Costing Format
Costing Format
Costing Format
PROJECT : HYDRAULIC ROBOT (JCB) NAME OF PART: BASE PLATE (18 MM) YEAR:2010 -2011 PART NO:1 MATERIAL : WOOD CLASS: MECHANICAL (6 TH SEM / 2NDSHIFT)
MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
3*2 44 1
260
MACHINING COST
PROCESS CUTTING SLOTTING DRILLING TOTAL COST/ HOUR 20 10 60 15 75 MINS 20 10 NET COST
30
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
2*2 45 1 180
MACHINING COST
PROCESS CUTTING TURNING DRILLING TOTAL COST/ HOUR 20 10 60 15 75 MINS 20 10 NET COST
30
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
3*3 60 2 540
MACHINING COST
PROCESS CUTTING DRILLING TOTAL COST/ HOUR 20 60 60 MINS 20 NET COST
20
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
3*3 27 2 245
MACHINING COST
PROCESS CUTTING DRILLING TOTAL COST/ HOUR 20 60 60 MINS 20 NET COST
20
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
3*3 23 2 210
MACHINING COST
PROCESS CUTTING DRILLING TOTAL COST/ HOUR 20 60 60 MINS 20 NET COST
20
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
2*2 7 2 30
MACHINING COST
PROCESS CUTTING SHAPING DRILLING TOTAL COST/ HOUR 20 20 60 15 75 MINS 20 20 NET COST
40
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
0.5*0.5 7 2 30
MACHINING COST
PROCESS CUTTING DRILLING TOTAL COST/ HOUR 20 30 30 MINS 20 NET COST
20
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
MATERIAL COST
LENGTH *WIDTH RATE/MM QTY TOTAL
1*1 7 4 45
MACHINING COST
PROCESS CUTTING DRILLING TOTAL COST/ HOUR 20 60 60 MINS 20 NET COST
20
LABOUR COST
LABOUR COST 50
TRANSPROTATION COST
TRANSPROTATION 20
TOTAL
870