Volume5 Section26 Newham
Volume5 Section26 Newham
Volume5 Section26 Newham
A1 3
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing Keyplan:
Al fe r d s
ay
R i v e r R o a d
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
B ak ri n gC re ek
Key:
Local authority boundary
A1 3
Order limits
Tunnel
Shaft
3WD d0.5
AV
NG I NCH E B
O R T N L CO NE A P
ON
O R T L NE PA
O R T N CO NEL A P
ON
O R T L NE PA
TR ON EL N PA
FOR INFORMATION
Siphon tunnel
A 1 0 2 0
Location
R D l a y o s k c o R d a o
0 02 A1
h c a e r sR ak o in gp l al pn i G p o h s
Tunnel pump-out discharge chamber
River Thames
July 2012
y d B d r a
Track 5.0m
Me a n W H ih a g t e r ( 1 9 9 0 )
L o n gM ak r
Bol
r af Wh
El Sub Sta
B a ri k n gC r e e k R i v e r R L o o dn n gM ig a
r k
& t s n Co o r o B
B L
y d B
W L CC
N
Bol Chy
g n i p l So
m s ao ny r
Mud
Bol
El Sub Sta
g n m o i Sl p
n i a r D
Bowling Alley
M a H en i g Wa h t (9 e 19 r 0 )
h g W n a Hi Me
WB
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Works
27
B C T
NS E J NKI ANE L
y r s n a o
a h e c o gR L n
g dn v r Rie Ro i e k r ig Ba kn Cr e
RO VER RI
Football Pitches
Bol
tr ae
AD
Pavilion
2.1m
Pond
9
3
Bol
CCL W
Bo o r Co n t s &L B Bd y
y d B d r a
RO AD
Tank
UL AR
Pond
RT H CI RC
n ri Da
NO
Ac/Ap
n ai Dr
NO
El Sub Sta
Depot
1 3 a
n i a r D
Bol
Pond
W E N
M A H
Y A
Bol
2 1 o t 4 1
Works
E NT RY
Pond
&
AS PS R E S OD H L
Bol
2.1m
Bol
Bol
El
WB 3.0m
Dr an i
U n d ep ra s s
WB
Drain
D r a i n
Wh r af
n o t k c e B
AD
e g a w e S
8 1
m t a e r T
W t n e
s k r o
Depot
Mud
E T L
Mud
0 2
CK S RO
Bo l r l d a s
YA L DO
2.4m
n ri Da
I RC E
E N A EL K LR C A
Works
Beckton Sewage
RO
Treatment Works
Da ri n
FB FB
Depot
4 o 2 t
8 2
n i a r D
WB
Tank
Piggeries
C I ER
E K R A L C
E N A L
Dr i an
1.7m
El Sub Sta
n i a r D
L Twr
El Sub Sta
Piggeries
C I R E
E K R A L C
E N A L
Beckton Meadows
n ri Da
Pond
El Sub Sta
D r a i n
1.5m
Tanks
Da ri n
Da ri n
2.8m
Wharf
Tanks
2 TCB
o r Bo
TCB
FS
4.4m
Shoulder of Mutton
2.0m
n i a r D
Creek
Sludge Lagoon
Tanks
Bol
4.3m
Gateway
Retail Park
2.0m
D W . 5 3 d0
NG E B NCHI
Sludge Lagoon
CO NTRO L
PANEL
2.0m
CO NTRO L PANEL
CO NTROL
PANEL
CONTROL
PANEL
Water Tower
CONTROL
CONTRO L
PANEL
PANEL
Navigation Lights
(fixed white)
Outfall
Refuse Tip
4.4m
T EL
MLW
4.0m
EL T
Nr ot hr en O t ua fl l e Sw e r
W ap o r o l Re s a h c
7.4m
Depot
EL T
7.3m
1.9m
ETL
5.0m
T E L
7.4m
Conveyor
7.3m
Car Park
Nr ot hr en O t ua fl l e Sw e r
Bc ek t S o n e wg ae Te ra te m n t Wok r s
E L T
El Sub Sta
Refuse Tip
Beckton Sewage Treatment Works
El Sub Sta
5.8m
4.9m
7.1m
2.3m El Sub Sta 6.6m
6.9m 3.9m
Tanks
7.4m
EL T
S M
E L T
Tank 6.9m 5.5m
El Sub Sta
L T E
ESS
Factory
ESS
El Sub Sta
Pond
Superstore Tks
FS
KS R OAD
Da ri n
ESS
2
ESS
7.1m
ROY AL DOC
Tks
6a
5 . 6 m
Sl p n o ig m a o r s ny
7.1m
Tks
13
Tank
18
15
6.8m
4.2m Shelters
Gallions Reach
ed l l i F l lr a de Wl ou B
GVC
Shopping Park
2 4
ESS
Cupola Chy
E T L
Restaurant ESS
El Sub Sta
r e t l e Sh
1
El Sub Sta
ESS
Restaurant
Y R A A A M D WA
Filling Station
ET
W AY
14
6.4m
y r sn ao gm n i p l So
RN
HO
s k n a T
Beckton Gas Works
o t
16
4
Monument
5.6m
E T L
El Sub Sta
15
o t
r e t h i Wa Hg en M a
So i m s ny l n p g ao r
17
ny p g ao r l n So i m s
Y R A A A M D WA
2.1m
Gas Holder
A R MA D AWA Y
4.4m
Mud
18
2.3m
Gas Holder
A D
K S
El Sub Sta
27
Y A L
El Sub Sta
4.6m
2.7m
Posts
El Sub Sta
6 2
SM
Tank
4.6m
r e t Wa g ih H n a e M
El Sub Sta
Tn ak
Tank
ARM ADA
W AY
3.7m
3 2
S M
Mud
w o L n a e M
r e t a
Jetty
Crane
T EL
a 5
e r et C n n d g ai l l r e T rmw Co
1
b Su l E
a t S
E T L
tr h g W ae a M e n Hi
a te s t g n E ai rd a l l T ae Kt
Elizabethan House
LB
1.5m
i an Dr
4 2
&
AS PS R E S OD H L
i an Dr
k ac r T
1.8m
Sub Sta
9 2 1 3
3 3
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
1.8m
k ac r T
Key:
Limits of land to be acquired or used (LLAU)
30
29
28
10 0
9 4
90
Ap
Works
Ac
E T L
Notes:
Steel Yard
WB
f r ha W k c be ds er i ar l K l
Bo
ng Lo R
h c ea
1. This plan does not show stopping up and diversions of limited duration (eg hoarding erection, minor utility diversions and minor highway works).
Timber Yard
M
m
y r on as
ANE NS L ENKI J
n ea H gh i
are shown.
Wharf
y d B
i an Dr
C & t s n o
B L
f e
The full extents of rights of way are not shown where they cease to be relevant to the project.
R ng i k r a B
g n i d o R r eek e r v i C
d on P d on P
L DO RO YA CKS D ROA
k ac r T
M n a e H
h g i
M ud
W r e t a
k c a Tr
ud
Wharf
Bol
Sl p n m a o r o ig s ny
tr g a M e n Hi h W a e
Bol
M e n Hi h W a e a g tr
W CCL
Creekmouth
s ad l lr Bo
d Mu
e e k g Cr kn ri Ba
100m
ig h dn c o a Re rR e l v os o Ri p r
W
a
100m
d Mu
hW g n Hi a Me
tr ae
a 18
1 9
19
Sluice SL
Foot Bridge
FOR APPROVAL
Location
2 8
ng i op Sl
Outfall
9
10 o t 11
22
y r on as
13
ge wa s k Se or on t k tW Bec m en eat Tr
2.0m
n i a r D
Table 1
Beckton Sewage Treatment Works
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing
Maximum height above finished ground level (Minimum heights are in brackets where applicable) 8.0m
Keyplan:
2.0m
2.0m
3.5m
2.0m
4.6m
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Discharge chamber(s)
2.0m
Key:
Grit removal gantries 5.0m Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located
Refuse Tip
4.4m
Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1)
EL T
Notes:
Depot
EL T
1.9m
ETL
5.0m Conveyor
7.3m
Nr ot hr en O t ua fl l e Sw e r
Bc ek t S o n e wg ae Te ra te m n t Wok r s
1. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.
E L T
Refuse Tip
Beckton Sewage Treatment Works
El Sub Sta
7.1m
2.3m
7.4m
EL T
E L T
Tank
El Sub Sta
ESS
ESS
Superstore
Da ri n
2
ESS
k ac Tr
Bol
Bo o r Co n t s &L B Bd y
NORT H CI RCUL AR
ROAD
El Sub Sta
n i a Dr
CCL W
Bol
Pond
Bol
Pond
Bol
2.1m
Bol
Bol
WB
Dr an i
WB
Dr a i n
n ri Da
E N A EL K A LR I C RC E
Beckton Sewage
Treatment Works
n i a Dr
Tank
Bo l r l d a s
Wh r af
n o t k c Be
e g a w e S
m t a e r T
W t n e
s k r o
Mud
E T L
Mud
Piggeries
Dr i an
1.7m
El
Sub Sta
n i a r D
L Twr
El Sub Sta
Piggeries
2.1m
Beckton Meadows
Drain
Pond
D r a i n
1.5m
Tanks
Da ri n
Tank
Da ri n
Tanks
TCB
FS
4.4m
Shoulder of Mutton
2.0m
n i a r D
Creek
Tanks
4.3m
2.0m
Sludge Lagoon
2.0m
Water Tower
Refuse Tip
4.4m
T EL
EL T
Depot
EL T
1.9m
ETL
5.0m
T E L
Conveyor
n i a r D
7.3m
Car Park
Nr ot hr en O t ua fl l e Sw e r
Bc ek t S o n e wg ae Te ra te m n t o W r k s
E L T
Refuse Tip
Beckton Sewage Treatment Works
El Sub Sta
5.8m
Dr i an
1.7m
7.1m 6.9m
4.9m
2.3m El Sub Sta 6.6m 3.9m Tanks
7.4m
ETL
SM
E L T
Tank 6.9m El Sub Sta 5.5m
L ET
ESS Chimneys
ESS
Pond
Superstore Tks
FS
Da ri n
ESS
n i a r D
6a
6.7m
5 . 6 m
7.1m
13
Tks
18
15
6.8m
Gallions Reach
Shelters
Shopping Park
2 4
ESS
Cupola Chy
E T L
Restaurant ESS
El Sub Sta
r e t l e Sh
El Sub Sta
1
ESS
Restaurant
Y R A A A M D WA
Filling Station
RNE TW
AY
14
6.4m
HO
s k n a T
5.6m
Monument
16
o t
El Sub Sta
15
o t
r e t h a i W Hg en M a
So i m s ny l n p g ao r
17
ny p g ao r l n So i m s
n ai Dr
6.7m
7.1m
Tks
k ac r T
Beckton
100m
ng Lo R h c ea
ANE NS L ENKI J
m
y onr as
30
29
i an Dr
d n o P
6.8m
d n o P
FOR APPROVAL
Chy
k c a Tr
E T L
Location
m y r on as
s k n a T
5.6m
18a
1 9
So i m s ny l n p g ao r
28
19
2 8
ng opi Sl
9
10
o t
m
y r on as
4.4m
22
11
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing Keyplan:
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
Local authority boundary Limits of land to be acquired or used (LLAU) Existing sewers Proposed access cover + 104.10m Existing Level (shown in metres above tunnel datum) Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located
ng i k ar B C k ee r
104.50
N E O N TY R
Notes:
&
PAS H O L S DER
S
&
PAS H O L S DER
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan. 4. The Lee Tunnel and STW extensions are currently under construction and will be existing when construction of the project commences.
For details see Sheet 2 Existing Tideway Pumping Station Existing overflow shaft Existing connection shaft
3WD d0.5
AV
NG I NCH E B
O R T N L CO NE A P
The collection chamber and discharge chamber to be connected by a pipeline, either above ground (maximum height 10m above ground level) or buried in tunnel.
ON
O R T L NE PA
O R T N CO NEL A P
ON
O R T L NE PA
O R T L CONNE A P
TR ON EL N PA
t te ge al az B R d oa
ILLUSTRATIVE
Location
Section 48 publicity
For details see Sheet 4
N
Existing grade 2 listed chimney
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing Keyplan:
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
Limits of land to be acquired or used (LLAU) Existing sewers Proposed access cover + 104.10m Existing overflow shaft Extent of new hardstanding 104.50 Existing Level (shown in metres above tunnel datum) Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located
Notes:
2.8m internal dia tunnel from siphon inlet shaft 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan. 4. The Lee Tunnel and STW extensions are currently under construction and will be existing when construction of the project commences.
Culvert 109.10
Ventilation duct
10m
10m
106.000
ILLUSTRATIVE
7.0m internal dia siphon outlet shaft Zone within which valve chamber and ventilation duct may be located Zone within which Work No. 27b would be located
Location
N
Existing Tideway Pumping Station
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing Keyplan:
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
Limits of land to be acquired or used (LLAU) Existing connection shaft Existing Lee Tunnel + 104.10m Existing sewers Proposed access cover Existing Level (shown in metres above tunnel datum) Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located
104.50
Notes:
Existing odour control unit 2 No. drain down pipes 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan. 4. The Lee Tunnel and STW extensions are currently under construction and will be existing when construction of the project commences.
104.75
Valve chamber 12.7 x 11.2m 1.3m high above ground Existing valve chamber
Ventilation duct
Siphon inlet shaft 9.0m internal dia with 17m x 7m x 8m high superstructure 111.00 103.50
10m
10m
108.50
ILLUSTRATIVE
Zone within which above ground chambers, superstructures and above ground pipelines may be located
Location
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing Keyplan:
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
Existing sewers Proposed access cover + 104.10m Existing Level (shown in metres above tunnel datum) Proposed level (shown in metres above tunnel datum)
104.50
Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan. 4. The Lee Tunnel and STW extensions are currently under construction and will be existing when construction of the project commences. 5. Air from proposed discharge chamber will be treated by existing (Lee Tunnel) odour control unit.
+102.10 Discharge chamber Existing discharge chamber (Lee tunnel) Existing inlet works odour control unit
Existing elevated
+107.00 +106.90
ILLUSTRATIVE
inlet works
Location
g n i p l So
m s ao ny r
n i a Dr
Bowling Alley
Football Pitches
E T L
ETL
Pavilion
2.1m
Pond
Pond
El Sub Sta
n i a Dr
Pond
Pond
2.1m
Bo o r Co n t s &L B Bd y
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing
g n m o i Sl p
A NS L NE E J NKI
y r s n a o
CCL W
i an Dr
k c a r T
D n ai r
WB
E T L
WB
Dr ai n
E N A EL K A LR I C RC E
Beckton Sewage
Treatment Works
n i a r D
Piggeries
Dr i an
1.7m
El Sub Sta
n i a Dr
El Sub Sta
Piggeries
Beckton Meadows
Drain
Pond
W e t lv t n s ee a i o
D r a i n
1.5m
Tanks
Da ri n
Da ri n
Tanks
4.4m
2.0m
n i a Dr
Wh r af
Keyplan:
k ac Tr
A N E J NKI S L NE
m
y r on as
i an Dr
d on P
d n Po
k ac r T
4.3m
2.0m
3WD d0.5
Sludge Lagoon
4.6m
2.0m
Water Tower
Refuse Tip
4.4m
ETL
103.50
ETL
Depot
ETL
1.9m
ETL
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
T E L
Car Park El Sub Sta 6.4m
5.0m
Bc ek t S o n e wg ae Te ra te m n t Wok r s
7.0m
E L T
Refuse Tip
Beckton Sewage Treatment Works
El Sub Sta 4.9m
7.1m 2.3m
5.8m
7.4m
ETL
SM
E L T
Tank 6.9m El Sub Sta 5.5m
L ET
ESS
Notes:
ESS
ESS
Pond
Da ri n
7.1m ESS
6a
6.7m
6.5m
7.1m
13
18
15
1. All dimensions and levels are approximate. 2. Drawing is based on approved planning
a 18
1 9
6.8m
Gallions Reach
Shelters
Shopping Park
2 4
ESS
E T L
Restaurant ESS
El Sub Sta
r e t l e h S
El Sub Sta
1
ESS
ARMADA WAY
Filling Station
ET
W AY
14
HORN
o t
o t
16
El Sub Sta
15
Gas Holder
A R MA D AW A Y
17
2.3m
13
Gas Holder
18
Road
Road
Road
ILLUSTRATIVE
Proposed West elevation
Location
1 0 0 0 5 0
Section 48 publicity
D
PLOTTED ON
04/07/2012
BY
LOCATION :
2 0 m 0 m
Se t n l e ci o i n
Se t n l e ci o i n
30
29
28
19
2 8
Restaurant
ng i op Sl
m y r on as
5.6m
Sloping masonry
10
o t
11
22
4.4m
El Sub Sta
27
N
i an Dr
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing
d n o P
N
TCB
Keyplan:
d n o P
FS
n i a r D
Parking area
AV
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
Site power structure Limits of land to be acquired or used (LLAU) Grout production Hoarding
Sludge Lagoon
N E B NCHI G
D W . 5 3 d0
Site access
Crane
CONTROL
PANEL
Existing sewers
CONTROL
PANEL
Notes :
CONTROL PANEL CONTROL PANEL
CONTROL
PANEL
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors
Refuse Tip
may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls Workshop buildings on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the
Security office
EL T
appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise
EL T
Conveyor
Nr ot hr en O t ua fl l e Sw e r
Bc ek t S o n e wg ae Te ra te m n t o W r k s
Refuse Tip
Beckton Sewage Treatment Works
El Sub Sta
10m
EL T
100m
Tank
ESS
ILLUSTRATIVE
ESS Superstore
Location
Beckton STW
Da ri n
2
ESS
a 6
Section 48 publicity
8
Construction phases - phase 1 - site A Setup, shaft constrn & syphon tunnelling
9
S48-PP-27X-BESTW-000342
1 8
July 2012
a 18
1 5
1 9
El Sub Sta
N
Tanks
S M
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing Keyplan:
L T E
W CCL
k c a Tr
Chimneys
El Sub Sta
Pond
Tks
gC kn ri Ba
FS
e k re
Tks
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
d Mu
Key:
Limits of land to be acquired or used (LLAU) Hoarding
tr ae
nH a Me
Crane
W g ih
Tks
Foot Bridge
Existing sewers
Notes :
1. These construction phasing plans have been
Chy
E T L
prepared to illustrate possible site layouts for the principle construction phases. Contractors may choose to lay sites out differently during
El Sub Sta
construction depending on their preferred construction methods subject to any controls on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management Steel reinforcement preparation area
ng i op Sl
19
arrangements are shown. 3. Utility supplies for the construction of the works
y r sn ao gm n i p l So
m y r on as
Monument
4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing.
Grout production
15 o t
16
Crane Shaft
So i m s ny l n p g ao r
17
ny p g ao r l n So i m s
r e t h i Wa Hg en M a
22
18
10m
13
El Sub Sta
100m
El Sub Sta
ILLUSTRATIVE
6 2
Location
Beckton STW
Tank
W g ih H n a e M r e t a
ge wa s k Se or on t k tW c en Be m t ea Tr
El Sub Sta
Document Information
4 2 3 2
Section 48 publicity Construction phases - phase 1 - site B Setup, shaft constrn & other structures
Mud
S48-PP-27X-BESTW-000343
Jetty
Crane
July 2012
Navigation Light
AV
N E B NCHI G
i an Dr
N
d n o P
TCB
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 This drawing Keyplan:
d n o P
FS
n i a r D
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
Limits of land to be acquired or used (LLAU)
D W . 5 3 d0
Hoarding
Sludge Lagoon
Maximum extent of working area Storage (open area or containerised) Security office Storage (open area or containerised) Piling rig (low headroom)
Refuse Tip
Site access
CONTROL
Existing sewers
CONTROL PANEL CONTROL PANEL
Workshop buildings
Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors
may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls on layout imposed through the planning
EL T
2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works
EL T
Conveyor
would be agreed with the relevant utility company. 4. Additional noise mitigation including noise
Nr ot hr en O t ua fl l e Sw e r
Crane
Bc ek t S o n e wg ae Te ra te m n t o W r k s
E L T
Refuse Tip
Beckton Sewage Treatment Works
El Sub Sta
Security office
EL T
Heras fencing adjusted to suit progress of work Crane for lifting grit gantries into position
Tank
10m
El Sub Sta
100m
ESS
ESS
ILLUSTRATIVE
Da ri n
Location
ESS
a 6
Section 48 publicity
9
a 18
1 5
1 9
Gallions Reach
c Thames Water Utilities Ltd 2008