Offshore Rig Survey For TRS Personnel

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

1-Top drive connection.

This is required for the Fill up tool 2- Different bails onboard + Space out required when running a Davis Lynch type fill up tool or Draw works type. 3- Rotary table make and size. (Required for PS500) 4- Offline makeup capability of stands in the mouse hole. We will be using a KT14000 with a backup.

5- Location of tugger sheave above the mouse hole. Does the tugger line hang straight above the mouse hole or is it off to the side? possible to move the sheave to mouse hole centre position in order to ensure that the tong will hang perfectly straight when makin connections? 6- Power unit location with it being a Diesel power unit. 7-Placement area for ITS tools.

8-Travel distance of the Top Drive. It was mentioned by RIL office that when Franks ran 13 3/8 the pipe had to be tilted to the side them to install the fill up hose inside the casing before they could actually stab the stand with the pipe handling machine. See if you some more info from the Co-Man or pusher on this as to what the cause of this was so we dont experience the same problem. 9-Try and take some photos of the Pipe handling system that is used to place the pipe in the mouse hole. 10-Tugger load rating to be able to hang the KT14000. Tong weight approx 2000kg.

11-Do they use the BX elevator to run the casing in stands at well centre. What size casing inserts do they have for the BX elevator?

12-RIL want to know if our TQTN will be able to be used with the rigs Hydra Tong. Need to talk to Sean about this prior to going off s Friday. 13-Take dimensions of the BX elevator as to help work out the space out for the Fill up tool.

14-While you are there the rig crew will be running 36 and 20. Please make notes of their running procedures and what equipmen 15-See if Franks have any tools onboard and if so try to get an inventory of same.

16-Check the rig floor to see where to place FMS control panel and see what length of hoses would be required. This is in case we h casing at well centre.

17-Check with co man and rig pusher should casing have to be run in singles whether the casing will be brought in from the casing d deck. If from the casing deck how would they move the casing to well centre? 18-Check to see if there will a area for iTS to be able to do maintenance and cleaning of our equipment. 19-Check with rig pusher if the Hydra tong can be worked manually that is being used for offline work. 20- See if you can get your hands on the full inventory of the rig for TRS tools.