Box Culvert 2x 2.5m
Box Culvert 2x 2.5m
Box Culvert 2x 2.5m
1201
12
1202
12
1203
12
1204
12
1205
12
1206
12
1601
16
1602
16
2001
20
APRON
Bar Mark type & Dia. no./mbr
1202
12
1203
12
1204
12
1205
12
1,000.00
1,388.80
84.00
37.80
29.40
24.00
14.70
756.40
441.64
586.44
68
44
76
20
bar length
2600
7400
2700
7400
176800
325600
205200
148000
176.80
325.60
205.20
148.00
60
160
160
bar length
7400
2900
600
444000
464000
96000
444.00
464.00
96.00
WINGWALL
Bar Mark type & Dia.
1201
12
1601
16
1602
16
T 12
T16
T20
total qty
kg/m
kg
0.888 1233.254
0.888
74.592
0.888
33.566
0.888
26.107
0.888
21.312
0.888
13.054
1.579 1194.356
1.579
697.350
2.466 1446.161
0.888
0.888
0.888
0.888
156.998
289.133
182.218
131.424
0.888
1.579
1.579
394.272
732.656
151.584
2556
2776
1447
1/1800
EXCAVATIONS
Excavate foundation trench 2 - 5m deep
Apron
1 /
0.5
1/
1/
2/
2/
12
3.3
2.6
102.96
10.7
2.55
2.6
70.94
7.4
0.7
0.3
m
Formwork to walls
F - External sides of Walls
1/
1/
F - Headwall
F - Wingwall
F-
1/
1/
1/
1/
2/
2/
4/
1/
2/
2/
2/
2/
2/
2/
4/
12
2.6
62.4
12
2
48
12
2.5
60
3.3
0.8
10.56
0.8
0.3
0.96
3
1.65
39.6
1
0.3
1.2
Fair vertical
Rough vertical
Rough suspended
CONCRETE
Provision of concrete in blinding and placing
3.11
178 m
115.00 m
48.00 m
60.00 m
1/
12
3.3
0.05
2.00 m
Wing Wall
1/
0.5
0.5
1/
1/
1/
2/
4/
2/
2/
3.3
0.8
0.3
3
3.3
0.3
2.55
10.5
0.3
7.4
0.3
0.7
SOLID BOX
Add Chamfer
Deduct
1/
0.5 /
1/
4/
1/
1.58
5.94
7.52 m
8.03
3.11
11.14 m
12
2.6
3.3
102.96
12
0.15
0.15
0.54
12
2.5
2
60.00
43.50 m
2.00
63.00
MATERIAL
Vol. Of chippings
CONC. 10/40
CONC. 25/20
0.92 /
0.88 /
2.00
63.00
Vol. Of Sand
CONC. 10/40
0.58 /
2.00
1.84
55.44
57.28 m
1.16
65.00
CONC. 20/20
0.55 /
63.00
30 /
57.28
18 /
35.81
2/
15
7.4
2.6
1/
34.65
35.81 m
1719.00
645.00 m-km
578 m
EXCAVATIONS
Excavate foundation trench 2 - 5m deep
F.224
Apron
F.243
F.511.2
Wing Wall Footings
F522.1
m
Formwork to walls
F - External sides of Walls
F542
F900.1
R - Internal sides of Walls
F900.3
R - Soffit of suspended slab
I 242
F - Headwall
L544.1
L544.1
F - Wingwall
L544.1
F-
L544.1
G.240
Fair vertical
Rough vertical
Rough suspended
E.551
CONCRETE
Provision of concrete in blinding and placing
Wing Wall
SOLID BOX
Add Chamfer
Deduct
MATERIAL
Vol. Of chippings
CONC. 10/40
CONC. 25/20
Vol. Of Sand
CONC. 10/40
CONC. 20/20
INTERNAL WIDTH
INTERNAL HEIGHT
THICKNESS OF WALLS& SLAB
DEPTH OF EXCAVATION W/W FT
AVG LENGTH
WIDTH
HEIGHT
MIN HEIGHT OF W/W
MAX HEIGHT OF W/WL
LENGTH OF WING WALL
HEIGHT OF HEAD WALL
LENGTH OF APRON
MIN WIDTH OF APRON
MAX WIDTH OF APRON
THICKNESS OF HEAD WALL
THICKNESS OF WING WALL
THICKNESS OF APRON
THICKNESS OF W/W FOOTING
HEIGHT OF W/W FOOTING
HEIGHT OF W/W END
HAULAGE DISTANCE SAND
DITTO COARSE AGGREGATES
NUMBER OF CULVERTS
CHAMFER
Inlet and outlet channel distance
2.0 x 2.5 m
2.5
2
0.3
1
12
3.3
2.6
1
2.3
3
0.8
2.55
3.1
7.4
0.3
0.3
0.3
0.3
0.7
1
18
30
1
0.15
15
ITEM
DESCIRIPTION
SITE CLEARANCE
Clearing site of vegetation including trees up
to 1000mm girth
UNIT
QTY
RATE
AMOUNT
ha
0.2
12,000,000
2,400,000
Earthwork
Excavate foundation trench for culvert, depth
not exceeding 2-5m
178
80,000
14,240,000
m3
578
80,000
46,240,000
m3
178
32,000
5,696,000
Insitu Concrete
Provide concrete grade 10/40 blinding
1,118,000
2,236,000
63
1,350,000
85,050,000
m3
175,000
350,000
m3
63
175,000
11,025,000
m3
2,364
3,000
7,092,000
Concrete Ancillary
Rough formwork to vertical surfaces
m2
48
30,000
1,440,000
115
32,000
3,680,000
m2
60
35,000
2,100,000
kg
2,556
12,500
31,950,000
kg
2,776
12,800
35,532,800
kg
1,447
12,800
18,521,600
267,553,400