LNG Mottakterm Moss Maritime Offshore
LNG Mottakterm Moss Maritime Offshore
LNG Mottakterm Moss Maritime Offshore
LNG MOTTAKSTERMINALER av
26 Mai 2005
A company of
O:2000\\2005\norsk offshore dag\1
Moss Maritime:
A leader in Maritime Technology
More than 30 years of experience in designs of a variety of ships and offshore platforms
A company of
O:2000\\2005\norsk offshore dag\2
LNG/LPG Technology
Moss Maritime
A Leader in Maritime Gas Technology Moss Maritimes Gas Carriers have been licensed worldwide for nearly 3 decades and have a leading position in the market
LNG FPSO Moss LNG Carrier LNG FPSO
A company of
O:2000\\2005\norsk offshore dag\3
NIMBY
A floating LNG receiving terminal is hard to notice from shore. Break-water and turning basin required
The NIMBY* and BANANA* issues can be handled!
* NIMBY * BANANA
A company of
O:2000\\2005\norsk offshore dag\7
Crew facilities with control room and utility machinery Moored with an external turret, soft yoke arrangement or STL for free weather-vaning Gas send-out line arranged through the mooring system down to the seabed and from there directly to the shore manifold LNG Carriers berthing side-by-side for offloading
A company of
O:2000\\2005\norsk offshore dag\8
ADVANTAGES
No environmental impact on shore line High degree of safety Fabricated in shipyard Significant overall cost savings (Capex) Early import of gas and early revenue No real estate cost and no reduction in real estate value Relocation possibility Pipe lines and cables can be landed in the best location with respect to existing infrastructure
A company of
O:2000\\2005\norsk offshore dag\9
SPB (IHI)
MOSS Spherical
GTT Membrane
Only two LNG Carriers of this type in operation No filling restrictions Extensive internal structural stiffeners Prone to structural fatigue Questionable if subjected by sloshing
A company of
Long experience from LNG carriers Excellent track record Not affected by sloshing No filling restrictions No internal stiffeners Excellent fatigue properties No modifications to containment system needed for use as FSRU
O:2000\\2005\norsk offshore dag\10
Long experience from LNG carriers Good track record Affected by sloshing Filling restrictions
No problem.
The sloshing phenomena occur when the ship motions coincide with the natural frequency of the liquid motion in the tanks. The build-up of violent motion is due to frequency, not amplitude.
A company of
O:2000\\2005\norsk offshore dag\11
The sloshing phenomena takes place in partially filled tanks. A floating LNG Terminal is always partially filled.
Single point mooring Weather vaning Tug assisted berthing Position monitoring system Ship-to-ship cargo offloading started almost 30 years ago in US waters About 850 lightering operations annually in GOM Major lightering operations on US West Coast Safety record is excellent
A company of
O:2000\\2005\norsk offshore dag\12
Relative motion between the LNG Terminal and Carrier are well within operability envelope of standard LNG loading arms in use today
Storage Tanks
Vaporizers
Mooring Turret
Pipeline Tie-in
FSRU
Flexible Riser
PLEM
Subsea Pipeline
A company of
O:2000\\2005\norsk offshore dag\14
Statutory Regulations
Safety regulations for LNG
ICLL
International Convention of Load Lines
IMO
Gas Code
SOLAS
International Convention for Safety at Sea
OCIMF
Standardization of Manifolds for LNG
A company of
Industry Standards
(API, ASME, ISO, etc.)
SIGGTO
Society of International Gas Tankers & Terminal Operators
A company of
O:2000\\2005\norsk offshore dag\17
A company of
LNG FSRU
FSRU TERMINAL
LNG storage volume 125 - 450,000 m3 Nominal gas send out 2 - 6 MMTPA / 290 - 850 MMSCFD Length 280 - 400 m Breadth 45 - 70 m Water depth 20 - 1000 m Design life 40 years
A company of
O:2000\\2005\norsk offshore dag\19
Projects
FPSO GBS FSRU Concept, Sunrise an exception First projects starting construction 2005 (Rovigo) First shuttle & regasification vessel to be delivered (Excelerate) First carrier conversion planned (OLT Livorno) Large capacity FSRU being engineered (Cabrillo Port)
From Alaska
FEED & PROPOSAL stage for converted FSRU by Saipem for Mediterranean sea location based on a Moss type LNG carrier
A company of
For water depths > 40m typ. Fast track solutions Early gas delivery
O:2000\\2005\norsk offshore dag\21
A company of
O:2000\\2005\norsk offshore dag\22
6 5 0
6 5 0
65 0
A company of
O:2000\\2005\norsk offshore dag\23
TAMMSA
A company of
O:2000\\2005\norsk offshore dag\24
Project status: Midway through USCG approval Ongoing design verification work by Moss
A company of
O:2000\\2005\norsk offshore dag\26
newbuilds
conversions
A company of
O:2000\\2005\norsk offshore dag\27
offloading
LNG storage
Shuttle tanker
A company of
O:2000\\2005\norsk offshore dag\28
Connection:
3.5 m significant waveheight more than 90% availability 4.5 m significant waveheight more than 95% availability 30-35 hours offloading time
Offtake:
A company of
O:2000\\2005\norsk offshore dag\29
A company of
O:2000\\2005\norsk offshore dag\30