yard
WB

f r ha W k c be ds er i ar l K l

Bo

ng Lo R

h c ea

1. This plan does not show stopping up and diversions of limited duration (eg hoarding erection, minor utility diversions and minor highway works).
Timber Yard
M
m
y r on as

ANE NS L ENKI J

2. Only rights of way in or close to worksites


W
r e t a

n ea H gh i

are shown.
Wharf
y d B

i an Dr

C & t s n o
B L

f e

The full extents of rights of way are not shown where they cease to be relevant to the project.
R ng i k r a B
g n i d o R r eek e r v i C

d on P d on P

L DO RO YA CKS D ROA

k ac r T

M n a e H
h g i

M ud

W r e t a
k c a Tr

ud
Wharf
Bol

Sl p n m a o r o ig s ny

tr g a M e n Hi h W a e
Bol

M e n Hi h W a e a g tr

W CCL

Navigation Light (Fixed Green)

Creekmouth

s ad l lr Bo

d Mu

e e k g Cr kn ri Ba

100m
ig h dn c o a Re rR e l v os o Ri p r
W
a

100m

d Mu
hW g n Hi a Me
tr ae

Scale 1:2500 at A1 1:5000 if reproduced at A3

a 18
1 9
19
Sluice SL

Foot Bridge

FOR APPROVAL

Location

Beckton Sewage Treatment Works London Borough of Newham


Document Information
FB

2 8
ng i op Sl

Outfall

9
10 o t 11
22

y r on as

Section 48 publicity Access plan Book of plans - section 26


S48-AC-27X-BESTW-000025 July 2012

13
ge wa s k Se or on t k tW Bec m en eat Tr

c Thames Water Utilities Ltd 2008

2.0m

n i a r D

Table 1
Beckton Sewage Treatment Works

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing

Above ground permanent structure

Maximum height above finished ground level (Minimum heights are in brackets where applicable) 8.0m

Keyplan:

Superstructure over siphon inlet shaft Siphon inlet valve chamber(s)

1.5m Zone within which Work No. 27a would be located

2.0m

Siphon outlet shaft

2.0m

Siphon outlet valve chamber(s)

3.5m
2.0m

4.6m

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Discharge chamber(s)

2.0m

Key:
Grit removal gantries 5.0m Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located
Refuse Tip
4.4m

Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1)
EL T

Notes:
Depot
EL T
1.9m

ETL

5.0m Conveyor

7.3m

Nr ot hr en O t ua fl l e Sw e r

Northern Outfall Sewer


7.0m

Bc ek t S o n e wg ae Te ra te m n t Wok r s

1. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

E L T

Refuse Tip
Beckton Sewage Treatment Works
El Sub Sta

7.1m

2.3m

6.6m 6.9m 3.9m

7.4m
EL T

E L T
Tank

El Sub Sta

ESS

ESS

Superstore

Da ri n
2

ESS
k ac Tr
Bol
Bo o r Co n t s &L B Bd y

NORT H CI RCUL AR

ROAD

Beckton Sewage Treatment Works


Pond

Refuse Transfer Station

El Sub Sta

n i a Dr

CCL W

Bol

Pond

Bol

Pond

Bol

2.1m

Bol

Bol

WB

Dr an i

WB

Dr a i n

n ri Da

E N A EL K A LR I C RC E

Beckton Sewage
Treatment Works

n i a Dr

Tank

Bo l r l d a s

Wh r af

n o t k c Be

e g a w e S

m t a e r T

W t n e

s k r o
Mud
E T L

Mud

Piggeries

Dr i an

1.7m

El
Sub Sta

n i a r D

L Twr

El Sub Sta

Piggeries

2.1m
Beckton Meadows

Drain

Pond

D r a i n

1.5m

Tanks

Da ri n

Tank

Da ri n

Beckton Sewage Treatment Works


ng i op l S

Tanks

TCB

FS

4.4m

Shoulder of Mutton
2.0m

n i a r D

Creek

Tanks

Beckton Sewage Treatment Works

4.3m

2.0m

Sludge Lagoon

Beckton Sewage Treatment Works


FB 4.6m

2.0m

Water Tower

Refuse Tip

4.4m

T EL

EL T

Depot
EL T
1.9m

ETL

5.0m

T E L
Conveyor

n i a r D

7.3m

Car Park

Nr ot hr en O t ua fl l e Sw e r

Northern Outfall Sewer


7.0m

Bc ek t S o n e wg ae Te ra te m n t o W r k s

E L T

Refuse Tip
Beckton Sewage Treatment Works
El Sub Sta

El Sub Sta Chy 6.4m

5.8m

Dr i an

1.7m
7.1m 6.9m

4.9m
2.3m El Sub Sta 6.6m 3.9m Tanks

7.4m
ETL

SM

E L T
Tank 6.9m El Sub Sta 5.5m

L ET

ESS Chimneys

4.7m El Sub Sta

ESS

Pond
Superstore Tks

FS

Da ri n
ESS

7.1m ESS Tks

n i a r D

6a

Beckton Sewage Treatment Works


EL T
8

6.7m

5 . 6 m

7.1m

13

Tks

18

15

Gallions Reach Shopping Park

Beckton Sewage Treatment Works

6.8m

Gallions Reach
Shelters

Shopping Park
2 4

ESS

Cupola Chy

E T L

Restaurant ESS

El Sub Sta

r e t l e Sh

El Sub Sta

1
ESS

Restaurant

Y R A A A M D WA
Filling Station

RNE TW

AY

14

6.4m

HO

s k n a T
5.6m

Monument

16

o t

El Sub Sta

15

o t

r e t h a i W Hg en M a

So i m s ny l n p g ao r
17

ny p g ao r l n So i m s

n ai Dr

6.7m

7.1m

Tks

k ac r T

Beckton

10m Sewage Treatment


Works
f har W k c be ds er ar l Ki ol

0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

ng Lo R h c ea

ANE NS L ENKI J

m
y onr as

30

29

i an Dr
d n o P

6.8m
d n o P

FOR APPROVAL
Chy

k c a Tr

E T L

Location

Beckton STW London Borough of Newham


Document Information

Section 48 publicity Site works parameter plan


ng i op Sl
6.4m

m y r on as

s k n a T
5.6m

Book of plans - section 26


Monument

S48-PP-27X-BESTW-000336 July 2012

18a
1 9

So i m s ny l n p g ao r

Zone within which Work No. 27b would be located


ny p g ao r l n So i m s

28

19

2 8

ng opi Sl

9
10
o t

m
y r on as

4.4m
22

11

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing Keyplan:

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Local authority boundary Limits of land to be acquired or used (LLAU) Existing sewers Proposed access cover + 104.10m Existing Level (shown in metres above tunnel datum) Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located
ng i k ar B C k ee r

104.50

N E O N TY R

Notes:
&
PAS H O L S DER
S

&
PAS H O L S DER

Access for maintenance vehicles

Existing Beckton Sewage Treatment Works

Existing power supply complex

For details see Sheet 3

Existing Lee Tunnel

1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan. 4. The Lee Tunnel and STW extensions are currently under construction and will be existing when construction of the project commences.

For details see Sheet 2 Existing Tideway Pumping Station Existing overflow shaft Existing connection shaft
3WD d0.5
AV

Work No. 27c. Syphon tunnel 100m 0 100m

NG I NCH E B

O R T N L CO NE A P

The collection chamber and discharge chamber to be connected by a pipeline, either above ground (maximum height 10m above ground level) or buried in tunnel.

ON

O R T L NE PA

O R T N CO NEL A P

ON

O R T L NE PA

O R T L CONNE A P

TR ON EL N PA

t te ge al az B R d oa

Scale 1:2500 at A1 1:5000 if reproduced at A3

ILLUSTRATIVE

Location

Beckton Sewage Treatment Works London Borough of Newham


Document Information

Section 48 publicity
For details see Sheet 4

Permanent works layout


e s Ri v e rT h a m

Sheet 1 of 4 Book of plans - section 26


S48-PP-27X-BESTW-000337 July 2012

Northern outfall sewer

Existing inlet works

c Thames Water Utilities Ltd 2008

N
Existing grade 2 listed chimney

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing Keyplan:

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Existing sewers Proposed access cover + 104.10m Existing overflow shaft Extent of new hardstanding 104.50 Existing Level (shown in metres above tunnel datum) Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located

Notes:
2.8m internal dia tunnel from siphon inlet shaft 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan. 4. The Lee Tunnel and STW extensions are currently under construction and will be existing when construction of the project commences.

Culvert 109.10

108.00 Valve chamber

Ventilation duct

10m

10m

106.000

Scale 1:200 at A1 1:400 if reproduced at A3

ILLUSTRATIVE
7.0m internal dia siphon outlet shaft Zone within which valve chamber and ventilation duct may be located Zone within which Work No. 27b would be located

Location

Beckton Sewage Treatment Works London Borough of Newham


Document Information

Extent of proposed hard standing

Section 48 publicity Permanent works layout Sheet 2 of 4 Book of plans - section 26


S48-PP-27X-BESTW-000338 July 2012

c Thames Water Utilities Ltd 2008

N
Existing Tideway Pumping Station

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing Keyplan:

Existing power complex building

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Existing connection shaft Existing Lee Tunnel + 104.10m Existing sewers Proposed access cover Existing Level (shown in metres above tunnel datum) Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located

104.50

Notes:
Existing odour control unit 2 No. drain down pipes 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan. 4. The Lee Tunnel and STW extensions are currently under construction and will be existing when construction of the project commences.

104.75

Existing underground pipeline

Valve chamber 12.7 x 11.2m 1.3m high above ground Existing valve chamber

Ventilation duct

Siphon inlet shaft 9.0m internal dia with 17m x 7m x 8m high superstructure 111.00 103.50

10m

10m

Scale 1:200 at A1 1:400 if reproduced at A3

108.50

ILLUSTRATIVE
Zone within which above ground chambers, superstructures and above ground pipelines may be located

Location

Beckton Sewage Treatment Works London Borough of Newham


Document Information

Section 48 publicity Permanent works layout


2.1m dia pipe or tunnel to inlet works Existing 2.1m internal dia underground pipeline 2.8m dia siphon tunnel to siphon outlet shaft

Sheet 3 of 4 Book of plans - section 26


S48-PP-27X-BESTW-000339 July 2012

c Thames Water Utilities Ltd 2008

2.1m internal dia pipeline or tunnel

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing Keyplan:

Existing 2.1m internal dia pipeline (Lee Tunnel)

Existing 0.35m internal dia pipeline (Lee Tunnel)

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Existing sewers Proposed access cover + 104.10m Existing Level (shown in metres above tunnel datum) Proposed level (shown in metres above tunnel datum)

104.50

Existing Lee Tunnel

Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan. 4. The Lee Tunnel and STW extensions are currently under construction and will be existing when construction of the project commences. 5. Air from proposed discharge chamber will be treated by existing (Lee Tunnel) odour control unit.

Existing discharge chamber odour control unit (Lee Tunnel)


l e n n u eT e gL n t si i x E

+102.10 Discharge chamber Existing discharge chamber (Lee tunnel) Existing inlet works odour control unit

109.00 10m 0 10m

Scale 1:200 at A1 1:400 if reproduced at A3

Existing elevated
+107.00 +106.90

ILLUSTRATIVE

inlet works
Location

Beckton Sewage Treatment Works London Borough of Newham


Document Information

Section 48 publicity Permanent works layout


Tunnel discharge structure

Sheet 4 of 4 Book of plans - section 26


S48-PP-27X-BESTW-000340 July 2012

Three grit removal gantries approx 10m x 4m x 5m high

c Thames Water Utilities Ltd 2008

g n i p l So

m s ao ny r

n i a Dr

Bowling Alley

Football Pitches

E T L

ETL
Pavilion

2.1m

Pond

Pond

Refuse Transfer Station

El Sub Sta

n i a Dr

Pond

Pond

2.1m

Bo o r Co n t s &L B Bd y

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing

g n m o i Sl p

A NS L NE E J NKI

y r s n a o

CCL W

i an Dr
k c a r T

D n ai r

WB

E T L

WB

Dr ai n

E N A EL K A LR I C RC E

Beckton Sewage
Treatment Works

n i a r D

Piggeries

Dr i an

1.7m

El Sub Sta

n i a Dr

El Sub Sta

Piggeries

Beckton Meadows

Drain

Pond

W e t lv t n s ee a i o

D r a i n

1.5m

Tanks

Da ri n

Da ri n

Beckton Sewage Treatment Works


ng i op Sl

Tanks

4.4m

2.0m

n i a Dr

Wh r af

Keyplan:

k ac Tr

A N E J NKI S L NE
m

y r on as

i an Dr
d on P

d n Po

k ac r T

Beckton Sewage Treatment Works

4.3m

2.0m
3WD d0.5

Sludge Lagoon

Beckton Sewage Treatment Works

4.6m

2.0m

Water Tower

Refuse Tip

4.4m

ETL

103.50

ETL

Depot
ETL
1.9m

ETL

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
T E L
Car Park El Sub Sta 6.4m

5.0m

Bc ek t S o n e wg ae Te ra te m n t Wok r s
7.0m

E L T

Refuse Tip
Beckton Sewage Treatment Works
El Sub Sta 4.9m
7.1m 2.3m

5.8m

6.6m 6.9m 3.9m

7.4m

ETL

SM

E L T
Tank 6.9m El Sub Sta 5.5m

Wind turbine (by others)


Superstore
2

L ET

ESS

4.7m El Sub Sta

Notes:
ESS

ESS

Pond

Da ri n
7.1m ESS

6a

Beckton Sewage Treatment Works


ETL
8

6.7m

6.5m

7.1m

13

18

15

Gallions Reach Shopping Park

Beckton Sewage Treatment Works

1. All dimensions and levels are approximate. 2. Drawing is based on approved planning

a 18
1 9

6.8m

Gallions Reach
Shelters

Shopping Park
2 4
ESS

E T L

Restaurant ESS

El Sub Sta

r e t l e h S

El Sub Sta

drawings of the Lee Tunnel and STW


6.4m

1
ESS

ARMADA WAY
Filling Station

ET

W AY

14

HORN

o t

o t

16

El Sub Sta

15

Gas Holder

A R MA D AW A Y

17

2.3m
13

Gas Holder

18

Eric Clarke Lane

Road

Final settlement tanks

Road

Proposed West elevation


Zone within which Thames Tunnel works would be located Fence

Existing inlet work 10m 0 40m

Scale 1:500 at A1 1:1000 if reproduced at A3 Pumping station


1 0 5

Road

ILLUSTRATIVE
Proposed West elevation

Location
1 0 0 0 5 0

Beckton Sewage Treatment Works London Borough of Newham


Document Information

Section 48 publicity
D

Proposed elevation Book of plans - section 26


S48-PP-27X-BESTW-000341 July 2012

PLOTTED ON

04/07/2012

BY

LOCATION :

e:\async working dir\pw-ttp\_pdf_svc_4\dms25665\S48-PP-27X-BESTW-000341.dgn

c Thames Water Utilities Ltd 2008

2 0 m 0 m

Se t n l e ci o i n

Se t n l e ci o i n

30

29

28

19

2 8

Restaurant

extension work which are currently under


ny p g ao r l n So i m s

ng i op Sl

m y r on as
5.6m

Sloping masonry

construction and will be "existing" when construction of the project commences .

10

o t
11
22
4.4m

Gemini Business Park

El Sub Sta

27

N
i an Dr

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing

d n o P
N

TCB

Keyplan:
d n o P

FS

n i a r D

Parking area

AV

Storage (open area or containerised)

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Site power structure Limits of land to be acquired or used (LLAU) Grout production Hoarding

Sludge Lagoon

Offices / welfare building Crane

N E B NCHI G

Maximum extent of working area

D W . 5 3 d0

Site access

Access / haul route


CONTROL PANEL

Segment storage area

Crane
CONTROL
PANEL

Existing sewers

CONTROL

PANEL

Storage (open area or containerised)

Notes :
CONTROL PANEL CONTROL PANEL

CONTROL

PANEL

1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors
Refuse Tip

may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls Workshop buildings on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the

Security office

EL T

Storage (open area or containerised)


Depot

appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise

EL T

Conveyor

barriers may be required but is not shown Shaft on this drawing.

Nr ot hr en O t ua fl l e Sw e r

Northern Outfall Sewer

Bc ek t S o n e wg ae Te ra te m n t o W r k s

Excavated material storage and handling area Security office


E L T

Refuse Tip
Beckton Sewage Treatment Works
El Sub Sta

10m
EL T

100m

Tank

Scale 1:1000 at A1 1:2000 if reproduced at A3


El Sub Sta

ESS

ILLUSTRATIVE
ESS Superstore

Location

Beckton STW
Da ri n
2

London Borough of Newham


Document Information

ESS

a 6

Section 48 publicity
8

Construction phases - phase 1 - site A Setup, shaft constrn & syphon tunnelling
9

Book of plans - section 26


1 3

S48-PP-27X-BESTW-000342
1 8

July 2012

a 18

1 5

1 9

Gallions Reach Shopping Park

c Thames Water Utilities Ltd 2008

El Sub Sta

N
Tanks

S M

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing Keyplan:

L T E

W CCL

k c a Tr

Chimneys

El Sub Sta

Pond
Tks

gC kn ri Ba

FS

Offices / welfare building Security office

Excavated material processing area


ESS

e k re

Grade II listed chimney

Tks

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

d Mu

Beckton Sewage Treatment Works


Sl p n o ig m a o r s ny

Key:
Limits of land to be acquired or used (LLAU) Hoarding
tr ae

nH a Me

Crane

W g ih

Tks

Maximum extent of working area


SL

Site access Piling rig Access / haul route

Foot Bridge

Existing sewers

Notes :
1. These construction phasing plans have been
Chy

E T L

prepared to illustrate possible site layouts for the principle construction phases. Contractors may choose to lay sites out differently during

El Sub Sta

construction depending on their preferred construction methods subject to any controls on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management Steel reinforcement preparation area
ng i op Sl

19

arrangements are shown. 3. Utility supplies for the construction of the works
y r sn ao gm n i p l So

would be agreed with the relevant utility company.

Segment storage area


s k n a T

m y r on as
Monument

4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing.

Grout production
15 o t

16

Crane Shaft
So i m s ny l n p g ao r
17
ny p g ao r l n So i m s

r e t h i Wa Hg en M a

22

Excavated material storage and handling area


Mud

Gemini Business Park

18

10m
13
El Sub Sta

100m

Scale 1:1000 at A1 1:2000 if reproduced at A3


27

El Sub Sta

ILLUSTRATIVE
6 2

Location

Beckton STW
Tank
W g ih H n a e M r e t a

London Borough of Newham


Mud

ge wa s k Se or on t k tW c en Be m t ea Tr

El Sub Sta

Document Information

4 2 3 2

Section 48 publicity Construction phases - phase 1 - site B Setup, shaft constrn & other structures
Mud

Book of plans - section 26


w o L n a e M W r e t a

S48-PP-27X-BESTW-000343
Jetty
Crane

July 2012

Gemini Business Park

Navigation Light

Option for contractor to transport materials using barges

c Thames Water Utilities Ltd 2008

AV

N E B NCHI G

i an Dr

N
d n o P

TCB

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing Keyplan:

d n o P

FS

n i a r D

Storage (open area or containerised) Parking area Office / welfare buildings

Additional pumps to be installed inside pumping station

Site power structure

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU)
D W . 5 3 d0

Hoarding
Sludge Lagoon

Maximum extent of working area Storage (open area or containerised) Security office Storage (open area or containerised) Piling rig (low headroom)
Refuse Tip

Additional electrical equipment to be installed in existing building


CONTROL PANEL CONTROL PANEL

Site access

CONTROL

PANEL CONTROL PANEL

Access / haul route

Existing sewers
CONTROL PANEL CONTROL PANEL

Workshop buildings

Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors

Temporary working area for pipeline

may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls on layout imposed through the planning
EL T

submission and approval process. Shaft


Depot

2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works

EL T

Conveyor

would be agreed with the relevant utility company. 4. Additional noise mitigation including noise
Nr ot hr en O t ua fl l e Sw e r

Crane
Bc ek t S o n e wg ae Te ra te m n t o W r k s

barriers may be required but is not shown on this drawing.

Northern Outfall Sewer

E L T

Refuse Tip
Beckton Sewage Treatment Works
El Sub Sta

Temporary road closure for pipe crossing

Security office

EL T

Heras fencing adjusted to suit progress of work Crane for lifting grit gantries into position

Tank

10m
El Sub Sta

100m

ESS

Scale 1:1000 at A1 1:2000 if reproduced at A3

Temporary working areas for grit gantries


Superstore

ESS

ILLUSTRATIVE
Da ri n

Location

ESS

Beckton STW London Borough of Newham


Document Information

a 6

Section 48 publicity
9

Construction phases - phase 2 - site A


1 3

Flow transfer & other structures


1 8

a 18

1 5

Book of plans - section 26


S48-PP-27X-BESTW-000344 July 2012

1 9

Gallions Reach Shopping Park

Gallions Reach
c Thames Water Utilities Ltd 2008

You might also like