Rework Production Order
Rework Production Order
Rework Production Order
CODE:
Then go to ca02
Then create and confirm the production order with rework Qty then automatically rework order creates.
2) OPL8 T.CODE:
THEN GO TO OPERATIONS
TRANSACTION DATA
CO01 T.CODE:
THEN CREAT THE REWORK ORDER FOR 100-100 MATERIAL FOR REWORK QTY 5 PC. CO07 T.CODE:
Then execute .
Go back and assign a material which is required for rework and press enter.Then it will ask for operation allocation then assign the 0020 operation.
Then do the confirmation for the rework order. then you will get the error
Save Then maintain the checking rules for KP03. Then confirm the rework order.
Then do GR to header order & settlement will take place to header order only not to re-work order Note: a) For rework work, GR will not take place b) It is not possible to carry out an automatic goods receipt for operations that are marked as rework operations. FAQS: REWORK Generally in the Shop floor, rework happen frequently, In SAP rework is done by different ways
Automatic triggering of rework order when we enter rework qty in confirmation screen. If rework has to be done immediately after entering in to rework qty in the confirmation screen before proceeding next operation, by done by control key with rework option and enter the time in operational detail and operation quantity.
Create a reference operation set and create a rework order with rework order type and settle the rework order into main production order. If the order quantity is 100, and have 5 oprn, in the second operation rework happened means confirm the operation with partial confirmation with entering yield and rework quantity, and create a rework order, in the rework order confirm the quantity with Final operation. Again in main production order, in the 2 nd operation confirm the rework quantity with out entering any activity in the confirmation with final confirmation.
16. Now choose that line ,select the Details---> Trigger Point 17. The system will says standard trigger point exists from which you can select the created Trigger Point (EXx Production)and save. 18. MD02/MD04. 19. Convert the Planned Order into Production Order and Release the order. 20. Now confirm th ops. 21. For the last op enter the yield and rework qty and set the status as PCNF. 22. If the status of last op is PCNF then in the system a POP UP will appear as Activited by Trigger Point /Create order with reference/order number/sequence and op number which trigger point works and enter.